COMMISSIONING PROCEDURE
FOR
11KV SWITCHGEAR
Revision Changed
sheets Prepared by Checked by
No. Date Total Sheet Reviewed by Approved by
e N No.
e o
.
Page 2 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
TABLE OF CONTENT
Page
Content number Description
Number
(i) Cover page 1
(ii) Revision control sheet 2
(iii) Table of content 3
1.0 Introduction 6
2.0 Purpose 6
3.0 Pre-requisites & Initial conditions 6
3.1 Requirement of other systems 6
3.2 System requirements 7
3.3 Manpower requirements 7
3.4 Test instruments and other materials 8
requirement
3.5 Requirement of outside agencies 8
3.6 Hazards and special precautions 8
4.0 General methods 9
4.1 Installation checks 9
4.2 Checks on bus ducts 11
4.3 Cabling and connection checks 11
4.4 Interfacing Checks 12
4.5 Pre-commissioning checks on 11KV 13
switchgear (excluding working supply
incomers, VT cubicle & outgoing feeders)
4.6 Pre-commissioning checks on working 15
supply incomers
A Visual inspection of the cubicle 15
B Internal wiring checks 16
C Testing of circuit breaker 16
D Testing of current transformer 19
E Testing of potential transformer 21
F Testing of electromagnetic locks, limit 21
switches, circuit breakers, fuses,
resistances, heaters & indication lamps
G Testing of relays 22
H Testing of meters 22
I Logics and interlocks checks 22
4.7 Pre-commissioning checks on main and 23
supplementary VT cubicles
A Visual inspection of the cubicle 23
B Internal wiring checks 24
C VT checks 24
D Testing of electromagnetic locks, limit 25
Page 3 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 4 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 5 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
1.0 Introduction:
11KV switchgears are intended for reception and distribution of a three phase,
50Hz AC power to Power Plant auxiliary loads. 11KV switchgear includes
normal operation power supply system switchgears and common station
auxiliary power supply system switchgears. The 11KV switch gears have
been designed based on IEC 62271-200 standards for station smooth
operation by providing ABB 11KV HT Switchgear Type UniGear ZS1 (ABB
Ref no: 4201539208-01) with all relevant protections for electrical system
healthiness.
2.0 Purpose:
This procedure is prepared for carrying out the pre-commissioning checks,
energization and post energization checks on 11KV switchgears of 2 X 35MW
of Rwanda power plant. This procedure is applicable for ABB 11KV HT
Switchgear listed in annexure-1. Switchgears to be tested in order to ensure
that it has not been damaged during transport & erection and to ensure its
trouble free operation.
Page 6 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 7 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 8 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 9 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
8. Check and ensure that bus duct erection and connections from
transformer to the switchgear is completed.
9. Check and ensure that phase sequence of feeding transformer to the
11KV switchgear, 11KV bus duct and 11KV switchgear are matching.
10. Check and ensure that all cubicles are bolted to earthing bus bar at rear
side and the earthing bus bar is connected to station grounding grid at two
points.
11. Check the contact resistance between switch gear grounding point and
station grounding. Resistance shall not be more than 0.1 ohm.
12. Check that control and power cabling is completed as per design/ drawing.
13. Check and ensure that switchgear and surrounding area is clean and free
from debris.
14. Check and ensure that free access is available to all points of installed
components and especially to points requiring frequent operations,
maintenance and control.
15. Check and ensure that the bonding / blocking material for relays,
contactors etc is removed.
16. Check and ensure that all unused holes and openings are properly
plugged.
17. Check and ensure that “11KV” grade insulation mat is provided in front
and back of switchgear.
18. Check and ensure that “11KV” danger sticker is pasted at front and back
side of switchgear.
19. Check and ensure that no unwanted tools, tackles, equipment’s etc are
left nearby.
20. Check and ensure that adequate illumination is available in switchgear
room.
21. Check and ensure that all WDs relay settings etc are available.
22. Check and ensure that cubicle illumination lamps are provided with lamps.
Page 10 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
23. Check and ensure that all trench openings and unused floor openings are
closed.
24. Check and ensure that all civil works in and around 11KV switchgears are
completed, room floor painting is completed and room is in lockable
condition.
4.2 Checks on bus ducts:
1. Checklist for bus duct checks enclosed as annexure-3 shall be filled.
2. Check and ensure that the bus ducts are installed as per the WD and note
down pending points related to installation if any.
3. Check and ensure the continuity of bus bars of bus duct from transformer
end to switchgears.
4. Check and ensure that phase sequence at transformer end is matching
with phase sequence at 11KV switchgear end.
5. Check and ensure bus ducts are earthed at transformer end as well as at
11KV switchgear end.
6. Check the insulation resistance of bus duct with 5KV megger before HV
test.
7. Carry out HV test of the bus duct at __ KV AC voltage for 1 minute.
8. Check the insulation resistance of bus duct with 5KV megger after HV test
4.3 Cabling and connection checks
1. Cabling and connections checklist attached as annexure-4 shall be filled.
2. Check and ensure that external power and control cables are laid and
terminated as per the WDs and record all details in the data sheet
available in annexure-4.
3. Check and ensure all external cables (control, signal, power, indication)
connected at individual switchgear panels are dressed, glanded,
supported, clamped and provided by aluminium identification tags at both
ends as well as at intermediate points at a regular interval of 15 meters.
Cable number shall be punched in aluminium tags.
Page 11 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
4. Check and ensure spare cores of control cable shall be neatly dressed
and placed in its location. Also ensure that spare cores are tagged as
spare cores.
5. Check and ensure that armour of cable is earthed at switchgear end only
(applicable if armoured cables are laid).
6. Check and ensure that single core cables are laid in trefoil formation and
trefoil clamps are provided through out its length.
7. Check for continuity, IR value, correct ferruling, lugging, connection
tightness, IR value of all external cables connected to switchgear and also
that they are connected as per WDs.
Page 12 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
6. Check interfacing cabling between 11KV switchgear and other Inter panel
contacts and ensure that continuity, correct ferruling, lugging, connection
tightness, IR value, tagging, proper dressing and supporting have been
checked as per annexure-4.
7. Check interfacing cabling between 11KV switchgear and transformer
protection scheme and ensure that continuity, correct ferruling, lugging,
connection tightness, IR value, tagging, proper dressing and supporting
have been checked as per annexure-4.
8. Check interfacing cabling between 11KV switchgear and 110V DCDB and
ensure that continuity, correct ferruling, lugging, connection tightness, IR
value, tagging, proper dressing and supporting have been checked as per
annexure-4.
9. Check interfacing cabling between 11KV switchgear and 220V AC panel
and ensure that continuity, correct ferruling, lugging, connection tightness,
IR value, tagging, proper dressing and supporting have been checked as
per annexure-4.
10. Check interfacing cabling between 11KV switchgear and control room and
ensure that continuity, correct ferruling, lugging, connection tightness, IR
value, tagging, proper dressing and supporting have been checked as per
annexure-4 (if applicable).
11. Check interfacing cabling between 11KV switchgear panel and its standby
switchgear feeder and ensure that continuity, correct ferruling, lugging,
connection tightness, IR value, tagging, proper dressing and supporting
have been checked as per annexure-4.
12. Check and ensure the interfacing bus duct between 11KV switchgear and
feeding transformer.
4.5 Pre-commissioning checks on 11KV switchgear (excluding working
supply incomers, VT cubicle & outgoing feeders):
1. Checklist for pre-commissioning checks on 11KV switchgear enclosed as
annexure-6 shall be filled.
Page 13 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
2. Check that bus bars are installed as per WDs. Check that bus ducts are
correctly connected to the switchgear buses with respect to phase
sequence.
3. Check and ensure switchgears for proper phase sequence.
4. Check all bus bars are properly painted with red, yellow & blue colors.
5. Check and clean the bus bars and support insulators properly. Check that
there is no physical damage to any insulator or bus bars.
6. Check and ensure that no foreign materials are left inside the bus bar
chamber.
7. Check the clearance of bus bars between phases and between phases
and earth and record the results in annexure-7.
8. Check all joint tightness and record the result in annexure-8. Torque value
of various size nut and bolt are as follows,
9. Check the contact resistance of all joints i.e. carryout milli volt drop test for
each joint and record the results in annexure-8. Contact resistance of
various joints based on current carrying capacity are as follows,
Sl. No. Nominal current rating of contact in Contact resistance in
Ampere micro-ohm
1 400 As recommended by
2 630 Manufacturer
3 1000
Page 14 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
4 1600
5 ≥2000
Page 15 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
b) Check and clean the breaker compartment completely and ensure that
no foreign materials are left inside.
c) Check bill of material and ensure that all the components are existing
as per WDs.
B. Internal wiring checks:
Check and ensure that the internal wiring and control circuit are as per
WDs and tighten all wires and TBs.
i. Control & protection circuit checks:
a) Check the control & protection circuit is wired as per drawing and
check the continuity of each wire.
b) Check IR of control & protection circuit at 250V.
ii. Monitoring and indication circuit checks:
a) Check the monitoring and indication circuit is wired as per drawing.
b) Check the continuity of each wire.
C. Circuit breaker checks:
Checklist for checks on CB enclosed as annexure-10 shall be filled.
i. Physical inspection and mechanical interlocks checks
a. Inspect the CB for any physical damage & missing of parts.
b. Clean of all the insulators & interrupter surface with dry cloth.
c. Check and ensure lubrication of all the linkages, moving / sliding parts
as per manufacturer’s instructions.
d. Check blue matching of the female cluster contact with male bus bar
contact and ensure that blue matching is successful.
e. Check and ensure manual spring charging is functional and check the
local operation of circuit breaker.
f. Check vacuum in the breaker interrupter chamber.
g. Carryout a closing-opening cycle and an opening-closing-opening
cycle of operation manually and check that CB is functional and no
abnormality is noticed. Check that CB open/close status indicator and
spring charged/uncharged status indicator is functional.
Page 16 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 17 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
k. Insert the plug into the socket for control circuit connection between
fixed portion of cubicle and the CB truck; check that the plug can be
inserted in only one position i.e. correct position.
ii. Contact resistance check:
a) Close the circuit breaker and measure the contact resistance between
upper pole and lower pole for each phase. Acceptable contact
resistance of various capacity circuit breakers are as follows,
b) Rack in the circuit breaker into service position and check the contact
resistance of upper and lower cluster contacts respectively with bus
bars for each phase separately. Also measure the contact resistance
from upper bus to lower bus with circuit breaker in closed position.
c) Check contact resistance between circuit breaker body (foot paddle)
and switchgear base frame. Contact resistance shall be less than 0.1
ohm.
iii. Insulation resistance checks:
a) Measure the insulation resistance between upper and lower contacts
with CB in open condition for each phase with 5KV megger.
b) Measure the insulation resistance between phase to phase and phase
to earth respectively with CB in close condition with 5KV megger.
iv. CB coils & spring charging motor checks:
a) Measure the insulation resistance of spring charge motor, closing coil
& tripping coil with respect to earth at 250V.
b) Measure the winding resistance of spring charging motor, coil
resistance of closing coil & coil resistance of tripping coil respectively.
Page 18 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 19 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
d. Verify the wiring as per drawing of the CT secondary and earthing with
respect to the scheme.
e. Check for earthing of CTs as per scheme.
f. Interchanging of CTs among protection CTs and measuring CTs shall
not be done even if VA rating is same.
g. Measure secondary winding resistance.
h. Carryout IR measurement at 5KV of CT for secondary to earth &
primary to secondary.
i. Using a battery operated polarity tester, check that positive emf is
induced between S-1 to S-2 terminal when a positive current pulse is
applied between P-1 to P-2
j. Using a primary injection test kit, inject rated primary currents into the
P1 & P2 terminals. Measure these currents and those flowing out of
CT secondary terminals. Tabulate the readings. Calculate the ratio and
compare with these name plate ratio.
k. For protection class of CT carry out saturation test as follows,
Using a 1 phase variac; apply increasing voltages across the CT
secondary winding. Increase the voltage up to Vk/2 mentioned on CT
name plate. Note the voltage applied and the current flowing into the
CT secondary at each step of increase in the voltage. Draw a graph
with voltage and current as the x and y-axis respectively and
incorporate the tabulated readings into the graph. When an increase in
the current by 50% is observed for an increase in the voltage by 10%,
V knee is said to have been reached. The magnetizing current Im at
voltage Vk/2 shall be within the limit as mentioned on CT name plate.
l. CBCTs (core balance current transformers) shall be tested for ratio as
follows,
Pass the known current to primary and measure the current in the
secondary of CBCT.
Page 20 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 21 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 22 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 23 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 24 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
2. Check and ensure that earthing switch driving rod can be inserted
into the drive slot only after releasing of electromagnetic lock.
3. Check and ensure that earthing switch drive blocking casing cannot
be opened if VT is in service position.
4. Check and ensure that when earthing switch is closed then earthing
switch drive blocking casing cannot be closed.
5. Check and ensure that VT cannot be racked into service position if
earthing switch is closed.
g. Check and ensure contact changeover of test position limit switch,
service position limit switch & earthing switch operation limit switch.
ii. Winding resistance checks:
a. Measure the primary and secondary winding resistance of VT.
b. Check contact resistance between VT body (foot paddle) and
switchgear base frame.
iii. Insulation resistance checks:
a. Measure the insulation resistance between phase to earth of primary
and secondary respectively with 5KV megger.
b. Measure the insulation resistance between primary and secondary with
5KV megger.
iv. Ratio checks:
Conduct ratio test by applying 11KV across the primary with 11KV/240V
step up transformer. Note voltage at secondary. Tabulate and compare
the values with the nameplate values & manufacturers documents.
D. Testing of electromagnetic locks, limit switches, miniature circuit
breakers, fuses, resistances, heaters & indication lamps:
a. Checklist for checks on electromagnetic locks, limit switches, miniature
circuit breaker, fuses, resistances, heaters & indication lamps enclosed
as annexure-13 shall be filled.
Page 25 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
b. Note down the make, type, ratings & model number of electromagnetic
locks, limit switches, circuit breaker, fuses, resistances, heaters &
indication lamps.
c. Check the operation of electromagnetic lock manually and also by
supply DC voltage.
d. Check the operation of limit switches manually.
e. Check the operation of miniature circuit breaker manually.
f. Check the operation of indication lamps.
g. Check the resistance values of resistances.
h. Check the resistance value and IR value of heaters.
E. Testing of relays:
a. Check the ABB IED relays as per annexure-14,16,16A.
F. Testing of meters and transducers:
a. Check voltmeters as per annexure-18
b. Check ammeters as per annexure-19
4.8 Pre-commissioning checks of outgoing feeders:
A. Visual inspection of the cubicle:
a. Checklist for pre-commissioning checks on outgoing feeders
enclosed as annexure-23 shall be filled.
b. Clean the breaker compartment completely and ensure that no
foreign materials are left inside.
c. Check bill of material and ensure that all the components are existing
as per WDs.
B. Internal wiring checks:
Check and ensure that the internal wiring and control circuit are as per
WDs.
i. Control & protection circuit checks:
a. Check and ensure that control & protection circuit is wired as per
drawing and check the continuity of each wire.
b. Check IR of control & protection circuit at 250V.
Page 26 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 27 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 28 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
b. Rack in the circuit breaker into service position and check the contact
resistance of upper and lower cluster contacts respectively with bus
bars for each phase separately. Also measure the contact resistance
from upper bus to lower bus with circuit breaker in closed position.
c. Check contact resistance between circuit breaker body and switchgear
base frame.
iii. Insulation resistance checks:
a. Measure the insulation resistance between upper and lower contacts
with CB in open condition for each phase with 2.5KV megger.
b. Measure the insulation resistance between phase to phase and phase
to earth respectively with CB in close condition with 2.5KV megger.
Page 29 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
b. Measure the closing time of CB using CB timing kit at 70%, 100% &
110% of 110V DC respectively across closing coil. Note down closing
time of each pole.
c. Measure the CB opening time using CB timing kit at 70%, 100% &
110% of 110V DC respectively across trip coil-1. Note down opening
time of each pole.
d. Measure the CB opening time using CB timing kit at 70%, 100% &
110% of 110V DC respectively across trip coil-2. Note down opening
time of each pole.
vi. Anti pumping & trip free feature checks:
a. Insert the CB trucks into the cubicle and check for anti pumping and
trip free feature. Press the close PB and keep it pressed, the CB
closes. Now press the trip PB, the CB trips, but does not close again
even though a persistent close command is present. Now release the
close PB and then again press it, the CB closes now. Hence it is
checked that the anti- pumping feature is operating.
b. Check the trip free feature of the CB. Press the trip PB and keep it
pressed, breaker opens. Now press the close PB and check that
mechanism operates to close the CB but CB do not close. This
indicates that trip command over-ride close command and trip free
feature is functional.
D. Testing of current transformers:
a. Checklist for current transformer checks enclosed as annexure-11
shall be filled.
b. Check that CTs are as per WDs. Note down name plate details of CTs.
c. Inspect the CT for any breakages, damages, improper mounting /
clamping
d. Verify the wiring as per drawing of the CT secondary and earthing with
respect to the scheme.
e. Check for earthing of CTs as per scheme.
Page 30 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 31 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 32 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 33 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
l. Check the local and remote tripping of circuit breaker in both service
position and test position with 110V DC supply connected to only trip
coil-1.
m. Check the local and remote tripping of circuit breaker in both service
position and test position with 110V DC supply connected to only trip
coil-2.
n. Check protection trips of circuit breaker by simulating faults with only
trip coil-1 energized.
o. Check protection trips of circuit breaker by simulating faults with only
trip coil-2 energized.
p. Check protection trips of circuit breaker by simulating faults with both
trip coil-1 & trip coil-2 energized.
q. Check that indication/annunciation/alarm circuit is functional as per
WDs.
r. Check the interlock related to electromagnetic locks as per WDs.
s. Check various contact changeovers as per WDs with respect to circuit
breaker positions.
t. Check other logics as per relay logic diagram
Page 34 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 35 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 36 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE-1
Page 37 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 38 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
YN1V300013-LA-
15 PNL.NO.15 VFD TRANSFORMER-2 SLD
YN1V300013-LA-
16 PNL.NO.16 SPARE TRANSFORMER FEEDER SLD
BAG FILTER TRANSFORMER YN1V300013-LA-
17 PNL.NO.17 FEEDER SLD
YN1V300013-LA-
18 PNL.NO.18 VFD TRANSFORMER-4 SLD
YN1V300013-LA-
19 PNL.NO.19 BUS PT-2 SLD
YN1V300013-LA-
20 PNL.NO.20 INCOMER-2 SLD
ANNEXURE – 2
Page 39 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 40 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 41 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 42 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
23 Check and ensure that all civil works in and around 11KV
switchgears are completed, room floor painting is
completed and room is in lockable condition
6. Remarks:
ANNEXURE – 3
CHECKLIST FOR BUS DUCT CHECKS
Page 43 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
1. Switchgear code:
2. Bus duct code:
3. Location:
4. Date of check:
5. Ambient temperature:
6. Test instruments details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
7. Details of checks:
Page 44 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
R-(Y+B+E)
Y-(B+R+E)
B-(R+Y+E)
7. Remarks:
Page 45 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –4
CHECKLIST FOR CABLING AND CONNECTION
1. Switchgear code:
2. Location:
3. Date of check:
4. Test instrument details:
5. Details of check:
Page 46 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 47 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Page 48 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
39
40
41
6. Remarks:
Page 49 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE – 5
CHECKLIST FOR INTERFACING CHECKS
1. Switchgear code:
2. Location:
3. Date of check:
4. Ambient temperature:
5. Test instruments details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
6. Details of checks:
Page 50 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 51 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 52 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
annexure-4
Check interfacing cabling between 11KV switchgear and
contacts of FBT and ensure that continuity, correct
ferruling, lugging, connection tightness, IR value, tagging,
proper dressing and supporting have been checked as per
annexure-4
Check interfacing cabling between 11KV switchgear and
contacts of Up stream/Down stream and ensure that
continuity, correct ferruling, lugging, connection tightness,
IR value, tagging, proper dressing and supporting have
been checked as per annexure-4
13 Check interfacing cabling between 11KV switchgear and
billing and metering panel and ensure that continuity,
correct ferruling, lugging, connection tightness, IR value,
tagging, proper dressing and supporting have been
checked as per annexure-4
7. Remarks:
Page 53 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –6
CHECKLIST FOR PRE-COMMISSIONING CHECKS ON 11KV SWITCHGEAR
(EXCLUDING WORKING SUPPLY INCOMERS, VT CUBICLE & OUTGOING
FEEDERS)
1. Switchgear code:
2. Location:
3. Date of check:
4. Ambient temperature:
5. Testing instrument details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
6. Details of checks:
Sl. Description of checks Observation
No.
1 Check that bus bars are installed as per WDs. Check that
bus ducts are correctly connected to the switchgear buses
with respect to phase sequence
2 Check all bus bars are properly painted with red, yellow &
blue colors.
3 Check and clean the bus bars and support insulators
properly. Check that there is no physical damage to any
insulator or bus bars
4 Check and ensure that no foreign materials are left inside
the bus bar chamber
5 Check the clearance of bus bars between phases and
Page 54 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 55 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
R-(Y+B+E)
Y-(B+R+E)
B-(R+Y+E)
22. Remarks:
ANNEXURE – 7
Page 56 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
7. Details of checks:
Acceptance Measured
Cubicle
Clearance between value/Factory value in mm Remarks
No.
value in mm (minimum)
R---Y
Y---B
R---N
R---Body
Y---Body
B---Body
R---Y
Y---B
R---N
R---Body
Y---Body
Page 57 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
B---Body
R---Y
Y---B
R---N
R---Body
Y---Body
B---Body
R---Y
Y---B
R---N
R---Body
Y---Body
B---Body
R---Y
Y---B
R---N
R---Body
Y---Body
B---Body
R---Y
Y---B
R---N
R---Body
Y---Body
B---Body
R---Y
Y---B
R---N
R---Body
Page 58 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Y---Body
B---Body
8. Remarks:
Page 59 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE – 8
CHECKLIST FOR JOINT TIGHTNESS AND CONTACT RESISTANCE CHECKS
OF BUS BARS
1. Switchgear code:
2. Make of switchgear:
3. Location:
4. Date of check:
5. Ambient temperature:
6. Test instruments details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
7. Details of checks:
Page 60 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
Page 61 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
8. Remarks:
Page 62 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –9
CHECKLIST FOR PRE-COMMISSIONING CHECKS ON WORKING SUPPLY
INCOMERS
1. Switchgear code:
2. Make of switchgear:
3. Location:
4. Date of check:
5. Ambient temperature:
6. Testing instruments details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
7. Details of check:
Sl. Description of checks Observations
No.
2 Check and clean the breaker compartment completely
and ensure that no foreign materials are left inside
3 Check bill of material and ensure that all the
components are existing as per WDs
4 Check and ensure that the internal wiring and control
circuit are as per WDs and tighten all the wires and TBs.
5 Check that control & protection circuit is wired as per
drawing and check the continuity of each wire and
tighten all the wires.
6 Check IR of control & protection circuit at 250V
7 Check that monitoring and indication circuit is wired as
Page 63 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
8. Remarks:
Page 64 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –10
CHECKLIST FOR CIRCUIT BREAKER CHECKS
1. Switchgear code:
2. Cubicle code:
3. CB Serial number:
4. CB model number:
5. Make of circuit breaker:
6. Location:
7. Date of check:
8. Ambient temperature:
9. Testing instrument details:
Page 65 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 66 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 67 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 68 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
i) R to earth
ii) Y to earth
iii) B to earth
c Measure the insulation resistance between phase
to phase with CB in close condition with 5000V
megger.
i) R phase to Y phase
ii) Y phase to B phase
iii) B phase to R phase
Page 69 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 70 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
b) Coil resistance of close coil, trip coil 1 & 2 should be 1.1K ohms.
c) Spring charging time for 70% to 110% of 110V DC should be between
6 to 7 sec.
d) Circuit breaker closing time for 100% of 110V DC should be between
60 to 70 msec.
e) Circuit breaker tripping time for 100% of DC should be between 40 to
50 msec.
11. Remarks:
Page 71 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –11
CHECKLIST FOR CURRENT TRANSFORMER CHECKS
1. Switchgear code:
2. Cubicle code:
3. Make of current transformer:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing of instrument details:
8. Details of check:
2 CT model
Page 72 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
RØ
T11/12
YØ
T21/22
BØ
T31/32
4 Inspect the CT for any breakages, damages, improper
mounting / clamping
5 Verify the wiring as per drawing of the CT secondary and
earthing with respect to the scheme
6 Check for earthing as per scheme
Page 73 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Core-2
prim to
sec
Core-2
sec to
earth
10 Using a battery operated polarity tester, check that positive
emf is induced between S-1 to S-2 terminal when a
positive current pulse is applied between P-1 to P-2
11 Using a primary injection test kit, inject rated primary currents into the P1 & P2
terminals. Measure these currents and those flowing out of CT secondary
terminals. Tabulate the readings. Calculate the ratio and compare with these name
plate ratio (Ratio error should not be more than 2% at specified temperature)
Current applied Current measured Ratio %error
In primary In secondary
Core-1 Core-1 Core-1 Core-1
R Y B R Y B R Y B R Y B
Page 74 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
2
R Y B R Y B R Y B R Y B
Page 75 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 76 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
17 Test the measurement CTs for primary injection with burden connected into
secondary
Current applied in Current measured Expected current % Error
primary in meter
9. Remarks:
Page 77 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –12
CHECKLIST FOR POTENTIAL TRANSFORMER CHECKS
1. Switchgear code:
2. Cubicle code:
3. Make of potential transformer:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
Page 78 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
V.A
Page 79 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Core 1 – Earth
Core 2 – Earth
Core 3 – Earth
Core 1 – Core 2
Core 2 – Core 3
Core 3 – Core 1
10 Take IR value of primary at __V (IR should be more RØ YØ BØ
than 1000 M ohms)
Primary –Earth
Primary – Core 1
Primary – Core 2
Primary – Core 3
Page 80 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
9. Remarks:
Page 81 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –13
CHECKLIST FOR ELECTROMAGNETIC LOCKS, LIMIT SWITCHES, CIRCUIT
BREAKERS, FUSES, RESISTANCES & INDICATION LAMPS CHECKS
1. Switchgear code:
2. Cubicle code:
3. Location:
4. Date of temperature:
5. Ambient temperature:
6. Testing instrument details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
7. Details of check:
Sl. Description of checks Observations
No.
2 Check the electromagnetic lock for earthing switch
interlocks
3 Check the electromagnetic lock for circuit breaker
position interlocks
4 Check the limit switch of test position
5 Check the limit switch of service position
6 Check the limit switch of earthing switch
7 Check the circuit breakers/Contactors in control
circuits
8 Check the fuses in control circuit/ lighting/heating
circuit
Page 82 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
8. Remarks:
Page 83 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –14
CHECKLIST FOR ABB IED RELAY CHECKS
1. Switchgear code:
2. Cubicle code:
3. Make of relay:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details
8. Details of check:
Page 84 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
Page 85 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
50
50N
51
51N
27A
27B
59A
59N
51B
50BF
51B
30
95
Page 86 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
9. Remarks:
Page 87 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –15
CHECKLIST FOR IED RELAY TEST FOR INCOMER, VFD TRANSFORMER &
BUS COUPLER PANEL
1. Switchgear code:
2. Cubicle code:-
3. Make of relay:
4. Location:
5. Date of checks:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
B Relay model
Page 88 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
physical damage
E Check the external wiring as per WDs
Page 89 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
RYB
RYB
RYB
RYB
Page 90 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
RYB
14. Remarks:
Page 91 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –16
CHECKLIST FOR IED RELAY TEST FOR BUS PT AND BRBPT PANEL
1. Switchgear code:
2. Cubicle code:
3. Make of relay:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
Sl. Description of checks Observations
No.
A Relay make
B Relay model
Page 92 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
9.Measurement Checks
Phase Voltage Voltage measured in relay
Ref Applied Ua-b Ub-c Uc-a Ua Ub Uc
Ua-b
Ub-c
Uc-a
Page 93 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
13. Remarks:
Page 94 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE –16A
CHECKLIST FOR IED RELAY TEST FOR BUS PT AND BRBPT PANEL
1. Switchgear code:
2. Cubicle code:
3. Make of relay:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
B Relay model
Page 95 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
damage
E Check the external wiring as per WDs
Ia
Ib
Ic
Page 96 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
11. Remarks:
Page 97 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
ANNEXURE – 17
CHECKLIST FOR IED RELAY TEST FOR TRANSFORMER FEEDER PANEL
1. Switchgear code :
2. Cubicle code :
3. Make of the relay :
4. Location :
5. Date of check :
6. Ambient temperature :
7. Testing instrument details :
8. Details of checks:
b Relay model
Page 98 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
10. Voltage Measurement checks: (63.5V is applied to all phases with respect to
neutral)
Measured voltage by relay in volts
R-N Y-N B-N R-Y Y-B R-B
RYB
Page 99 of 123
2 X 35 MW PEAT FIRED POWER PLANT - 11KV SWITCHGEAR
COMMISSIONING PROCEDURE AND TEST REPORT
DOC.NO: SPEPC.RWANDA.11KV.CP01
RYB
RYB
RYB
RYB
9. Remarks:
ANNEXURE – 17A
CHECKLIST FOR IED RELAY TEST FOR TRANSFORMER FEEDER PANEL
1. Switchgear code :
2. Cubicle code :
3. Make of the relay :
4. Location :
5. Date of check :
6. Ambient temperature :
7. Testing instrument details :
8. Details of checks:
B Relay model
ANNEXURE – 18
CHECKLIST FOR VOLTMETER CHECKS
1. Switchgear code:
2. Cubicle code:
3. Make of voltmeter:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
2 Model
4 Range of measurement
5 Accuracy class
9. Remarks:
ANNEXURE – 19
CHECKLIST FOR AMMETER CHECKS
1. Switchgear code:
2. Cubicle code:
3. Make of ammeter:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
2 Model
4 Range of measurement
5 Accuracy class
9. Remarks:
ANNEXURE –20
CHECKLIST FOR LOGICS & INTERLOCKS CHECKS
ON WORKING SUPPLY INCOMER,BUS PT CUBICLE,OUTGOING FEEDER
1. Switchgear code:
2. Cubicle code:
3. Feeder description:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
(b)
c)
d)
e)
9. Remarks:
ANNEXURE –21
CHECKLIST FOR PRE-COMMISSIONING CHECKS ON INCOMER AND BUS VT
CUBICLES
1. Switchgear code:
2. Cubicle code:
3. Make of VT:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
8. Details of check:
9. Remarks:
ANNEXURE –22
CHECKLIST FOR VT CHECKS
1. Switchgear code:
2. Cubicle code:
3. Make of VT:
4. Location:
5. Date of check:
6. Ambient temperature:
7. Testing instrument details:
8. Details of check:
9. Remarks:
ANNEXURE –23
CHECKLIST FOR PRE-COMMISSIONING CHECKS ON OUTGOING FEEDERS
1. Switchgear code:
2. Cubicle code:
3. Load code:
4. Load description:
5. Date of check:
6. Ambient temperature:
7. Testing instruments details:
Sl. Instrument Make & Serial Calibration valid up to
No. number
8. Details of check:
Sl. Description of checks Observations
No.
1 Note down WD number of the outgoing feeder
2 Check and clean the breaker compartment
completely and ensure that no foreign materials are
left inside
3 Check bill of material and ensure that all the
components are existing as per WDs
4 Check and ensure that the internal wiring and
control circuit are as per WDs and ensure tightness
of the wires.
5 Check that control & protection circuit is wired as per
9. Remarks:
ANNEXURE –24
CHECKLIST FOR ENERGISATION OF SWITCHGEAR
1. Switchgear code:
2. Make of switchgear:
3. Location:
4. Date of check:
5. Ambient temperature:
6. Testing instrument details:
7. Details of check:
(iv) Any
annunciation/ala
rm
(v) Any tripping
8. Remarks:
ANNEXURE –25
CHECKLIST FOR RELAY SETTINGS CHECKS
1. Switchgear code:
2. Cubicle code:
3. Load description:
4. Date of check:
5. Details of checks:
6. Remarks: