Bricklaying

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

aaa

KISI-KISI

BIDANG LOMBA :

BRICKLAYING

 
LOMBA KOMPETENSI SISWA(LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIONAL KE XXIV- 2016

BIDANG LOMBA

BRICKLAYING

MALANG
2016

KEEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN

DIREKTORAT JENDERAL MANAJEMEN PENDIDIKAN DASAR DAN MENENGAH


DIREKTORAT PEMBINAAN SEKOLAH MENENGAH KEJURUAN
2016

Page 1 of 4 1
KISI – SISI
SOAL

I. Introduction

The practical test is included 2 parts: part 1 and part 2

- Part 1 Bricklaying and finishing joint:


+ Bricklaying:
Bricklaying complex - structure with clay bricks of 6x10x21,
Time: 8 hours.
- Part 2 are included 2 works:
+ Bricklaying complex - structure with clay bricks of 6x10x21 and light brick 10x20x43
Time: 7 hours.
+ Plastering:
Plastering complex - structure
Time: 1 hours.
Time allowed for 2 parts is 16 hours over the 3 days of competition.
II. Project information

Projects have designed to incorporate the following technical skills:


1. Excution of drawings.
2. Measurement and marking out.
3. Leveling and plumbing.
4. Cutting and shaping bricks using traditional hand tool and masonry saws.
5. Building walls in accordance to plans including all decorative work.
6. Joints finishing.
7. Work cleanliness.
8. Bricklaying of part 1 commences on day one and second day
9. Part 2 commences on the second day and third day
10. Plastering of part 1 commences on the third day.
11. Marking for bricklaying of the part 1 will commence on the first evening or the second
morning and evening.
12. Marking for bricklaying of the part 2 will commence on the third afternoon and evening
13. The plastering of the part 1 will be marked on the third afternoon or evening.
14. Final marks may not be known until the end of the competition.
15. Final marking will be at the end of day 3 and be completed the day following the
competition.

III. Specification.
1. All brickwork to be set out and constructed to dimensions, bonds and angles as specified on
the drawings.
2. All decorative and practical details to be constructed to projections, angles, radii and
overhangs as shown on drawings.
Page 2 of 4 2
3. All cut bricks to be produced accurately to shape required whilst maintaining 10 mm perpend
joints.
4. All bricks to be laid showing best face and arises.
5. All brickwork to be taken up maintaining plumb level in alignment and to the correct angles.
6. Brickwork to be taken up to a vertical gauge.
7. Cut faces where possible to be concealed in wall, not shown on back.
8. All details to be built as per instructions available on the drawings.
9. Bricklaying mortar:
Cement - sand mortar (1 PC : 3 sand ) or drymix (SIKA Produk)
10. Plastering mortar:
Cement - sand ( 1 PC : 2,5 sand ) or drymix (SIKA Produk)
IV. Instruction to competitors

1) Time allowed is 16 hours finishing 2 parts.


2) Requirement for competitors
It is 10 minutes prior to the commencement of competition, competitors will be provided
materials, and know the position as they drow lots.
Competitors are not allowed to ask about the drawing and method of construction during
the competition.
Competitors are not allowed to mark any symbols on their products .If they do so, their
products will not be marked.
When the time is over, competitors must announce to the expert about their products.
Materials are available at site and competitors will be helped to do cleaning.
Competitors to check the measuring tools.
Competitors to wear safety clothes suitable with their work.
If there’s any problem, competitors to speak to the expert for help.
Competitors are not allowed to leave the competition without permission.

3) Materials
Clay Brick (batu bata pres) 6 x 10 x 21cm
Light brick (bata ringan) 10x20x43 cm
Fine sand (pasir halus)
cement (semen)
or drymix (SIKAProduk/MU)

4) Tools and means of production


The competitor must bring the remaining tools in a toolbox (Peralatan yang harus
dibawa peserta) :
 Brick trowel (cetok pasang bata)
 Plastering trowel (cetok plesteran)
 Pointing trowel (cetok lidah/lancip)
 Wooden float (roskam kayu)
 Measuring (meteran)
Page 3 of 4 3
 Hammer (palu)
 Leveling (waterpass) 100 or 120 mm
 Leveling (Waterpass 50 cm)
 Plumb line (unting – unting)
 Square appliance (alat penyiku)
 Handsaw (gergaji tangan)
 Helmed (helm)
 Safety footwear (sepatu kerja)
 Safety clothes (pakaian kerja)
 Eye protection (kacamata pengaman)
 Masker (penutup debu)
 Formwork for rolag (bekisting untuk rolag)

The committee must be prepare the remaining tools for competitors (Peralatan yang
disediakan panitia)
 Folding rule (Jidar aluminium 200 mm)
 Hoe (cangkul)
 Mortar box (kotak adukan)
 Pail (ember)
 Electric cutting brick machine (mesin pemotong bata bermeja)
 Wood (papan 2x5x100 cm)

V. Test Project marking

The experts will decide together on the marking criteria and the dimensional tolerances.
1. Marking Criteria Building the part 1 and 2 :
 Basic dimension
 Structure
 Joint thickness
 Vertically
 Flatness
 Perpendicular
 Leveling
 Solid of joint
 Cutting
 Working productivity

2. Marking Criteria Plastering :


 Vertically
 Flatness
 Smoothness
 productivity

The experts with every competitors the best during the competition.
Good luck.

Page 4 of 4 4
aaa

LAY OUT

BIDANG LOMBA :

BRICKLAYING

 
RECESSED
aaa

LEMBAR
INFORMASI

BIDANG LOMBA :

BRICKLAYING

 
LEMBAR INFORMASI

1. PEMBIMBING :

 Mengikuti teknikel meeting sebelum pelaksanaan lomba dengan waktu dan


tempat ditentukan kemudian.
 Diperkenankan membantu kompetitor dalam penyiapan peralatan sebelum
pelaksanaan lomba.
 Diperkenankan membantu kompetitor dalam pembersihan lokasi dan
perapihan bahan serta peralatan setelah selesai lomba.
 Dilarang membantu dalam bentuk apapun kepada kompetitor ketika lomba
berlangsung, kecuali seijin juri.
 Diperkenenankan melihat prosesi penilaian dengan tidak mengganggu atau
intervensi terhadap keputusan juri.
 Membantu menciptakan suasana meriah dan kekeluargaan diantara sesama
pembimbing,kompetitor,juri dan semua yang terlibat dalam pelaksanaan
lomba dengan tidak mengganggu kompetitor.

2. KOMPETITOR :

 Mengikuti teknikel meeting sebelum pelaksanaan lomba dengan waktu dan


tempat ditentukan kemudian.
 Datang 15 menit sebelum lomba dimulai.
 Mempersiapkan peralatan dan bahan dengan atau tanpa bantuan
pembimbing.
 Mengikuti lomba dengan tertip dan tidak mengganggu sesama kompetitor
pada waktu berjalanya lomba.
 Menggunakan alat pelindung diri (APD) berupa :kaca mata,masker, dan
penutup telinga pada waktu memotong bata/beton ringan.
 Jika menemui masalah harus melapor kepada juri.
 Tidak diperkenenkan berbicara dengan juri kecuali pada waktu istirahat dan
ishoma.
 Wajib membersihkan lokasi lomba,menata bahan dan peralatan setiap lomba
telah selesai.
 Mengikuti pengarahan akhir dari juri sebelum meninggalkan lokasi lomba.
RECESSED/

You might also like