Estimate of Road
Estimate of Road
Estimate of Road
9.0 Providing and laying ,fitting and placing Mild steel reinforcement
complete in sub-structure as per drawing and Technical MT 9.21 125,405.20
Specification.
11.0 Providing and laying of hand pack Stone soling with 150 to 200 mm
thick stones and packing with smaller stone on prepared surface as
per Drawing and Technical Specifications.. m3 6.00 6,996.82
12.0 Providing and laying of Flat Brick soling all complete as per drawing
and technical specifications m2 1.38 1,072.57
13.0 Providing and laying of Plain Cement Concrete all complete as per
Drawing and Technical Specifications. PCC Grade M 15 (1:2:4) m3 4.10 12,948.74
14.0 Providing and laying of Stone Masonry Work in Cement Mortar 1:4
in Foundation complete as per Drawing and Technical
Specifications. m3 28.00 11,219.63
15.0 Providing and laying Stone Masonry work in cement mortar 1:4 in
structure complete as per Drawing and Technical Specifications
Random Rubble Masonry m3 21.00 12,889.85
16.0 Providing and laying brick masonry work in 1:4 cement sand mortar
in structure excluding pointing and plastering all complete as per
drawing and technical specifications. m3 1.23 15,235.44
17.0 Proving & laying 12.5 mm thick plastering in 1:4 cement motar all
complete m2 2.88 3859.03
18.0 Providing and fixing cover of C.I. grating (medium duty) with frame
at required level including all complete as per drawing and
specifications Size(450mm*600mm)(18 kg) No 2.00 4,535.60
19.0 Proving & laying 200mm internal diameter NP3 flush jointed pipe
inclunding fixing with cement mortar 1:2 as per drawing & technical
specification m 10.00 3,606.78
Sub Total(a)
1.0 Insurance premium for the work, plant and materials damage
for contract work for all risk including Riot,Strike,
Damage,Malicious damage and Terrorism for contract work of
0.25 year + 1 year Maintenance period.,(b)Insurance premium
for the insurance of owner and consultant staff (named)
Rs.1000000.00 per person for 5 persons with unlimited
number of occurances for 3months (c)Insurance Premium for
construction equipments and machines with value of Rs. PS 1.00 29,733.89
1000000.00 for 3 months (d) Insurance Premium for third
party liability personal only per person Rs.4,00,000.00 for 8
persons for 3 months
Source of
Ammount Rate
9.1.I B
81,331.13
10.2 B
7,867.80
10.4 I
38,677.76
12.7 A ii
479,683.55
20.2 C
1,548,462.19
35,685.49
18.1 a
31,796.58
20.60
1,154,705.50
9.4.I.A.i
1,584.35
10.80
41,980.92
1,483.57
20.2 A
53,138.26
26.3 B
314,149.64
26.5 A
270,686.85
25.1.C
18,726.18
25.4 C
11,114.00
1.00
9,071.20
7.20
36,067.80
4,192,724.61
29,733.89
5,000.00
34,733.89
4,227,458.50
169,098.34
4,396,556.84
571,552.38
4,968,109.22
Location:Godawari NA.Pa10
S.No. Description of Work Unit No. Length Breadth Height Quantity
1 Earthwork Excavation
0+005 to 0+100 m3 1 685.24
Total 685.24
2.0 Bitumin Road Scarifying m2
1st Section 1 60.00 4.50 270.00
3rd Section 1 60.00 4.50 270.00
Total 540.00
3.0 Subgrade Preparation m2
1st Section
0+000 to 0+100 1 100.00 5.50 550.00
0+100 to 0+117 1 17.00 6.00 102.00
2nd Section
0+000 to 0+020 1 20.00 6.00 120.00
3rd Section
0+000 to 0+060 1 60.00 5.00 300.00
Total 1072.00
5.0 Base course m3
1st Section
0+000 to 0+100 1 100.00 5.50 0.10 55.00
0+100 to 0+117 1 17.00 6.00 0.10 10.20
2nd Section 0.10
0+000 to 0+020 1 20.00 6.00 0.10 12.00
3rd Section 0.10
0+000 to 0+060 1 60.00 5.00 0.10 30.00
Total 107.20
6.0 RCC (1:1.5:3 Mix) m3
1st Section
0+000 to 0+100 1 100.00 5.50 0.10 55.00
0+100 to 0+117 1 17.00 6.00 0.10 10.20
2nd Section 0.10
0+000 to 0+020 1 20.00 6.00 0.10 12.00
3rd Section 0.10
0+000 to 0+060 1 60.00 5.00 0.10 30.00
Total 107.20
7.0 Form work m2
1st Section
0+000 to 0+100 2 100.00 0.20 40.00
0+100 to 0+117 2 17.00 0.20 6.80
2nd Section
0+000 to 0+020 2 20.00 0.20 8.00
3rd Section
0+000 to 0+060 2 60.00 0.20 24.00
Total 78.80
8.0 Plywood for partion m2
1st Section
0+000 to 0+100 10 5.50 0.15 0.03 0.21
0+100 to 0+117 2 6.00 0.15 0.03 0.05
Remarks
685.24
540.00
1072.00
107.20
107.20
78.80
0.41
6.00
4.00
28.00
21.00
1 reinforcement
a Long Bar 4358.00
1st Section
0+000 to 0+100 10 36 100.0 3600 0.617 2222.2
0+100 to 0+117 10 40 17.0 680 0.617 419.8
2nd Section
0+000 to 0+020 10 40 20.00 800 0.617 493.8
3rd Section
0+000 to 0+060 10 33 60.00 1980 0.617 1222.2
b Short bar 4411.33
1st Section
0+000 to 0+100 10 667 5.50 3667 0.617 2263.4
0+100 to 0+117 10 113 6 680 0.617 419.6
2nd Section
0+000 to 0+020 10 133 6 800 0.617 493.8
3rd Section
0+000 to 0+060 10 400 5 2000 0.617 1234.6
Sub total 8769.33
wastage @ 5% 438.47
Grand total 9207.80
9.21
Remarks
MT
S.No. Description of Work Unit No. Length Breadth Height Quantity Remarks
Project :Road
Improvement
Works atSite: Lalitpur
Project
Godawori
Period
Municipality ward 3 0.25 1
no 10 Pyong gau -
Project
Chapa Gau Worth
HealthNRs 4192724.61
1 Post
InsuranceGau
- Bista premium
for the work, plant and materials damage for contract work for all risk including
Badi Khel Road
Riot,Strike, Damage,Malicious damage and Terrorism
Insurance with value NRs. 4192724.61 for the
Rs. 3.03 per contract
thousandwork for Rs
3 months + 1 year
15,879.94
do for Terrorism Rs. 1.49 per thousand Rs 7,808.95
Premium Rs 23,688.89
for stamp duty Rs 10.00
Premium with stamp duty Rs 23,698.89
VAT 13.00% of premium with stamp duty Rs 3,080.86
Total Amount with VAT Rs 26,779.75
2 Insurance premium for the insurance of owner and consultant staff (named) Rs.1000000.00 per person for
5Personnel
persons with unlimited
accident number offoroccurances
of 1000000.00 5 for 3 months
Rs.2.00 per thousand Rs 2,500.00
Do for Terrorism Rs.0.50 per thousand Rs 625.00
Premium Rs 3,125.00
For stamp duty Rs 10.00
Premium with stamp duty Rs 3,135.00
VAT 13.00% of premium with stamp duty Rs 407.55
Total Amount with VAT Rs 3,542.55
3 Insurance Premium for construction equipments and machines with value of Rs. 1000000.00 for 3 months
Insurance premium of Rs. 1000000.00 Rs.2.03 per thousand Rs 507.50
Do for Terrorism Rs.1.49 per thousand Rs 372.50
Premium Rs 880.00
For stamp duty Rs 10.00
Premium with stamp duty Rs 890.00
VAT 13.00% of premium with stamp duty Rs 115.7
Total Amount with VAT Rs 1005.70
4 Insurance Premium for third party liability personal only per person Rs.4,00,000.00 for 8persons for 3
months
P.A. of third party 8 person Rs.2.00 per thousand Rs 1600.00
Do for Terrorism Rs. 0.50 per thousand Rs 400.00
Premium Rs 2000.00
For stamp duty Rs 10.00
Premium with stamp duty Rs 2010.00
isk including
hs + 1 year
8persons for 3
Total
F.Y:076/77
Remarks
917.791