ACCOR Engineering Solutions: Quotation
ACCOR Engineering Solutions: Quotation
ACCOR Engineering Solutions: Quotation
DATE: 11/22/2019
QUOTATION
To,
MEENAKSHI POWER CONTACT DETAILS
Contact Person MR.MURTHY
Hand Phone 9845112455
Fixed Line
Extension
Email ID [email protected]
Fax
Dear Sir
We are pleased to quote our lowest rates for Supply and installation of equipmenyt f0or Autumn
Extra @ at actuals Prevailing VAT is 14.5%and Stax 15%.any extra burden due to changes in
2 TAXES :
taxation structure shall be to youe account
For Lighting fixtures we have not been able to get proper quotes due to lack of information
7 NOTE : and we could not gettherate for brandssuggested by you.In case of Track mounted, we have
treferred to jainsons catalouge on line. For others we have taken quotesfrom Bajaj etc
We trust this offer is inline with your requirement and hope to get your valuable order at the earliest.
Your's Sincerely
For ACCOR Engineering Solutions
Shashidhara |9900477861
Bank Details
Name ACCOR Engineering Solutions Current Acct. No. 7511633390 Bank Kotak Mahindra Bank
DETAILS
akshipower.com
Autumn
AMOUNT
₹ 1,083,829
₹ 201,899
₹ 1,285,728
560485003
DETAILED SPECIFICATION AND ABSTRACT BILL OF QUANTITIES OF INTERIOR ELECTRICAL WORKS FOR
M/s. TREASURES, HSR LAYOUT - BANGALORE
Note: - -
1. The Panel shall be fully as per the requirement of - -
Electrical Inspectorate/ EB authorities.
2. Auxilliary contactor to be provided along with auto- - -
manual switch where ever required.
3. All Breakers both Incoming & Outgoing shall have - -
LED 'ON / OFF / TRIP' indications without fail.
4. CTs shall be with dual ratio and cast resin type only. - -
Insulation: XLPE - -
Inner sheath: PVC only for Multicore - -
Outer sheath: Extruded Type ST2 PVC - -
Voltage grade:1100Volts - -
- -
- -
- -
- -
3C x 4 sq.mm cable with PVC-FRLS insulated outer
sheath & multi strand copper conductors, unarmoured, Rm
4.07 50 142.50 36.40
cable to be laid in powder coated raceways, (cost of
Raceways to exclude).
- -
- -
TOTAL PART -4 - -
- -
5.0 POWER RECEPTACLES. - -
Supply, Installation, Testing and Commissioning of the
following Modular/Industrial Switch, sockets with - -
modular front plate, and accessories as per the site
conditions.
- -
2 x 13A INTEL socket controlled by 16A switch,
5.11 including box No. 10 701.10 158.70
(For UPS power)
- -
3 x 13A INTEL socket controlled by 16A switch,
5.12 including box No. 8 1,071.60 175.70
(For UPS power)
- -
1No. 16A 3 pin 1phase Industrial type socket with plug
5.13 No. R.O 1,391.90 220.40
top controlled by 16A DP MCB
- -
Data Backbox - -
- -
5.14 2 Module GI back box for data outlets in partions No. 4 330.60 141.80
- -
TOTAL PART -5 - -
- -
6.0 POINT WIRING - -
- -
LIGHT POINTS - -
A Switch control - -
- -
6.01 Single light point controlled by a 6A SP switch No. 85 470.80 115.40
- -
6.02 Two light points controlled by a 6A SP switch No. 8 620.20 134.70
- -
6.03 Three light points controlled by a 6A SP switch No. 15 768.40 159.70
- -
6.04 Four light points controlled by a 16A SP switch No. 4 943.90 190.80
- -
6.05 Five light points controlled by a 16A SP switch No. 6 1,092.10 215.90
- -
6.06 Six light points controlled by a 16A SP switch No. R.O 1,241.50 292.20
- -
6.07 Seven light points controlled by a 16A SP switch No. R.O 1,391.90 340.10
- -
6.08 Eight light points controlled by a 16A SP switch No. R.O 1,541.30 410.70
- -
B MCB control - -
- -
6.09 Three light points controlled by MCB (Excluding MCB) No. R.O 668.00 169.60
- -
6.10 Four light points controlled by MCB (Excluding MCB) No. R.O 816.20 211.70
- -
6.11 Five light points controlled by MCB (Excluding MCB) No. R.O 966.70 242.50
- -
6.12 Six light points controlled by MCB (Excluding MCB) No. R.O - -
- -
TOTAL PART - 6 - -
- -
7.0 LIGHT FIXTURE - -
- -
- -
150W Flood Lights.
7.1.9 Nos 2 11,970.00 635.60
- -
TOTAL PART - 7 - -
- -
8.0 CABLE TRAYS - -
- -
8.1 Ladder Type - -
- -
8.1.1 300 x 50mm Size M R.O 3,616.70 129.40
- -
8.1.2 200 x 50mm Size M R.O 256.50 117.90
- -
8.1.3 150 x 50mm Size M R.O 228.00 106.00
- -
8.1.4 100 x 50mm Size M 100 222.30 100.20
- -
8.2 Perforated Type - -
- -
8.2.1 450 x 50mm Size M R.O 541.50 167.70
- -
8.2.2 300 x 50mm Size M 10 427.50 148.90
- -
8.2.3 150 x 50mm Size M R.O 262.20 118.00
- -
TOTAL PART - 8 - -
- -
9.0 RACEWAYS - -
- -
Supply & Installation of following size MS / GI raceway /
wire way with cover, made out of 16 SWG for body
and 14 SWG for cover sheet steel duly powder coated
MS / GI.
Junction boxes to be provided with enough supports
inside the box.
Raceway installed above false ceiling/floor shall
include necessary mounting supports, junction boxes
and accessories to fix it firmly to the ground/ ceiling.
The raceways shall be fixed to the floor with GI/MS
(25mm x 3mm) strips so that there is no movement of
the channels when civil work (pouring of cement
concrete) is being done. - -
Rate includes necessary floor cutting and chipping with
machine of minimum 50mm depth, removal of debris
out of site and neatly finished with M15 grade concrete
up to the finished floor level. Race ways to be covered
with Chicken mesh before concreting. Curing
compound to be applied after initial setting of the
concrete.
All edges, cut faces shall be free of burrs & shall be
smooth.
The channels shall be earthed at the boxes and at the
joints with 14 SWG bare copper wire with screws so
that earth is continuous.
Jointing of the race ways to be done with welding.
- -
9.1 Junction boxes - -
- -
9.1.1 Junction Boxes - Power - -
- -
9.1.1c 110 x 110 x 50mm Size No. 2 218.10 105.60
- -
9.1.2 Junction Boxes - Network - -
- -
9.1.2c 110 x 110 x 50mm Size No. 4 218.10 105.60
- -
9.2 Floor Raceways - -
- -
9.2.1 Floor Raceways - Power - -
- -
9.2.1a 150 x 40mm Size M R.O 410.40 5.50
- -
9.2.2 Floor Raceways - Network - -
9.2.2e 100 x 40mm Size M R.O 314.20 4.20
- -
9.2.2f 80 x 40mm Size M R.O 250.10 3.30
- -
9.3 Ceiling Raceways - -
- -
9.3.1 200 x 40mm Size M R.O - -
- -
9.3.2 150 x 40mm Size M R.O - -
- -
9.3.3 100 x 40mm Size M 5 - -
- -
Supply & Installation of following size Powder coated
9.4 raceway / wire way with cover, made out of 16 SWG - -
GI/MS for body and 14 SWG GI/MS for cover. - The
shade shall be as per site approval
- -
9.4.1 150 x 40mm Size M R.O 250.10 140.10
- -
9.4.2 300 x 100mm Size M R.O 487.40 6.50
- -
9.4.3 100 x 150mm Size M R.O 352.70 4.70
- -
9.5 Raceways for AV - -
- -
- -
9.6.1 32mm dia M 500 43.30 16.60
- -
9.6.2 25mm dia M 30 33.10 14.10
- -
9.6.3 19mm dia M R.O 25.10 11.70
- -
9.6.4 Flexble Conduit 25mm M R.O 16.00 7.10
- -
9.6.5 Flexble Conduit 19mm M 100 9.10 5.80
- -
TOTAL PART -9 - -
- -
10.0 EARTHING - -
- -
- -
- -
10.2 EARTH STRIPS - -
- -
10.2.1 8 SWG GI Wire M 70 8.20 4.70
- -
10.2.2 8 SWG Cu Wire M R.O 67.30 5.60
- -
10.2.3 25 x 3mm GI Earth flat M 300 51.30 14.50
- -
10.2.4 50 x 6mm GI Earth flat M R.O 205.20 35.00
- -
PVC Insulated Copper Conductor Unarmoured Cables
10.3 - -
(YY Type)
1.1kV grade, copper conductor, PVC insulated,
unarmoured, power cables. The cables shall be laid on
tray / hume pipe /in ready made trenches, with nylon - -
cable ties / MS Clamps @ 600mm interval etc., as
required. Rate quoted shall exclude cost of tray / h
- -
10.3.1 1 Core x 6 Sq. mm M 120 39.90 13.10
- -
10.3.2 1 Core x 4Sq. mm M 100 27.40 8.40
- -
Busbar of 0.5 Mtr length made out of 25 x 6 mm GI
10.3.3 strip with drill holes of M8 at 25mm interval mounted No. 2 - -
on insulators.
- -
Busbar of 0.5 Mtr length made out of 25 x 6 mm Cu.
10.3.4 strip with drill holes of M8 at 25mm interval mounted No. R.O 39.90 114.60
on insulators.
- -
TOTAL PART - 10 - -
- -
11.0 MISCELLANEOUS ITEMS - -
- -
11.01 Rubber mat 1100V grade ISI approved - 2 m x 1m No. 1 1,824.00 255.40
- -
Shock treatment chart as approved by the Electrical
11.02 Inspectorate mounted on teak wood frame and No. R.O 1,368.00 248.50
suitable for wall mounting.
- -
11.03 First aid kit No. 1 2,280.00 262.20
- -
11.04 Danger boards No. 1 456.00 177.80
- -
11.05 MS Fabricated Items Kg. 5 79.80 18.40
- -
Supply & fixing of rubber gloves of Approved Make &
11.06 No. 1 1,083.00 16.30
as per supply voltage
- -
11.07 Laminated Schematic with glass frame No 1 7,410.00 624.20
- -
- -
150mm wide x 100mm depth 18G DB cabinet M S
11.09 Rm 15 376.20 26.20
Powder coated including supply & installation.
- -
11.10 Professional Charges: (If applicable) - -
- -
11.11 As built drawings: - -
- -
- -
TOTAL PART - 11 #REF! #REF!
Grand Total
CTRICAL WORKS FOR
E
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
14,938.00 1,136.00
- -
- -
- -
- -
- -
- -
14,938.00 1,136.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
15,240.00 4,770.00
1,642.00 1,119.00
- -
- -
- -
- -
2,052.00 716.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
2,820.00 1,465.00
1,094.00 1,110.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
13,927.00 2,318.00
- -
- -
- -
- -
34,735.00 5,822.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
7,970.00 1,829.00
- -
56,632.00 9,969.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
47,900.00 9,850.00
- -
3,000.00 624.00
- -
- -
- -
69,825.00 9,030.00
- -
95,760.00 23,360.00
- -
14,370.00 2,955.00
- -
7,125.00 1,820.00
- -
912.00 150.00
- -
238,892.00 47,789.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1,288.00 270.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
18,695.00 4,840.00
- -
- -
- -
- -
- -
812.00 240.00
- -
2,679.00 839.00
- -
7,011.00 1,587.00
- -
8,573.00 1,406.00
- -
- -
- -
- -
- -
1,322.00 567.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
40,018.00 9,809.00
- -
4,962.00 1,078.00
- -
11,526.00 2,396.00
- -
3,776.00 763.00
- -
6,553.00 1,295.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
66,835.00 15,341.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
67,431.00 8,800.00
- -
14,364.00 3,294.00
- -
415,530.00 43,173.00
- -
8,151.00 1,126.00
- -
15,561.00 2,150.00
- -
5,928.00 1,001.00
- -
- -
- -
5,130.00 761.00
- -
23,940.00 1,271.00
- -
556,035.00 61,576.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
22,230.00 10,020.00
- -
- -
- -
- -
- -
4,275.00 1,489.00
- -
- -
- -
26,505.00 11,509.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
436.00 211.00
- -
- -
- -
872.00 422.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
21,650.00 8,300.00
- -
993.00 423.00
- -
- -
- -
- -
- -
910.00 580.00
- -
24,861.00 9,936.00
- -
- -
- -
- -
- -
10,944.00 4,268.00
- -
- -
- -
- -
574.00 329.00
- -
- -
- -
15,390.00 4,350.00
- -
- -
- -
- -
- -
- -
4,788.00 1,572.00
- -
2,740.00 840.00
- -
- -
- -
- -
- -
34,436.00 11,359.00
- -
- -
- -
1,824.00 255.00
- -
- -
- -
2,280.00 262.00
- -
456.00 178.00
- -
399.00 92.00
- -
1,083.00 16.00
- -
7,410.00 624.00
- -
- -
- -
5,643.00 393.00
- -
- -
- -
- -
- -
- 17,100.00
- -
45,600.00 14,364.00
- -
64,695.00 33,284.00
1,083,829.00 201,899.00
1,285,728.00