Gantt Chart L2
Gantt Chart L2
[Company Name]
Project Start Date 11/15/2019 Display Week 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
Project Lead 11 Nov 2019 18 Nov 2019 25 Nov 2019 2 Dec 2019 9 Dec 2019 16 Dec 2019 23 Dec 2019 30 Dec 2019
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
WORK
WBS TASK LEAD START END DAYS % DONE M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
DAYS
1 [Task Category]
0.1 Design and Approval 11/15/2019 1/13/2020 60 0% 42
0.1 Material Procurement 12/1/2019 2/15/2020 77 0% 55
0.1 Coil Winding 1/15/2020 2/7/2020 24 0% 18
0.1 Core Aseembly 2/1/2020 2/9/2020 9 0% 5
0.1 Active Part Assembly 2/1/2020 2/20/2020 20 0% 14
0.1 Active Part Drying 2/21/2020 3/8/2020 17 0% 11
0.1 Final Assembly and Filling 3/1/2020 3/14/2020 14 0% 10
0.1 Factory Tests 3/7/2020 3/14/2020 8 0% 5
0.1 Final ınspeciton (FAT) 3/15/2020 3/21/2020 7 0% 5
2 [Task Category]
2.1 [Task] 12/30/1899 12/30/1899 0 0% 0
2.2 [Task] 12/30/1899 12/30/1899 0 0% 0
2.3 [Task] 12/30/1899 12/30/1899 0 0% 0
2.4 [Task] 12/30/1899 12/30/1899 0 0% 0
2.5 [Task] 12/30/1899 12/30/1899 0 0% 0
3 [Task Category]
3.1 [Task] 12/30/1899 12/30/1899 0 0% 0
3.2 [Task] 12/30/1899 12/30/1899 0 0% 0
3.3 [Task] 12/30/1899 12/30/1899 0 0% 0
3.4 [Task] 12/30/1899 12/30/1899 0 0% 0
3.5 [Task] 12/30/1899 12/30/1899 0 0% 0
4 [Task Category]
4.1 [Task] 12/30/1899 12/30/1899 0 0% 0
4.2 [Task] 12/30/1899 12/30/1899 0 0% 0
4.3 [Task] 12/30/1899 12/30/1899 0 0% 0
4.4 [Task] 12/30/1899 12/30/1899 0 0% 0
4.5 [Task] 12/30/1899 12/30/1899 0 0% 0
Help
https://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html
Be sure to read the Getting Started Tips below. Watching the video demos for Gantt Chart Template
Pro may also help you see how to use the spreadsheet.
Please read the license agreement in the TermsOfUse worksheet to learn how you may or may not
use and share this spreadsheet.
• [Bracketed Text] is meant to be edited, like the project title and task descriptions.
• Some of the labels include cell comments to provide extra information.
• To adjust the range of dates shown in the Gantt chart, change the Display Week number.
• The Project Start Date is used to define the first week shown in the gantt chart.
• For each task, enter the Start Date and the duration of the task in Days. The End Date and Work
Days columns are calculated using formulas.
• If you see "#####" in a cell, widen the column to display the cell contents.
• Backup your file regularly to avoid losing data! Excel files get corrupted occasionally.
METHOD 1 (recommended)
• Insert a new blank row by right-clicking on the row number and selecting Insert.
• With the new blank row selected, press Ctrl+d to copy the formulas and formatting down from the
row above OR use the row drag handle to copy the formulas and formatting down.
METHOD 2
• Copy a row from the set of template rows at the bottom of the worksheet.
• Right-click on the row where you want to insert the new task and select Insert Copied Cells.
Method 2 will work, but Excel will split/fracture/duplicate conditional formatting rules rather than
merging the rules. This can cause inefficiencies in very large and heavily modified files.
Help improve Excel by voting on a suggestion to fix this problem.
Each different WBS level uses a different formula in the WBS column.
You can either copy/paste/insert these template rows via Method 2 as explained above, OR you can
just copy/paste the desired WBS cell when you want to change the WBS level.
If you leave a blank cell above a WBS number, the numbering will reset to 1.x.x. The formulas are
meant for convenience, but you can manually enter the WBS numbers if you want to.
You can indent the task description for sub-tasks by entering leading spaces or using the Indent
feature in Excel.
FAQs
Q: How do I enter the Work Days instead of Calendar Days?
Entering work days instead of calendar days is a feature of the Pro version. There is nothing in the
free version preventing you from entering your own formulas, though.
Q: How do I calculate Calendar Days after entering the Start and End Dates?
You can calculate the duration in calendar days (including both start and end dates) using the formula
=enddate-startdate+1
Q: How do I create a summary row that shows the MIN and MAX dates for all sub-tasks?
In the Start column, use the formula =MIN(range_of_start_dates)
In the End column, use the formula =MAX(range_of_end_dates)
In the Days column, use the formula =end_date-start_date+1