0% found this document useful (0 votes)
236 views1 page

Assignment #02

This document contains an assignment for an Electrical Power Transmission course. The assignment contains 5 questions related to electrical transmission line design and analysis. Specifically, it asks students to: 1) Determine the additional load capacity and efficiency of converting a 2-wire DC system to a 3-wire AC system. 2) Calculate the aluminum conductor volume required for single and 3-phase transmission lines supplying a 5 MVA load over 50 km. 3) Compare the copper requirements of a 3-phase 4-wire lighting system to a 2-wire DC system with the same specifications. 4) Find the most economical conductor cross-section for a feeder carrying 250A constantly throughout the year. 5) Determine

Uploaded by

shahrooz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
236 views1 page

Assignment #02

This document contains an assignment for an Electrical Power Transmission course. The assignment contains 5 questions related to electrical transmission line design and analysis. Specifically, it asks students to: 1) Determine the additional load capacity and efficiency of converting a 2-wire DC system to a 3-wire AC system. 2) Calculate the aluminum conductor volume required for single and 3-phase transmission lines supplying a 5 MVA load over 50 km. 3) Compare the copper requirements of a 3-phase 4-wire lighting system to a 2-wire DC system with the same specifications. 4) Find the most economical conductor cross-section for a feeder carrying 250A constantly throughout the year. 5) Determine

Uploaded by

shahrooz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

University of Wah,

Department of Electrical Engineering


Document No: UW/EE/AF/REV00

UNIVERSITY OF WAH
WAH ENGINEERING COLLEGE
Electrical Engineering Department
Assignment # 02
Course Title: Electrical Power Transmission Course Code: EE-413
Semester & Section: 7th Semester Course Teacher: Mr. Ijaz Husnain
Total Marks: 10 Time: 1 week till (24/10/2018)
Student Name_____________________ Reg. No. _______________________

Course Program Learning Domain


Learning Learning
Outcome Outcome

CLO-2 PLO-2 C3

PLO-2: Problem Analysis: An ability to identify, formulate, research literature, and analyze
complex engineering problems reaching substantiated conclusions using first principles of
mathematics, natural sciences and engineering sciences
CLO 2: Determine parameters, model and mechanical component of transmission line.

Question No. 01 PLO 2, CLO 2 Marks=10

a. A d.c. 2-wire system is to be converted into a.c. 3-phase, 3-wire system by the addition
of a third conductor of the same cross-section as the two existing conductors.
Determine the percentage additional load which can now be supplied if the voltage
between wires and the percentage loss in the line remain unchanged. Assume a balanced
load of unity power factor.
b. A 50 km long transmission line supplies a load of 5 MVA at 0·8 p.f. lagging at 33kV.
The efficiency of transmission is 90%. Calculate the volume of aluminum conductor
required for the line when (i) single phase, 2-wire system is used (ii)3-phase, 3-wire
system is used. The specific resistance of aluminum is 2·85 ×10−8Ω m.
c. A 3-phase, 4-wire system is used for lighting. Determine and Compare the amount of
copper required with that needed for a 2-wire d.c. system with the same line voltage.
Assume the same losses and balanced load. The neutral is one-half the cross-section of
one of the respective outers.
d. A 2-wire feeder carries a constant current of 250 A throughout the year. The portion of
capital cost which is proportional to area of X-section is Rs 5 per kg of copper
conductor. The interest and depreciation total 10% per annum and the cost of energy is
5P per kWh. Find the most economical area of X-section of the conductor. Given that
the density of copper is 8.93gm/cm3and its specific resistance is 1·73 ×10−8Ωm
e. Determine the best current density in A/mm2for a3-φoverhead line if the line is in
use for 2000 hours per year and if the conductor costing Rs 3·0 per kg has a specific
resistance of 1·73 ×10−8Ωm and weighs 6200kg/m3. Cost of energy is 10 P/unit.
Interest and depreciation is 12% of conductor cost.
Page 1 of 1