SR - No Description Qty

This document provides a bill of quantities for the proposed erection of a single storey data center and ancillary facilities in Jakarta, Indonesia. It includes schedules of works for the fire alarm system in the data hall area and office area, listing the components, quantities, and costs. The contractor is responsible for creating their own bill of quantities and pricing according to the technical specifications and drawings provided.

Uploaded by

Boyzannaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views12 pages

SR - No Description Qty

This document provides a bill of quantities for the proposed erection of a single storey data center and ancillary facilities in Jakarta, Indonesia. It includes schedules of works for the fire alarm system in the data hall area and office area, listing the components, quantities, and costs. The contractor is responsible for creating their own bill of quantities and pricing according to the technical specifications and drawings provided.

Uploaded by

Boyzannaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Proposed Erection of a Single Storey Single User Data Centre with Ancillary Facilities in Jakarta, I

Schedule of Works- Fire Alarm- Data Hall Area


Sr.No Description Qty

NOTE The Bill of Quantities (“BOQ”) is provided as a sample and for


informational purposes only and should not be relied upon. You
are responsible for creating your own bill of quantities for the
Project, and any use or reliance on the BOQ by you is at your sole
risk and will not relieve you of any of your obligations under
contract or at law. Amazon and its affiliates disclaim all liability for
errors, omissions, and inaccuracies in the BOQ and will not be liable
for any loss or damage arising from any use or reliance on the
BOQ. By accepting this sample BOQ, you agree that you will not
be entitled to any increase in cost, extension of time, or other claim
arising from your reliance or use of the BOQ.

Note: The Contractor shall refer to the technical specifications,


drawings, scope matrix and shall quote accordingly.
The installation shall be in accordance to the installation details
provided in the drawings and technical specifications.

The price shall include all the requirements as per codes,


standards, testing & comissioning
Contractor shall allow for co-ordination with third party vendor/
employers vendor/ representative for any execution / approvals.

1 FIRE ALARM SYSTEM

Supply, install, test and commission fire detection and alarm


system; all in accordance with the drawings & specification

1.1 Detector
- Alarm Bell 5
- Expose Smoke Detector 44
- Fire Alarm Strobe Light 5
- Manual Call Point 5
- Warden Intercom Point-PB 5

1.2 Wiring and installation cable for :


- Alarm Bell 5
- Expose Smoke Detector 44
- Fire Alarm Strobe Light 5
- Manual Call Point 5
- Warden Intercom Point-PB 5

To Summary

2 ANY OTHER WORKS

060 / Fire Alarm (DH) /1


Any related work not mentioned above but required for the
completion of the Work (if not listed below shall deemed to be
inclusive).

Tenderer to add as necessary

a)

To Summary

TOTAL AMOUNT CARRIED FORWARD TO CONTRACTOR RFP

060 / Fire Alarm (DH) /2


illary Facilities in Jakarta, Indonesia

Rate Total
Unit
(IDR) (IDR)

No -
No -
No -
No -
No -

pts -
pts -
pts -
pts -
pts -

Rp -

060 / Fire Alarm (DH) /3


-

Rp -

Rp -

060 / Fire Alarm (DH) /4


Proposed Erection of a Single Storey Single User Data Centre with Ancillary Facilities in Jakarta, I

Schedule of Works-Fire Alarm -Office Area

Sr.No Description Qty


1 FIRE ALARM SYSTEM

NOTE The Bill of Quantities (“BOQ”) is provided as a sample and for


informational purposes only and should not be relied upon. You
are responsible for creating your own bill of quantities for the
Project, and any use or reliance on the BOQ by you is at your sole
risk and will not relieve you of any of your obligations under
contract or at law. Amazon and its affiliates disclaim all liability for
errors, omissions, and inaccuracies in the BOQ and will not be liable
for any loss or damage arising from any use or reliance on the
BOQ. By accepting this sample BOQ, you agree that you will not
be entitled to any increase in cost, extension of time, or other claim
arising from your reliance or use of the BOQ.

Note: The Contractor shall refer to the technical specifications,


drawings, scope matrix and shall quote accordingly.
The installation shall be in accordance to the installation details
provided in the drawings and technical specifications.

The price shall include all the requirements as per codes,


standards, testing & comissioning
Contractor shall allow for co-ordination with third party vendor/
employers vendor/ representative for any execution / approvals.

Supply, install, test and commission fire detection and alarm


system; all in accordance with the drawings & specification

Supply and install devices complete as described

1.1 Main Equipment

Pontoon Bridge FCC Room, the consist of : 1


- Fireman Intercom Panel : 1 No
- Decam : 1 No
- Main Alarm Panel : 1 No
- Battery : 1 No
- Master Mimic Panel (FFL) : 1 No

Red Zone Work Room, the consist of : 1


- Floor Mimic Panel (FFL) : 1 No
- SAP 1 : 1 No
- Battery : 1 No

1.2 Detector
- Alarm Bell 3
- Expose Smoke Detector 47
- Fire Alarm Strobe Light 3
- Heat Detector 2
- Manual Call Point 3
- Warden Intercom Point-PB 1

060 / Fire Alarm (OF) /5


1.3 Detector (For Area PLN & Substation)
- Alarm Bell 3
- Expose Smoke Detector 14
- Fire Alarm Strobe Light 3
- Manual Call Point 3

1.4 Wiring and installation cable for :

A. Pontoon Bridge FCC Room: interfacing signal cable from main


alarm panel to followings
- Connected to Repeater Main Alarm Panel At Guard Room / Visitor
1
Room
- Connected to Signal ASDS 1
- Connected to Signal PA System 1
- Connected to Signal Pressurizztion Fan 1
- Connected to Main Equipment 1
- Connected to Sprinkler Pump Room 1
- Connected to Domestic Water Pump Room 1
- Connected to MDF 1
- Connected to MEDS-1A, MEDS-1B, MEDS-1C, Carcher Room 1

B. Detector
- Alarm Bell 3
- Expose Smoke Detector 47
- Fire Alarm Strobe Light 3
- Heat Detector 2
- Manual Call Point 3
- Warden Intercom Point-PB 1

Detector (For Area PLN & Substation)


- Alarm Bell 3
- Expose Smoke Detector 14
- Fire Alarm Strobe Light 3
- Manual Call Point 3

To Summary

2 ANY OTHER WORKS

Any related work not mentioned above but required for the
completion of the Work (if not listed below shall deemed to be
inclusive).

Tenderer to add as necessary

a)

To Summary

TOTAL AMOUNT CARRIED FORWARD TO CONTRACTOR RFP

060 / Fire Alarm (OF) /6


lary Facilities in Jakarta, Indonesia

Rate Total
Unit
(IDR) (IDR)

Set -

Set -

No -
No -
No -
No -
No -
No -

060 / Fire Alarm (OF) /7


No -
No -
No -
No -

Ls -
Ls -
Ls -
Ls -
Ls -
Ls -
Ls -
Ls -
Ls -

pts -
pts -
pts -
pts -
pts -
pts -

pts -
pts -
pts -
pts -

Rp -

Rp -

Rp -

060 / Fire Alarm (OF) /8


Proposed Erection of a Single Storey Single User Data Centre with Ancillary Facilities in Jakarta, I

Schedule of Works-Fire Alarm -GUARD HOUSE & VISITOR

Sr.No Description Qty


1 FIRE ALARM SYSTEM

NOTE The Bill of Quantities (“BOQ”) is provided as a sample and for


informational purposes only and should not be relied upon. You
are responsible for creating your own bill of quantities for the
Project, and any use or reliance on the BOQ by you is at your sole
risk and will not relieve you of any of your obligations under
contract or at law. Amazon and its affiliates disclaim all liability for
errors, omissions, and inaccuracies in the BOQ and will not be liable
for any loss or damage arising from any use or reliance on the
BOQ. By accepting this sample BOQ, you agree that you will not
be entitled to any increase in cost, extension of time, or other claim
arising from your reliance or use of the BOQ.

Note: The Contractor shall refer to the technical specifications,


drawings, scope matrix and shall quote accordingly.
The installation shall be in accordance to the installation details
provided in the drawings and technical specifications.

The price shall include all the requirements as per codes,


standards, testing & comissioning
Contractor shall allow for co-ordination with third party vendor/
employers vendor/ representative for any execution / approvals.

Supply, install, test and commission fire detection and alarm


system; all in accordance with the drawings & specification

Supply and install devices complete as described

1.1 Main Equipment consist of (Refer Dwg No.10-ZZ-DR-M-1720) : 1


- Decam : 1 No
- Main Alarm Panel : 1 No
- Battery : 1 No
- Master Mimic Panel (FFL) : 1 No
- Floor Mimic Panel (FFL) : 1 No
- SAP 1 : 1 No
- Battery : 1 No

1.2 Detector
- Alarm Bell 3
- Expose Smoke Detector 28
- Fire Alarm Strobe Light 3
- Manual Call Point 3

1.3 Wiring and installation cable for :

A. Detector
- Alarm Bell 3

060 / Fire Alarm (GH) /9


- Expose Smoke Detector 28
- Fire Alarm Strobe Light 3
- Manual Call Point 3

To Summary

2 ANY OTHER WORKS

Any related work not mentioned above but required for the
completion of the Work (if not listed below shall deemed to be
inclusive).

Tenderer to add as necessary

a)

To Summary

TOTAL AMOUNT CARRIED FORWARD TO CONTRACTOR RFP

060 / Fire Alarm (GH) /10


lary Facilities in Jakarta, Indonesia

Rate Total
Unit
(IDR) (IDR)

Set -

No -
No -
No -
No -

pts -

060 / Fire Alarm (GH) /11


pts -
pts -
pts -

Rp -

Rp -

Rp -

060 / Fire Alarm (GH) /12