Once the design has been completed, there are four basic methods for implementing the MIS.
These ares-
FOLLOWERS
1. Install the system in a new operation or organization.
2. Cut off the old system and install the new Follower (39) Weiter
MOBILE SOFTS INFO
This produces a time gap during which no system is in operation. Practically, installation requires one or two
days for small companies or small systems.
3. Cut over by segments
This method is also referred as” phasing in” the new system. Small parts or subsystems are substituted for
the old. In the case of upgrading old systems, this may be a very desirable method.
4. Operate in parallel and cut over.
The new system is installed and operated in parallel with the current system until it has been checked out,
then only the current system is cut out. This method is expensive because of personal and related costs. Its
big advantages are that the system is fairly well debugged when it becomes the essential information system.
For small projects, the order of performance may simply be described in text form. A Gantt chart or network
diagram makes visualization of the plan and schedule much clearer.
For large projects, many concurrent and sequential activities are interrelated so that a network diagram
must be employed in any good plan.
Establish a Schedule
Schedule is prepared by having the system designers estimate the times between the events in the program
network. The critical path (longest time through the network) can be calculated. After specifying the starting
date, the end date is established.
The cost for completing each task required to complete is established as part of the plan; then the rate of
expenditures should be budgeted.
Reporting and control of the work in progress may be obtained by weekly meetings. The financial personnel
must make certain that report formats allow them to show cost and technical progress relationship as well as
cost and time.
For the installation of a new system to replace a current one may require a major revision of facilities as well
as completely new office, computer room etc.
The MIS project manager must prepare rough layouts and estimates of particular floor areas that feel to be
needed. The manager then prepares cost estimates.
Space planning must be done by the space to be occupied by people, the space occupied by equipment and
the movement of people and equipment in the work progress. A large investment in good working conditions
will repay its cost many times.
As the implementation tasks have been defined, management usually assigns a project manager to guide the
implementation.
The purpose of the MIS is to increase the amount and quality of their contributions, the system is their
system.
Top management must make the middle managers for their involvement in implementation, besides these,
systems specialists, computer programmer; top management should make sure that each people who will
operate the system should have active parts in the implementation.
Procedures for evaluating and selecting hardware must be spelled out. Procedures for phasing in parts of the
MIS or operating the MIS in parallel must be developed.
The major part of implementing the MIS is the testing of each segment of total system as it is installed.
A program is developed keeping in mind to impress management and support. After developing the
program, it is necessary to train operating personnel in their new duties. They must have a thorough
understanding of what the new MIS is like and what it is supposed to do. They must learn how it will
operate. They are faced with many changes in their work and have to obtain acceptance of changes.
As there are various levels of personnel and these people will be working with only a small part of the MIS,
the seminars should be designed to provide them with an understanding of the complete system.
As the software is developed internally or under contract, in both cases, the software development must take
in mind the nature of the hardware required.
As the system designers and programmers provide the flow diagrams and the block diagrams during the
detailed design state. Some modification may be required, as the implementation stage progresses.
This acquisition is usually the limiting factor in getting am MIS implementation. These tasks should be
started during the design stage.
The decision is to be needed, whether to buy or lease the hardware. Capital expenditure analysis is only one
of many factors involved in this decision. Others are prestige, usage etc.
8. Generating files
In the implementation stage, the actual data must be obtained and recorded for the initial testing and
operation of the system. This requires format of the data, storage form and format and remarks to indicate
when the data have been stored.
The collection of data used in routine operations is often called the master file.
Responsibility for file maintenance for each file item should also be assigned. The development of files or
databases belongs to information system designers and storage and retrieval experts.
The translation of specifications for files into computer programs is a function of computer specialists.
9. Designing forms
For controlling the marketing, a salesperson has to fill out the forms summarizing the day’s activities. The
form ensures the right information to be supplied for computer storage.
Forms are required not just for input and output but also for transmitting data at intermediate stages.
As the total system is installed, tests should be performed with the test specifications and procedure. A test
during installation stage consists of component tests, subsystem tests and total system acceptance tests.
Components may be equipment (that can be new or old), new software programs, new data collection
methods, work procedures, reporting formats. Difficulties that occur during component tests may lead t
design changes.
As more components are installed, subsystems may be tested. There is a difference between the testing of
component and the testing of a system.
System tests require verification of multiple inputs, complex logic systems, and timing aspects of many
parts.
Cutover is a point at which the new component replaces the old component to the new system replaces the
old system. This involves old forms, old files and old equipment being retried.
The debugging proves associated with the cutover to the new system may extend for several months.
Documentation of the MIS means preparation of written descriptions of the scope, purpose, information
flow components, and operating procedures of the system.
Documentation is a necessity for troubleshooting, for replacement of subsystems, for interfacing with other
systems, for training new operating personnel and also for evaluating and upgrading the system.
After the MIS has been operating smoothly for a short period of time, an evaluation of each step in the
design and of the final system performance should be made.
Evaluation should not be delayed beyond the time when the system’s analysts have completed most of the
debugging. The longer the delay, the more difficult it will be for designer to remember important details.
Control and maintenance of the system are the responsibilities of the line managers.
Control of the systems means the operation of the system as it was designed to operate. Sometimes, well-
intentioned people or operators may make unauthorized changes to improve the system, changes that are
not approved or documented.
Maintenance is closely related to control. Maintenance is that ongoing activity that keeps the MIS at the
highest levels of effectiveness and efficiency within cost constraints.
Maintenance is directed towards reducing errors due to design, reducing errors due to environmental
changes and improving the system’s scope and services.
Labels: computer
Reactions: funny (0) interesting (1) cool (1)
13 comments:
Sirisha says:
February 20, 2014 at 7:39 PM
good one
thank u
awesome
Hi, very nice check out for optimize employee performance is a very effective thing used.
It helps performance management and check the daily work and activity. Get in touch
with us and grab the tool for your office.
The article provided by you is very nice and it is very helpful to know the more
information.keep update with your blogs .I found a article related to you..once you can
check it out.
no use
tharunbi says:
February 6, 2018 at 9:19 PM
Excellent website. Lots of useful information here, thanks in your effort! . For more
information please visit
Medical coding Placements In Hyderabad
The blog you shared is very good. I expect more information from you like this.
Thankyou.
LoadRunner Training in Chennai
Loadrunner course in Chennai
Best Loadrunner training institute in chennai
QTP Training in Chennai
UFT Training in Chennai
DOT NET Training in Chennai
Html5 Training in Chennai
LoadRunner Training in Chennai
Aravind says:
May 14, 2019 at 1:51 AM
I feel satisfied to read your blog, you have been delivering a useful & unique information
to our vision.keep blogging.
Regards,
gst classes in chennai
Web Designing Course in Chennai
microsoft dynamics crm training
CCNA Training in Chennai
Angularjs Training in Chennai
ux design course in chennai
StevenHWicker says:
June 14, 2019 at 7:29 PM
I really liked your Information. Keep up the good work. Organization implementation
plan
One of the best blogs that I have read till now. Thanks for your contribution to sharing
such useful information. Waiting for your further updates.
Spoken English Classes in Chennai
Best Spoken English Classes in Chennai
Spoken English Class in Chennai
Spoken English in Chennai
English Speaking Classes in Mumbai
English Speaking Course in Mumbai
IELTS Coaching in Chennai
IELTS Coaching Centre in Chennai
IELTS Classes in Mumbai
IELTS Coaching in Mumbai
Post a Comment
Publish Preview
ABOUT