This inspection and test plan (ITP) is for the installation of uninterruptible power supply (UPS) systems at two sites as part of a staff accommodation project for Oman Gas Company. The ITP outlines acceptance criteria and inspection requirements for material approvals, UPS installation, and testing. Key acceptance criteria include the project specifications, approved manufacturer submittals, and manufacturer recommendations. Inspections include reviewing material and shop drawings, witnessing installation, and testing the UPS units to verify specifications such as output voltage, operating mode, and auto restart time. Inspections will be conducted by the mechanical, electrical, and plumbing coordinator as well as the contract manager, and require sign off from the consultant and end user

Uploaded by

Ashraf Mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4K views4 pages

Itp Ups

This inspection and test plan (ITP) is for the installation of uninterruptible power supply (UPS) systems at two sites as part of a staff accommodation project for Oman Gas Company. The ITP outlines acceptance criteria and inspection requirements for material approvals, UPS installation, and testing. Key acceptance criteria include the project specifications, approved manufacturer submittals, and manufacturer recommendations. Inspections include reviewing material and shop drawings, witnessing installation, and testing the UPS units to verify specifications such as output voltage, operating mode, and auto restart time. Inspections will be conducted by the mechanical, electrical, and plumbing coordinator as well as the contract manager, and require sign off from the consultant and end user

Uploaded by

Ashraf Mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Document: ACO-9-3020-002-T7-4-0

:No.:
Date: 02-05-2019 CONTRACT OGC/14/2017 – EPC
Revision: 0 WORKS FOR PERMANENT STAFF
ACCOMMODATION AT FUHUD &
NIMR

Is this ITP for UPS manufacturing or for the installation at site.

INSPECTION AND TEST PLAN - UPS

Document No: ACO-9-3020-002-T7-4-0


21/05/2019

CONTRACT OGC/14/2017 – EPC WORKS FOR PERMANENT


STAFF ACCOMODATION AT FUHUD & NIMR

Rev. Date Check By Approved By Status

MEP Contract Issued for


0 02.04.2019
Coordinator Manager Approval
Walid
Khalid Javed
Makarem
INSPECTION AND TEST PLAN

ITP NO: UI/ITP/AR-OGC/01 Description: UPS


MEP Contractor: Al Rafaa Trad. & Cont. LLC Project Name: Fahud & Nimr OGC Staff Accommodation Revision: 00
Consultant: National Engineering Office (Architects &
End User: Oman Gas Company SAOC
Consulting Engineers) Date: 29/04/2019
UPS Supplier: Unicorn International LLC PO Ref: 19010461/19010462

Inspection Authority
Acceptance and Codes Quality
Item Activity Description Frequency Reference Remarks
Criteria Record
No. Document TGT OGC

1.0 MS/Material Approvals

MS for Installation of As per Project Project H


1.1 Once H/R R Approved MS
UPS Specification Specification

Project
1.2 UPS
As per Project Each
Specification / H/R R H MAR
Specification Delivery
Approved MAS
Approval/s Shall be
witness point
2.0 Installation
to OGC
As per Approved
Project
Drawing /
2.1 UPS Installation Each Unit Specification / W/R W/R Checklist
Manufacturer
Approved MAS
recommendation

As per manufacturer Project


Model number, dimension,
2.2 recommendation / Each Unit Specification / W/R W/R Checklist
make
approved MAS Approved MAS

Page 1 of 3
Legend: S – Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R- Record Review
INSPECTION AND TEST PLAN
Add inspection codes for Unicorn

ITP NO: UI/ITP/AR-OGC/01 Description: UPS


MEP Contractor: Al Rafaa Trad. & Cont. LLC Project Name: Fahud & Nimr OGC Staff Accommodation Revision: 00
Consultant: National Engineering Office (Architects &
End User: Oman Gas Company SAOC
Consulting Engineers) Date: 29/04/2019
UPS Supplier: Unicorn International LLC PO Ref: 19010461/19010462

Inspection Authority
Acceptance and Codes Quality
Item Activity Description Frequency Reference Remarks
Criteria Record
No. Document TGT OGC
All shall be
3.0 Testing Witness for
OGC
5 kVA inbuilt Battery Approved MAS /
3.1 Rating of UPS Each Unit W W/R Checklist
backup UPS configuration
Manufacturer
Approved MAS /
3.2 Function of UPS configuration Each Unit W W/R Checklist
UPS configuration
recommendation

3.3 Operating mode Online Each Unit UPS configuration W W/R Checklist
240v?
3.4 Output voltage .230V Each Unit UPS configuration W W/R Checklist
Checklist
shall be 5 ms
3.5 Auto restart .
5s Each Unit UPS configuration W WR

3.6 Buzzer Reduced Reduced Each Unit UPS configuration W W/R Checklist

Page 2 of 3
Legend: S – Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R- Record Review
INSPECTION AND TEST PLAN

ITP NO: UI/ITP/AR-OGC/01 Description: UPS


MEP Contractor: Al Rafaa Trad. & Cont. LLC Project Name: Fahud & Nimr OGC Staff Accommodation Revision: 00
Consultant: National Engineering Office (Architects &
End User: Oman Gas Company SAOC
Consulting Engineers) Date: 29/04/2019
UPS Supplier: Unicorn International LLC PO Ref: 19010461/19010462

Inspection Authority
Acceptance and Codes Quality
Item Activity Description Frequency Reference Remarks
Criteria Record
No. Document TGT OGC

clarify
. W
3.7 Battery low time 3 min Each Unit UPS configuration W W/R Checklist

After
4.0 Quality Record Complete Record Complete R R All Reports
Activities

Add- Inspection Release Note - Hold for all parties

Page 3 of 3
Legend: S – Surveillance Inspection W- Witness Inspection Point H- Mandatory Hold Point for Inspection R- Record Review