Patna Boq

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Annexure 1: Bill of Quantity


Mentioned below is the indicative Bill of Material for each proposed project component,
however the below quoted numbers are indicative only and MSI is required to access the
exact requirement, location wise, for all the proposed solution components and shall
accordingly size the hardware and software infrastructure requirement to meet the project
objectives and SLA.
Wherever under the indicative quantities “As per requirement” is mentioned, the Bidder has
to mention the proposed quantity along with the unit rates. Bidder has to justify the proposed
quantities as per the solution requirements during the technical bid evaluation.
Initially part of the BoQ would be housed in the temporary building as per the minimum and
essential requirements for the functioning of the ICCC. Later, full and final BoQ would be
housed in the permanent new building including the transfer of the equipment from the
temporary building to the permanent building.

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Pancity OFC
1 Network 50 mm HDPE Pipe Kms 220
Backbone
Pancity OFC
Manholes at every 500m(size-1.6m x
2 Network Nos
1.25m x 1m)
Backbone 440
Pancity OFC
3 Network Handholes at every 100m Nos 2200
Backbone
Pancity OFC Backbone Fiber Cable : Loose Tube, Gel-
4 Network Free Cable 144 F, Single-mode Kms 10
Backbone (Armoured)

Pancity OFC Backbone Fiber Cable : Loose Tube, Gel-


5 Network Free Cable 144 F, SM(Redundant) Kms 10
Backbone (Armoured)

Pancity OFC Distribution Fiber Cable : Loose Tube,


6 Network Gel-Free Cable 96 F, SMF for Secondary Kms 40
Backbone PoPs(Armoured)
Pancity OFC Distribution Fiber Cable : Loose Tube,
7 Network Gel-Free Cable 96 F, SMF For Tertiary Kms 120
Backbone PoPs(Armoured)
Pancity OFC
Access Fiber Cable : Loose Tube, Gel-
8 Network Kms 40
Free Cable 48F, MMF(Armoured)
Backbone

Patna Smart City Limited Page 9 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Rate contract Price for providing the
OFC Connection in the premises of
Pancity OFC As per
Government Building as and when
9 Network Unit requireme
required. Connectivity has to be
Backbone nt
provided on Fibre as well as on RJ45
Ethernet.
ICCC Video Wall,
70 inches Panel for DLP based Video
10 Displays, Unit 20
wall
Software, Etc
Video Wall Controller (With Required
ICCC Video Wall, Adaptors, Converter, 4-port Display
11 Displays, Graphic card, 4-channel HD capture No. 2
Software, Etc card with DVI splitter cables, Cabling &
Other Fixtures, etc)
ICCC Video Wall,
12 Displays, Video Wall Management Software No. 1
Software, Etc
ICCC Video Wall,
Keyboard Joystick to control PTZ
13 Displays, No. 30
Cameras
Software, Etc
ICCC Video Wall,
14 Displays, Network Access Switch No. 6
Software, Etc
ICCC Video Wall,
15 Displays, LED TV 55" No. 16
Software, Etc
ICCC Video Wall,
16 Displays, Public Address System Set 6
Software, Etc
ICCC Video Wall,
17 Displays, Audio Mixer and speaker system Set 4
Software, Etc
ICCC Video Wall,
Workstation Desktop with three
18 Displays, No. 40
monitors
Software, Etc
ICCC Video Wall,
19 Displays, FRS-Live Scan – Master Server No. 1
Software, Etc (Database) – 10,000 Live Templates
ICCC Video Wall,
20 Displays, FRS – Live Scan – Stream Processing No. 10
Software, Etc Servers (Capable of 50 Cameras)
ICCC Video Wall, FRS – Picture Intelligence Unit (PIU) –
21 Displays, Offline Database Matching – 5,00,000 No. 2
Software, Etc Database
ICCC Video Wall, As per
Online UPS (sizing as per proposed
22 Displays, No. requireme
solution)
Software, Etc nt (in n +

Patna Smart City Limited Page 10 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
n
redundan
cy)
ICCC Video Wall,
Video Conferencing software and
23 Displays, Set 1
solution
Software, Etc
ICCC Video Wall, Network & WiFi enabled MFP Colour Laser
24 Displays, Printer/Scanner/Copier with ADF (A3 size No. 4
Software, Etc Heavy Duty for min 50 PPM speed)
ICCC Video Wall, As per
25 Displays, Biometric access control system No. bidder’s
Software, Etc solution
ICCC Video Wall,
26 Displays, IR IS Recognition Camera No. 2
Software, Etc
ICCC Video Wall,
IRIS Recognition based Administration
27 Displays, No. 1
Software
Software, Etc
ICCC Video Wall,
28 Displays, Dome cameras for internal surveillance No. 30
Software, Etc
ICCC Video Wall,
Addressable Fire Detection and Alarm
29 Displays, Set 1
System
Software, Etc
ICCC Video Wall,
30 Displays, Rodent Repellent system Set 1
Software, Etc
ICCC Video Wall,
31 Displays, Gas Based fire Suppression System Set 1
Software, Etc
ICCC Video Wall,
32 Displays, Portable Fire Extinguishers(5 Kgs) No. 30
Software, Etc
ICCC Video Wall, As per
Split Air Conditioner 2 Ton (5 star
33 Displays, No. requireme
energy efficiency rating)
Software, Etc nt
ICCC Video Wall,
Lump
34 Displays, Site Preparation as per the RFP 1
sum
Software, Etc
ICCC Video Wall, As per
Workstation Furniture and Fixtures for
35 Displays, No. requireme
ICCC
Software, Etc nt
ICCC Video Wall, As per
36 Displays, Revolving Chairs for office staff No. requireme
Software, Etc nt
ICCC Video Wall, As per
37 Office Desk Furniture and Fixtures No.
Displays, requireme

Patna Smart City Limited Page 11 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Software, Etc nt

ICCC Video Wall, As per


38 Displays, Ergonomic Chairs for ICCC No. requireme
Software, Etc nt
ICCC Video Wall,
Conference Table (for 10 personnel) &
39 Displays, Set 4
Chairs Set
Software, Etc

40 ICCC Help Desk Hand Set No. 5

41 ICCC Help Desk Head Set No. 5

42 ICCC Help Desk Voice Logger Set 1

43 ICCC Help Desk Soft telephone No. 10

44 ICCC Help Desk Desktops No. 20

45 ICCC Help Desk Officer Furniture and Revolving Chair Lot 20

Data Centre
46 Core Router No. 2
Hardware
Data Centre
47 Core Switch No. 2
Hardware
Data Centre
48 Internet Router No. 2
Hardware
Data Centre
49 Web Application Firewall No. 2
Hardware
Data Centre
50 Firewall( NGFW) No. 2
Hardware
As per
Data Centre
51 Access Switches Type 1 Copper Switch No. requireme
Hardware
nt
As per
Data Centre
52 Access Switches Type 2 Fiber Switch No. requireme
Hardware
nt
Data Centre
53 DMZ Switch, 24 port No. 2
Hardware
As per
Data Centre
54 Edge Switches No. requireme
Hardware
nt
Data Centre 42U Network Rack with Console and
55 No. 30
Hardware necessary accessories

Patna Smart City Limited Page 12 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Data Centre
56 KVM Switch No. 2
Hardware
Data Centre
57 Blade Chassis No. 4
Hardware
As per
Data Centre Blade Server Fabric Interconnect
58 No. requireme
Hardware Switches
nt
Data Centre Integrated DNS, DHCP and IP Telephony
59 No. 1
Hardware Platform
Data Centre
60 Video Management Server No. 2
Hardware
Data Centre
61 Video Analytics Server No. 2
Hardware
Data Centre
62 ATCS Server No. 2
Hardware
Data Centre
63 ANPR Server No. 2
Hardware
Data Centre
64 RLVD Server No. 2
Hardware
Data Centre
65 TARS server No. 2
Hardware
Data Centre
66 Variable Message Signboard server No. 2
Hardware
Data Centre Smart Parking Information
67 No. 2
Hardware Management Solution Server
Data Centre
68 Environment Management server No. 2
Hardware
Data Centre Intrusion Prevention System(NIPS &
69 No. 2
Hardware HIPS)
Data Centre
70 Automatic Call Distributor Server No. 2
Hardware
Data Centre
71 Digital Voice Logger Server No. 2
Hardware
Data Centre
72 GIS server No. 4
Hardware
Data Centre
73 Database Server No. 8
Hardware
Data Centre
74 Web Server No. 4
Hardware
Data Centre
75 Server Load Balancer No. 2
Hardware
Data Centre
76 SAN Switch No. 2
Hardware
Data Centre
77 Storage (Primary) - 4000 TB TB 1
Hardware

Patna Smart City Limited Page 13 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Data Centre
78 Tape Library 200 Slots No. 1
Hardware
Data Centre 300 KVA UPS (sizing as per proposed
79 No. 2
Hardware solution)in N+N redundancy
As per
requireme
Data Centre Precision Air Conditioning System for
80 No. nt (in n+1
Hardware the Server Farm Area
redundan
cy
As per
requireme
Data Centre Split Air Conditioner for the Auxiliary
81 No. nt (in n+1
Hardware Area (2 Ton)
redundan
cy
Data Centre Lump
82 Site Preparation Cost 1
Hardware Sum
Data Centre
83 Water Leak Detection System No. 3
Hardware
Data Centre
84 Rodent Repellent system No. 3
Hardware
Data Centre
85 Fire Suppression System No. 3
Hardware
Data Centre
86 Fire Alarm System No. 3
Hardware
As per
Data Centre
87 Copper Cabling Mtr requireme
Hardware
nt
As per
Data Centre
88 Fibre Runner Nos requireme
Hardware
nt
As per
Data Centre
89 Wire basket for Copper Nos requireme
Hardware
nt
Software
90 Server OS License No. 1
Solutions
Software Digitization of PMC records and
91 No. 50,000
Solutions Maps(A0 size)
Software
92 Desktop GIS software No. 2
Solutions
Software 30
93 Licenses for Facial Recognition No.
Solutions channels
Software 350
94 Licenses for Video Analytics No.
Solutions channels
95 Software Virtualization Software License No. 1

Patna Smart City Limited Page 14 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Solutions
Software Anti-virus & Anti-Spam Enterprise
96 Nos 1
Solutions software
Software Any/All Off the Shelf Software License
97 Lot 1
Solutions required for complete solution
Software
98 Enterprise Management System Nos 1
Solutions
Software
99 ICCC core application(HA) Nos 1
Solutions
Software SMS Gateway with annual 200,000
100 Nos 1
Solutions SMSs
Software
101 Video Management Software Nos 1
Solutions
Software
102 Video Analytics Software Nos 1
Solutions
Software
103 ITMS - ACTS Software Nos 1
Solutions
Software
104 ITMS - ANPR Software Nos 1
Solutions
Software
105 ITMS - RLVD Software Nos 1
Solutions
Software
106 ITMS - SVD software Nos 1
Solutions
Software
107 ITMS – TARS Nos 1
Solutions
Software
108 ITMS - PA Software Nos 1
Solutions
Software
109 ITMS - ECB management software Nos 1
Solutions
Software
110 ITMS - Variable Message Software Nos 1
Solutions
Software
111 Environment Management System Nos 1
Solutions
Software Smart Parking Management
112 Nos 1
Solutions Information System
Software
113 City Portal Nos 1
Solutions
Software
114 Mobile Application Nos 1
Solutions
Software
115 Enterprise GIS Unit 1
Solutions
Software
116 Automated Call Distribution Software Nos 1
Solutions
Software Computer Telephony Integration
117 Nos 1
Solutions Software

Patna Smart City Limited Page 15 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Software
118 IVR Software Nos 1
Solutions
Software
119 e-Governance Application software Nos 1
Solutions
Software
120 e-challan software Nos 1
Solutions
Software
121 ERP solution Nos 1
Solutions
As per
Software
122 Edge Analytic Devices Nos requireme
Solutions
nt
As per
Data Centre
123 Aggregate bandwidth at DC Mbps requireme
Hardware
nt
As per
Data Centre
124 MPLS line between DC & Cloud DR Mbps requireme
Hardware
nt
As per
Data Centre Leased circuit/bandwidth termination
125 Mbps requireme
Hardware at field locations
nt
Data Centre
126 Diesel Genset, 650 KVA Nos 2
Hardware
32A IP PDU with Ethernet based As per
Data Centre
127 Environment Monitoring System with Nos requireme
Hardware
one Temperature Sensor nt
16A IP PDU with Ethernet based As per
Data Centre
128 Environment Monitoring System with Nos requireme
Hardware
one Temperature Sensor nt
As per
Data Centre
129 Blanking Panels Nos requireme
Hardware
nt
As per
130 DR Site Servers No. requireme
nt
As per
131 DR Site Storage No. requireme
nt
As per
132 DR Site Bandwidth Mbps requireme
nt

133 DR Site DC-DR license Lot 1

134 ITMS-ATCS ATCS Traffic signal controller No. 80

135 ITMS-ATCS Vehicle Detection Camera No. 320

Patna Smart City Limited Page 16 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment

136 ITMS-ATCS Countdown timer No. 320

137 ITMS-ATCS Traffic Light Aspects – Red No. 640

138 ITMS-ATCS Traffic Light Aspects – Green No. 640

139 ITMS-ATCS Traffic Light Aspects – Amber No. 640

140 ITMS-ATCS Pedestrian lamp heads – Stop No. 320

141 ITMS-ATCS Pedestrian lamp heads – Walk No. 320

Gantry Pole(Large for Traffic Signal)


142 ITMS-ATCS No. 320
including site preparation cost
Gantry Pole(Small for Pedestrian Signal)
143 ITMS-ATCS No. 320
including site preparation cost
Mounting Structure with poles,
144 ITMS-ATCS Set 640
junction boxes

145 ITMS-ATCS Network Switch Ruggedized No. 80

Red Light Violation Detection (RLVD)


146 ITMS-RLVD No. 560
Evidence Cameras

147 ITMS-RLVD RLVD Cameras with ANPR capability No. 1120

148 ITMS-RLVD Local processing unit No. 140

Mounting structure with junction boxes


149 ITMS-RLVD Set 1120
etc.

150 ITMS-RLVD Network Switch Ruggedized No. 140

Speed Detection System for covering 2


lanes in one direction with complete
subcomponents including ANPR
ITMS-Speed
151 camera, sensors, wide angle evidence No. 20
Detection
camera, IR illuminator, non-intrusive
speed sensor, with cabling & mounting
infrastructure as required

152 ITMS-RLVD ANPR System No. 40

Surveillance Outdoor Fixed Box Camera + IR


153 No. 60
System Illuminator

Patna Smart City Limited Page 17 of 304


Corrigendum NIT No: 02/MD/PSCL/2018 Date: 20-Apr-2018

Proposed
Unit of Indicative
Sr Solution / Quantity By
Line Item Measure quantity As
No Component Bidder As per
ment per RFP
His Assessment
Surveillance
154 Outdoor PTZ Camera + IR Illuminator No. 60
System
Public Address Public Address System – IP based PA
155 No. 250
Syetem with speakers, UPS etc.
Public Address
156 Mounting structure No. 250
Syetem
Variable
Variable Message Sign Board with all
157 Messaging No. 250
accessories
System
Variable
158 Messaging Mounting structure No. 50
System
Emergency Call ECB system with Mounting structure,
159 No. 250
Box UPS, pole etc.
As per
160 Sensors All type of Sensors No. requireme
nt
ICCC Video Wall,
SIEM Solution (Separately for
160 Displays, No. 2
Information & Event Management)
Software, Etc

Patna Smart City Limited Page 18 of 304

You might also like