0% found this document useful (0 votes)
34 views1 page

Plan at El (+) 16.200/el (+) 15.500M Level: Up Up

The document describes a ship layout with multiple rooms and equipment at different elevations, including a pipe hatch, door under hold, maintenance room, control equipment room, control room, engineering room, bracing bay, and staircase. Key equipment mentioned includes an air conditioning unit, bop, and lvs-70. Dimensions provided include elevations, widths, and lengths of various areas.

Uploaded by

subramanian Siva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

Plan at El (+) 16.200/el (+) 15.500M Level: Up Up

The document describes a ship layout with multiple rooms and equipment at different elevations, including a pipe hatch, door under hold, maintenance room, control equipment room, control room, engineering room, bracing bay, and staircase. Key equipment mentioned includes an air conditioning unit, bop, and lvs-70. Dimensions provided include elevations, widths, and lengths of various areas.

Uploaded by

subramanian Siva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BRACING BAY BRACING BAY

BRACING BAY

B
PIPE HATCH PIPE HATCH PIPE HATCH

600

600
800

1200
1295

SHOE RACK
SD1 800 1000
1 DOOR UNDER HOLD 1385 5646
1200
1000 MAINTENANCE

800
ROOM
1200

1000
CONTROL EQUIPMENT ROOM(A/C) CONTROL ROOM
(A/C) SHIFT INCH.
EL (+) 16.200 AREA
(FFL)

3605

2600
1000

3540
1000 800 1000

SD
2
600

2000
800 1385

1535

T BOP

1600
ENGINEERING B-1 B-2
1365

1365
ROOM FOR #2
BRACING BAY (A/C) LVS-70"

BRACING BAY
C 1200
CCTV

1000
32"

STAIRCASE
UP LIFT

7500 7500 7500 9000 6000 7500

8 7 6 5 4 3 2
PLAN AT EL(+)16.200/EL(+)15.500M LEVEL

You might also like