This document summarizes 14 non-conformances across various API AAR departments:
1) The facility has not planned for implementation of requirements in API Q1 Addendum 2 for their QMS.
2) The quality system manual does not identify processes requiring validation.
3) The facility lacks a procedure for defining personnel competency and identifying training requirements within the quality management system scope.
4) Control of an external document defining pressure testing requirements is not evident.
5) The facility did not plan or conduct internal audits for outsourced calibration activities performed onsite.
This document summarizes 14 non-conformances across various API AAR departments:
1) The facility has not planned for implementation of requirements in API Q1 Addendum 2 for their QMS.
2) The quality system manual does not identify processes requiring validation.
3) The facility lacks a procedure for defining personnel competency and identifying training requirements within the quality management system scope.
4) Control of an external document defining pressure testing requirements is not evident.
5) The facility did not plan or conduct internal audits for outsourced calibration activities performed onsite.
This document summarizes 14 non-conformances across various API AAR departments:
1) The facility has not planned for implementation of requirements in API Q1 Addendum 2 for their QMS.
2) The quality system manual does not identify processes requiring validation.
3) The facility lacks a procedure for defining personnel competency and identifying training requirements within the quality management system scope.
4) Control of an external document defining pressure testing requirements is not evident.
5) The facility did not plan or conduct internal audits for outsourced calibration activities performed onsite.
This document summarizes 14 non-conformances across various API AAR departments:
1) The facility has not planned for implementation of requirements in API Q1 Addendum 2 for their QMS.
2) The quality system manual does not identify processes requiring validation.
3) The facility lacks a procedure for defining personnel competency and identifying training requirements within the quality management system scope.
4) Control of an external document defining pressure testing requirements is not evident.
5) The facility did not plan or conduct internal audits for outsourced calibration activities performed onsite.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 2
API AARs
AAR Department Non-conformance description
No. 1 QA The facility has not planned QMS for implementation of requirements of Addendum 2 of API Q1. 2 QA Quality System Manual does not identify the processes requiring validation. 3 HR The organization shall maintain a documented procedure for defining personnel competency and identifying training requirements or other actions to achieve the necessary competency of personnel whose responsibilities fall within the scope of the quality management system. 4 Engineering Control of External Document ASME B 16.34 (which the facility refers for deciding the pressure test requirements for the products where the pressure class is defined in terms of Pressure Classes like #600, #900, #1500 etc. ) , is not evident. 5 QA It is not evident that the facility had planned and conducted internal audit for the outsourced activities of Calibration of Testing, Monitoring and Measuring equipment" which are performed at the facility site. 6 Inside sales There was no Contract Review CUM Work Order Records evidenced for the Customer PO Number 4209140696, Rev 0 dated 06 Mar 2019 from M/s. Emerson Process Management for Retrofitting of chokes parts for lower size trim assembly. Para (b) of documented procedure JFC-P-IS-01, Rev 1 dated 01 Jun 2018 requires "Review shall be done for quote and customer purchase order". 7 QA Contingency Planning for the risk related to “delivery of non- conforming products to customers’ is not evidenced. 8 Engineering Evidenced records of Pressure Time Graphs for PR2 Validation testing of API 6A GLOBE VALVE (Model VGB-40) 4-1/16”, 10000 psi, PSL3G, PR-2,FF-0.5, K+X, API 6FA, with Gear Box, BX-155, do not demonstrate that the product was held at Maximum Temperature of 180 degrees C for a period of 01 hour. Also, validation records for required Fire Safe Testing could not be evidenced by the facility. 9 Purchase It is not evident that the facility has defined controls on the outsourced processes of 1. Fugitive Emission Testing 2. Third Party Inspections 10 Production Documented system does not address the requirements for qualification of equipment used for Post Weld Heat Treatment of welded parts. 11 QC Evidence of conformity to requirements of Parallelism, Perpendicularity, Concentricity of various surfaces (as required in facility's drawing number 30A19CE1FA9CA9CFG-X, Rev 0) is not available 12 Purchase Supplier Evaluation Records/Vendor Audit Report dated 15 Sep 2017 do not evidence that the capability of the supplier was established to perform calibrations of Automatic Welding Machine, Ovens, Steel Scale, Digital Clamp meter etc. 13 QC Verification records of purchased Nuts do not evidence conformity to the requirements defined by the facility. 14 QC In one of the sampled cases, records of product release do not enable identification of the individual releasing the product.