Civil Works Plan - Aug'18
Civil Works Plan - Aug'18
Civil Works Plan - Aug'18
Unit - 1 Aug-18
S.No. Activity Plan Remarks
1 Mills final lift 417
3 ID Fan-A,B 198
4 ESP to ID Duct Support Foundations 375
5 CD Bay Pipe Rack 53
6 ESP Control Room 131
7 Fuel Oil Pump House 50
8 Boiler Maintenance Building 347
Excavation Blr Maint. Building
Excavation FOPH & Control Room
Total 1571
Boiler-2
S.No. Raft Plan Remarks
1 FD Fan-A,B (Raft + Pedestal 1st Lift) 18
2 ID FAN A & B (Raft+Wall) 260
3 Duct from boiler to esp 45
Total Quantity (Cum.) 323
ESP-2
S.N. Activity Plan Remarks
1 Raft 897
2 Pedestals 806
Total 1703
Boiler-3
S.No. Raft Plan Remarks
1 CF1 Raft 1184
2 Pedestals 121
3 Mills 1st lift 145
Total Quantity (Cum.) 1450
Unit - 1 Jul-18
S.No. Activity Plan Actual Balance Remarks
1 ID Fan-A,B 225 26 199
2 Boiler to ESP Duct Support Foundations 50 14 36
3 ESP to ID Duct Support Foundations 223 48 175
4 CD Bay Pipe Rack 0 0 0
5 ESP Control Room 200 313 -113
6 FD Fan-A,B 0 0 0
Total 698 401 297
Boiler-2
S.No. Raft Plan Actual Balance Remarks
1 Mills (IInd lift) 6 nos 0 0 0
2 Pedestal Ist lift (Elevator) 0 0 0
3 Pedestal 2nd lift 0 0 0
4 Elevator pit with slab 24 32 -8
5 FD Fan-A,B (Raft) 66 79 -13
6 ID FAN A & B (Raft+Wall) 175 0 175
Total Quantity (Cum.) 265 111 154
ESP-2
S.N. Activity Plan Actual Balance Remarks
Unit - 1
S.No. Activity Quantity (Cum.) Remarks
1 FD Fan-A,B 120
Total 120
ESP-1
S.N. Activity RCC (cum) Remarks
1 Raft 9 nos 308
2 Pedestal Ist lift 80 nos 192
3 Pedestal 2nd lift 109 nos 259
Total 759
Boiler-2
S.No. Raft RCC (Cum) Remarks
1 CF7 892
ESP-2
S.N. Activity RCC (cum) Remarks
1 Raft 10 nos 532
pedestals L1 ( 20 nos) 60
Total 592
Boiler-3
S.No. Raft RCC (Cum) Remarks
1 CF1A (Part-1) 1200
2 CF8A 288
3 CF4 483
4 CF8 288
Total Quantity (Cum.) 2259
A741000170S220
A741000170S240
A741000160S220
B741000110S220
C741000110S220
B741000160S220
A741000160S240
A741000160S241
B741000110S240
B741000110S241
B741000120S240
B741000160S240
B741000160S241
C741000110S240
A721000110S050
A721000120S050
A722000210S050
A729000901S050
A729000911S050
A333000310S050
A381000140S050
A725000000S030
A725000000S031
Plan Scope
Excavation - FD/ PA and APH-ESP/ SCAPH Duct
Foundations
RCC - FD Below Ground Foundations 120
Excavation - ESP Foundations
Excavation for foundations - Boiler and Bunker
Foundations
Excavation for foundations - Boiler and Bunker
Foundations
Excavation - ESP Foundations
RCC - ESP Raft 308
RCC - ESP Pedestal 451
RCC - Boiler and Bunker Columns Raft 892
RCC - Boiler and Bunker Columns Pedestal 500
RCC - Mills Raft Lift-1 and Lift-2 888
RCC - ESP Raft 532
RCC - ESP Pedestal 60
RCC - Boiler and Bunker Columns Raft 2449
Primary Main Structure Boiler -Tier-1 (Except JJ1) - Erection 628
Primary Main Structure Boiler -Tier-2 (Except JJ1) - Erection 261
Secondary Structure Boiler Main level -1 - Erection 30
Gratings and Step treads for Boiler Main level gallery -
Erection
15
Handrails for Boiler Main level gallery - Erection 5
Unlined Coal pipes and bends ALU- Erection 70
Hot PA duct from RAPH to Mill Inlet - Erection (Advance lift
up)
57
Coal Silo (Shell) - Fabrication 40
Coal Silo (Conical) - Fabrication 60
11010A A741000170S240
11010A A741000160S240
11010A A741000160S241
11010A A721000110S050
11010A A721000120S050
11010A A722000210S050
11010A A729000901S050
11010A A729000911S050
11010A A333000310S050
11010A A381000140S050
11010A A725000000S030
11010A A725000000S031
11010B B741000110S240
11010B B741000110S241
11010B B741000120S240
11010B B741000160S240
11010B B741000160S241
11010C C741000110S240
Target Monthly
Target Year
Month No Taget
2018 4 120
2018 4 308
2018 4 451
2018 4 628
2018 4 261
2018 4 30
2018 4 15
2018 4 5
2018 4 70
2018 4 57
2018 4 40
2018 4 60
2018 4 892
2018 4 500
2018 4 888
2018 4 532
2018 4 60
2018 4 2449