0% found this document useful (0 votes)
72 views

Example Progress Report

This document provides a status update on various road construction and maintenance projects overseen by several district public works departments in the Klang Valley area of Malaysia. It lists 12 ongoing projects managed by the Gombak district, with details on project names and locations, timelines, budgets, work progress indicators, and notes. Brief status updates are also provided for 5 additional projects under other district jurisdictions. The table tracks progress and timelines for various infrastructure projects from May 2019 through November 2019.

Uploaded by

Fendi Roon
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Example Progress Report

This document provides a status update on various road construction and maintenance projects overseen by several district public works departments in the Klang Valley area of Malaysia. It lists 12 ongoing projects managed by the Gombak district, with details on project names and locations, timelines, budgets, work progress indicators, and notes. Brief status updates are also provided for 5 additional projects under other district jurisdictions. The table tracks progress and timelines for various infrastructure projects from May 2019 through November 2019.

Uploaded by

Fendi Roon
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Tarikh Kemaskini 28-10-19 01-11-19

JKR Daerah Gombak


Maklumat Kerja
Hari Pemantauan Status CPC Catatan % Tarikh Sebenar
Tarikh Projek Peruntukan
Bil Nama Laluan/Kaedah Tempoh Lokasi EOT Isu/Catatan
L/R/L& (RM) Sedang Tarikh Tarikh
T.M.T T.S.K. Masa I S R K J S Sudah Siap Kerja Seterusnya Berjalan Siap Notis Terima Baseline Actual
R/Medi dilakukan Mula Akhir
FT68 Seksyen 22.8 Jln Gombak - Bentong
1 FT68 22.80 13.5.19 12.8.19 3 Bulan L 400,000.00 100% 100% 30.5.19 1.8.19
(Precast Drain and Close Turfing) ✔ ✔ ✔ - - - ✔ ✔ ✔ ✘
FT001 Seksyen 406.9 Jln KL - Tanjung Malim
2 FT001 406.90 28.5.19 27.9.19 4 Bulan L 648,000.00 100% 100%
(Soil Nailing and Guniting) ✔ ✔ ✔
FT001 Seksyen 407.6 Jln KL - Tanjung Malim
3 FT001 407.60 19.6.19 18.10.19 4 Bulan R 668,200.00
(Soil Nailing and Guniting) ✔
FT68 Seksyen 28.2 Jln Gombak - Bentong
4 FT68 28.20 19.6.19 18.11.19 5 Bulan R 658,600.00
(Soil Nailing and Erosion Control Mat) ✔ ✘
FT68 Seksyen 27.7 Jln Gombak - Bentong
5 FT68 27.70 19.6.19 18.11.19 5 Bulan R 658,600.00
(Soil Nailing and Erosion Control Mat) ✔
FT68 Seksyen 36.6 Jln Gombak - Bentong
6 FT68 36.60 27.6.19 29.10.19 4 Bulan R 640,500.00
(Soil Nailing and Erosion Control Mat) ✔
FT68 Seksyen 28.4 Jln Gombak - Bentong
7 FT68 28.40 27.6.19 26.9.19 3 Bulan L 389,200.00
(Tiebackwall) ✔ ✘
Rockfill,ID,Cascade,
FT68B Jln masuk UIAM
8 FT68B 0.50 24.6.19 24.10.19 4 Bulan L 600,000.00 Pasang Precast Berm,Backfill,Close Touchup Precast 100% 100% 24.6.19 24.10.19
(Rockfill and Extension Culvert)
✔ ✔ ✔ drain, JMS Turf,Precast Drain Drain, SlopeID ✔ ✘
FT68 Seksyen 21.8 Jln Gombak - Bentong
9 FT68 21.80 10.7.19 19.10.19 3 Bulan R 204,400.00
(Reprofile Slope and Gabion Wall) ✔ ✘
FT68 Seksyeb 26.3 Jln Gombak - Bentong
10 FT68 26.30 10.7.19 9.10.19 3 Bulan R 193,000.00
(Soil Nailing and Guniting) ✔ ✘
FT68 Seksyeb 30.0 Jln Gombak - Bentong
11 FT68 30.00 10.7.19 11.11.19 4 Bulan R 455,000.00
(Soil Nailing and Guniting) ✔ ✘
AK
FT68 Seksyeb 29.7 Jln Gombak - Bentong
12 FT68 29.70 TBA TBA TBA R TBA Baru/Kickoff
(Soil Nailing and Guniting)
✘ 4.11.19
JKR Daerah Hulu Langat
FT31 Seksyen 35.0Jln Banting - Semenyih (Soil
1 FT31 35.00 25.4.19 24.9.19 5 Bulan L
Nailing and Erosion Control Mat) ✔
JKR Daerah Petaling
FT15 Jalan Bul. Subang Airport (Gabion
1 FT15 JBSA 19.6.19 18.10.19 4 Bulan L
Wall) ✔
JKR Daerah Sepang
1 FT27 Seksyen 11.7 Jalan Sepang FT27 11.70 16.7.19 15.10.19 3 Bulan L ✔
2 FT324 Seksyen 2.60 Jalan Sepang FT324 2.60 16.8.19 15.11.19 3 Bulan R ✔
3 FT324 Seksyen 1.90 Jalan Sepang FT324 1.90 16.8.19 15.11.19 3 Bulan R ✔

Disediakan Oleh Disemak Oleh

………………………………………………………. ……………………………………………………….
Noor Affendi bin Dikkir Mohd Fadly Arif bin Abdullah
Assistant Resident Engineer Resident Engineer