0% found this document useful (0 votes)
1K views9 pages

Program-Of-Works Sample

The document contains three project proposals from Pindasan National High School. The first is a proposal to repaint classroom and office walls with a budget of PHP 16,200. The second is a proposal to repair a makeshift building with a budget of PHP 456,666. The third is another proposal to repaint classroom and office walls with a smaller budget of PHP 15,000 funded by the Special Education Fund.

Uploaded by

charissa suazo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views9 pages

Program-Of-Works Sample

The document contains three project proposals from Pindasan National High School. The first is a proposal to repaint classroom and office walls with a budget of PHP 16,200. The second is a proposal to repair a makeshift building with a budget of PHP 456,666. The third is another proposal to repaint classroom and office walls with a smaller budget of PHP 15,000 funded by the Special Education Fund.

Uploaded by

charissa suazo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Republika ng Pilipinas

KAGAWARAN NG EDUKASYON
Rehiyon XI
Sangay ng Compostela Valley

PINDASAN NATIONAL HIGH SCHOOL


Pindasan, Mabini, Compostela Valley Province

DATE: May 25, 2018

Name of Project : Repainting of Classroom and Offices


walls
District : Mabini, Compostela Valley Province
Total Project Estimated Cost : P 16,200.00
Materials : P 14,682.00
Labor Cost : P 4,200.00
Source of Fund : Donations

PROGRAM OF WORKS
Quantity Unit Description of Materials Unit Price Amount
70 gallons White Latex Paint 450.00 31,500.00
1 piece Exhaust fan 500.00 500.00
18 quarts Raw sienna 57.00 1,026.00
70 pieces Roller Brush (big) 90.00 6,300.00
35 pieces Roller Plate 35.00 1,225.00
35 pieces Roller Brush (small) 45.00 1,575.00
35 pieces Paper tape 25.00 875.00
Total Materials Estimated Cost: 43,001.00
Labor Cost 28,400.00
Total: 71,401.00

Prepared and submitted by:

ELMER C. BORDIOS SHARAE LEZARAH M. ANG


School Facilities Coordinator Brigada Eskwela Coordinator

Approved by:

TEODORA P. BARING
School Principal II
Republika ng Pilipinas
KAGAWARAN NG EDUKASYON
Rehiyon XI
Sangay ng Compostela Valley

PINDASAN NATIONAL HIGH SCHOOL


Pindasan, Mabini, Compostela Valley Province

DATE:
May 10, 2018

Name of Project : REPAIR OF MAKESHIFT BUILDING


District : Mabini, Compostela Valley Province
Total Project Estimated Cost : P 456,666.00
Materials : P 360,666.00
Labor Cost : P 96,000.00
Source of Fund : Donations

PROGRAM OF WORKS
Quantity Unit Description of Materials Unit Price Amount
100 sacks Cement 280.00 280,000.00
125 pieces Round bar (10 mm) 160.00 20,000.00
50 pieces G.I. Sheets (8 ft.) 315.00 15,750.00
50 pieces G.I. Sheets (10 ft.) 350.00 17,500.00
1,200 pieces Hollow Block 9.00 10,800.00
2 pieces Door 2,500.00 5,000.00
144 bd. Ft. Door and Window Jam 34.00 4,896.00
4 sets Window Jalousie 1,680.00 6,720.00

Total Materials Estimated Cost: 360,666.00


Labor Cost 96,000.00
Total: 456,666.00

Prepared and submitted by:

ELMER C. BORDIOS SHARAE LEZARAH M. ANG


School Facilities Coordinator Brigada Eskwela Coordinator

Approved by:

TEODORA P. BARING
School Principal II

Republika ng Pilipinas
KAGAWARAN NG EDUKASYON
Rehiyon XI
Sangay ng Compostela Valley

PINDASAN NATIONAL HIGH SCHOOL


Pindasan, Mabini, Compostela Valley Province

May 10, 2018

Sir/Madam:

Greetings of Peace and Love!

Pindasan National High School in cooperation with the Department of Education will conduct the
2018 Brigada Eskwela from May 28, 2018 to June 2, 2018 with the theme “Pagkakaisa Pasa sa
Handa, Ligtas at Matatag na Paaralan Tungo sa Magandang Kinabukasan”. The Brigada Eskwela is the
National School Maintenance Week, that aims to bring together all education stakeholders to
participate and contribute their time, effort and resources to prepare public school facilities for the
opening of the school year in June. We make sure that our students get the best education and stay in
an environment that is conducive to learning.

In line with this, we would like to request in kind materials or donation needed by our school which
will be used in repair and improvement of our classroom and other school facilities.

We are hopeful that this request will be given an affirmative response that will do so much in the
development and success of the program of our institution.

Thank you very much and God Bless us all!


Respectfully yours,

FLORENCE JASMIN D. VITASOLO


Resource Mobilization Chairperson

SHARAE LEZARAH M. ANG


Brigada Eskwela Coordinator

Noted:

TEODORA P. BARING
School Principal II

Republika ng Pilipinas
KAGAWARAN NG EDUKASYON
Rehiyon XI
Sangay ng Compostela Valley

PINDASAN NATIONAL HIGH SCHOOL


Pindasan, Mabini, Compostela Valley Province

DATE: May 25, 2018

Name of Project : Repainting of Classroom and Offices


walls
District : Mabini, Compostela Valley Province
Total Project Estimated Cost : P 15,000.00
Materials : P 10,000.00
Labor Cost : P 5,000.00
Source of Fund : Special Education Fund (SEF)

PROGRAM OF WORKS
Quantity Unit Description of Materials Unit Price Amount
24 gallons White Latex Paint 380.00 9,120.00
12 quart Raw Sienna 73.00 876.00

Total Materials Estimated Cost: 9,996.00


Labor Cost 5,000.00
Total: 14,996.00

Prepared and submitted by:

ELMER C. BORDIOS SHARAE LEZARAH M. ANG


School Facilities Coordinator Brigada Eskwela Coordinator

Approved by:

TEODORA P. BARING
School Principal II

You might also like