100% found this document useful (1 vote)
3K views5 pages

Bar Bending Schedule For Pile Foundation With Calculations

Bar Bending Schedule for Pile Foundation With Calculations

Uploaded by

A K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
3K views5 pages

Bar Bending Schedule For Pile Foundation With Calculations

Bar Bending Schedule for Pile Foundation With Calculations

Uploaded by

A K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
sweer2019 Bar Bending Schedule for Pils Foundation with Caleulatons Bar Bending Schedule for Pile Foundation with Calculations theconstructor org/stucturaren a a pile-foundation-bar-bending-schedule- 20, 2018 To clearly understand the bar bending schedule of a pile foundation, it is necessary to be familiar about the typical reinforcement details of a pile foundation. Pile foundation is a common type of deep foundation, used for supporting heavy loaded structures when the site under consideration have a very weak soil that is compressible in nature. Layout of a Typical Pile Foundation A typical pile foundation arrangement have the load structure supported by a pile cap, which is in turn supported by several piles as shown in the plan and front view arrangement in the below figures. Fig.1: Pile Foundation OC) O Arrangement — Superstructure, Pile Pile group Cap and Piles aia hitps:theconstrucor org/structura-engg/plefoundation-bar-bending-schedule-calculations/20989/ 15 sweer2019 Bar Bending Schedule for Pile Foundation with Caleulatons Structural Specification and Reinforcement Details of a Pile Foundation The figure-2 shows the typical reinforcement details and drawing of a pile foundation. The details of pile cap are not explained in this article Fig.2: Pile Foundation Details fp Pile Cap Cutoff Level Ld The whole 4 arrangement is clearly understood from the figure-2. The A pile cage has 1 vertical reinforcement 20 held together by outer and inner rings. The Reinforcement in pile construction , include: Hird Rock or Campletely Weathered rock 1. Vertical Reinforcement 2. Outer Ring Reinforcement 3. Inner Ring Reinforcement The above details are mentioned in the figure-3 below. The Outer rings are provided as helical rings and the inner is circular or spiral ties. Fig.3: Cross-section details in section A-A of figure-2 The development length ‘Ly’ is provided outside of the column piercing into the pile cap. The anchorage length to the recommended amount is provided to the bottom of the column as shown in figure-2. From the Figure: hitps:theconstrucororgstructura-engg/plefoundation-bar-bending-schedule-calculations/20989/ 25 sweer2019 Bar Bending Schedule for Pile Foundation with Caleulatons Concreter. <-#12-Y20 Spacer YI6 @ 2000c/c se ‘YS © 200c/e Length of Pile = 20m Diameter of Pile = 0.6m Diameter of a. Vertical Reinforcement = 20mm — 12nos b. Outer Helical Ring = 8mm @ 200mm c/e c. Inner spiral ties = 16mm @ 2000mm c/c Bottom Length of Anchorage = 300mm Development Length = 40d Clear Cover = 75mm oN oan Calculation for Bar Bending Schedule of Pile Foundation Step 1: Length of Vertical Reinforcement In the case of bar bending schedule of a column or a pile, there comes need for lapping the rods so that the length of pile (20m) is attained. Hence, a lapping length equal to 5Dd is provided in extra. Therefore, Total Cutting Length for Vertical Reinforcement = Anchorage Length at the bottom of the pile + the height of the pile + development length (40d) + Lap length (50d) — clear cover provided at the bottom. ie. Ly = 300 + 20000 + 40d +50d -75 = 300 + 20000+ (40 x 12) + (50 x 12) — 75 hitps:theconstrucororg/structural-engg/plefoundation-bar-bending-schedule-calculations/20989/ 35 sweer2019 Bar Bending Schedule for Pile Foundation with Caleulatons Total length of vertical reinforcement, L, = 21.3m Note: During tying the bar, it is recommended to tie at the middle, as tying at the ends of the bars will be subjected to higher stress values Step 2: Inner Spacing Ring — Number and Length of each Ring Here, we have to determine the length of each inner ring along with their numbers arranged The number of rings (Nr) [Length of the Pile / Spacing] +1 = [2000/2000] +1 = 11 No’s The circumference of the ring gives the length of each ring. For this the radius of the ring has to be determined. Given the radius of the pile, the clear cover, outer ring radius The radius of the ring = [Radius of the pile — clear cover — diameter: of outer ring — diameter: of vertical reinforcement:}/2 = [600 ~ 75 ~ 8 - 12)/2= 252.5mm Hence, Length of ring = 2xpixr = 2x 3.147 x 252.3 = 1584.4mm = 1.58m Step 3: Outer Helical Ring - Number and Length of each ring For every specification of outer helical ring, the radius of the same have to be determined. Radius of Helical Ring Outer = [Diameter of Pile - Clear Covery/2 = [600 -75)/2 = 262.5mm Length of ring = 2xpixr = 2x 3.147 x 262.5 = 1648.5mm = 1.65m The number of rings (Ny [Length of the Pile / Spacing] + 1 hitps:theconstrucororg/structura-engg/plefoundation-bar-bending-schedule-calculations/20989/ 4s sweer2019 Bar Bending Schedule for Pile Foundation with Caleulatons = [20000/200] +1 = 101 No’s Step 4: Bar Bending Schedule Specification Vertical Bar Inner Ring bar Outer ring bar Diameter of Bars (m) 12 16 No. of Bars (m) 12 1 101 Length of rods (m) 213 1.58 1.65 Total Length (m) 255.6 17.4 166.65 hitps:theconstrucororgstructura-engg/plefoundation-bar-bending-schedule-calculations/20989/ 55

You might also like