Functional Specifications
WMT-M-59569 Work Management Metrics
Release 3
Sirirat Sethapokin
02 June 2011
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
1SAP Release 3
Document Information
Document Title: WMT-M–59569 Work Management Metrics
Document Purpose: This document depicts the requirements pertaining to the Work Management
Metrics. It provides the development team with a basis to develop the required
Metrics.
File Name: R3 DD-PRO-090 WMT-M 59569 Work Management Metrics v5.0
File Location: https://eroom3.bhpbilliton.com/eRoom/Facility54/1SAPProject6/0_155b1
Document Owner
Author Position / Responsibility
Sirirat Sethapokin Process Analyst
Vaishali Pethad R&A Consultant
2. Correct description of
numerator and denominator for
Finished WO not Completed
Approvals Record
Approver Title / Role Signature
Tugrul Baysal Work management Process Engineer 2012.07.27
16:27:19
+08'00'
Document Distribution
Recipient Position / Responsibility
Charles Fazackerley Work Management Process Lead
Greg Owens Integration Engineer – Applications and Integration
Christian Schelling Integration Engineer – BPM, Methodology and Training
Christian Hobelsberger Integration Engineer – Development and Netweaver
Miguel Barbosa Integration Engineer – Security & Compliance
Table of Contents
1 WRICEFAMP Information
WRICEF ID: WMT-M-59569–Work Management Metrics
Description: As part of the 1SAP project, metrics have been identified to enable BHP Billiton to
better analyse performance and to identify potential areas of improvement.
Team: Work Management
Area (SAP Components): PM
Priority:
High/mandatory Med/recommend Low/optional
Complexity:
Very Complex Complex Medium Simple
2 Introduction
2.1 Functional Description
Work Management Metrics have been identified to enable Work Management GJG to analyse performance and to
identify potential areas of improvement. In the Asset Report, Work Management Metrics are grouped into two groups
with the details below:
All metrics will be presented monthly. In most of the metrics, information for the monthly figures originate from the date
of transaction, with the exception of the metrics listed below which are derived from weekly snapped data. Historical
Data cannot be reloaded to the Snapshot due to changes of the Statuses.
Work Order and Operation scheduling, which reflects the following mechanism:
Snap data includes Work Orders with header user status = SCH (Scheduled) or Work Order Operations with user
status = DSP (Dispatched) as at the date of snapshot.
Scheduling has to be completed by Thursday night by 23:59:59, as the Snap for the following Scheduling Week
occurs at 23:59:59 every Thursday night local time for individual Planning Plants based on the user time zones.
The Scheduling Week is expected to have a list of Work Orders and operations along with other related data,
such as dates, status etc. The Work Orders and operations contained in this list is not to change for any reason
as it is the baseline for the metrics.
Scheduling Week = Monday to Sunday always.
The metric results for‟ „Adherence to Schedule Finished within the Week‟ will fall into the month in which the last
day of the Scheduling Week (Sunday), lies.
For example:
If the Sunday is on the 1st of September, the results of the entire scheduling week results will be
reflected in the reporting month of September even though most of the week was in August
The metrics results for „Adherence to Schedule Done on the Day‟ will fall into the months as per operation early
start Date.
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 8 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
Outstanding Work Orders and Notification, which reflects the following mechanism:
Data is derived from transaction data.
HSEC Reporting
Where Measurement Documents are used, the Measurement Reading Date is used to determine the reporting period.
For example:
If the Measurement Reading Date is the 30th of September, the data will be included into the September period.
2.2 Assumptions
3 Metrics
3.1.1 Information
Short name
Long name Compliance to Work Plan
Description Compares the number of finished system generated Work Orders in
period within tolerance, to the number of finished system generated Work
Orders in period.
Unit of measure %
nd
Data to be loaded on 2 Calendar day of every month.
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Order Actual End date AFKO-GETRI 0CALMONTH Is equal to Metric period
Work Order Type AUFK-AUART RCORD_TYP
Work Order Header User AUFK- OBJNR -> RPM_ORDER__R
Status JEST- OBJNR -> STATUSR1
JEST - STAT
Include:
Work order type = PM02
Work Order Header System
Status = CNF or TECO or CLSD
Work Order Header User Status
= SCH
Work Order Category = 4
Order Actual End Date = Not Null
Execution Interval (Days) Count of days Order Actual Start Date - Called
Planned Date
Include:
Work Order Type = PM02
Work Order Header System
Status = CNF or TECO or CLSD
Work Order Header User Status
= SCH
Work Order Category = 4
Order Actual End Date = Not
Null
Finished PM02 Work Orders Count of Work Count of Work Orders
within tolerance Orders
Include:
Work order type = PM02
Work Order Header System
Status = CNF, TECO, CLSD
Work Order Header User Status
= SCH
Work Order Category = 4
Order Actual End Date = Not
Null
Execution Interval (Days) is
within ( ≤ ) Tolerance for
Compliance (Days)
3.2.1 Information
Short name
Long name Adherence to Schedule Done on the Day
Description Compares the number of Scheduled Work Order Operations in period
that was started inside a 24 hour window of the scheduled start time, to
the number of Scheduled Work Order Operations in the period.
Formula (Number of Scheduled Work Order Operations in period that were started
inside a 24 hour window / Number of Scheduled Work Order Operations
in period) *100
Unit of measure %
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Operation Early Start Date AFVV-FSAVD 0CALMONTH Is equal to Metric period
Operation Early Start Time AFVV-FSAVZ RSTARTTIM
Work Order Types AUFK-AUART RCORD_TYP
Work Order Priority AFIH-PRIOK RPRIORITY
Revision Type T352R_D-REVTY RICHREVNO_
RREV_TYP
Operation Actual Start Date AFVV-ISDD RACTSTART
Operation Actual Start Time AFVV-ISDZ ROPR_AST
Planner Group AFIH-INGRP RPMPLNGRP
Main Work Centre AUFK-VAPLZ RWORKCNTR
Plant AFIH- GEWRK => RPLANT
CRHD -WERKS
Planning Plant AFIH-IWERK RPLNPLANT
Key Figures
List fields that are needed to the calculations
Compliant Operations Count of Count of Operations
Operations
Include:
All Snapped Operations
Work Order Type = PM01 or
PM02 or PM04 or PM06
Operation Actual Start Date and
Time is within the scheduled 24
hour window
Scheduled Window = Early Start
Date and Time minus 6 hours
and plus 18 hours.
Exclude:
Revision Type = 2
Priority = Immediate or
Urgent (1 or 2)
Scheduled operations Count of Count of Operations
Operations
Include:
All Snapped Operations
Work Order Type = PM01 or
PM02 or PM04 or PM06
Exclude:
Revision Type = 2
Priority = Immediate or
Urgent (1 or 2)
Calculations
Details on calculations
Numerator N/A RNOM_U Sum of Compliant Operations
Denominator N/A RDEM_U Sum of Scheduled Operations
Metric - Result N/A N/A (Sum of Compliant Operations /
Sum of Scheduled operations) *100
3.3.1 Information
Short name
Long name Planned & Scheduled Work
Description Compares the sum of actual hours Time Confirmed on Planned and
Scheduled Work Orders in period, to the sum of actual hours Time
Confirmed Work Orders in the period.
Formula (Sum of actual hours Time Confirmed on Planned and Scheduled Work
Orders in period / Sum of actual hours Time Confirmed on Work Orders
in period)*100
Unit of measure %
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Work Order Actual End Date AFKO-GETRI 0CALMONTH Is equal to Metric period
Work Order Type AUFK-AUART RCORD_TYP
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 14 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
Exclude:
Order Actual End Date = Null
Priority = Immediate or Urgent
(1 or 2)
N/A Count of Actual Count of Actual Work (hours)
Work (hours)
Include:
Order Types = PM01 or
PM02 or PM04 or PM06
Header System Status = CNF or
TECO or CLSD
Work Order Header User Status
Confirmed Work Hours for
= SCH
Planned & Scheduled Work
Days Variance from Work Order
Creation Date to Actual Start is
greater than 7 days
Exclude:
Order Actual End Date = Null
Priority = Immediate or Urgent
(1 or 2)
Work Order Hours N/A Count of Actual Count of Actual Work (hours)
Work (hours)
Include:
Work order type = PM01 or
PM02 or PM03 or PM04 or
PM06
Header System Status = CNF or
TECO or CLSD
Exclude:
Order Actual End Date = Null
Calculations
Details on calculations
Numerator N/A Sum of Confirmed Work Hours for
RNOM_U Planned & Scheduled Work
3.4.1 Information
Short name
Long name Adherence to Schedule Finished within the Week
Description Compares the number of finished Scheduled Work Orders in period, to
the number of Scheduled Work Orders for execution in period.
None
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Last Date of Scheduling 0CALMONTH Is equal to Metric period
Week Derived
Basic Finish Date AFKO-GLTRP RFINISHDT
Work Order Type AUFK-AUART RCORD_TYP
Work Order Priority AFIH- PRIOK RPRIORITY
Revision Type T352R_D-REVTY RICHREVNO__
RREV_TYP
Work Order Actual End Date AFKO-GETRI RORD_ENDT Exclude: Null
Planner Group AFIH-INGRP RPMPLNGRP
Main Work Centre AUFK-VAPLZ RWORKCNTR
Plant AFIH- GEWRK => RPLANT
CRHD -WERKS
Planning Plant AFIH-IWERK RPLNPLANT
Work Order Header System AUFK - OBJNR -> RPM_ORDER__R
Status JEST- OBJNR -> STATSYS0
JEST - STAT
Key Figures
List fields that are needed to the calculations
Exclude:
Revision Type = 2
Priority = Immediate or Urgent
(1 or 2)
Exclude:
Revision Type = 2
Priority = Immediate or Urgent
(1 or 2)
Calculations
Details on calculations
Numerator N/A RNOM_U Number of Finished Scheduled
Work Orders
Denominator N/A RDEM_U Number of Scheduled Work Orders
Metric - Result N/A N/A (Number of finished Scheduled
Work Orders / Number of
Scheduled Work Orders) *100
3.5.1 Information
Short name
Long name Outstanding Work Orders and Notifications
Description Compares the number of outstanding Notifications and outstanding Work
Orders to the number of open Notifications and open Work Orders.
Outstanding Notification:
Notification Age in Days will be calculated considering the Last date of the metric month – Notification
Created date
Data to be loaded on 2nd Calendar Day of every month
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant For Work Order: RPLANT To derive for Reporting Unit
AFIH- GEWRK =>
CRHD -WERKS
For Notification:
QMEL- ARBPLWERK
Planner Group For Work Order: RPMPLNGRP To derive for Reporting Unit
AFIH-INGRP
For Notification:
QMIH-INGRP
Characteristics
List fields that are needed to select and filter relevant data from source
Metric month Load Date‟s previous 0CALMONTH Is equal to Metric period
month
Work Order Type For Work Order: RCORD_TYP
AUFK-AUART
For Work Order: RPM_ORDER__R
Work Order Header System AUFK - OBJNR -> STATSYS0
Status JEST- OBJNR ->
JEST - STAT
Order Basic Start Date For Notification: RBASSTART
AFKO-GSTRP
Order Actual End Date For Work Order:
AFKO-GETRI
Notification Type For Notification: RNOT_TYPE
QMEL-QMART
TQ80_T-QMARTX
Notification System Status For Notification: RNOTIFNUM__RS
JEST – STAT TATSYS0
Notification‟s Cancelled For Notification: RNOTIFNUM_RNO
Indicator Derived TIFCIND
For Notification:
QMIH-INGRP
For Notification:
QMEL- ARBPL ->
CRHD-ARBPL
Plant For Work Order: RPLANT
AFIH- GEWRK =>
CRHD -WERKS
For Notification:
QMEL- ARBPLWERK
Planning Plant For Work Order: RPLNPLANT
AFIH-IWERK
For Notification:
QMEL- QMNUM ->
QMIH- IWERK
Notification System Status For Notification: RCREATEON
Date (NOCO/ORAS) JCDS-UDATE
Key Figures
List fields that are needed to the calculations
Days Variance from Last Count of Days Last date of the metric month –
date of the metric month to Basic Start date
Basic Start Date(Orders)
Include:
Work order type = PM01 or PM02
or PM03 or PM04 or PM06
Outstanding Work
Orders (metric
month)
+
Outstanding Work
Orders (snapshot
month)
Notification Age in Days Count of Days Last date of the metric month –
Notification Created Date
Outstanding M1 Notif > 7 Count of Count of Notifications
days (metric month) Notifications
Include:
Notification type = M1
System status = OSNO or NOPR
Notification Age in Days > 7 days
Notification Created Date ≤ last
date of metric month
Exclude:
BW Status: NTF2 = ORAS
Notification‟s Cancelled Indicator
=X
Outstanding M1 Notif > 7 Count of Count of Notifications
days (snapshot month) Notifications
Include:
Notification type – M1
System status = ORAS or NOCO
Notification Age in Days > 7 days
Notification Created Date ≤ last
date of metric month
Notification system status Date
(ORAS/NOCO)> last date of
metric month
*e.g. metric loading for June 2011
on 2nd July 2011: includes
Notification with Notification
System Status Date
(ORAS/NOCO) Date =
01.07.2011 – 02.07.2011
Exclude:
Notification‟s Cancelled Indicator
=X
Outstanding M1 Notifications CKF:
> 7 days
Outstanding M1
Notif > 7 days
(metric month)
+
Outstanding M1
Notif > 7 days
(snapshot month)
Exclude:
BW Status: NTF2 = ORAS
Notification‟s Cancelled Indicator
=X
Outstanding M1 (snapshot Count of Count of Notification
month) Notifications
Include:
Notification type = M1
System status = ORAS or NOCO
Notification Created Date ≤ last
date of metric month
Notification system status Date
ORAS/NOCO> last date of metric
month
Exclude:
Notification‟s Cancelled Indicator
=X
Outstanding M1 Notifications CKF:
Outstanding M1
(metric month)
+
Outstanding M1
(snapshot month)
Calculations
Details on calculations
Numerator N/A RNOM_U Sum of Outstanding Work Orders
older than Threshold +
Sum of M1 Notifications older than
7 days
3.6.1 Information
Short name
Long name Work Orders with Task List
Description Compares the number of completed Work Orders in period which have a
Task List, to the number of completed Work Orders in period.
Formula (Number of completed Work Orders in period which have a Task List /
Number of completed Work Orders in period) * 100
Unit of measure %
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Work Order Actual End Date AFKO-GETRI 0CALMONTH Is equal to Metric period
Work Order Type AUFK-AUART RCORD_TYP
Work Order Header System AUFK - OBJNR -> RPM_ORDER__R
Status JEST- OBJNR -> STATSYS0
JEST - STAT
Work Order Header System AUFK - OBJNR -> RPM_ORDER__R
Status1 JEST- OBJNR -> STATSYS1
JEST - STAT
Planner Group AFIH-INGRP RPMPLNGRP
Main Work Centre AUFK-VAPLZ RWORKCNTR
Plant AFIH- GEWRK => RPLANT
CRHD -WERKS
Planning Plant AFIH-IWERK RPLNPLANT
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 24 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
Exclude:
Work Order Header System
Status1 = NCMP
No. Completed Work Orders N/A Count of Work Count of Work Orders
Orders Includes:
Work Order Type = PM01 or
PM02 or PM03 or PM04
Work Order Header System
Status = TECO or CLSD;
Exclude:
Work Order Header System
Status1 = NCMP
Calculations
Details on calculations
Numerator N/A RNOM_U Sum of Completed Work Orders
with a Task List
3.7.1 Information
Short name
Long name Finished Work Orders not Completed
Description Compares the number of finished but not completed Work Orders older
than threshold, to the number of Finished but not completed Work
Orders.
Formula (Number of finished but not completed Work Orders older than threshold /
Number of finished but not completed Work Orders) *100
Unit of measure %
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Metric month Load Date‟s previous 0CALMONTH Is equal to Metric period
month
Work Order Type AUFK-AUART RCORD_TYP
Order Actual End Date AFKO-GETRI RORD_ENDT
Work Order Completion RWOCOMPDT
AUFK-IDAT2
Date (TECO)
Planner Group AFIH-INGRP RPMPLNGRP
Main Work Centre AUFK-VAPLZ RWORKCNTR
Plant AFIH- GEWRK => RPLANT
CRHD -WERKS
Planning Plant AFIH-IWERK RPLNPLANT
Key Figures
List fields that are needed to the calculations
Days Variance from Last Last date of metric Count of Days Last Date of metric month - Order
Date of the metric month to month minus AFKO- Actual End Date
Order Actual End Date GETRI
Finished but not completed Count of Work Count of Work Orders.
Work Orders older than Orders Include:
threshold (metric month) Work order type = PM01 or
PM02 or PM03 or PM04 or
PM06
Work Orders with „Days
Variance from Last date of
metric month to Order Actual
End Date „> 7 days
Work Order Completion Date
(TECO) = Null
Order Actual End Date ≤ last
date of metric month
Exclude:
Order Actual End Date ≠ Null
Exclude:
Order Actual End Date ≠ Null
Finished but not completed Count of Work Count of Work Orders.
Work Orders (snapshot Orders Include:
month) Work order type = PM01 or
PM02 or PM03 or PM04 or
PM06
Work Order Completion Date
(TECO) > last date of metric
month or null
Order Actual End Date ≤ last
date of metric month
Finished but not completed CKF:
Work Orders
Finished Work
Orders (metric
month)
+
Finished Work
Orders (snapshot
month)
Calculations
Details on calculations
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 27 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
3.8.1 Information
Short name
Long name Immediate/Urgent Work Orders with Impact Data Entered
Description Compares the number of Notifications for Immediate/Urgent Work Orders
completed in period with all three Impact Data Codes entered, to the
number of Notifications for Immediate/Urgent Work Orders completed
within period.
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant QMEL- ARBPLWERK RPLANT To derive for Reporting Unit
Planner Group QMIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Notification Completed Date QMEL - QMDAB 0CALMONTH Is equal to Metric period
Notification Type QMEL-QMART RNOT_TYPE
Notification Priority QMEL-PRIOK RPRIORITY
Exclude:
Object Code = Null
Damage Code = Null
Cause Code = Null
Work Order = Null
Notifications for Count of Count of Notifications
Immediate/Urgent WO Notifications Include:
Notification type = M1
Notification System status =
NOCO
Notification Priority = 1 or 2
Work Order Type = PM03
Notification system status ≠
DLFL
Coding Catalogue = D
Coding Group = PM00022
Coding = S001
Exclude:
Work Order = Null
Calculations
Details on calculations
3.9.1 Information
Short name
Long name Overdue System Generated Work Orders
Description Compares the number of unfinished system generated Work Orders that
are overdue, to the number of unfinished system generated Work Orders.
Formula (Number of unfinished system generated Work Orders that are overdue /
Number of unfinished system generated Work Orders) *100
Unit of measure %
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Exclude:
Work Order Header System
Status = CNF or TECO or CLSD
Number of unfinished PM02 Count of Work Count of Work Orders
Work Orders overdue Orders Include:
(metric month) Work Order Type = PM02
Work Order Category = 4
Tolerance for Compliance
(Days) is within ( ≤ ) Overdue
Interval (Days)
Work Order Creation Date ≤ last
date of metric month
Exclude:
Work Order Header System
Status = CNF or TECO or CLSD
3.10.1 Information
Short name
Long name Schedule Loading
Description Compares the sum of hours Scheduled on Work Order Operations for
execution by Capacity Managed Resource Work Centres in period, to
Capacity Available on Capacity Managed Resource Work Centres in
period.
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant Work Order: RPLANT To derive for Reporting Unit
AFIH- GEWRK =>
CRHD -WERKS
Exclude:
Revision Type = 2
Priority = Immediate or Urgent
(1 or 2)
Control Key = PMSV
Operation Work Centre N/A Available capacity (Hours)
Capacity Hours
Include:
All Capacity Snap
Work Centre Responsible
Person = PM4
Exclude:
Control Key = PMSV
Calculations
Details on calculations
Numerator N/A Sum of Planned Work on
Scheduled Operations
Denominator N/A Sum of Operation Work Centre
Capacity Hours
Metric - Result N/A (Sum of Planned Work on
Scheduled Operations / Sum of
Operation Work Centre (Capacity
Hours)
3.11.1 Information
Short name
Long name Cancelled System Generated Work Orders
Description Compares the number of system generated Work Orders cancelled in
period, to the number of system generated Work Orders completed in
period
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant AFIH- GEWRK => RPLANT To derive for Reporting Unit
CRHD -WERKS
Planner Group AFIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Work Order Completion AUFK-IDAT2 <> blank; 0CALMONTH Is equal to Metric period
Date Result = AUFK-IDAT2;
Elseif AUFK-IDAT3 <>
blank;
Result = AUFK-IDAT3;
Else blank.
Work Order Type AUFK-AUART RCORD_TYP
Work Order Header System AUFK - OBJNR -> RPM_ORDER__R
Status JEST- OBJNR -> STATSYS0
JEST - STAT
Work Order Header User AUFK- OBJNR -> RPM_ORDER__R
Status JEST- OBJNR -> STATUSR1
JEST - STAT
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 35 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
Exclude:
Work Order Header User Status
= SCH
Number of system Count of Work Count of Work Orders
generated Work Orders Orders Include:
completed Work Order Header System
Status = TECO or CLSD
Work Order Type = PM02
Calculations
Details on calculations
Numerator N/A Number of system generated Work
Orders cancelled
3.12.1 Information
Short name
Long name Fatalities
Description Defines the number of fatalities that have occurred within the period.
The measure is for 'controlled activities', which are activities where BHP
Billiton sets workplace HSEC standards and enforces their application.
Formula Total count of Notification Items with an Actual Severity Level = 4 against
the Impact Type of 'Safety' within Event Notifications.
Unit of measure ST
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant QMEL- ARBPLWERKS RPLANT To derive for Reporting Unit
Planner Group QMIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Notification Date QMEL-QMDAT 0CALMONTH Is equal to Metric period
Notification Type QMEL-QMART
Notification‟s Cancelled Derived RNOTIFNUM_RNO
Indicator TIFCIND
Exclude:
Notification‟s Cancelled
Indicator = X
BW Status: NTF1 = DLFL
Calculations
Details on calculations
Metric - Result Sum of Count of Item
3.13.1 Information
Short name
Long name Total Recordable Injury Frequency (/ million manhour)
Description Defines the number of Recordable Injuries (Fatality, Lost Time Injury,
Restricted Work Injury, Medical Treatment Injury) per million hours
worked (exposure hours) within the period. The frequency, normalised by
exposure hours, enables direct comparison between businesses and
within businesses over time.
The measure is for 'controlled activities', which are activities where BHP
Billiton sets workplace HSEC standards and enforces their application.
Formula [(Medical Treatment Injury + (Restricted Work Injury & Lost Time Injury) +
Fatality) / Exposure Hours]*1,000,000
Unit of measure ST/H
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant Notification : RPLANT To derive for Reporting Unit
QMEL- ARBPLWERK
Measuring Document
IFLO -SWERK
EQUZ-SWERK
Planner Group Notification: RPMPLNGRP To derive for Reporting Unit
QMIH-INGRP
Measurement
Document:
IFLO-INGRP
EQUZ-INGRP
Characteristics
List fields that are needed to select and filter relevant data from source
Notification: 0CALMONTH Is equal to Metric period
Notification Date QMEL-QMDAT
Measurement
Document:
IFLO-INGRP
EQUZ-INGRP
Main Work Centre CRHD-ARBPL RWORKCNTR
Measuring Document
IFLO-SWERK
Planning Plant For Notification: RPLNPLANT
QMEL- QMNUM ->
QMIH- IWERK
Measuring Document:
IFLO-IWERK
EQUZ-IWERK
Measuring Position IMPTT-PSORT RPSORT
Measurement Document‟s RREVERSAL
IMRG_CANCL
Reversal Indicator
Notification Type QMEL-QMART RNOT_TYPE
RNOTIFNUM_RNO
Notification‟s Cancelled
Derived TIFCIND
Indicator
Excludes:
Notification‟s Cancelled
Indicator = X
BW Status: NTF1 = DLFL
MTC (Medical Treatment Count of Item Includes:
Injury) Notification Type = M1
Coding Catalogue = D
Coding Group = PM00022
Coding = S001
Impact Catalogue Type = B
Impact group = Impact Type
Impact Code = Safety
Severity Level Actual = Level 2
Control Level = Controlled
Excludes:
Notification‟s Cancelled
Indicator = X
BW Status: NTF1 = DLFL
Excludes:
Notification‟s Cancelled
Indicator = X
BW Status: NTF1 = DLFL
Exposure Hours - IMRG-READG Measurement Includes:
Reading Measuring Position = “HSEC
C2001” and “HSEC E2001”
Measurement Document‟s
Reversal Indicator = Null
Contractor/Employee N/A Notification:
If Vendor ≠ blank, „C‟.
If Vendor = blank, „E‟.
Measurement Document:
IMPTT-POINT > IMPTT-PSORT >
check first 6 characters
if „HSEC C‟, „C‟.
if „HSEC E‟, „E‟.
C = Contractor
E = Employee
Calculations
Details on calculations
Numerator N/A MTC + RWC & LTC + FtC
Denominator N/A Exposure Hours
Metric - Result N/A CKF:
(MTC + RWC & LTC +
FtC)/(Exposure Hours)*1,000,000
3.14.1 Information
Short name
Long name Occupational Illnesses
Description Defines the number of Occupational Illnesses that have occurred within
the period.
The measure is for 'controlled activities', which are activities where BHP
Billiton sets workplace HSEC standards and enforces their application.
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant IFLO-SWERK RPLANT To derive for Reporting Unit
EQUZ-SWERK
Planner Group IFLOT-INGRP RPMPLNGRP To derive for Reporting Unit
EQUZ-INGRP
Characteristics
List fields that are needed to select and filter relevant data from source
Measurement Date IMRG_IDATE 0CALMONTH Is equal to Metric period
Planner Group IFLOT-INGRP RPMPLNGRP
EQUZ-INGRP
Main Work Centre CRHD-ARBPL RWORKCNTR
Plant IFLO-SWERK RPLANT
EQUZ-SWERK
Planning Plant IFLO-IWERK RPLNPLANT
EQUZ-IWERK
Measuring Position IMPTT-PSORT
Measuring Point IMRG-POINT RMPOINT
Measurement Document‟s RREVERSAL
IMRG_CANCL
Reversal Indicator
Unit IMRG_RECDU RRECDU
Key Figures
List fields that are needed to the calculations
Measurement Reading IMRG-READG Include:
From “HSEC C1001”
to “HSEC C1011”
From “HSEC E1001”
to “HSEC E1011”
Measurement Document‟s
Reversal Indicator - Null
Calculations
Details on calculations
Convert to Unit
3.15.1 Information
Short name
Long name HSEC Significant Events
Description Defines the number of Events, within the period, with an potential level 4
or higher impact in one or more of the following Impact Types from the
BHP Billiton Severity Table:
- Health
- Safety
- Environment
- Social / Cultural
- Reputation
The measure is for 'controlled activities', which are activities where BHP
Billiton sets workplace HSEC standards and enforces their application.
Formula Total count of Notification Items with a Potential Severity Level =/> 4
against a HSEC related Impact Type within Event Notifications.
Unit of measure ST
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant QMEL- ARBPLWERK RPLANT To derive for Reporting Unit
Planner Group QMIH-INGRP RPMPLNGRP To derive for Reporting Unit
Characteristics
List fields that are needed to select and filter relevant data from source
Notification Date QMEL-QMDAT 0CALMONTH Is equal to Metric period
Notification Type QMEL-QMART RNOT_TYPE
Notification Number QMEL-QMNUM RNOTIFNUM
Notification‟s Cancelled Derived RNOTIFNUM_RNO
Indicator TIFCIND
Excludes:
Notification‟s Cancelled
Indicator = X
BW Status: NTF1 = DLFL
Calculations
Details on calculations
Metric - Result Sum of Count of Notifications
3.16.1 Information
Short name
Long name Type 1 Water Input
Description The total volume of Type 1 water which is received by the operational
facility, or which has become available from within the operational facility,
from surface water, groundwater and third party water sources within the
period. Type 1 water is close to drinking water standards.
The measure is for 'controlled activities', which are activities where BHP
Billiton sets workplace HSEC standards and enforces their application.
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant IFLO-SWERK RPLANT To derive for Reporting Unit
EQUZ-SWERK
Planner Group IFLO-INGRP RPMPLNGRP To derive for Reporting Unit
EQUZ-INGRP
Characteristics
List fields that are needed to select and filter relevant data from source
Measurement Date IMRG_IDATE 0CALMONTH Is equal to Metric period
Measuring Position IMPTT-PSORT RPSORT
Measuring Point IMRG-POINT RMPOINT
Measurement Document‟s RREVERSAL
IMRG_CANCL
Reversal Indicator
3.17.1 Information
Short name
Long name Greenhouse Gas Emissions
Description Defines the total amount of Greenhouse Gas Emissions produced within
the period.
The measure is for 'controlled activities', which are activities where BHP
Billiton sets workplace HSEC standards and enforces their application.
Report Field Name SAP Table-Field Name SAP BI Info Object Comments / Filters / Calculation /
<Process Specialist> <Process Specialist> <R&A Consultant> Formula / Descriptions
<Process Specialist>
Hierarchies
List fields that are needed to derive Reporting Unit
Plant IFLO-SWERK RPLANT To derive for Reporting Unit
EQUZ-SWERK
Planner Group IFLO-INGRP RPMPLNGRP To derive for Reporting Unit
EQUZ-INGRP
Characteristics
List fields that are needed to select and filter relevant data from source
Measurement Date IMRG_IDATE 0CALMONTH Is equal to Metric period
Measuring Position IMPTT-PSORT RPSORT
Measuring Point IMRG-POINT RMPOINT
Planner Group IFLOT-INGRP RPMPLNGRP
EQUZ-INGRP
Main Work Centre CRHD-ARBPL RWORKCNTR
Plant IFLO-SWERK RPLANT
Planning Plant IFLO-IWERK RPLNPLANT
EQUZ-IWERK
Measurement Document‟s RREVERSAL
IMRG_CANCL
Reversal Indicator
Key Figures
List fields that are needed to the calculations
Measurement Reading IMRG-READG Include:
Measuring Position –
from “HSEC 00006”
to “HSEC 00012”
Measurement Document‟s
Reversal Indicator - Null
Calculations
Details on calculations
Metric - Result N/A N/A Sum of Measurement Reading
Report using
Selections and
Filters identified in
the Metrics F/Spec
Data Mapping
section.
17 Validate Metrics Report – Numerator and Verify the All Metrics data
Metric Greenhouse Gas Denominator value in Numerator, required from the
Emissions reconcile with the Metrics Report Denominator and Work Orders BI
Measurement Reading BI reconcile with the data Result values in the Report.
Report. in the underlying BI Metrics Report
Report, and the Result against the Key
calculation/ aggregation Figures or Records
is correct. in the underlying BI
Report using
Selections and
Filters identified in
the Metrics F/Spec
Data Mapping
section.
5 Appendices
5.1 Glossary of Terms
Glossary of Terms
Terms Description
Work Management Metrics Report of Work Management Metrics, listing defined metrics for Work
Management and results.
HSEC Metrics Report of HSEC Metrics, listing defined metrics for HSEC and results.
Dimension Aggregation How data is calculated to the top level; for example, for a metric the value for
the entire organization is the sum of the values of the TMUs.
Time Aggregation Specify how e.g. monthly values are aggregated to quarterly values and
quarterly values are aggregated to yearly values for both actual and target
values.
Planning Plant A plant in which tasks are planned and prepared
Maintenance Plant A plant in which the technical objects of a company are installed.
Functional Location A Functional Location is a multi-level hierarchical structure organised
according to Functional, Process Related or Spatial criteria and are used to
capture Work Management History, Cost History and to facilitate Work
Management.
Planner Group Employee responsible for planning and processing Work Management tasks
in a plant.
Main Work Centre A Main Work Centre is assigned to a Supervisor who is responsible for
Resource Work Centres and responsible to maintain Technical Objects.
Resource / Operation Work Resource Work Centres are used for labour and machine resources.
Centre Resource Work Centres can be utilised for Planning and Scheduling or for
Time Confirmations only.
Capacity Managed Resource Capacity Managed Resource Work Centres are used for labour and machine
Work Centre resources. These Work Centres are used in Planning and Scheduling.
Task list An organisational unit that defines where a Work Order Operation must be
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 52 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
performed.
Task list group Unique identifier for a task list.
Task list group counter A sub set of a task list Group. Is used to make a distinction between similar
task lists.
Revision A Revision is used for identifying work which has requirements to be
planned, scheduled and/or costed together.
Notification A Notification is used to convey work requirements, document technical
findings, and record activities performed.
Notification Types Notifications can be differentiated and grouped according to Notification
category, Notification origin and other criteria.
M1 Notification Notification for work identified
Notification Priority Notification Priority is used to convey the urgency requirements of the Work
activities. There are four Notification Priorities:
Immediate - Commences within 24 hours from Notification creation.
Urgent - Commences within 1-7 days from Notification creation.
Planned - Commences more than 7 days from Notification creation.
Notification System Status SAP System sets internally as a part of general status management.
Notification User Status SAP System sets externally by a user as a part of general status
management.
Code Groups A group of Codes that are similar in content or related in some way are
combined into code groups for evaluation
Impact Type Predefined items on a maintainable item that has failed
Damage Predefined symptoms of the failure
Cause Predefined causes of the failure
Work Order A Work Order is the mechanism in the Work Management System to record
information, plan, schedule, and communicate the work requirements as well
as collect job costs. A work order is identified by a unique reference number.
Work Order Priority Planned Work Order Priorities are used to convey the scheduling
requirements of the work.
Work Order Type Defines work purpose and allocation of security roles, number ranges and
specified routing etc.
Date of Issue: 27/07/2012
2009 BHP Billiton Commercial in Confidence Page 53 of 56
1SAP Release 3
DD-PRO-090 WRICEFAMPS Functional Specifications
WMT-M- Work Management Metrics
PM01 Work Order Standard SAP PM01 Work Order with planned planning indicator and
settlement only to cost centres.
PM02 Work Order Standard SAP PM02 System Generated Work Order with planned planning
indicator and settlement only to cost centres.
PM03 Work Order Standard SAP PM03 Work Order without the combination of Notification and
order on the header screen. Unplanned planning indicator and settlement
only to cost centres.
PM04 Work Order Standard SAP PM04 Refurbishment Order with settlement only to a material.
PM06 Work Order Standard SAP PM06 Capital Investment order with settlement only to a Work
breakdown structure (WBS) element.
Revision Type Identifying the revision type. E.g. Shutdown, Weekly Schedule etc.
Work Order Header System A processing status that is set by SAP as certain steps are done on the
Status Header level.
Work Order Header User Status A processing status that is set manually by the authorised user
Work Order Operation User A processing status that is set manually by the authorised user
Status
Control Key Determines which business transactions should be executed for the Work
Order (for example scheduling or costing).
Work Duration The total planned time for all individuals on an operation.
Schedule Freeze A specified day and time in every week where a list of work becomes the
base against which completed work is measured for Adherence to Schedule.
Time Confirmation Documents the processing status of Work Order Operations. A Time
Confirmation is used to determine at which work centre the Operation was
carried out, who performed the Operation and time taken.
Work Order Operation A detailed description of the various tasks to be carried out such as,
Operation work centre, job duration, Scope of work, responsible person etc.
Work Order Header The Work Order carries the common information relating to the operations
such as, Technical Object, settlement rules, Priority, Planner group, Main
Work Centre etc.
Safety Critical Element A Safety Critical Element is identified when a Critical Control or a specified
Local Regulation (including legal, regulatory, statutory or classified), that is
consistent with the Work Management GLD, is managed by an equipment
Performance Standard linked.
Notification‟s Cancelled Indicator Cancelled Notification of Notification Type M1 contains BW System Status as
NOCO (but not ORAS) and User Status as NEW. This notification should be
excluded from reports.
Terms Description
OSNO Notification System status indicating that the Notification has not been
processed
NOCO Notification System status indicating that the Notification has been completed
NOPR Notification System status indicating Notification in process.
ORAS Notification System status indicating that a Work Order has been assigned to
the Notification
Terms Description
NEW Notification User Status on creation.
INF Notification User Status indicating an more information required (Scope) on
the Notification
MPT Notification User Status indicating that the Notification is generated from
Measuring Point
TLA Notification User Status indicating a Task List Attached to a Notification
APR Notification User Status indicating an Approved Notification
Terms Description
CRTD Work Order Header System status indicating that the Work Order is created.
This is the default when created.
TECO Work Order Header System status indicating that the Work Order Technically
Completed. No further planned costs can be accrued.
CNF Work Order Header System status indicating that all of the Work Order
operations have been finally confirmed.
PCNF Work Order Header System status indicating that not all of the Work Order
operations have been finally confirmed.
CLSD Work Order Header System status indicating that the Work Order has been
completed and no further Actual costs can accrue.
REL Work Order Header System status indicating that the Work Order is
Released.
Terms Description
SCH Work Order Header User status indicating that the Work Order has
completed the Scheduling Phase of the process.
Terms Description
SFC User Status SFC is set on all Work Order Operations for work on SCEs
which contribute to the achievement of the Performance Standard.
BSC User Status BSC is set on all Work Order Operations for work which reduces
the likelihood or consequence of Business Critical events and the work is not
Safety Critical.
Example Text „How to Use‟ section. Remove before completing the document.