5S Methodology
5S Methodology
5S Methodology
Prepared by:
Myilvaganan S
Six Sigma σ
For example, if a product must have a thickness between 10.32 and 10.38 inches to
meet customer requirements, then the process mean should be around 10.35, with a
standard deviation less than 0.005 (10.38 would be 6 standard deviations away from
10.35), assuming a normal distribution.
Six Sigma can also be thought of as a measure of process performance, with Six
Sigma being the goal, based on the defects per million. Once the current
performance of the process is measured, the goal is to continually improve the sigma
level striving towards 6 sigma. Even if the improvements do not reach 6 sigma, the
improvements made from 3 sigma to 4 sigma to 5 sigma will still reduce costs and
increase customer satisfaction.
DMAIC
A structured project improvement methodology that helps improve your chance of successfully solving a problem.
Define Phase is the first phase of the Lean Six Analyze Phase is often not given enough attention and,
Sigma improvement process. In this phase the without analysis, teams jump to solutions before Improve Phase is where the team brainstorms
project team creates a Project Charter, a high-level knowing the true root causes of the issues. The result is solutions, pilots process changes, implements solutions
map of the process and begins to understand the teams who implement solutions but don’t resolve the and lastly, collects data to confirm there is measurable
needs of the customers of the process. This is a problem! These efforts waste time, consume resources, improvement. A structured improvement effort can lead
critical phase in which the team outlines the project create more variation and, often cause new problems. to innovative and elegant solutions that improve the
focus for themselves and the leadership of the The ideal is for teams to brainstorm potential root causes baseline measure and, ultimately, the customer
organization. (not solutions), develop hypotheses as to why problems experience.
exist and then work to prove or disprove their
hypotheses. Verification includes both process analysis In the Control Phase the team is focused on creating
Measurement is critical throughout the life of the and data analysis and has to be completed before a Monitoring Plan to continue measuring the success
project. As the team starts collecting data they focus implementing solutions. This is the crux of the Analyze of the updated process and developing a Response
on both the process as well as measuring what Phase! Plan in case there is a dip in performance. Once in
customers care about. That means initially there are place, the team hands these plans off to the Process
two focuses: reducing lead time or improving Owner for ongoing maintenance.
quality. In the Measure Phase, the team refines the
measurement definitions and determines the current
performance or the baseline of the process.
Project Charter
The Project Charter is a living document that outlines a process improvement project for both the team as well as leadership. Teams use the charter to clarify the process issue
being addressed, the reason for addressing it and what “success” looks like for those working on it. It’s also used to clarify what’s not being addressed. The Project Charter is
periodically reviewed and refined throughout the project.
The elements of a Project Charter generally include the: Problem Statement: Business Case & Benefits:
-should address these questions. -should address these questions.
What is wrong, not working and not What is this project worth doing?
meeting our customer needs? Why is it important to do now?
When and where do the problems occur? What are the consequences of not doing
What is the frequency of the problem? this project?
What’s the impact of the problem on our How does it fit in with business
customers/business or employees? initiatives and targets?
What is the financial impact of the
project and/or problem?
In scope: Sponsor
Out scope: Team Member
Team Member
SIPOC
A SIPOC is a high-level view of a process which stands for Suppliers, Inputs, Process, Outputs, and Customers. Every Process starts with Suppliers who provide Inputs to
the Process which results in an Output that is delivered to Customers.
S- SUPPLIER
I- INPUT
P- PROCESS
O- OUTPUT
C- CUSTOMER
PLAN- The Plan-Do-Check-Act model is a helpful tool that can be used for a
Define the problem to be addressed, collect relevant
number of applications:
data, and ascertain the problem's root cause.
Exploring and testing multiple solutions in a small, controlled trial
DO-
Avoiding waste by catching and adapting ineffective solutions before
Develop and implement a solution; decide upon a
PLAN DO
measurement to gauge its effectiveness rolling them out on a large scale
ACT- What is great about the PDCA cycle is that it can be applied across
Document the results, inform others about process industries and organizational types.
changes, and make recommendations for the problem to
be addressed in the next PDCA cycle.
5S
Seiri organize sort Eliminate whatever is not needed by separating needed tools, parts, and
instructions from unneeded materials.
Seiton orderliness set in order Organize whatever remains by neatly arranging and identifying parts
and tools for ease of use.
Seiso cleanliness shine Clean the work area by conducting a cleanup campaign.
Seiketsu standardize standardize Schedule regular cleaning and maintenance by conducting seiri, seiton,
and seiso daily.
Shitsuke discipline sustain Make 5S a way of life by forming the habit of always following the first
four S’s.
Parker Dominick hunter are members of governing bodies such as BCAS (UK), CAGI (USA) and VDMA (Germany), which directly contribute to the
development of international standards for compressed air quality and testing.
There are three standards currently in use which directly relate to compressed air quality (purity) and testing. These are:
• ISO8573 Series
• ISO12500 Series
• ISO7183 Series
*The most commonly used standard is the ISO8573 Series and in particular ISO8573-1:2010.
7 QC tools can be applied across any industry starting from product 1. STRATIFICATION:
development phase till delivery. 7QC tools even today owns the same
• Stratification is a method of dividing data into sub–categories and
popularity and is extensively used in various phases of Six
classify data based on group, division, class or levels that helps in
Sigma (DMAIC or DMADV), in continuous improvement process (PDCA
deriving meaningful information to understand an existing problem.
cycle) and Lean management (removing wastes from process).
• The very purpose of Stratification is to divide the data and conquer the
The seven QC tools are:
meaning full Information to solve a problem.
1. Stratification (Divide and Conquer)
• Un–stratified data (An employee reached late to office on following
2. Histogram dates)
7. Control chart
Seven Basic Tools of Quality
2. HISTOGRAM: 3. CHECK SHEET (TALLY SHEET):
Histogram introduced by Karl Pearson is a bar graph representing the A check sheet can be metrics, structured table or form for collecting
frequency distribution on each bars. data and analyzing them. When the information collected is
The very purpose of Histogram is to study the density of data in any given quantitative in nature, the check sheet can also be called as tally sheet.
distribution and understand the factors or data that repeat more often.
The very purpose of checklist is to list down the important checkpoints
Histogram helps in prioritizing factors and identify which are the areas that or events in a tabular/metrics format and keep on updating or marking
needs utmost attention immediately the status on their occurrence which helps in understanding the
progress, defect patterns and even causes for defects.
The very purpose of this diagram is to identify all root causes behind a
problem. Once a quality related problem is defined, the factors leading to
the causal of the problem are identified. We further keep identifying the sub
factors leading to the causal of identified factors till we are able to identify
the root cause of the problem. As a result we get a diagram with branches
and sub branches of causal factors resembling to a fish bone diagram.
People
Methods
Machines
Material Click on the hyperlink to view fishbone template:
Measurements FishBone Template
Environment
Seven Basic Tools of Quality
5. PARETO CHART:
Pareto chart is named after Vilfredo Pareto. Pareto chart revolves around
the concept of 80-20 rule which underlines that in any process, 80% of
problem or failure is just caused by 20% of few major factors which are
often referred as Vital Few, whereas remaining 20% of problem or failure is
caused by 80% of many minor factors which are also referred as Trivial
Many.
The very purpose of Pareto Chart is to highlight the most important factors
that is the reason for major cause of problem or failure.
Pareto chart is having bars graphs and line graphs where individual factors
are represented by a bar graph in descending order of their impact and the
cumulative total is shown by a line graph.
Y = F(X) + C
Design equipment to partially automate the Pull parts through production based on customer
Align the goals of the company (Strategy),
manufacturing process (partial automation is typically demand instead of pushing parts through production based
with the plans of middle management (Tactics)
much less expensive than full automation) and to on projected demand. Relies on many lean tools, such
and the work performed on the plant floor
automatically stop when defects are detected. as Continuous Flow, Heijunka, Kanban, Standardized
(Action).
After Jidoka, workers can frequently monitor multiple Work and Takt Time.
Ensures that progress towards strategic goals is
stations (reducing labor costs) and many quality issues Highly effective in reducing inventory levels. Improves
consistent and thorough – eliminating the waste
that comes from poor communication and can be detected immediately (improving quality) cash flow and reduces space requirements.
inconsistent direction. 11) Kanban (Pull system) 12) Key Performance Indicators (KPIs)
A method of regulating the flow of goods both Metrics designed to track and encourage progress
10) Kaizen (Continuous Improvement)
within the factory and with outside suppliers and towards critical goals of the organization. Strongly
A strategy where employees work together
customers. Based on automatic replenishment promoted KPIs can be extremely powerful drivers of
proactively to achieve regular, incremental
through signal cards that indicate when more behavior – so it is important to carefully select KPIs that
improvements in the manufacturing process.
goods are needed. will drive desired behavior.
Combines the collective talents of a company to
Eliminates waste from inventory and The best manufacturing KPIs:
create an engine for continually eliminating waste
overproduction. Can eliminate the need for • Are aligned with top-level strategic goals (thus
from manufacturing processes.
physical inventories (instead relying on signal helping to achieve those goals)
cards to indicate when more goods need to be • Are effective at exposing and quantifying waste
ordered). (OEE is a good example)
• Are readily influenced by plant floor employees (so
they can drive results.
Lean Management
13) Muda (Waste) 14) Overall Equipment Effectiveness (OEE) 15) Root Cause Analysis
Framework for measuring productivity loss for a A problem solving methodology that focuses
Anything in the manufacturing process that
given manufacturing process. Three categories of loss on resolving the underlying problem instead of
does not add value from the customer’s
are tracked: applying quick fixes that only treat immediate
perspective.
• Availability (e.g. downtime) symptoms of the problem. A common approach
It doesn’t. Muda means ‘waste’. The elimination
• Performance (e.g. slow cycles) is to ask why five times – each time moving a
of muda (waste) is the primary focus of lean
• Quality (e.g. rejects) step closer to discovering the true underlying
manufacturing.
Provides a benchmark/baseline and a means to track problem.
16) PDCA
progress in eliminating waste from a manufacturing Helps to ensure that a problem is truly eliminated
An iterative methodology for implementing
process. 100% OEE means perfect production by applying corrective action to the “root cause”
improvements:
(manufacturing only good parts, as fast as possible, with of the problem.
• Plan (establish plan and expected results)
• Do (implement plan) no downtime) 18) SMART Goals
• Check (verify expected results achieved) Goals that are:
17) Poke Yoke (Error Proofing)
• Act (review and assess; do it again) Design error detection and prevention into 1. Specific,
Applies a scientific approach to making production processes with the goal of achieving 2. Measurable,
improvements: zero defects. 3. Attainable,
• Plan (develop a hypothesis) It is difficult (and expensive) to find all defects 4. Relevant, and
• Do (run experiment) through inspection, and correcting defects 5. Time-Specific.
• Check (evaluate results) typically gets significantly more expensive at each
Helps to ensure that goals are effective.
• Act (refine your experiment; try again) stage of production.
Lean Management
19) Single-Minute Exchange of Dies (SMED) 20) Six Big Losses 21) Takt Time
Reduce setup (changeover) time to less than 10 Six categories of productivity loss that are almost The pace of production (e.g. manufacturing one piece
minutes. Techniques include: universally experienced in manufacturing: every 34 seconds) that aligns production with customer
• Convert setup steps to be external (performed 1. Breakdowns demand. Calculated as Planned Production Time /
• Simplify internal setup (e.g. replace bolts with 3. Small Stops Provides a simple, consistent and intuitive method of
knobs and levers) 4. Reduced Speed pacing production. Is easily extended to provide an
• Eliminate non-essential operations 5. Startup Rejects efficiency goal for the plant floor (Actual Pieces / Target
Enables manufacturing in smaller lots, reduces Provides a framework for attacking the most common 25) Total Productive Maintenance (TPM)
inventory, and improves customer responsiveness. causes of waste in manufacturing. A holistic approach to maintenance that focuses on
23) Value Stream Mapping 24) Visual Factory proactive and preventative maintenance to maximize the
22) Standardization work
A tool used to visually map the Visual indicators, displays and operational time of equipment. TPM blurs the distinction
Documented procedures for
flow of production. Shows the controls used throughout between maintenance and production by placing a strong
manufacturing that capture best practices
current and future state of manufacturing plants to emphasis on empowering operators to help maintain their
(including the time to complete each task).
processes in a way that improve communication of equipment.
Must be “living” documentation that is easy
highlights opportunities for information. Creates a shared responsibility for equipment that
to change.
improvement. Makes the state and condition encourages greater involvement by plant floor workers.
Eliminates waste by consistently applying
Exposes waste in the current of manufacturing processes In the right environment this can be very effective in
best practices. Forms a baseline for future
processes and provides a easily accessible and very clear improving productivity (increasing up time, reducing
improvement activities.
roadmap for improvement – to everyone. cycle times, and eliminating defects).
through the future state. .