CONCRETE:

MINIMUM CONCRETE STRENGTH AT 28 DAYS COMPRESSIVE TEST SHALL BE AS FOLLOWS


UNLESS OTHERWISE SPECIFIED IN THE PLAN.
176 KG/CM2 2,500 PSI SLAB ON GRADE
211 KG/CM 3
3,000 PSI REINFORCED CONCRETE COLUMNS
211 KG/CM4 3,000 PSI WALLS AND SPANDRELS
211 KG/CM 5
3,000 PSI SUSPENDED REINFORCED CONCRETE STAIRS
211 KG/CM 6
3,000 PSI SUSPENDED REINFORCED CONCRETE STAIRS
211 KG/CM7 3,000 PSI SUSPENDED REINFORCED CONCRETE SLABS,BEAMS & GIRDERS
211 KG/CM 8
3,000 PSI OTHER STRUCTURES
281 KG/CM 9
4,000 PSI POST TENSION SLABS & BEAMS

ALL CONCRETE SHALL DEPOSITED, VIBRATED, FINISHED AND CURED IN ACCORDANCE


WITH THE LATEST RECCOMENDATIONS OF AMERICAN CONCRETE INSTITUTE (ACI) USE OF
CONCRETE CHUTE TO DEPOSIT CONCRETE SHALL BE LIMITED TO 1.8M (6'-0") LONG.

CONCRETE PROTECTION FOR REINFORCING BARS:


THE FOLLOWING SHALL BE THE CLEAR CONCRETE PROTECTIONS:
FOUNDATIONS 0.080 M.
SLABS ON GRADE 0.040 M. FOR NO.5 OR SMALLER SIZE BARS
SURFACE EXPOSED TO WEATHER 0.051 M. FOR NO.5 OR LARGER SIZE BARS
COLUMNS 0.040 M.
BEAMS & GIRDERS 0.040 M.
SUSPENDED SLABS AND STAIRS 0.020 M.
WALLS 0.020 M.

SIZE OF AGGREGATES TO BE USED:


MAXIMUM SIZES OF AGGREGATES TO BE USED FOR VARIOUS TYPES OF CONSTRUCTION

REINFORCED WALLS, LIGHTLY REINFORCED


MIN. DIMENSIONS BEAMS & COLUMNS UNREINFORCED WALLS HEAVILY REINFORCED OR UNREINFORCED
OF SECTION (MM) (MM) (MM) SLABS (MM) SLABS (MM)
64 - 125 12.7 - 19 19 19 - 25 19 - 39
150 - 275 19 - 39 39 39 39 - 75
300 - 725 39 - 75 75 39 - 75 75
750 OR MORE 39 - 75 150 39 - 75 75 - 150
REINFORCING STEEL BARS:
A. ALL REINFOCING BARS UNLESS SHOWN OTHERWISE ON PLANS SHALL BE BILLET-STEEL
STRUCTURAL GRADE IN ACCORDANCE WITH ASTM SPECIFICATIONS DESIGNATION A-615 W/
DEFORMATION CONFORMING WITH ASTM SPECIFICATIONS DESIGNATION A-305
B. ALL REINFORCING BARS SHALL BE FREE OF MILL SCALE OIL OR ANY OTHER SUBSTANCE
WHICH TENDS TO WEAKEN BOND STRENGTH. (2,320 KG/CM2)

C. ALL SPLICES SHALL BE WIRED TOGETHER AND SHALL LAP OR EXTEND A MINIMUM OF
40 DIAMETER UNLESS SHOWN OTHERWISE. VERTICAL BARS SPLICE LOCATION SHALL BE
STAGGERED FOR BEAMS & GIRDERS SPLICE TOP BARS AT MIDSPAN & BOTTOM BARS
AT SUPPORT, BENT BARS AT BEND POINTS IN SUPERSTRUCTURES.

TOLERANCES IN PLACING REINFORCEMENT:


UNLES OTHERWISE SPECIFIED BY THE ENGINEER, REINFORCEMENT SHALL BE PLACED IN
SPECIFIED POSITIONS WITHIN THE FOLLOWING TOLERANCES.
1. DEPTH, "D" IN FLEXURAL MEMBERS, WALL AND COLUMNS WHERE "D" IS 0.16 M OR
LESS THAN 0.006 M.
2. DEPTH, "D" IN FLEXURAL MEMBERS AND COLUMNS WHERE "D" IS MORE THAN 0.61 M
TO 0.0127 M.
3. LONGITUDINAL LOCATION OF BENDS AND END OF BARS 0.05 M EXCEPT THAT SPECIFIED
CONCRETE OVER AT ENDS OF MEMBERS SHALL NOT BE REDUCED.

REINFORCING BARS ARRANGEMENT:


WHEN A BEAM CROSSES A GIRDER, REST BEAM BARS ON TOP OF GIRDER BARS,
REINFORCING BARS SHALL BE SYMMETRICAL ABOUT THE CENTERLINE WHEREEVER POSSIBLE
& UPPER LAYERS SHALL BE PLACED DIRECTLY ABOVE THOSE IN BOTTOM LAYERS.
GENERALLY NO SPLICE SHALL BE PERMITTED ON BEAMS AT POINTS WHERE CRITICAL
BENDING STRESSES OCCUR. LENGTH OF LAP SPLICES WHERE SO PERMITTED SHALL BE
ON THE SPECIFICATION FOR WELDING OF REINFORCING BARS. SPLICES SHALL DEVELOP
IN TENSION ATLEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE BAR. NOT MORE
THAN 50% OF THE BARS AT ANY SECTION SHALL BE ALLOWED TO BE SPLICE THERE IN.
PROJECT TITLE CONSTRUCTION OF 1-STOREY RESIDENTIAL BLDG.
LOCATION
OWNER
AMOUNT P 524,600.37

Item Description Qty. Units MATERIALS LABOR


No. unit cost amount unit cost
AREA: 56 SQ.M
I. EARTWORKS

b. Exacavation
footing 10.80 cu.m. 600.00
wall footing/T-beam 7.50 cu.m. 600.00
backfill & compaction 0.10 cu.m. 350.00 35.00 120.00
35.00
c. Gravel base
footing 10.80 cu.m. 800.00 8,640.00 240.00
wall footing/T-beam 2.25 cu.m. 800.00 1,800.00 240.00
floor 5.60 cu.m. 800.00 4,480.00 240.00
14,920.00

SUB-TOTAL - I

II. FORMS AND SCAFFOLDINGS


form lumber 150.00 bd.ft 15.00 2,250.00 4.50
plywood (3/8" thick) 50.00 shts 400.00 20,000.00 120.00
22,250.00
SUB-TOTAL - II

III. CONCRETE WORKS


footing 9.00 cu.m.
wall footing 0.68 cu.m.
column 1.35 cu.m.
flooring 5.60 cu.m.
total volume 16.63 cu.m.
Portland Cement 166.25 bags 260.00 43,225.00 78.00
Coarse Sand 8.31 cu.m. 800.00 6,650.00 240.00
Crushed Gravel 16.63 cu.m. 800.00 13,300.00 240.00
63,175.00
SUB-TOTAL - III

IV. MASONRY 76.00 sq.m.


CHB4 walling 950.00 pcs. 15.00 14,250.00 4.50
Portland Cement 40.00 bags 260.00 10,400.00 78.00
Coarse Sand 42.00 cu.m. 800.00 33,600.00 240.00
58,250.00
SUB-TOTAL - IV

V. REINFORCING STEEL BARS


footing
12mm x 6.0m 47.97 kgs. 26.00 1,247.22 7.80
column
12mm x 6.0m 255.84 kgs. 26.00 6,651.84 7.80
10mm x 6.0m 185.00 kgs. 26.00 4,810.00 7.80
wall footing
10mm x 6.0m 68.20 kgs. 26.00 1,773.20 7.80
CHB ties
10mm x 6.0m (CHB4 hor. & vert.) 666.00 kgs. 26.00 17,316.00 7.80
flooring
10mm x 6.0m 222.00 kgs. 26.00 5,772.00 7.80
37,570.26
SUB-TOTAL - V

VI. ROOF FRAMING WORKS


2"x5" thk Good Lumber 100.00 bd.ft 26.00 2,600.00 7.80
2x5 thk." Good Lumber 100.00 bd.ft 26.00 2,600.00 7.80
1 1/2" Good Lumber 90.00 bd.ft 26.00 2,340.00 7.80
Labor on fabrication of roof frame 1.00 lot 2,000.00
7,540.00
SUB-TOTAL - VI

VII. ROOFING
Corr. G.I. Sheet 75.00 shts. 300.00 22,500.00 51.00
Umbrella Nails 5.00 kgs. 90.00 450.00 27.00
.4 mm x 10" x 8' Facia Cover 16.00 pcs. 175.00 2,800.00 52.50
# 4 Sanitary PVC Pipe 10.00 pcs. 282.00 2,820.00 84.60
Vulca Seal 2.00 ltrs 380.00 760.00 114.00
# 4 Sanitary PVC 90° Elbow 10.00 pcs. 40.25 402.50 12.08
29,732.50
SUB-TOTAL - VII

VIII. CEILING WORKS


2" x 2" x 20' (50pcs) Good Lumber 80.00 bd.ft. 28.00 2,240.00 8.40
1/4" Ordinary Plywood 68.00 shts. 380.00 25,840.00 114.00
C.W. Nails (Assorted) 15.00 kgs. 80.00 1,200.00 22.50
29,280.00
SUB-TOTAL - VIII
IX. FINISHING & CEMENT PLASTERING WORKS
1 Floor topping 56.00 sq.m.
portland cement 20.16 bags 260.00 5,241.60 78.00
fine sand 1.40 cu.m. 800.00 1,120.00 240.00
2 Plastering (interior & exterior) 152.00 sq.m.
portland cement 30.40 bags 260.00 7,904.00 78.00
fine sand 3.80 cu.m. 800.00 3,040.00 240.00
linear plastering 1.00 lot 1,000.00 1,000.00 1,000.00
18,305.60
SUB-TOTAL - IX

X. DOORS AND WINDOWS


1.2x1.2 sliding window w/ alu. Frame 4.00 sets 5,000.00 20,000.00 750.00
0.5x0.5 casement window w/ alu. Frame 1.00 set 3,500.00 3,500.00 750.00
1.2x0.5 fix window glass w/alu.frame 2.00 set 3,500.00 7,000.00 750.00
1.8x.70 m pvc door 1.00 set 2,500.00 2,500.00 750.00
0.80m x 2.1m Panel Door 1.00 sets 5,500.00 5,500.00 750.00
0.90m x 2.1m Panel Door 2.00 set 5,500.00 11,000.00 750.00
SUB-TOTAL - X

XI. ELECTRICAL WORKS


3/4" Ø Entrance Cap 1.00 pc. 42.00 42.00 12.60
1/2" Ø Entrance Cap 1.00 pc. 32.00 32.00 9.60
Screw Insulator 2.00 pcs. 50.00 100.00 15.00
3/4" Ø PVC Pipe 1.00 length 108.00 108.00 32.40
1/2" Ø PVC Pipe 1.00 length 80.00 80.00 24.00
6 Branches Panel Board 1.00 pc. 710.00 710.00 213.00
Utility Box 20.00 pcs. 17.00 340.00 5.10
1/2" PVC Clip 75.00 pcs. 3.00 225.00 0.90
60 Amp. Circuit Breaker 1.00 pc. 255.00 255.00 76.50
30 Amp. Circuit Breaker 2.00 pcs. 250.00 500.00 75.00
20 Amp. Circuit Breaker 2.00 pcs. 250.00 500.00 75.00
15 Amp. Circuit Breaker 1.00 pc. 250.00 250.00 75.00
One Way Switch 1 gang 2.00 sets 65.00 130.00 19.50
One Way Switch 2 gang 2.00 sets 125.00 250.00 37.50
One Way Switch 3 gang 2.00 sets 190.00 380.00 57.00
Outlet 3 gang 10.00 sets 150.00 1,500.00 45.00
4" Ø Receptacle 10.00 pcs. 38.00 380.00 11.40
Cable Outlet 4.00 sets 145.00 580.00 43.50
Coaxial Cable RG 6 40.00 m. 23.00 920.00 6.90
3 Way Spliter 1.00 pc. 40.00 40.00 12.00
2 Way Spliter 1.00 pc. 35.00 35.00 10.50
Cable Connector RG 6 15.00 pcs. 17.00 255.00 5.10
1/2" Ø Flexible Hose 50.00 m. 12.00 600.00 3.60
Split Knob w/ Flat Head Nail 100.00 pcs. 6.00 600.00 1.80
Electrical Tape 5.00 rolls 32.00 160.00 9.60
#8 THHN Stranded 20.00 m. 78.00 1,560.00 23.40
#12 THHN Stranded 2.00 rolls 32.00 64.00 9.60
#14 THHN Stranded 2.00 rolls 22.00 44.00 6.60
9W LED G.E. 10.00 pcs. 280.00 2,800.00 84.00
13,440.00
SUB-TOTAL - XI

XII. PLUMBING WORKS


Toilet & lavatory 2.00 set 3,500.00 7,000.00 1,050.00
Sink 1.00 pc 2,050.00 2,050.00 615.00
Faucets 4.00 pc 1,315.50 5,262.00 394.65
# 4 Sanitary Pipe 3.00 pc 245.00 735.00 73.50
# 3 Sanitary Pipe 4.00 pc 185.00 740.00 55.50
# 2 Sanitary Pipe 2.00 pc 90.00 180.00 27.00
# 4 Sanitary 90° Elbow 4.00 pc 35.00 140.00 10.50
# 3 Sanitary 90° Elbow 2.00 pc 25.00 50.00 7.50
# 3 Sanitary 90° Couple 3.00 pc 15.00 45.00 4.50
# 2 Sanitary 90° Elbow 5.00 pc 15.00 75.00 4.50
# 2 Sanitary 90° Tee 2.00 pc 30.00 60.00 9.00
# 3 Sanitary Y 2.00 pc 45.00 90.00 13.50
G.I. Pipe 1/2 " ø 4.00 pc 280.00 1,120.00 84.00
G.I. Elbow 90° 1/2 " ø 10.00 pc 10.00 100.00 3.00
G.I. Tee 90° 1/2 " ø 6.00 pc 15.00 90.00 4.50
G.I. Unoin 1/2" ø 2.00 pc 35.00 70.00 10.50
Fittings 2.00 pc 864.00 1,728.00 259.20
19,535.00
SUB-TOTAL - XII

XIII. SEPTIC VAULT


Portland Cement 75.00 bag 260.00 19,500.00 78.00
Sand 7.00 cu.m 800.00 5,600.00 240.00
Gravel 9.00 cu.m 800.00 7,200.00 240.00
10mmx20mmx40mm CHB 168.00 pcs. 15.00 2,520.00 4.50
Tie Wire # 16 1.00 kgs. 80.00 80.00 24.00
10mm Ø Def. Bars 185.00 kgs. 26.00 4,810.00 7.80
\ 39,710.00
SUB-TOTAL - XIII

TOTAL COST
Conform me:

0
Owner
56 560,000.00

LABOR TOTAL
amount AMOUNT
41.34 413400

46.1
6,480.00
4,500.00
12.00
10,992.00 11,027.00

2,592.00
540.00
1,344.00
4,476.00 19,396.00

30,423.00

675.00
6,000.00
6,675.00 28,925.00
28,925.00

12,967.50
1,995.00
3,990.00
18,952.50 82,127.50
82,127.50

40
4,275.00 15
3,120.00 55
10,080.00
17,475.00 75,725.00
75,725.00

374.17

1,995.55
1,443.00

531.96

5,194.80 325.28 54.21

1,731.60
11,271.08 48,841.34
48,841.34

780.00
780.00
702.00
2,000.00
4,262.00 11,802.00
11,802.00

3,825.00 0.17000 0.17


135.00 0.3 0.3
840.00 0.24
846.00 0.3
228.00 0.3
120.75 0.3
5,994.75 35,727.25
35,727.25

672.00
7,752.00
337.50
8,761.50 38,041.50
38,041.50
1,572.48
336.00

2,371.20
912.00
1,000.00
6,191.68 24,497.28
24,497.28

750.00 20,750.00
750.00 4,250.00
750.00 7,750.00
750.00 3,250.00
750.00 6,250.00
750.00 11,750.00
total 54,000.00

12.60
9.60
30.00
32.40
24.00
213.00
102.00
67.50
76.50
150.00
150.00
75.00
39.00
75.00
114.00
450.00
114.00
174.00
276.00
12.00
10.50
76.50
180.00
180.00
48.00
468.00
19.20
13.20
840.00
4,032.00 17,472.00
17,472.00

2,100.00
615.00
1,578.60
220.50
222.00
54.00
42.00
15.00
13.50
22.50
18.00
27.00
336.00
30.00
27.00
21.00
518.40
5,860.50 25,395.50
25,395.50

5,850.00
1,680.00
2,160.00
756.00
24.00
1,443.00
11,913.00 51,623.00
51,623.00