Equipment
Equipment
Equipment
By Equipment department
• Learning is a continuous process and thus before moving on to any new project,
As an Equipment team, we ensure that the past learning must be taken in to
account.
• As an Equipment team, we ensure the same as below standard practice
Preparation of the lesson learnt sheet at the end of each project, which mainly
describes the lesson learnt during the last project in terms of safety,
constructability, accessibility, maintainability and design improvements.
User feedbacks are taken for the past project learning / improvements for the
next projects.
Discussions with OEM and sub-vendors for the latest developments /
improvements in the industry for the Equipment.
• Typical Lesson Learnt Sheet for Equipment Project
• Few examples of lesson learning & improvement considered in the latest
Equipment Projects are as below.
SAFETY IN EQUIPMENT DESIGN 2
Rail Replacement Trolley for RMQC :
First time design development across the
globe
High Safer
Reliability maintenance
and safety practices
In house Optimise
maintenance down time for
can be rail
carried out replacement
Save
Cost
scaffolding
effective
and other
solution
expenditure
Auto operation
Low toxicity
Installation on STS
spreader
Installation on STS
spreader
Detect the
Avoid
gap No Automatic Provides only
toppling of Fail safe
between operators Hoist up hoist down
the system
two intervention stops permission
containers
containers
Optimise
Safely lashing Optimise man Optimize Fail safe
operation
& De lashing power resources system
efficiency
Protect
from Wider Flexible No
Laser based Fail safe
collision detection system operators
system system
with any range configuration intervention
object
Installed on RTGC
Laser technology
Protect Truck
Provides
lifting if twist
confidence to
lock is not
Operator
removed
Protects
Maximise Truck from
the output mechanical
damage
Improves the
safety in
Terminal
Installed on RTGC
2D Scanner technology
Protection
Protect
from
from bay
Container
collision
collision
Real time
Enhance
monitoring
operation
of stack
safety
profile
Provide Enhance
yard stack operation
profiling efficiency
THIRD PARTY
INSPECTION FABRICATION
INTER DISCIPLINARY
DRAWING LEAD ENGINEER CHECKS (AS CHECKS
APPLICABLE)
FROM OEM
DESIGN FABRICATION
CONSULTANT
REVIEW DRAWING AS-BUILT
DRG
SUBMISSION
YES NO
FEEDBACK / DRAWING
RESUBMISSION
OBSERVATION APPROVED
• To ensure the safe and proper design of the Equipment, the competency of the
designer / reviewer is necessary.
• Below are the few aspects by which ensuring the same.
Designer & reviewer CV needs to review and need to ensure that similar kind of
equipment experience of designing & reviewing team.
Ensure the appointment of world renowned design review consultant for design
check. (i.e. CP & A, BMT WBM, TBA etc.) ensuring there are proven precedence,
track record and desired credentials.
Ensuring the world renowned third party inspection agency for the inspection &
pre-shipment commissioning at the manufacturer’s work as well for site testing
and commissioning checks. (Lloyd's Register, Beuro Veritas, TUV Nord )
SAFETY IN EQUIPMENT DESIGN 21
EQUIPMENT / FACILITY CHECK POINTS
• To ensure the safe and reliable working of the Equipment with maximum
availability and reliability during operation, various check points has been
ensured during each stage of the project.
• Below are the few aspects by which ensuring the same.