CHAPTER 6.2. Converting A CPM Into Precedence Diagram

The document provides instructions for converting a Critical Path Method (CPM) diagram into a precedence network diagram. It states that one should 1) replace the starting event with a start node, 2) replace activities with precedence nodes, 3) replace the finishing event with a finish node, 4) perform a forward pass, and 5) perform a backward pass. It then provides two examples of converting a CPM diagram into a precedence network diagram.

Uploaded by

noxa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
235 views2 pages

CHAPTER 6.2. Converting A CPM Into Precedence Diagram

The document provides instructions for converting a Critical Path Method (CPM) diagram into a precedence network diagram. It states that one should 1) replace the starting event with a start node, 2) replace activities with precedence nodes, 3) replace the finishing event with a finish node, 4) perform a forward pass, and 5) perform a backward pass. It then provides two examples of converting a CPM diagram into a precedence network diagram.

Uploaded by

noxa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Converting a CPM Diagram into Precedence

Network Diagram
Once you have drawn the CPM diagram:
1. Replace the 1st event or node of the CPM with a Start node (they are equal)
2. Replace every activity on the CPM with a precedence diagram node
3. Replace the last event or node on the CPM diagram with a Finish node (they are equal)
4. Do the forward pass
5. Do the backward pass

EXAMPLE 1:
1. The naming convention for Activity-on-arrow (CPM) network diagram 
EVENT
NUMBER
2
3 6 EARLIEST LATEST
A=3 3 C=6 DATE DATE

1 4 SLACK
0 0 12 12
0 0

B=5 3 D=7
5 5
0

Activity-on-node (Precedence) network diagram

0 3 3 3 6 9
A C
3 3 6 6 3 12

START FINISH

0 5 5 5 7 12
B D
0 0 5 5 0 12
EXAMPLE 2
Activity-on-arrow (CPM) network diagram

3 6
54 62 81 81
B=20 12 E=12 0
H=30
1 2 F=7 8 9
A=34 5
34 34 J=6
0 0 74 74 111 111 117 117
0 0 0 0 0
G=6
C=15 D=25 I=28
4 7
49 49 80 83 28
0 3
Critical Path

Activity-on-node (Precedence) network diagram


COPIED from Assignment 3