1 Hyundai Elevator Profile
1 Hyundai Elevator Profile
kr
HYUNDAI
ELEVATOR
PROFILE
HYUNDAI ELEVATOR PROFILE - We reserve the right to change designs and specifications for the product development without prior notice. Printed in Korea.
Catalog Code : C-HGB-E1101 /2008. 2/ Revision11
The “Hyundai Spirit”, the creative and positive way of thinking is vitally alive and
spread every where in Hyundai’s lcheon Head Office & Factory. It’s the Hyundai
spirit that builds the brilliant future of Hyundai today.
HISTORY
1984 01 Agreement signed by Hyundai and Westinghouse(U.S.A.) to 1997 04 Certificated ISO 14001 environmental certification from DNV
establish a joint venture company
1998 03 Certificated ISO 9001 and ISO 14001 certification from DNV
05 Hyundai Elevator Co., Ltd. established. Technical License for the Auto Parking Systems and Material Handling Systems
Agreement signed by Hyundai and Westinghouse to
manufacture various kinds of elevators and escalators 1999 08 Certificated CE Mark for escalator from DNV
1988 01 Established Auto Parking System Division 10 Signed a contract for a technology alliance with Japan’s Nabco for
PSD (platform screen doors)
1989 09 Termination of joint venture with Westinghouse
2001 07 Certificated CE Mark for elevator from DNV
1990 04 Established Material Handling System Division
2002 03 Certificated EM Mark for MRL(Machine-Room-Less) elevator from
1991 12 Certificated ISO 9001 certification from DNV Korean Agency for technology & standards
1993 08 Established joint venture in Shanghai, China 03 Certificated CE Mark for all elevator safety components from DNV
09 Established joint venture in the Philippines 2003 09 Certificated Korea Productivity Award from Korea Productivity
Center
1995 04 Completed construction of Research & Development
Building at Icheon 2004 12 Certificated ISO9001 and ISO14001 Certification from DNV for
Platform Screen Doors
09 Grand prize of Customer Satisfaction & Management
Innovation by K.M.A.C awarded 2005 02 Selected one of the most admired companies from the federation
of Korean industries and the Seoul economic daily
11 Distribution Center in Chonan completed
12 Certificated CE mark for material handling system from TUV
CONTENTS
02 _ HISTORY 04 _ HIGH SPEED TRACTION ELEVATORS 06_MEDIUM SPEED TRACTION ELEVATORS 08_MACHINE-ROOM-LESS ELEVATORS 09_MARINE ELEVATORS
10 _ ESCALATORS 11 _ MOVING WALKWAYS 12_MATERIAL HANDLING SYSTEMS 14_ AUTO PARKING SYSTEMS 16_ PLATFORM SCREEN DOORS
17_ QUALITY ASSURANCE 18_ RESEARCH & DEVELOPMENT 19_ PREVENTIVE MAINTENANCE
02 03
HYUNDAI ELEVATOR PROFILE
Main Specifications
Control AC-Gearless or AC-Geared
System Microprocessor Control with Motor Drive
Speed 150 ~ 600 m/min Hanwha Condo, Busan, Korea
Capacity 13 ~ 28 persons/900~1800 kg
1Car : Selective Collective (1C2BC)
Operation
2 ~ 8 Cars : Group Operation
National Agricultural Cooporative Mokdong Hyperion, Seoul, Korea Hyundai Dept. Store, Seoul, Korea Korea Securities Finance Corp.
Federation, Seoul, Korea Seoul, Korea
04 05
HYUNDAI ELEVATOR PROFILE
Park Hyatt Seoul, Seoul, Korea Nurimaru APEC House, Busan, Korea
Main Specifications
Control Geared or Gearless
System VVVF (Inverter) Microprocessor Control
Speed 30~120 m/min
Capacity 6~24 persons/450~1600 kg
1Car : Selective Collective
Operation
2~4 Cars : Group Operation
06 07
HYUNDAI ELEVATOR PROFILE
An innovative new elevator which does not require a separate machine Another example of how Hyundai offers innovative solutions for vertical
room. Applicable to residential or mid-to high rise commercial buildings. transportation system needs in special environments.
Applicable to wide range of shipboard use-tanker, bulk carrier,
containership, Ro-Ro, ferry, navy vessel, FPSO, RIG, etc.
Widely recognized brand by major classification societies-DNV, ABS, LR,
GL, BV, NK & KR.
Leejo Building, Seoul, Korea Hyundai Home Town, Bucheon, Korea A Residence, Seoul, Korea Control panel The swing-type fireproof landing door Cab design with required safety features
08 09
HYUNDAI ELEVATOR PROFILE
Most reliable, fail-safe mode of transportation for shopping malls, Simple, elegant designs with high people-moving efficiency which saves
department stores, subways, mass transit stations, terminals, and so on. both energy and space in airport, shopping centers, subway links,
Minimal maintenance requirements are another benefit you can expect connections to car parks, and sports stadium.
from Hyundai escalators.
Kentucky International Convention Center, Louisville, Kentucky, USA Incheon International Airport, Incheon, Korea
10 11
HYUNDAI ELEVATOR PROFILE
High Speed Sorting System Laser Guided Vehicle(LGV) AMHS for TFT-LCD
Automated Guided Vehicle(AGV) Pneumatic Tube System Sky RAV (Overhead Transportation System) Loop Type RTV High Rised Automatic Warehouse
12 13
HYUNDAI ELEVATOR PROFILE
Cheonho Hyundai Department Store, Seoul, Korea-HIP (Hyundai Integrated Parking) System Geo Place, Busan, Korea Cheonho Hyundai Department Store, Seoul, Korea
14 15
HYUNDAI ELEVATOR PROFILE
PSD(Platform Screen Doors) is a safety system used in subway and LRT Excellence of Quality is the most critical factor in
(Light Rail Transit) to cut off platform from the railway. Sliding doors interact today’s global market place.
with car doors, open and close as a ATO (Automatic Train Operation) system With a firm belief that the best quality is the best
make a signal when an electric train stops at the designated place. PSD is service for the customers, all the Hyundai Elevator
becoming more popular in the field of subway and LRT as it offers the following employees are committed to providing superior
benefits to the customers. quality products and services that conform to
customer’s requirements.
To ensure perfect safety of passengers while getting on and off.
To improve amenity on platform.
Recognizing ‘Zero Defects’ as the Standard of
To maximize energy saving.
Performance, all the Hyundai Elevator employees
are continuously trained in the “Total Quality
Full-closed Type Management’ program and participating in various
quality management activities.
And a wide variety of test and inspections are also
carried out by inspection specialists utilizing the
most modern testing and inspection equipments,
ensuring the compliance of our products with
customer requirement.
Products passing the various specialized tests
and through inspections are packed, shipped and
delivered to our customers in seaworthy packing.
The excellence of the Hyundai Elevator Company
and its employees have been acknowledged by
the various international standard and quality
associations as show in the above certifications.
Yongdu Station of Seoul Subway Line 2 Dongmyo Station of Seoul Subway Line 1
Semi-closed Type
Gate Type
Hyundai recognizes the continuous research and development of the highly Hyundai has developed a centralized, computerized Remote Monitoring
sophisticated systems and innovative new products as the most critical System (RMS) nationwide that provides a comprehensive and immediate
factor and the key investment for continued competitiveness and service for the Hyundai maintenance customers. This system
leadership in this technology-sensitive industry. continuously keeps tabs on the operation of your elevator for 24 hours a
day.
Hyundai Elevator Research & Development Center plays the vital role in
leading the various development efforts of new system technologies.
R & D is also trying to apply to our products the whole new concepts of
related technologies-linear motor elevator, group control system utilizing
artificial intelligence based on fuzzy theory, interface with building
management system.
A new generation of elevator systems is being developed on the basis
of these technological frontier.
The Elevator Test Tower, equipped with variety of specialized test
equipments, provides a simulated installation/operation field for various
strategical tests such as the Simulation Tests, Code & Regulation Tests,
New Product Development Tests & Troubleshooting Tests as well.
Training of field service technicians on existing and newly developed
products prior to market application is another key advantage it provides.
ELEVATOR INSTALLATION
18 19