I11c Instrument Close Loop Check PG 1

This document appears to be a checklist for closing out an instrument loop commissioning project. It includes sections for project details, instrument data, commissioning checks to perform, and test equipment used. The checklist contains 5 commissioning checks to verify pre-commissioning activities were completed, instruments are calibrated, the loop is configured as specified, enclosures are clean internally and externally. It notes that if full loop testing was done onshore, current injection can be used offshore to complete the loop check.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
716 views1 page

I11c Instrument Close Loop Check PG 1

This document appears to be a checklist for closing out an instrument loop commissioning project. It includes sections for project details, instrument data, commissioning checks to perform, and test equipment used. The checklist contains 5 commissioning checks to verify pre-commissioning activities were completed, instruments are calibrated, the loop is configured as specified, enclosures are clean internally and externally. It notes that if full loop testing was done onshore, current injection can be used offshore to complete the loop check.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INSTRUMENT CLOSE LOOP CHECK

I11-C
NON FIELDBUS FIELDBUS
Project No.
Project Title
Facilities
INFORMATION
Platform/
Plant name

System Number System Description

INSTRUMENT DATA
Controller Tag
Signal Range Manufacturer
Number
Initiator Tag
Dial/Chart Range Model Number
Number
Service Data Sheet Serial Number
Loop Line of Equip Loop Diag No
□Direct □Direct Final Element Tag
Controller Action Valve Action
□Reverse □Reverse number
COMMISSIONING CHECK OK N/A P/L
Verify to ensure that all the pre commissioning activities have been completed and all punch
1
list closed as per I11-B

Verify each Instrument Equipment is calibrated and confirm the duration of the calibration
2
certificate from vendor are still valid

Test and ensure that loop is configured and functioning as per Control Narrative (Controller
3
Action Auto Manual changeover, split range etc.)

4 Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces are clean.

5 Verify Instruments & its Accessories /Electrical equipment/Panel externally clean.

Note: If functional test of the full loop has been successfully completed during onshore pre-commissioning, loop verification with
current injection can be done to complete the loop check for offshore commissioning