Contoh CV
Contoh CV
Contoh CV
Experiences
Key Expertise CV Minerba Consultama as Junior Mine Plan, Muara Enim | July – Sep 2019
(Reference : Manggar Riptawidigdya, ST. )
Mine Plan Design The Project Experiences:
Designing and Planning (short • Revision Rock Mining Feasibility Study in PT Sarana Alam Sejahtera, Muara Enim | Sep 2019
term, middle term, and long • Revision Coal Mining Feasibility Study in PT Abadi Ogan Cemerlang, Ogan Komering Ulu |
July – Sep 2019
term) of pit designs of coal
• Revision Coal Mining Feasibility Study in PT Adimas Puspita Serasi, Ogan Komering Ulu |
getting, stripping overburden, July – Sep 2019
and disposal area using mining
software. Geotechnical Study in PT Banjarsari Pribumi, Lahat | June 2018 - August 2018
(Reference: Prof. Dr. Ir. H. M. Taufik Toha, DEA)
• Probability failure analysis of disposal area with circular and non circular surface failure
Geotechnical • Slope stability testing with bishop simplified and hoek & bray method
Analysing of slope stability with PT Golden Hikari as Junior Mine Plan, Palembang | April 2018 – April 2019
circular and non circular (Reference : Bochori, ST., MT.)
surface failure using hoek & The Project Experiences:
bray grafik and simplified • Reclamation Plan (RR) and Post-Mining (RPT) report in PT Bumi Merapi Energi, Lahat | Des
bishop methods. 2018 – May 2019
• Revision Coal Mining Feasibility Study Report in PT Bumi Merapi Energi, Lahat | April – Aug
2018
Mining Activities Final Project in PT Baturona Adimulya, Musi Banyuasin | Jan – Mar 2018
Determining of Equipment • The title of my thesis is “Technical Pit Design of stripping and filling overburden at Pit 3 PT.
Productivity, drill & blast, and Baturona Adimulya”
surface mining methods. • Sequence Planning Design yearly
• Pit Limit and Final Disposal Slope Stability Testing