MODROPS Proposal
MODROPS Proposal
Education
(A Statutory body under Ministry of HRD, Govt. of India)
Proforma for
Address RANGAREDDY-500097
Application Id
Current lab utilization Digital Signal Processing and Basic Simulation Lab are used for UG & PG
Strength & Weakness of lab The lab is equipped with Personal computers, MATLAB Software and DSP
Processor kits.
Technical Field of proposal Engineering and Technology – Electronics and Communication Engineering
Abstract
Upgrading the software and hardware equipments that support new technologies to perform
application oriented experiments to the students and to conduct project works , Research by the faculty
Objective
To upgrade PC configurations
- Students and Faculty members can be exposed to cutting edge technologies in the field
of Signal Processing specific to Image Processing & Networking .This leads to carry out
research by the young faculty
Total Cost
S.No Proposed equipment/s Specifications No of units Justification
(in Lakhs)
3 HDL Coder Version 17A 80,000 02
4 Computer Systems Dell vostro 3668 10.6 35
5 UPS Online 1.0 1
Utilization
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
Submit timely progress reports about grant utilization.
Submit utilization certificate duly authenticated by CA on/before project period is over.
Return full/partial unutilized grant amount to the Council.
Important: You need to apply on web portal using your Institute login and password. Select tab “AQIS
application”. Press “New” to create new application. Your application is assigned unique application Id. Fill all the
details over there. Prepare application in this Proforma also. Attach PDF of it to the application on web portal.
Now press “submit” on web portal to submit application. Pay processing fees on web portal using appropriate
payment option.
NR R R R R R R
Travel, Stay & Ptg& Stationery
Equip purchase AMC Consumables Salary Fellowship
DA / office Exp
MODROB Y - Y - - - -
Annexure I
Achievements:
1. Conducted one day Work shop (7th February, 2014) on Impact of Communication.
2. Conducted two day Work shop (18th to 19th Sep, 2015) on PCB design.