Section / Dept: civil Activity: Risk Assessment Location-
Contractor :- -Dismantling of staging
Proba
Init Additio
Proba
bility
Resid
Risk rating Ri
risk
ual
bility
No. Steps Hazard nce ial nal sk
Ris control ra
k measur ti
P E A R P E A R
e n
Deployment only experienced workmen g
Only authorised persons are allowed for working
at height 1 0 0 0 2 2
Fall of man Get
Climbing up on due to slip Injury/Fatality To fill up the Wah permit & daily attachment sheet
1 the top of the before starting the activity
scaffolding Use double rope full body harness while
ascending or descending
2 0 0 1 2 4
Slip of All the portable tools must be tied with rope while
tools/Materials working for preventing the accidental fall
Area should be properly barricaded and nobody
allow under the suspended load
Slip/Fall of Get
Deployment only experienced workmen
Lowering of materials Injury/Fatality
Pulley and rope must be checked before starting
pipe,clamps
the activity on daily basis
2 planks etc.by 2 0 0 1 2 4
using rope Only authorised persons are allowed for working
pulley at height
Working at Get
height Injury/Fatality Use double rope full body harness and it must be
fixed above the head height