Borlog Roxi

1. The boring log provides information from a borehole drilled at Jl. Rawa Bahagia Raya No. 28, Jakarta Barat. 2. Soil was encountered from 0-32.45 meters consisting of soft clay, silty clay, and silty clayey sand with N-values ranging from 4-25. 3. From 32.45-34.45 meters a very dense silty clayey sand was encountered with N-values of 25-26.

Uploaded by

Yanus S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
355 views2 pages

Borlog Roxi

1. The boring log provides information from a borehole drilled at Jl. Rawa Bahagia Raya No. 28, Jakarta Barat. 2. Soil was encountered from 0-32.45 meters consisting of soft clay, silty clay, and silty clayey sand with N-values ranging from 4-25. 3. From 32.45-34.45 meters a very dense silty clayey sand was encountered with N-values of 25-26.

Uploaded by

Yanus S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

BORING LOG

PROJECT NAME : MAN 1 JAKARTA


LOCATION : Jl. Rawa Bahagia Raya No. 28, Grogol - Jakarta Barat BORING No. : DB. 1
GROUND LEVEL (GL) : - m DRILLER : WARDI
GROUND WTR LEVEL : - 2,00 m (GL.) DATE : 12 ~ 18 OKT 2019

LOG SYMBOL
THICKNESS, M.
ELEVATION, M.

N - VALUE
DEPTH, M.

FIELD SAMPLING
SCALE

GENERAL SOIL DESCRIPTION AND TESTING STANDARD PENETRATION TEST


Depth Below Existing Ground

N-1

N-2

N-3
Level in M.

10 20 30 40 50

1
M.A.T
2
Tanah Urugan Sedikit Lempung
1 2.00 ~ 2.45 1 2 2 4
2.50
3
Lempung , Soft , Kepasiran 1 3.50 ~ 4.00
4 Coklat Kehitaman 2 4.00 ~ 4.45 2 2 3 5
5 5.00

2 5.50 ~ 6.00
6
3 6.00 ~ 6.45 2 2 4 6
7
3 7.50 ~ 8.00
8
4 8.00 ~ 8.10 2 3 5 8
9
4 9.50 ~ 10.00
10
5 10.00 ~ 10.45 2 3 4 7
11
Lempung , Soft , Sedikit Pasir
12 Hitam Kecoklatan 6 12.00 ~ 12.45 2 3 3 6
13
5 13.50 ~ 14.00
14
7 14.00 ~ 14.45 2 3 3 6
15

16
16.50 8 16.00 ~ 16.45 2 4 5 9
17

18
Lempung , Soft , Kepasiran 5 17.50 ~ 18.00

Abu - Abu 9 18.00 ~ 18.45 4 5 6 11


19
19.50

20
10 20.00 ~ 20.45 4 6 7 13
21
Lanau kelempungan , Medium ,
22 Kuning Kecoklatan 11 22.00 ~ 22.45 5 7 9 16
23
23.50

24
12 24.00 ~ 24.45 6 8 10 18
25
25.50

26
13 26.00 ~ 26.45 7 10 13 23
27

28
14 28.00 ~ 28.45 9 12 15 27
29 Lanau kelempungan, Very
Siftt , coklat keabu- abuan
30
15 30.00 ~ 30.45 6 10 14 24
31

32
16 32.00 ~ 32.45 7 11 14 25
33

Thin Wall Tube Sample (TW) No. :


Standard Penetration Test (SPT).
Fig. :
Core Sample Clay Silt Sand
BORING LOG
PROJECT NAME : MAN 1 JAKARTA
LOCATION : Jl. Rawa Bahagia Raya No. 28, Grogol - Jakarta Barat BORING No. : DB. 1
GROUND LEVEL (GL) : - m DRILLER : WARDI
GROUND WTR LEVEL : - 2,00 m (GL.) DATE : 12 ~ 18 OKT 2019

LOG SYMBOL
THICKNESS, M.
ELEVATION, M.

N - VALUE
DEPTH, M.

FIELD SAMPLING
SCALE

GENERAL SOIL DESCRIPTION AND TESTING STANDARD PENETRATION TEST


Depth Below Existing Ground

N-1

N-2

N-3
Level in M.

10 20 30 40 50
16 32.00 ~ 32.45 7 11 14 25
33

34
17 34.00 ~ 34.45 7 12 14 26
35

36
18 36.00 ~ 36.45 12 14 16 30
Lanau Kepasiran , Very Stiff,
37 Sedikit Lempung Coklat
Kekuningan
38
19 38.00 ~ 38.45 12 15 17 32
39

40
20 40.00 ~ 40.45 13 16 19 35
41
Akhir pengeboran : - 40.17 m.GL
42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

Thin Wall Tube Sample (TW)


No. :
Standard Penetration Test (SPT).
Fig. :
Core Sample Clay Silt Sand