0% found this document useful (0 votes)
125 views13 pages

BTS Rehoming Method of Procedure

The document provides the scope of work and procedures for BTS rehoming. It outlines the activities involved in the rehoming process pre, during, and post rehoming. It also details the site procedures for configuring the BTS IP address, BSC IP address, VLAN, port IP, and router through the site maintenance terminal application.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views13 pages

BTS Rehoming Method of Procedure

The document provides the scope of work and procedures for BTS rehoming. It outlines the activities involved in the rehoming process pre, during, and post rehoming. It also details the site procedures for configuring the BTS IP address, BSC IP address, VLAN, port IP, and router through the site maintenance terminal application.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

BTS Rehoming

Method of Procedure
Scope of Work
Scope of Work

NOC Config
Activities BSS Eng'g RF Eng'g TPE NOC Tx WATO Opti Smart - Build Vendor
(Access/Core)
Provide Site List for BTS Rehoming X X
Provide Tx Assessment X
Provide Site Cluster for Rehoming X
Request for TFRF X
BTS Rehoming WO/Data fill Issuance (PARWO, TX WO, CDD) X X
WO/Data fill Implementation X X X X
Rehoming Implementation X X X X
KPI Monitoring X X
Drive Test X X
Rehoming Process
Rehoming Process

Pre-Rehoming Actual Post Rehoming


Rehoming

• Transmission • On-site Access • Core Definition


Checking (BTSM) and Unblocking
• Logs Collection • BSC Script Loading • Functionality
• IWO Verification (NOC) Test
• Alarm • KPI Monitoring
Suppression
Site Procedures
Site Procedures

Setup IP Address on PC Connect the SMT PC to the BTS Prepare Software


PC IP Address: 192.168.0.73 Follow the setting communication port parameters: Paste the files needed on the Desktop of your PC
Connect the SMT PC to the ETH port of the GTMU using an
Ethernet cable.
Site Procedures
1. Open BTSM Application 2. Log-In Site Maintenance Terminal user name & password:
Extract BTSM .zip User name: admin
Password: hwbs@com

Select ENG

Double click btsm.exe


Site Procedures
3. Site Management Right
Select Get to allow configuration
Site Procedures
4. IP over FE Static IP, click Config BTS BSC and VLAN Tab
a) Configure BTS IP Address/BSC IP Address/VLAN

b) Query Config BTS BSC and VLAN Configuration


Select Static Query

192.168.82.15

192.168.252.106

192
Site Procedures
5. IP over FE Static IP, click Config Port IP tab
a) Configure Board Site/FE0IP/FE0 IP Mask Address
Note: FE0 = BTS IP
b) Query Config Port IP
Select Static Query

ETH PORT 0

192.168.82.15 255.255.255.224
Site Procedures
6. IP over FE Static IP, click Config Router tab
a) Configure Destination IP Address/Mask Address/Next Hop IP Address
Note: Destination IP = BSC IP
Next Hop IP = BTS Gateway IP a) Query Config Router
Select Static Query

192.168.82.1

6
192.168.252.106

255.255.255.255
Site Procedures
7. Release Site Management Right
Select Release to save configuration

You might also like