QA QC Manual Final
QA QC Manual Final
Department (MA&UD)
Contents
CHAPTER 1 ........................................................................................................................................................... 7
INTRODUCTION ................................................................................................................................................ 7
1.1 Quality Definition ......................................................................................................................................... 7
1.2 QA / QC Manual ............................................................................................................................................ 8
1.2.1 Key Parameters of Quality Assurance ................................................................................................ 8
1.3 Health Safety & Environment ...................................................................................................................... 8
CHAPTER 2 ......................................................................................................................................................... 10
CONSTRUCTION QUALITY CONTROL ...................................................................................................... 10
2.1 Introduction .................................................................................................................................................. 10
2.2 Testing ........................................................................................................................................................... 10
2.3 Inspections of Sites ...................................................................................................................................... 12
2.3.1 Everyday Supervision: ....................................................................................................................... 12
2.3.2 Periodical Inspection for Quality...................................................................................................... 12
2.3.3 Random Checks .................................................................................................................................. 14
CHAPTER 3 ......................................................................................................................................................... 15
CONTROL OF MATERIALS AND EQUIPMENT ......................................................................................... 15
3.1 General .......................................................................................................................................................... 15
3.2 Mandatory Tests Performed at Site ............................................................................................................ 15
CHAPTER 4 ......................................................................................................................................................... 18
MATERIALS AND EQUIPMENTS TO BE CERTIFIED BY MANUFACTURER ....................................... 18
CHAPTER 5 ......................................................................................................................................................... 19
DEPARTMENTAL INSPECTIONS .................................................................................................................. 19
5.1 Materials and Equipment to be Inspected by Departmental Team at the Factory................................ 19
CHAPTER 6 ......................................................................................................................................................... 20
CONTROL OF CIVIL / STRL. WORKS AND WATER RETAINING STRUCTURES............................... 20
6.1 Proportions of Cement Concrete ................................................................................................................ 20
6.2 Proportions of Cement Mortar .................................................................................................................... 21
6.3 Construction of Water Retaining Structures ............................................................................................. 21
CHAPTER 7 ......................................................................................................................................................... 26
SOURCE OF WATER AND TREATMENT UNITS OF CANAL BASED WS SCHEMES ......................... 26
7.1 Water Works Units including WTP ........................................................................................................... 26
CHAPTER 8 ......................................................................................................................................................... 28
TESTING OF MATERIALS ............................................................................................................................... 28
CHAPTER 9 ......................................................................................................................................................... 29
PROCEDURE OF SAMPLING AND TESTING OF MATERIALS............................................................... 29
9.1 Cement........................................................................................................................................................... 29
9.1.1 Sampling Procedures and Sample Collections............................................................................... 29
9.1.2 Tests for Cement ................................................................................................................................ 30
A. Test for Fineness .......................................................................................................................... 30
B. Test for Compressive Strength.................................................................................................... 30
Page 1
Quality Assurance & Quality Control Manual
9.2 Aggregates..................................................................................................................................................... 32
9.2.1 Sampling Procedures and Sample Collections............................................................................... 32
A. Tests for Fine Aggregate (Sand) ................................................................................................ 33
B. Tests for Coarse Aggregate (Stone Grit).................................................................................... 36
9.3 Bricks ............................................................................................................................................................. 38
9.3.1 Sampling Procedures and Sample Collections............................................................................... 38
9.3.2 Tests for Bricks IS: 1077-1992............................................................................................................ 38
A. Visual............................................................................................................................................. 38
B. Dimensions ................................................................................................................................... 39
C. Water Absorption ......................................................................................................................... 39
D. Efflorescence................................................................................................................................. 40
E. Compressive Strength ................................................................................................................. 41
9.4 Cement Concrete .......................................................................................................................................... 42
9.4.1 Sampling Procedures and Sample Collections............................................................................... 42
9.4.2 Tests of Cement Concrete ................................................................................................................. 42
A. Slump Test .................................................................................................................................... 42
B. Compressive Test:......................................................................................................................... 43
9.5 Reinforcement Steel & Structural Steel ..................................................................................................... 44
9.5.1 Sampling Procedures and Sample Collections ................................................................................ 44
9.5.2 Tests of Steel for Reinforcement IS: 1786-2008 ................................................................................ 44
9.5.3 Mild Steel (Structural)........................................................................................................................ 46
A. Tensile strength of structural steel............................................................................................. 46
9.6 Pipes for Water Supply & Sewerage .......................................................................................................... 46
9.6.1 Sampling Procedures and Sample Collections............................................................................... 46
9.6.2 Tests of UPVC Pipes for Potable Water Supply IS: 4985-2000 ...................................................... 46
9.6.3 Tests of UPVC Pipes for Drainage / Sewerage Work..................................................................... 47
9.6.4 Tests of Glazed Stone Ware Pipes IS: 651-2007 .............................................................................. 48
9.6.5 Tests of R.C.C Pipes........................................................................................................................... 49
9.6.6 Tests of HDPE Pipes .......................................................................................................................... 50
9.6.7 Tests of G.I Pipes ............................................................................................................................... 51
CHAPTER 10 ....................................................................................................................................................... 52
WATER FOR CONSTRUCTION PURPOSES ................................................................................................ 52
10.1 Sampling of Water...................................................................................................................................... 52
CHAPTER 11 ....................................................................................................................................................... 53
TESTS & STANDARDS FOR TIMBER ........................................................................................................... 53
11.1 Surface Electrode Test................................................................................................................................ 53
11.2 Knife Electrode Test ................................................................................................................................... 53
CHAPTER 12 ....................................................................................................................................................... 54
TESTS & STANDARDS FOR OTHER CONSTRUCTION MATERIALS ................................................... 54
12.1 Terracing ..................................................................................................................................................... 54
12.2 Precast Concrete Manhole Covers and Frames ....................................................................................... 54
12.3 Plastic Encapsulated Footrests .................................................................................................................. 54
12.4 LDPE Sheet ................................................................................................................................................. 55
Page 2
Quality Assurance & Quality Control Manual
CHAPTER 13 ....................................................................................................................................................... 56
DRINKING WATER SAMPLING .................................................................................................................... 56
13.1 Sampling for Physical and Chemical Analysis ....................................................................................... 56
13.2 Sampling for Bacteriological Analysis ..................................................................................................... 56
13.3 Bacteriological Guidelines ........................................................................................................................ 58
CHAPTER 14 ....................................................................................................................................................... 59
CHECKS AND TESTS OF FINISHED WORKS ............................................................................................. 59
14.1 Damp Proof Course .................................................................................................................................... 59
14.2 Brick Masonary ........................................................................................................................................... 59
14.3 RCC Works .................................................................................................................................................. 59
14.4 Plastering ..................................................................................................................................................... 59
14.5 Thickness of Floors .................................................................................................................................... 59
14.6 Chaukhats.................................................................................................................................................... 59
14.7 Steel Windows ............................................................................................................................................ 59
14.8 Paint, Distemper Plastic Emulsion (One test for each brand of paint) ................................................. 59
14.9 Fittings ......................................................................................................................................................... 60
14.10 Distempered Surface ................................................................................................................................. 60
14.11 Glass Panes................................................................................................................................................. 60
14.12 Sal Wood for Chaukhats ........................................................................................................................... 60
14.13 Timber for Shutters ................................................................................................................................... 60
14.14 Thickness of Shutters................................................................................................................................ 60
CHAPTER 15 ....................................................................................................................................................... 61
HYDROSTATIC TESTS OF PIPELINES ......................................................................................................... 61
CHAPTER 16 ....................................................................................................................................................... 62
TEST REPORT FORMATS ................................................................................................................................ 62
16.1 Test Certificate for Cement ....................................................................................................................... 63
16.2 Test Certificate for Coarse Aggregate ...................................................................................................... 64
16.3 Test Certificate for Fine Aggregate........................................................................................................... 65
16.4 Test Certificate for Construction Water (For saline zone only)............................................................. 66
16.5 Compressive Strength of Concrete ........................................................................................................... 67
16.6 Concrete Slump Test .................................................................................................................................. 68
16.7 Hydrostatic Test for Non Pressure Pipes ................................................................................................. 69
16.8 Hydrostatic Test for Pressure Pipes.......................................................................................................... 70
16.9 Leak Test for Under Ground RCC Structures ......................................................................................... 71
16.10 Leak Test for Elevated RCC Structures................................................................................................... 72
16.11 Water Absorption of Bricks...................................................................................................................... 73
16.12 Silt Content ................................................................................................................................................ 74
CHAPTER 17 ....................................................................................................................................................... 75
RECORDS TO BE MAINTAINED AT CONSTRUCTION SITE.................................................................. 75
17.1 Site Order Book .......................................................................................................................................... 75
17.2 Material Register ........................................................................................................................................ 76
17.3 Daily Progress Report ................................................................................................................................ 77
17.4 Concrete Pour Record ................................................................................................................................ 78
17.5 Test Record.................................................................................................................................................. 79
Page 3
Quality Assurance & Quality Control Manual
Page 4
Quality Assurance & Quality Control Manual
ABBREVIATIONS
Sl. No. Abbreviation Description
1 AC Asbestos cement
2 BIS Bureau of Indian standard
3 BOQ Bill of quantities
4 0C Degree Celsius temperature
5 CCDU Communication and capacity development unit
6 CI Cast iron
7 Cm Centimeter
8 3 Cubic meter
Cum/ M
9 CWR Clear water reservoir
10 Dia Diameter
11 E.E. Executive Engineer
12 FC Fully covered
13 Fig Figure
14 GC Galvanized corrugated
15 GI galvanized iron
16 Gm Gram
17 GPWSC Gram Panchayat Water Supply Committee.
18 HDPE High density poly ethylene
19 HRD Human resources development
20 ISI Indian Standard Institution
21 ITP Inspection test plan
22 J.E. Junior Engineer
23 Kg Kilogram
24 Kl Kilo Litre
25 Km Kilo meter
26 M Meter
27 MC Manufacturer Certificate
28 MH Manhole
29 Ml Milliliter
30 Mm Millimeter
31 m3 Cubic meter
32 M&E Monitoring and evaluation
33 NC Not covered
34 No. Number
35 OHSR Over head service reservoir
36 O&M Operation and Maintenance.
37 PC Partially covered
Page 5
Quality Assurance & Quality Control Manual
Page 6
Quality Assurance & Quality Control Manual
CHAPTER 1
INTRODUCTION
This Quality Assurance Quality Control Manual is prepared for the use of Department of
PUBLIC HEALTH ENGINEERING/ULB/APUFIDC. It is based on Various Quality Assurance
practices, PWD specifications, requirement of the tender document for test of materials,
Field/laboratory testing and relevant IS: codes. This will provide a base document outlining
policy, procedure, responsibilities, compliance acceptance criteria and documentation for
carrying out tasks related to inspection, testing and reporting on various materials, items
involved for the satisfactory completion of the work. In all cases however, it is important to
understand that the contract documents including the technical specifications are the basis for
execution of the construction. Quality Assurance Quality Control (QA/QC) Manual provides a
guide lines for supervision of construction project. A QA/QC Manual establishes a standard
guideline for enabling supervisory staff to check different activities of construction in respect
of technical specifications. Quality assurance plan serve as a road map to supervisory staff to
ensure quality of project works.
The contractor has been prepare a Construction Quality Control / Quality Assurance Manual
for the type of construction generally carried out for public health engineering department
and sanitation, and also to describe the responsibility and accountability of the supervisory
staff. Reporting system shall also be covered in the Manual.
1.1 Quality Definition
Quality is the totality of features and characteristics of a product for service that bears on its
ability to satisfy the projects functional requirements. The quality of output is always agreed
upon between the supplier and the client (In project work, Contractor and the employer,
respectively), and the quality objective is to achieve zero defects with best quality of the
project works. This is possible only by ensuring quality control at every stage during progress
of construction.
Quality is conformity to standards and requirements to achieve excellence. The following are
some definitions pertaining to quality and how to achieve it.
Page 7
Quality Assurance & Quality Control Manual
At the contract package level, inspection and testing is required to ensure that the works
executed meet the required quality standards.
1.2 QA / QC Manual
This QA/QC Manual focuses on the implementation activities of the project following
contract award, primarily on supervision and quality control of construction works. The
QA/QC Manual is intended to be used as guide line for supervision of construction activities,
primarily by the field staff of the ENGINEER INCHARGE AND RE/ APUFIDC and the
Design and Supervision Consultants.
It will provide a base outline towards, procedure, responsibilities, compliance acceptance
criteria and documentation for carrying out inspection, testing and reporting on various
materials, items involved for the satisfactory execution of the project work. In all cases,
somehow, it is most important to understand that the technical specifications as specified in
the contract document / agreement are the guidelines for any construction activity.
The QA/QC Manual for the Construction activity does not attempt to suggest technical
specifications, since these are stated in the contract documents. Its aim is to ensure that the
works are executed as per specifications to achieve best results. Test results shall be
interpreted as applicable for individual package, in accordance with the technical
specifications as specified in the conditions of contract.
1.2.1 Key Parameters of Quality Assurance
Quality system involves the various key tools which are generally practiced in the field for
Quality Assurance System. The well designed quality assurance system will provide
confidence that the project outputs will fulfill all the requirements for which it is being
planned. The quality assurance system should have the following basic parameters.
Site documents
Mandatory and optional testing
Availability of field and departmental laboratories
Manufacturing test certificates
Departmental team inspections
Checklist guide form works
Site inspections
Post quality testing of finished works
Quality certification
Monthly reporting and review meetings
1.3 Health Safety & Environment
The Health and Safety of any project site also plays an important role and is also a part of the
quality control of any project work. The HSE audits have to be conducted at the Project Sites
for the various work areas generally encountered in the projects being executed. The following
activities are to be maintained under HSE.
Page 8
Quality Assurance & Quality Control Manual
Display of Notices
Warning tape, lighting arrangement at location of any excavated trench,
electrical installation or mechanical erection.
Fire Prevention and Protection
Environment & Health
House Keeping
Lighting
Monsoon Precaution
Noise and Vibration
Personnel protective equipment (PPE) for field staff.
Health, Safety and Environmental aspects are given in detail in the separate HSE manual.
Page 9
Quality Assurance & Quality Control Manual
CHAPTER 2
CONSTRUCTION QUALITY CONTROL
This section provides an overview of construction quality control activities, including testing
and site inspection. Materials control requirements are presented in detail here while specific
testing and inspection requirements for each category of works are presented in Chapters 10 to
15 of this Manual.
2.1 Introduction
Construction Quality Control (CQC) is intended to provide a comprehensive, common and
consistent framework for quality control across various contract packages. CQC comprises two
main elements of quality control:
Testing
Inspections
Testing control covers the type of tests to be carried out, frequency of testing and stage of
testing.
Inspection control covers the timing of inspections, what to be inspected and the inspection
procedures. QC should be affected at five stages:
Page 10
Quality Assurance & Quality Control Manual
The contractor shall set-up the site laboratory within 15 days after getting letter to proceed
and inform the EIC for conducting inspections. Laboratory equipment shall be properly
calibrated, and certificates and its updating as and when required should be kept at the
laboratory for review by ULB’S and GPWSC as necessary. Specialized tests at outside
laboratories shall only be undertaken with the prior approval of the ULB’S. Zonal
laboratories one in each zone shall also be established for quality testing of materials used by
the contractor. The tests to be conducted in the Zonal laboratory are given in Table 2.2.
Table: 2.2 Tests to be Conducted in the Zonal Laboratory
Sl. No. Material Tests to be conducted Equipment
1 Cement Consistency Vicat apparatus
Tests should be performed in accordance with the contract documents. The control of test
reports shall be done as stipulated in Section 10 of this Manual. All test samples should be
preserved in a sealed container, with proper identification numbers, test log reference, test
date, and other applicable information. These samples must be stored at contractor’s
office/laboratory by the contractor.
In addition to tests performed on site, the contractor is responsible for external tests which
are performed at approved laboratories as per the contract document.
Page 11
Quality Assurance & Quality Control Manual
Page 12
Quality Assurance & Quality Control Manual
The ULB’S and GPWSC shall also inspect the materials certified by manufacturers, materials
and equipment components upon delivery to the site. The contractor shall give advance notice
to the ULB’S and GPWSC when critical activities are proposed or major equipment items are to
be delivered. On completion of one stage of the construction and before proceeding to the next
stage the engineer in charge of ULB’S shall inspect and certify the quality of the works
completed before granting approval for the next stage of the works to start. The final inspection
shall encompass tests on completion and trial runs. The certification of quality will be based on
the documents and the periodic site visits. The ULB’S representative and the GPWSC
representative should witness all the tests conducted by the contractor.
Page 13
Quality Assurance & Quality Control Manual
Page 14
Quality Assurance & Quality Control Manual
CHAPTER 3
CONTROL OF MATERIALS AND EQUIPMENT
This section on control of materials and equipment gives an overview of control requirements
for construction materials and equipment including field testing, manufacturer’s certification,
departmental team inspection for materials, efficiency of equipment and calibration of
equipment.
3.1 General
General Control and approval of construction materials and equipment to be incorporated in
the works shall be based on the following;
Test reports for materials tested at site, such as cement, sand, water, and aggregate; the
contractor will perform all tests. The designated ENGINEER- IN-CHARGE and RE
representative and APUFIDC representative shall witness as per Chapter 1. They shall sign
the report in token of witnessing.
Manufacturer’s certificates and IS mark for manufactured items are as indicated in Table 4.1 or
as stipulated in the contract;
3.2 Mandatory Tests Performed at Site
For mandatory tests the list of materials if to be performed at site is given in Table 3.1. Types of
tests are presented in Tables 3.2 to 3.5 under the referenced procedure number. Test report
formats are included in Chapter 16. The reports are to be maintained in a bound register, where
in 3 copies of report will be prepared, two copies to be submitted with monthly report to
ENGINEER-IN-CHARGE and RE & APUFIDC and third copy to be retained by contractor.
Page 15
Quality Assurance & Quality Control Manual
Procedures
Sl. No. Type of Test Frequency of Test Timing of Test / Inspection
(Page No.)
1 Fineness Clause One for each On receipt of material at
10.1 source of 10 T or site and before using as
(60) part thereof and directed by the Engineer.
when called for by Test certificate to be
the Engineer. produced to the Engineer
Sampling should before use.
comply with
2 Compressive Clause IS: 3535 – 1986
strength – 72 hrs, 10.1
168 hrs, 672 hrs. (60)
1
Particle Size and shape Clause 10.2 One test for 20m3 or
IS: 2386 -Part-(I)-1963 ( 62-63) part thereof. On receipt at site and
test certificate to be
produced to the
Engineer before use.
Clause 10.2
2 Fineness modulus
( 62-63) One test for 20m3
3 Bulking test
Clause 10.2 One test per 20m3
( 64) or part thereof
Page 16
Quality Assurance & Quality Control Manual
Particle size
Clause 10.4
1 distribution IS One for each source of 40
(66)
2386(I)-1963 cum. Or part thereof and
On receipt of
10% Fine when called for by the
material at site
value as per IS ENGINEERING
2 Lab INCHARGE.
2386- Part (IV
)-1963
Page 17
Quality Assurance & Quality Control Manual
CHAPTER 4
MATERIALS AND EQUIPMENTS TO BE CERTIFIED BY MANUFACTURER
Page 18
Quality Assurance & Quality Control Manual
CHAPTER 5
DEPARTMENTAL INSPECTIONS
Departmental Team (DT) shall have one SDE from ENGINEER-IN-CHARGE & RE and one AE
from other division.
Page 19
Quality Assurance & Quality Control Manual
CHAPTER 6
CONTROL OF CIVIL / STRUCTURAL WORKS AND WATER RETAINING STRUCTURES
This section of the Quality assurance and Quality control Manual covers the testing of works
working procedures and sequences for general civil and structural works. The key elements
to be inspected in these works are concreting brickwork and finishes. The requirements for
testing and control of materials for these works are already described in previous section.
M5 800 60
Generally 1:2 but
M 7.5 625 45
subject to upper limit
M 10 480 34
of 1: 1.5 and a lower
M 15 330 32
limit of 1:2.5
M 20 250 30
NOTE- The proportions of the fine to coarse aggregate should be adjusted from upper limit to
lower limit progressively as the grading of the aggregates becomes finer and the maximum
size of the coarse aggregate becomes larger. Graded coarse aggregate shall be used.
For an average grading of the fine aggregate (that is, Zone II of Table 4 of IS 383), proportions
shall be 1:1.5, 1:2 and 1:2.5 for maximum size of aggregates 10 mm, 20mm and 40mm
respectively.
The cement content of the mix specified in above Table for any Nominal mix shall be
proportionately increased if the quantity of water in a mix has to be increased to overcome the
difficulties of placement and compaction, so that the water – cement ratio as specified is not
exceeded.
The Civil engineering Hand Book provides strength expected to be attained by concrete of
different proportions and the permissible stresses are laid down as given in Table 6.2.
Page 20
Quality Assurance & Quality Control Manual
M10-1:3:6 70 100
MM – 3 3-5 1:6
MM – 5 5-7.5 1:5
The selection of mortar will be governed by the strength required by the masonry and
reference may be made in IS: 1905- 1987 for knowing the suitability of combination of various
types of mortars and grade of bricks for the different strength required for the masonry.
6.3 Construction of Water Retaining Structures
In the case of Reinforced Cement Concrete (RCC) retaining structures, only concrete mix
proportions by volume shall be used. The associated quarry and source of sand and aggregate
shall be approved by Engineer after satisfactory tests of aggregates. Mechanical mixing with
mixtures is mandatory. Mechanical vibrators in sufficient number should be used for
compaction of concrete. Hand compaction cum manual compaction is not permitted under any
circumstances. Adequate mixtures and vibrators, including standby should be available at site
well before the start of concrete work.
Shuttering quality should be of good standard, as approved by the Engineer well before the
fixing of any shuttering. Shuttering should be fixed in such a manner that no slurry or water
seeps through the jointing or box outs. For this plastic tape, Plaster of Paris (POP), putty other
suitable sealants should be used at joints of shuttering.
Page 21
Quality Assurance & Quality Control Manual
The concrete should be kept moist throughout 24 hours a day for the specified number of days
for adequate curing by flooding with water, or by putting moist gunny bags. Adequate
separate labor and supervisor should be deployed for curing work, in ensuring that this
important component of the work is satisfactorily conducted.
Table: 6.4 List of Tests for Civil Works and Liquid Retaining Structures
Material
Sl. No. Activity Type of test (Page Test & Sampling
Name
No.) Procedure (Page No.)
1 Pump chamber
1.1 Earth Bedding Earth/Soil QC-P-01 (35) Lab
Coarse Aggregate QC-M-04 (30) Clause 10.2 (62)
1.2 Gravel Bedding Cement QC-M-01 (29) Clause 10.1 (58)
Fine Aggregate QC-M-02 (30) Clause 10.2 (62)
Cement QC-M-01 (29) Clause 10.1 (58)
Fine Aggregate QC-M-02 (30) Clause 10.2 (62)
1.3 Masonry
Water Lab
Bricks QC-M-03 (30) Clause 10.3 (68)
Cement QC-M-01(29) Clause 10.1 (58)
Coarse Aggregate QC-M-04 (30) Clause 10.2 (62)
1.4 Horizontal DPC
Fine Aggregate QC-M-02 (30) Clause 10.2 (62)
Bitumen Lab
Cement QC-M-01(29) Clause 10.1 (58)
Coarse Aggregate QC-M-04 (30) Clause 10.2 (62)
1.5 RCC Slab Fine Aggregate QC-M-02 (30) Clause 10.2 (62)
Water Lab
Steel MC -2 (30) Lab
Cement QC-M-01(29) Clause 10.1 (58)
1.6 Mortar Fine Aggregate QC-M-02 (30) Clause 10.2 (62)
Water Lab
2 Water retaining structures
Cement QC-M-01(29) Clause 10.1 (58)
Coarse Aggregate QC-M-04 (30) Clause 10.2 (62)
2.1 RCC works Fine Aggregate QC-M-02 (30) Clause 10.2 (62)
Water Lab
Steel MC -2 Lab
Page 22
Quality Assurance & Quality Control Manual
Material
Sl. No. Activity Type of test (Page Test & Sampling
Name
No.) Procedure (Page No.)
3 Completion of Stage Completion Test Field
Liquid Retaining
Structures (Wet
Wells, Storage
Reservoirs,
UGSR/ OHSR,
Pretreatment
Units, RCC Open
Channels, etc.)
The QC-P-01 to QC-P-06 are Reference Numbers given to various quality control process of
works to be executed as mentioned in Table: 6.5.
Table: 6.5 Identification Numbers Given to Various Quality Control Processes
Sl. Type of work Reference
1 Bedding QC-P-01
2 Concreting QC-P-02
3 Cement sand mortar QC-P-03
4 Liquid retaining structure QC-P-04
5 Completion of pipe line and QC-P-05
6 Manholes and valve chambers QC-P-06
The formats below provide the types of tests, frequency of tests and time of tests etc.
Page 23
Quality Assurance & Quality Control Manual
Page 24
Quality Assurance & Quality Control Manual
Timing of
SI. Test Report Frequency
Type of Test Test/
No. Format No. of Test
Inspection
Page 25
Quality Assurance & Quality Control Manual
CHAPTER 7
SOURCE OF WATER AND TREATMENT UNITS OF CANAL BASED WATER
SUPPLY SCHEMES
Public health engineering department schemes are based on surface source or ground
water source. Surface water is drawn from irrigation canals. Depending upon the
availability of potable water in the region the source of water supply is selected as
surface or ground water.
7.1 Water Works Units with proposal of WTP included in the Water Supply Scheme
The water works units required for utilization of various water sources including the
proposal of conventional Water Treatment Plant and their purpose are given in Table: 7.1.
Table: 7.1 Water Works Units
Sl.
Description Purpose
No.
Page 26
Quality Assurance & Quality Control Manual
Sl.
Description Purpose
No.
Page 27
Quality Assurance & Quality Control Manual
CHAPTER 8
TESTING OF MATERIALS
All the materials proposed to be used in the works must have been tested by the contractor and
approved by the ENGINEER INCHARGE AND RE well before the start of work at site. The
contractor shall submit the concrete pouring report to the ENGINEER INCHARGE AND RE
and APUFIDC as and when concreting is done and shall obtain the approval of the ENGINEER
INCHARGE AND RE when a particular stage is completed and before proceeding to the next
stage.
Tests for general civil and structural works are listed in Table: 6.4. Test processes are
presented in Table 6.6, 6.7, 6.8 under the referenced test numbers. Required materials tests
are also indicated (materials testing processes are presented in Chapter 9). Test report
formats are included in Chapter 16. Testing of liquid retaining structures is given in Table
6.9. The contractor shall be responsible for conducting tests as stipulated.
Page 28
Quality Assurance & Quality Control Manual
CHAPTER 9
PROCEDURE OF SAMPLING AND TESTING OF MATERIALS
Sampling procedures, sample collection, test to be conducted and acceptable test results of
widely used materials in the projects are covered as under;
9.1 Cement
9.1.1 Sampling Procedures and Sample Collections
The sample collected represents the typical of average properties of material to be tested. Such
sample is said to be the representative sample. Much care and systematic sampling procedure
is required to be followed, which are now standardized by the relevant BIS.
Divide the entire lot in to sub lots. Sub lots should consist of equal No. of bags.
Increments are to be taken by inserting a tube sampler as per IS: 3535. The material so
collected from each bag is 0.75kg.
Material so collected should be placed in to air tight containers. Cans, plastic bags
may be used. These containers shall be sealed immediately. Gross- samples thus
obtained have to be reduced to laboratory samples by quartering. Reduction should be
continued till about 7-10 kg material required for laboratory sample are obtained.
Page 29
Quality Assurance & Quality Control Manual
All laboratory samples and composite samples should be sealed in an air tight
moisture proof container.
9.1.2 Tests for Cement
The cement is the important ingredient of mortar and concrete used for construction purposes.
The various physical and chemical test should be conducted as per prescribed frequency.
Following are the tests to be conducted to judge the quality of cement.
1. Consistency
2. Fineness
3. Soundness
4. Initial and Final Setting Time Of Cement
5. Compressive strength
A. Test for Fineness
To determine the fineness of cement by dry sieving as per IS: 4031 (Part 1) – 1996. The
principle of this is that we determine the proportion of cement whose grain size is larger
than specified mesh size. The apparatus used are 90µm IS Sieve, Balance capable of weighing
10g to the nearest 10mg, A nylon or pure bristle brush, preferably with 25 to 40mm, bristle,
for cleaning the sieve.
Procedure to Determine Fineness of Cement
i) Weigh approximately 10g of cement to the nearest 0.01g and place it on the sieve.
ii) Agitate the sieve by swirling, planetary and linear movements, until no more fine
material passes through it.
iii) Weigh the residue and express its mass as a percentage R1, of the quantity first
placed on the sieve to the nearest 0.1percent.
iv) Gently brush all the fine material off the base of the sieve.
v) Repeat the whole procedure using a fresh 10g sample to obtain R2. Then calculate
R as the mean of R1 and R2 as a percentage, expressed to the nearest 0.1 percent.
When the results differbymorethan1percentabsolute, carry out a third sieving and
calculate the mean of the three values.
Reporting of Results
Report the value of R, to the nearest 0.1 percent, as the residue on the 90µm sieve.
B. Test for Compressive Strength
Method
1) Gauge a mixture of cement and regarded identified Indian Standard sand in the
proportion of 1:3 by weight using (P/4+3.0) percent of water where P is the percentage
of water required to produce a paste of standard consistency.
Page 30
Quality Assurance & Quality Control Manual
Page 31
Quality Assurance & Quality Control Manual
9.2 Aggregates
9.2.1 Sampling Procedures and Sample Collections
The method of sampling from stacks on site is described below;
Divide the lot in sub lots.
Minimum weight of gross samples is the minimum No. of increments.
Increments should be drawn with the help of scoop.
Sampling of aggregate from the stacks should be carried out, as for as possible,
during making of the stack.
Number of increments should be equally distributed over the sub-lot.
When it becomes necessary to sample a stationary stack, trench sampling method
may be used.
Page 32
Quality Assurance & Quality Control Manual
Page 33
Quality Assurance & Quality Control Manual
STANDARDS
Ref. of
Test Frequency Acceptance/Standard
Codes
1. Particle Once for IS: 383- Fine aggregates should be grading for as given
Sizes every 1970 below
a) Sieve source IS: 2386 IS
Analysis approval (Part I)– Sieve
Percent by weight passing for
Once in 1963 Design-
a month IS: 1542- ation
1992 Zone-I
Zone II Plaster
IS: 2116- (High Masonry
(Stand. IS:
1980 strength IS: 2116
Conc.) 1542
Conc.)
10mm 100 100 100
For crushed stone sands, crushed gravel sand the permissible limit on 150 micron I S sieve
is increased to 20 %. Tolerance of ± 5 % is allowed except on 600 for sand used in
concrete.
Silt Test
Method
A sample of sand to be tested shall be placed without drying in a 200 ml measuring cylinder.
The size of the sample shall be such that it fills the cylinder up to 100 ml mark. Water shall be
added to 150 ml mark. The mixture shall then be shaken vigorously and allowed to settle for 3
hours.
The height of silt visible as settled layer above the sand shall be expressed as percentage
the height of sand settled below the jar.
The reporting is to be made on format No. A/TR-12 .
Standards
Not more than 8% by weight in natural sand.
Not more than 10% by weight in case of crushed stone sand.
Page 34
Quality Assurance & Quality Control Manual
Organic Impurities
Method
Fill a 350 ml clear glass medicine bottle up to 70 ml mark with a 3% solution of caustic soda or
sodium hydroxide. The sand is next added gradually until the volume measured by the sandy
layer is 125 ml. The volume is then made up to 200 ml by addition of more of solution. The
bottle is then Stoppard and shaken vigorously and allowed to stand for 24 hours. At the end of
this period, the color of the liquid will indicate whether the sand contains a dangerous amount
of matter.
Standards
A colorless liquid indicates a clean sand free from organic matter.
A straw colored solution indicates some organic matter but not enough to be seriously
objectionable. Darker color means that the sand contains injurious amounts and should not be
used unless it is washed, and a retest shows that it is satisfactory.
Bulkage of Sand
Method
Take a measuring cylinder and fill it with damp sand (consolidated by shaking) to its four fifth
capacity. Let the volume of damp sand in the cylinder be X, then pour water in the cylinder
and stir the sand well. The water shall be sufficient to submerge the sand completely. Let the
volume of consolidated sand be Y. The percentage of bulk age of damp sand shall be
calculated from the formula:
Percentage Bulkage =
STANDARD
Test Frequency Ref. Codes Acceptance/Standard
1.Deleterious Once for every IS: 383-1970 Deleterious Percentage by
materials source approval IS: 2386 Material weight (Max.)
Once in a month (Part Coal and Lignite 1
II) – 1963 Clay and Lumps 1
Material finer that 3
75 micron IS Sieve
Soft Fragment -
Shale 1
Total % of all. 5
2.Silt Content Once for every Maximum 8% or as specified in
source approval Agreement
Once daily
3.Specific Gravity Once for every IS: 383-1970 Test is required for maintaining
and Density source approval IS: 2386 uniformity of material brought from
Once every 3 (Part III) – the source
months 1963
Page 35
Quality Assurance & Quality Control Manual
STANDARDS
Page 36
Quality Assurance & Quality Control Manual
Page 37
Quality Assurance & Quality Control Manual
9.3 Bricks
9.3.1 Sampling Procedures and Sample Collections
The sample may be drawn by random sampling.
The stack shall be divided into a number of real or imaginary sections and the
required number of bricks is drawn from each sections. For this purpose bricks in
the upper layers of the stack shall be removed to enable units to be sampled from
places with in the stack.
The bricks shall be selected and inspected for each lot separately for ascertaining
their conformity to the requirement of the relevant specification.
9.3.2 Tests for Bricks IS: 1077-1992
Following tests are required for bricks;
Visual,
Dimension,
Absorption,
Efflorescence,
Compressive strength.
A. Visual
Method:
20 bricks shall be selected at random out of 50,000 bricks of each class, then color and
shape is observed. Two bricks are struck back to back with each other and sound observed
is recorded.
Page 38
Quality Assurance & Quality Control Manual
STANDARDS:
All Classes for masonry Over Burnt for road
Shall have a uniform deep cherry red Shall have a deep copper color, and
color, and shall be thoroughly burnt and shall be over-burnt and regular in
not over burnt. The bricks must give a shape. The bricks should emit a clear
clear ringing sound on being struck. ringing sound when struck. The bricks
They may be free from cracks, chips, must be free from cracks, chips, flaws
flaws and stones lumps of any kind. and stones or lumps and spongy
matter.
B. Dimensions
Method
20 whole bricks shall be selected at random and their dimensions shall be measured
by spreading the bricks in contact with one another, length, breadth and height wise
on a level surface. These dimensions should be within the tolerance limits specified
below:
Length 4600 ± 80
Modular Bricks
Length 3800 ± 80 mm
Standard size of one brick
Width 1800 ± 40 mm Length : 190 mm
Width : 90 mm
1800 ± 40 cm for 90 mm high
Height Height : 90 mm or 40 mm
± 40 for 40 mm high
C. Water Absorption
Method
5 whole dry bricks shall be selected at random from the sample obtained. The test specimen
Page 39
Quality Assurance & Quality Control Manual
shall be weighted and shall then be completely immersed in clean water at room temperature
and allowed to remain in this state for a period of 24 hours. The specimen shall then be taken
out, wiped with damp cloth and then weighed immediately.
STANDARD
Sl.
Class Ref. codes Limit
No.
D. Efflorescence
Method
Five dry bricks shall be selected at random from the sample of bricks obtained. Each brick
shall be placed on end in a flat bottom dish containing distill water. The depth of emersion of
the brick being not less than 2.5 cm. The whole arrangement shall be allowed to stand in a
warm room (i.e. 18 to 30oC ) and well ventilated room until all the water in the dish
evaporate. When the water is absorbed and the bricks appear to be dry, a similar quantity of
distilled water shall again be placed in the dishes and the same allowed to evaporate as
before. At the end of this period the bricks shall be examined for efflorescence.
STANDARDS:
The liability to efflorescence shall be reported as per following definitions:
Page 40
Quality Assurance & Quality Control Manual
E. Compressive Strength
Method:
The bricks when used in masonry are subjected to compressive stresses due to load
transferred. So in order to enable them to sustain the load coming on them, they should be
tested for their compressive strength.
5 whole bricks shall be selected at random from the sample of bricks. The bricks shall be
0
immersed in water at 25 to 29 C for 24 hours. They shall then be removed and allowed to dry
at room temperature for about 5 minutes and wiped free from surplus moisture. Their frogs
shall be filled with mortar composed of one part Portland cement and three parts clean sand
graded to 3 mm and down. The bricks shall then be stored under damp sacks for 24 hours.
After the expiry of this period, they shall be immersed in water for 3 days.
At the end of 3 days the sample of bricks shall be taken out, wiped dry and placed with the
flat surface horizontal and the mortar filled face facing upwards between 2 or 3 plywood
sheets
Approximate 3 mm thick and carefully centered between the plates of the compression testing
machine. The compression plate of the testing machine shall have a ball seating in the form of
a portion of a sphere, the centre of which coincides with the centre of the face of the plate. The
load shall be applied axially at a uniform rate of approximately 140 kg/cm2 per minute until
2
failure occurs. The compressive strength of bricks shall be expressed in kg/cm or N/mm2.
During testing of bricks if any brick is found to have strength more than 20% of the group, it
shall be limited to +20%only for calculating the average strength.
STANDARD
Page 41
Quality Assurance & Quality Control Manual
The first class bricks as per technical specifications should have strength of 10.5 N/ mm2
Page 42
Quality Assurance & Quality Control Manual
B. Compressive Test:
Method
The 150 mm cube moulds as per IS: 10086 -1982 are used for this purpose. Six specimens shall
be taken for each sample to be tested for 7 and 28 days. The mould is filled with concrete mix
in 3 layers of equal thickness. Each layer is template 25 times by the 16 mm diameter bullet
pointed 60 cm length iron pinning rod. The test shall be made at the edge of concrete
corresponding that to for which the strength specified, Compression tests shall be made
immediately upon removal of the concrete test specimens from the curing room i.e. the test
specimens shall be loaded in damp condition. The dimensions of the test specimens shall be
measured in millimeters accurate to 0.5.The metal bearings plates of the testing machine shall
be place in contact with sides of the test specimens.
Cushioning material shall not be used in the machine. In the case of cube, the test specimen
shall be placed in the machine in such a manner that the load is applied to the sides of the
specimen. An adjustable bearing block shall be the used to transmit the load to the test
specimen. The size or lower section of the bearing block shall be kept in machine as the head
of the testing machine is brought to a bearing on test specimen.
The load shall be applied axially without shock at the rate of approximately 140 kg/ cm2 per
minute. The total load indicated by the testing machine at failure of the test specimen shall be
recorded and the unit compressive strength calculated from the measured dimensions of the
test specimen. The type of failure and appearance of the concrete shall be noted. The reporting
Page 43
Quality Assurance & Quality Control Manual
Type of steel
Nominal size
Cross-section
Grade and mould number
Test to be done on the samples.
9.5.2 Tests of Steel for Reinforcement IS: 1786-2008
Method
The steel should be got tested in authorized laboratories before it is used for work at site.
Following tests should be conducted for reinforcement steel,
Page 44
Quality Assurance & Quality Control Manual
Page 45
Quality Assurance & Quality Control Manual
Sl.
Test Standards
No.
9.6.2 Tests of UPVC Pipes for Potable Water Supply IS: 4985-2000
Methods and Standards
The dimension test should be carried out in the field and other types should be carried out
in the laboratory before use.
Page 46
Quality Assurance & Quality Control Manual
Pipes of 1.0 m length each size should be sampled out for test.
Ref.
Field tests Standards
codes
Length of pipe IS: As per Table-1
Mean outside dia.(Min/Max) 4985- ,,
Diameter at any point.(Min/Max) 2000 ,,
Wall Thickness .Average (Min/Max)
Visual appearance ,,
Smooth, clean, both end square cut
Dimensions of sockets Ls = 0.5dn + 6mm
Ls = minimum socket length
dn = nominal outside dia of pipe
REF.
LAB TEST STANDARDS
CODES
IS: Shrinkage not more than 5%
Reversion test 12235(5)-
2004 Pipe shall not fail during the
Short term hydro static pressure test prescribed test duration.
4.19xPN( MPa) at 27oC for one hour TIR not more than 10%
IS: 12235 VST of specimen shall not be less than
Resistant to external blows at (8)-2004 800 C
IS:
13360 (3)
9.6.3 Test of UPVC Pipes for Drainage / Sewerage Work
Methods and Standards
The dimension test should be done in field on receipt of pipes using ball ended screw
gauge/and caliper for other test sample as above should be sent to approved laboratory and
it should be used only after the result are found satisfactory as per relevant standards.
Page 47
Quality Assurance & Quality Control Manual
STANDARDS
Field test Ref. codes Standards
1) Dimension IS: 1) IS 15328- 2003 Table-1
(i)Mean outside dia. 15328- ---- do ----
(ii)Outside dia. at any point 2003 IS 15328- 2003 Table-3
(iii)Wall thickness 2) The internal & external surface of the pipe
shall be smooth clean and free from any
2) Visual appearance
other ducts
3) The color shall be dark (any shade of
3) Color brown) uniformly colored throughout the
entire wall, slight variations in the
appearance of the color are permitted.
Page 48
Quality Assurance & Quality Control Manual
Page 49
Quality Assurance & Quality Control Manual
Ref.
Test Frequency Acceptance / Standard
code
1.Dimensions As per Table
(i) Out side Dia.
(ii) Wall thickness No localized swelling, leakage, weeping, or
1. Hydraulic bursting during subjecting to internal pressure
Characteristics creep test.
2. Reversion Test Longitudinal reversion shall not be more than
3%
3. Density 940.5 to 946.4Kg/m3 at 270C and shall not differ
from the nominal value by more than 3kg/ m3
4. Melt Flow Rate 0.41 to 1.10 at 1900C with nominal load of 5kg
(MFR) and shall be within 20% of the value declared by
the manufacturer.
5. Carbon Black
Content and 2.5+ 0.5% with uniform dispersion.
Dispersion
Page 50
Quality Assurance & Quality Control Manual
1. Mass of Zinc One test per lot IS: 6745-1972 400 g/m2 minimum total mass of Zinc
Coating (inside and outside) per surface area
(inside and outside) of the coated surface.
The Zinc coating shall be free from
2Visual Test One test per lot IS: 2629-1985 imperfection like flux, ash and dross
inclusions, bare patches, black spots,
pimples, lumpiness, rums, rust, blister,
white deposit etc.
Minimum 1m pipe length for each size should be sent for lab test.
Page 51
Quality Assurance & Quality Control Manual
CHAPTER 10
WATER FOR CONSTRUCTION PURPOSES
Water used for mixing and curing shall be clean and free from injurious amounts of oil,
acids, alkalis, salts, sugar, organic materials or other substances that may be deleterious to
concrete or steel. Potable water is generally considered satisfactory for mixing concrete.
10.1 Sampling of Water
The containers of glass or other inert material like polythene must be carefully cleaned
before use. Minimum one liter sample should be collected for lab test.
Methods and Standards
Water should be tested as per relevant IS Codes as shown below, and shall conform to IS: 456 -
2000 and IS: 10500-1991. The reporting is to be made on format A/TR-4.
Ref.
Test Frequency Acceptance/Standard
Codes
1. Chemical Analysis Once for every
source approval IRC: 21-
(a) PH value Every Quarterly 2000 a) Minimum6
Chemical tests daily
in the site b) 2000mg/L for concrete
(b) Chlorides (as Cl) Laboratory with IS: 3025 not containing
testing kits (Part 32) - embedded steel and
1987 500mg/L for RCC and
PSC
(c) Sulphates (as SO3) IS: 3025 c) 400mg/L
(Part 28)
(d) Neutralization with
-1987 d) Max. 5 ml of 0.2 normal
NaoH (with
IS: 3025 NaOH to neutralize 100
phenolphthalein as
(Part 22) ml. sample of water
indicator)
-1987
2. Physical Analysis
(a) Suspended Matter Once for every IS: 3025 a) 2000 mg/ l max.
(b) Organic Matter source approval (Part 23)
(c) Inorganic Matter Every Quarterly -1987 b) 200 mg/ l max.
IS: 3025
(Part 17) c) 3000mg/l max.
IS: 3025
(Part 18)
IS: 3025
(Part 19)
- 1987
Page 52
Quality Assurance & Quality Control Manual
CHAPTER 11
TESTS & STANDARDS FOR TIMBER
All the mechanical properties of seasoned timber vary with moisture content, and
therefore, it is necessary that the moisture content of timber be determined. It can be
measured by moisture meter using electrode. When moisture content of timber is checked by
oven drying method, the result of electrical moisture meter shall be ignored.
Methods
11.1 Surface Electrode Test
For surface measurement of moisture content of veneers, plywood and finished wood ware
item as there are no needles or knives to be driven into the timber, it does not spoil the
fabricated articles, just press lightly on the surface of the wood and you get an instantaneous
reading of the moisture content.
11.2 Knife Electrode Test
For measuring the moisture content of planks and boards, the knives are en -headed in a
plastic material, which can stand light hammers for driving the knives up to about 8mm into
the timber. This will give the average moisture content of a plank from 25 to 40 mm thick.
STANDARD
Page 53
Quality Assurance & Quality Control Manual
CHAPTER 12
TESTS & STANDARDS FOR OTHER CONSTRUCTION MATERIALS
12.1 Terracing
Method
When terracing is completed and curing is done for a period of 7 days, the roof shall be tested
by filling of 10 cm deep water for 72 hours. The seepage shall be watched and results entered
in site register of checks. Standard required is as mentioned hereunder:
STANDARD
The roof surface as completed shall be even and true to slope of 1 in 48 or as specified and
should be leak proof.
Concrete weaker than M-30 shall not be used. Compaction of concrete shall be done by
machine vibrations.
12.3 Plastic Encapsulated Footrests
Orange color safety footrest of minimum 6 mm thick plastic encapsulated as per IS : 10910-
1984 on 12 mm dia. steel bar conforming to IS : 1786-2008 having minimum cross section as 23
mm x 25 mm and overall minimum length 263 mm and width as 165 mm with minimum 112
mm space between protruded legs having 2 mm tread on top surface ribbing or chequering
besides necessary and adequate anchoring projections on tail length on 138 mm as per
standard drawing and suitable to with stand the bend test and chemical resistant test as per
specifications and having manufacturer’s permanent identification mark to be visible even
after fixing. The step shall be tested at a load of 225 Kg. as per IS : 5455-1969.
Page 54
Quality Assurance & Quality Control Manual
Page 55
Quality Assurance & Quality Control Manual
CHAPTER 13
DRINKING WATER SAMPLING
Physical, chemical and bacteriological analysis are necessary for drinking water. All samples
of water should be properly labeled and should be accompanied by complete and accurate
identifying and descriptive data. Data should include date and time of collection, type of
source of the sample and temperature of water at the time of collection.
13.1 Sampling for Physical and Chemical Analysis
The containers of glass or other inert material like polythene must be carefully cleaned before
use. It can be rinsed with alkaline permanganate solution followed by oxalic acid solution.
After having been cleaned, should be rinsed thoroughly with tap water and then with distilled
water. About 2.5 liters of the sample is required for analysis. Prior to filling, the sample bottle
should be rinsed out two or three times with water to be collected. Care should be taken to
obtain a sample that is truly representative of existing conditions and to handle it in such a
way that it does not deteriorate or become contaminated before it reaches the laboratory. The
sample should reach the place of analysis as quickly as possible with in 72 hours of collection.
The sample should only be collected after the well has been pumped for a sufficient time to
ensure that the sample will be representative of the groundwater.
Page 56
Quality Assurance & Quality Control Manual
**Cause for
Sl. No. Characteristics *Acceptable
rejection
7 Chlorides (as CI) (mg/I) 200 1000
8 Sulphates (as SO4) (mg/I) 200 400
9 Fluorides (as F) (mg/I) 1.0 1.5
10 Nitrates (as NO3) (mg/I) 45 45
11 Calcium (as Ca) (mg/I) 75 200
12 Magnesium (as Mg) (mg/I) 30 150
If there are 250mg/I of Sulphates, Mg content can be increased to a maximum of 125mg/I
with the reduction of Sulphates at the rates of 1 unit per every 2.5 units of sulphates.
13 Iron (as Fe) (mg/I) 1.0 1.0
14 Manganese (as Mn) (mg/I) 0.05 0.5
15 Copper (as Cu) (mg/I) 0.05 1.5
16 Aluminum (as AI ) (mg/I) 0.03 0.2
17 Alkalinity (mg/I) 200 600
18 Residual Chlorine (mg/I) 0.2 >1.0
19 Zinc (as Zn ) (mg/I) 5.0 15.0
20 Phenolic compounds (as Phenol) 0.001 0.002
21 Anionic detergents (as MBAS ) (mg/I) 0.2 1.0
22 Mineral Oil (mg/I) 0.01 0.03
TOXIC MATERIALS
23 Arsenic (as As ) (mg/I) 0.01 0.05
24 Cadmium (as Cd ) (mg/I) 0.01 0.01
25 Chromium (as hexavalent Cr ) (mg/I) 0.05 0.05
26 Cyanides (as CN ) (mg/I) 0.05 0.05
27 Lead (as Pb ) (mg/I) 0.05 0.05
28 Selenium (as Se ) (mg/I) 0.01 0.01
29 Mercury (total as Hg ) (mg/I) 0.001 0.001
30 Polynuclear aromatic hydrocarbons (PAH) (µg/I) 0.2 0.2
31 Pesticides (total, mg/I) Absent Refer to WHO
guidelines for
drinking water
Quality Vol. I-1993
RADIO ACTIVITY+
32. Gross Alpha activity (Bq/I) 0.1 0.1
33. Gross Beta activity (Bq/I) 1.0 1.0
Notes:
* The figures indicated under the column “Acceptable” are the limits up to which water is
generally acceptable to the consumers.
** Figures in excess of those mentioned under “Acceptable “ render the water not
acceptable, but still may tolerated in the absence of an alternative and batter source but up
to the limits indicated under column “Cause for Rejection” above which they have to be
rejected.
+ It is possible that some mine and spring waters may exceed these radioactive limits and
in such cases it is necessary to analyze the individual radio nuclides order nuclides
order to asses the acceptability or otherwise for public consumption.
Page 57
Quality Assurance & Quality Control Manual
E. coli or thermo tolerant Coli form bacteria must not be detectable in any 100-ml sample
E. coli or thermo tolerant Coli form bacteria must not be detectable in any 100-ml sample
Total Coli form bacteria must not be detectable in any 100-ml sample
E. coli or thermo tolerant Coli form bacteria must not be detectable in any 100-ml sample
Page 58
Quality Assurance & Quality Control Manual
CHAPTER 14
CHECKS AND TESTS OF FINISHED WORKS
14.4 Plastering
The finished plaster surface be cut out 10x10 cms in size and thickness be checked and
recorded in site register of checks. Such cut outs should be in each wall of every room.
1 kg of sample is required for chemical tests.
14.5 Thickness of Floors
Cut out of size 5x5 cms will be made in the corner of each room and thickness of floor
will be measured and recorded in the site check register.
14.6 Chaukhats
The section of the chaukhats be checked and dimensions recorded in the site register of
checks. Each chaukhat be checked by J.E. in token of having been checked. The
dimensions of sections should be within the prescribed tolerances.
14.8 Paint, Distemper Plastic Emulsion (One test for each brand of paint)
Approved paint will be obtained in container and each container will be opened in the
presence of J.E. who will sign the container in token thereof. Such container when
empty will be kept in his custody and counted when all painting work is completed to
ascertain that the spreading capacity has been maintained as laid down by the
manufacturers. The results be noted in the site register for checks.
Page 59
Quality Assurance & Quality Control Manual
14.9 Fittings
The fittings for doors and windows shutters will be checked to see that they are in
according to specifications, designs and results are entered in the register of checks. It
should also be ensured that the fittings are fixed with the specified number and quality
of screws.
Page 60
Quality Assurance & Quality Control Manual
CHAPTER 15
HYDROSTATIC TESTS OF PIPELINES
After a new pipe has been laid, jointed and back filled (or any valve section thereof), it shall
be subjected to the following two tests:
i) Pressure test at a pressure of at least double the maximum working pressure-pipe
and joints shall be absolutely water tight under the test.
ii) Leakage test (to be conducted after the satisfactory completion of the pressure test)
at a pressure to be specified by the authority for duration of two hours.
The portions of the line shall be tested by subjecting to pressure test as the laying progresses
before the entire line is completed. In this way any error of workmanship will be found
immediately and can be corrected at a minimum cost. Usually the length of the section to be
tested shall not exceed 500m.
Where any section of a main is provided with concrete thrust blocks or anchorages, the
pressure test shall not be made until at least five days have elapsed after the concrete is cast.
If rapid hardening cement has been used in these blocks or anchorages, test shall not be
made until at least two days have elapsed.
Prior to testing, enough back fill shall be placed over the pipe line to resist upward thrust. All
thrust blocks forming part of the finished line shall have been sufficiently cured and no
temporary bracing shall be used.
The open end of the section shall be sealed temporarily with an end cap having an outlet
which can serve as an air relief vent or for filling the line, as may be required. The blind face of
the end cap shall be properly braced during testing by screw jacks and wooden planks or steel
plate. The section of the line to be tested shall be filled with water manually or by a low
pressure pump. Air shall be vented from all high spots in the pipe line before making the
pressure strength test because entrapped air gets compressed and causes difficulty in raising
the required pressure for the pressure strength test.
The test pressure shall be gradually raised at the rate of approximately one Kg,/sq. cm. /min.
the duration of the test period if not specified shall be sufficient to make a careful check on the
pipe line section.
The pipe shall be judged to have passed the test satisfactorily if the quantity of water required
to restore the test pressure does not exceed 1.5 liters per 10 mm of nominal bore for a length of
1 km.
Page 61
Quality Assurance & Quality Control Manual
CHAPTER 16
TEST REPORT FORMATS
All the essential test report formats for implementation of QA/QC procedures are
given and are listed below;
Page 62
Quality Assurance & Quality Control Manual
CONSISTENCY
Trial Weight of Weight Percentage of Reading of Consistency
No. cement of water water indicator (P) Remarks
SETTING TIME
Time recorded when Time recorded at
Setting Time water added set Setting time Remarks
Initial
Final
FINENESS
Weight of Retained on 0.075
cement used Percentage retained Remarks
Sieve
COMPRESSIVE STRENGTH
Crushing
Room Date of Date of Age of Crushing strength
temperature casting testing specimen load (T) Remarks
kg/cm2
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 63
Quality Assurance & Quality Control Manual
A - 20 mm Nominal size
B - 10 mm Nominal size
Cumulative Remarks /
Sieve size Weight weight Cumulative Cumulative
Standards
in mm retained (g) retained % retained % passing
% Passing
12.5 mm 100
10 mm 85-100
4.75 mm 0-20
2.36 mm 0-5
Pan
TOTAL
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 64
Quality Assurance & Quality Control Manual
Name of work :
Contract Agreement No :
Name of contractor :
Source of supply :
Date of sampling & Quantity:
Material description :
Cumulative Standards
Sieve Weight Cumulative
weight Cumulative Zone II
size in retained % (wt)
retained % retained Passing
mm (g) passing
limits
4.75mm 90-100
2.36 mm 75-100
1.18 mm 55-90
600 µ 35-59
300 µ 8-30
150 µ 0-10
Pan
TOTAL
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 65
Quality Assurance & Quality Control Manual
16.4 Test Certificate for Construction Water (For saline zone only)
Form No. A/TR-4
Name of work :
Contract Agreement No :
Name of contractor :
Source of supply :
Date of sampling & Quantity :
Material description :
Inorganic
Sl. PH Organic Sulphates Chlorides Suspended
Solids
No. Color Value Solids (mg/l) (mg/l) (mg/l) matter (mg/l)
(mg/l)
PCC < 2000
Limits >6 < 2000 < 3000 < 500 < 2000
RCC < 1000
1
2
3
4
5
Remarks/
Recommendations……………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 66
Quality Assurance & Quality Control Manual
Name of work :
Contract Agreement No :
Name of contractor :
Sampling done By :
Date of sampling & Quantity:
Description of structural member
Test No.
Sl. No. Particulars Unit
1 2 3
1 Identification Mark
2 Weight Kg
3 Length Cm
4 Breadth Cm
5 Height Cm
6 Area Cm2
7 Crushing Load Kg
8 Compressive strength Kg/cm
2
Remarks /
Recommendations. ………………………………………………………………..
Signature :
Name :
Date :
For Contractor
Page 67
Quality Assurance & Quality Control Manual
Name of work :
Contract Agreement No. :
Name of contractor :
Source of supply :
Date of sampling & Quantity:
Material description :
Remarks / Recommendations.
………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 68
Quality Assurance & Quality Control Manual
Name of work :
Name of contractor :
Source of supply :
Material description :
Volume of water
Internal Time
Sl. Water level to restore to
diameter in Stretch Length (m)
No. drop (mm) original level
(mm) hours
(liters)
10 min 30 min 10 min 30 min
Remarks / Recommendations
……………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 69
Quality Assurance & Quality Control Manual
Name of work :
Name of contractor :
Source of supply :
Material description :
Applied
Internal test
Sl. Material Length
diameter Stretch pressure Time (hours) Observations
No. of pipe (m)
(mm)
kg/cm2
1 2 3
Remark / Recommendation.
……………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 70
Quality Assurance & Quality Control Manual
Name of contractor :
Material description :
Remark / Recommendation.
……………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 71
Quality Assurance & Quality Control Manual
Name of work :
Contract Agreement No. :
Name of contractor :
Description :
Observation Date of
Initial Final Time
no. observation
1.
2.
3.
4.
5.
6.
Remark / Recommendation.
……………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Department
Page 72
Quality Assurance & Quality Control Manual
Name of contractor :
Description :
Brand ……………………
Weight of Water
Weight of Dry Dimensions
Sl. No. water Bricks Absorption
bricks (Kg) - A (mm)
(Kg) - B (B-A) / A x 100
1
Remark / Recommendation.
……………………………………………………………………..
Signature : Signature :
Name : Name :
Date : Date :
Page 73
Quality Assurance & Quality Control Manual
Name of contractor :
Description :
Brand : ……………………
It should not
Height of sand
be more
layer (A)
than 8 %
Height of silt
layer (B)
Remark / Recommendation.
……………………………………………………………………
Signature : Signature :
Name : Name :
Date : Date :
Page 74
Quality Assurance & Quality Control Manual
CHAPTER 17
RECORDS TO BE MAINTAINED AT CONSTRUCTION SITE
The contractor shall be responsible for a site order book, in triplicate, at the site of work at all
time, and this shall be open for inspection by authorized representative of ULB’S. The site
order book has two primary purposes to record day today instruction to the contractor and
the contractor’s compliance with these instructions, and to record the inspections and
expectations of work completion stages along with issuing approvals to the contractor to
proceed with the next stage of constructions.
As noted above the status of the contractor’s compliance with instructions issued is to be
summarized in the site order book, Format No. C/QRF-1 given below, and reviewed monthly
by the ULB’S and during the periodic squad checks. In cases where the contractor has failed to
comply with the instructions the reasons therefore shall be determined and necessary
remedial action required to be taken.
The ULB’S will maintain a file of site orders issued to contractor for record and compliance.
Compliance
*(3 copies per set- one copy each to be sent to ULBs by the contractor, one copy to be
retained at site)
Page 75
Quality Assurance & Quality Control Manual
Addition Balance
Cumulati Cumu Present Signature
Sl. Previous Invoice/ al Issued / Out
Date ve lative require of
No. Quantity Bill No Quantity consumed standing
Quantity Issue ment contractor
Quantity
Page 76
Quality Assurance & Quality Control Manual
Name of Work :
Contract Agreement No. :
Name of Contractor :
Date :
EQUIPMENT AT SITE
Available :
Under Repair :
Signature : Signature :
Name : Name :
Date : Date :
Page 77
Quality Assurance & Quality Control Manual
Name of Work :
Contract Agreement No. :
Name of Contractor :
Steel checked By :
Form work Checked By :
Scaffolding checked By :
Slump checked By
Cube filled in the presence of
Name of
Mix Approved Time of Cement Time of
Date compo Structural Qty. Laid
nent Member Proportion By Start bags used completion
Signature : Signature :
Name : Name:
Designation: Designation:
For Contractor For Department
Page 78
Quality Assurance & Quality Control Manual
Page 79
Quality Assurance & Quality Control Manual
Name of Work :
Name of Contractor :
Status of
Date of
Sl. Drawing Contractor’s S.D.E./E.E.
Details of Drawing Title/ No Receipt of
No. (Original/ Signature Signature
Drawing
Revised )
Page 80
Quality Assurance & Quality Control Manual
Name of Work :
Name of Contractor :
Nature of non-conforming-
Comments:
Signature : Signature :
Name : Name :
Date : Date :
Page 81
Quality Assurance & Quality Control Manual
CHAPTER 18
QUALITY ASSURANCE BY DEPARTMENTAL ENGINEERS DURING INSPECTION
The tenders are on turnkey basis and all the material is procured by the contractor, hence to
have a proper quality control and to improve the quality of work, the departmental engineer’s
at various level will ensure thekey parameters of quality assurance during inspections as per
Table 18.1. Such tools are not covered up in the Manual of orders. These inspections shall not
impinge the existing responsibilities of the officers/ engineers as laid down in the Manual of
orders.
Page 82
Quality Assurance & Quality Control Manual
Sl.
Key parameters of Quality Assurance
No
4.12 Silver ionization plant
4.13 Any other item as per agreement
DEPARTMENTAL TEAM
5
INSPECTION
5.1 DI, CI,PVC,
5.2 Pumps , Motors & D.G. Sets
5.3 Manhole Frames and covers
5.4 R.C.C. Pipes
CHECK LIST GUIDE FOR
6
WORKS
Laying and jointing of pipeline, Back
6.1
filling, Hydro testing
6.2 Pump & machinery of
6.3 Disinfecting plant
6.4 Pump chamber
6.5 Development of water works
6.6 O.H.S.R / U.G.S.R
6.7 Water treatment plant (canal based)
6.8 Sewer laying & treatment
6.9 Control panel for 3 phase pump & motor
6.10 Centrifugal pump and motor
PERIODICAL SITE
7
INSPECTIONS
POST QUALITY INSPECTION OF
8
FINISHED WORKS
9 QUALITY CERTIFICATION
MONTHLY REPORTING AND
10
REVIEW MEETINGS
Page 83
Quality Assurance & Quality Control Manual
CHAPTER 19
CHECK LIST GUIDES FOR VARIOUS WORKS
20.1 Check List for Laying and Jointing of Pipe Lines, Back Filling, Hydrotesting
1. Name of work :
2. R.B. No. :
3. Contract Agreement No. :
4. Name of contractor :
Sl.
Description Yes/No/NA Remarks
No.
A. Stage 60% Payment schedule: - Supplying of pipe and valves, excavation, laying,
jointing, and fixing of valves.
1 a) Whether pipes are of proper specifications and as per
approved make as per DNIT?
b) Whether pipes have been tested at manufacturer’s
premises and has been inspected by two officers deputed as
per instructions of the department and test certificates are
available?
5 Whether the pipe line has been laid true to the alignment
with proper bedding made as per specifications?
7 Whether all the lanes are provided with pipe lines as per
approved drawing?
Page 84
Quality Assurance & Quality Control Manual
Sl.
Description Yes/No/NA Remarks
No.
B. Stage 40% Payment schedule: - Completion, testing and commissioning.
6 Whether the road metal was separately collected and all type
of roads reinstated properly after laying of pipes?
Name : Name :
Date : Designation :
Date :
Page 85
Quality Assurance & Quality Control Manual
Page 86
Quality Assurance & Quality Control Manual
Sl.
No. Description Yes/No/NA Remarks
Page 87
Quality Assurance & Quality Control Manual
Sl.
No. Description Yes/No/NA Remarks
Page 88
Quality Assurance & Quality Control Manual
Sl.
No. Description Yes/No/NA Remarks
12. Whether proper tile terracing has been done on roof as per
specification?
13. Whether proper quality and type of wood has been used with
correct thickness of shutters as per specification?
14. Whether thickness of Glass used in window panes is correct
as per specification?
15. Have grills been provided as per standard drawings?
Page 89
Quality Assurance & Quality Control Manual
1. Name of work :
2. Contract Agreement No. :
3. Name of contractor :
Page 90
Quality Assurance & Quality Control Manual
Name : Name :
Date : Designation :
Date :
Page 91
Quality Assurance & Quality Control Manual
Page 92
Quality Assurance & Quality Control Manual
B. Stage 30% Payment schedule: - From ring beam up-to roof slab and completion of stair
case.
1 Is the reinforcement in the following members provided is as
per drawing/design and whether it has been checked by
EE/SDE?
Bottom Ring beam
Bottom dome and gallery
Tank wall
Top ring beam
Top dome
Staircase and landings
Page 93
Quality Assurance & Quality Control Manual
Page 94
Quality Assurance & Quality Control Manual
Page 95
Quality Assurance & Quality Control Manual
Page 96
Quality Assurance & Quality Control Manual
Name : Name :
Date : Designation :
Date :
Note : Check list for components namely OHSR, Pump chamber, Centrifugal pump and
motor, Control panel, Development of water works compound and Disinfecting unit shall be
required to be filled separately on prescribed format .
Page 97
Quality Assurance & Quality Control Manual
Page 98
Quality Assurance & Quality Control Manual
Page 99
Quality Assurance & Quality Control Manual
Page 100
Quality Assurance & Quality Control Manual
Note : Check list for components namely Pump chamber, Development of water works
compound shall be required to be filled separately on prescribed format .
Page 101
Quality Assurance & Quality Control Manual
20.8 Check List for Control Panel for 3-Phase Pump & Motor
FORM No. B/CL-8
1. Name of work :
2. Contract Agreement No. :
3. Name of contractor :
Page 102
Quality Assurance & Quality Control Manual
Page 103
Quality Assurance & Quality Control Manual
20.9 Check List for Centrifugal Pump, Motor & Fittings of Delivery Pipe in Pump
Chamber
FORM No. B/CL-9
1. Name of work :
2. Contract Agreement No. :
3. Name of contractor :
11 Whether the suction lift is within the limit (4.5 m IS: 9694 Part-I)?
12 Whether the suction pipe joints are airtight and pump starts
without priming?
13 Whether Sluice valve, reflux valve and Air valve are ISI marked
and as per specifications & the MC has been obtained?
14 Whether the pipes and specials, rubber packing, nut and bolts are
as per specifications?
15 Is there any leakage from fittings?
a)Inside the pump chamber
b) Outside the pump chamber
16 Is Air Valve/Non Return Valve installed properly?
17 Is double earthling done for machinery and is in order?
18 Is there any excess vibrations observed on running of Pump?
Page 104
Quality Assurance & Quality Control Manual
Page 105
Quality Assurance & Quality Control Manual
1. Name of work :
2. Contract Agreement No. :
3. Name of contractor :
4. Name of Structure/Location:
QUALITY CERTIFICATE
This is to certify that we have inspected the conduct of the works in accordance with
established Quality Control procedures and that the items included in this Interim
Payment Certificate satisfy the required quality of works and are acceptable with regard
to the specifications and standards as prescribed under the Contract. Requisite Test
Certificates are attached.
Enclosures
1
2
3
4
5
6
7
8
9
10
Signature/Date:
[ULB]
Note: This Quality Certificate shall be completed and attached to each Interim Pay before
payment is made.
Page 106
Quality Assurance & Quality Control Manual
CHAPTER 20
PROJECT IMPLEMENTATION ARRANGEMENTS
1. ULB’S has created a State Project Management Cell for overall programme planning,
fund flow management, capacity building , IEC, Quality Control, monitoring of physical
and financial progress and reporting.
2. Quality Management and Surveillance Wing have been created for technical audit of
different activities of construction at various stages during progress of project work.
3. Department of water supply and sanitation (ULB’S) have 3 Chief Engineer, 11
Superintending Engineer and team of Executive Engineers, Sub Divisional Engineers
(SDE), and Junior Engineers (J.E.) for project planning, supervision of projects in the
state and O&M of MV schemes.
4. A consultant has been engaged for providing technical support.
5. Consultant has also been appointed for Water Quality Monitoring, Remote sensing and
source studies.
6. District Project Management Cell (DPMC) has been created in all the 20 Districts for the
support to the GPWSCs and responsible for planning and monitoring of programme
activities in the district.
7. Consultant for IEC and MIS development has been engaged.
8. A consultant for preparing QA/QC manual and its implementation, capacity building
with strategic supervision has also been appointed.
9. GPWSCs are formed for participation as owner’s representative towards monitoring of
the water supply and sanitation schemes to be implemented for single village and intra
villages and ensure O&M of assets.
20.1 Responsibilities of Key Organizations
Table20 1 identifies the responsibilities of each organization’s to avoid any
misunderstanding.
Table: 20.1 Responsibilities of Key Organizations
Sl.
Task Activities Unit
No.
1 TECHNICAL APPROVAL OF DESIGN Approval
DRAWING AND COST ESTIMATES.
2 TENDER, ALLOTMENT AND UPKEEP OF Invitation,
CONTRACT DOCUMENTS. Receive tenders,
evaluation
Page 107
Quality Assurance & Quality Control Manual
Page 108
Quality Assurance & Quality Control Manual
Page 109
Quality Assurance & Quality Control Manual
6 REPORTING
6.1 Submit monthly project progress report. Submission
8 OTHER RESPONSIBILITIES
Page 110
Quality Assurance & Quality Control Manual
CHAPTER 21
QA / QC DUTIES OF CONTRACTORS
These procedures are prepared with a view of ensuring stream lime action in various activities
that might have over lapping responsibilities. These are only clarifications on the responsibilities
as prescribed in the department. in case of variance, the contract documents will prevail over the
stipulations above.
20.1 QA / QC Duties
The contractor’s QA/QC duties are summarized in Table: 21.1. Apart from these other duties
shall be performed as per the contract documents or directed by the Engineer. It is essential to
keep certain documents at site for making a permanent record of each and every item related to
the project. Such items may include tests conducted at site, test certificates, instructions issued to
contractor, record of drawings issued to the contractor, inventory of the material at site. All such
site documents play an important role not only in assuring the quality of the work, but also in
making the project management comparatively easier. All these documents with a definite
identification number have been listed in Chapter-3.
Table: 21.1 List of Contractor’s QA/QC Duties
Activity/Item Contractor’s QA/QC Duties
Designs/Drawings Maintain design / drawing register at site
for contract Use only approved drawings for construction
Page 111
Quality Assurance & Quality Control Manual
Page 112
Quality Assurance & Quality Control Manual
7 Bitumen Shalimar
8 AC Sheets Everest, Armco, Charminar, Uppal
Page 113
Quality Assurance & Quality Control Manual
15 Oil distemper and other paint Shalimar, British paint, any Asian brand, Berger
Page 114
Quality Assurance & Quality Control Manual
52 Thimbles Dowell,
Page 115
Quality Assurance & Quality Control Manual
CHAPTER 22
DESIGN REQUIREMENTS
Page 116
Quality Assurance & Quality Control Manual
f) In general, reinforcement for buildings and sewage treatment units shall be TMT-CRS
(Corrosion Resistant Steel) of Grade Fe 500D. All physical and chemical properties of
this Fe 500 grade steel shall conform to IS: 1786-2008. Welded wire fabric shall conform
to IS: 1566 as shown or specified on the drawing. The CRS (corrosion resistant steel)
index shall be at least 1.35 when tested for Salt Spray test as per "ASTM B 117 - 2009 test
procedure for 120 hours when compared with the Fe 500D normal reinforcement bars
and with same bar diameter. All test results (including physical and chemical properties
and salt spray tests) have to be produced for the respective bar diameter for each
consignment of steel delivered at site and at a frequency of every 20 Metric Tons.
Reinforcement bars and structural steel to be procured only from Primary steel
producers with Integrated Steel such as TATA/ SAIL/ RINL/ JSW/ SHYAM STEEL/
EQUIVALENT using iron ore as the basic raw material and having in-house iron
making facilities followed by production of liquid steel and crude steel with in-house
rolling, adopting BF-BOF route or DRI-EAF technology as per Ministry of Steel
guidelines. No Re-rolled material/secondary steel will be accepted or allowed for any
structural works.
Only those firms are eligible who are primary steel producer and should have
integrated steel plant in single premises.
Certificate issued by ministry of steel of primary steel producer and integrated steel
plant having infrastructure in single premises for producing sponge iron, billet and TMT
reinforcement bars using iron ore as base material. The steel manufacturing company
should have latest ISO accreditation for Quality Management System.
g) The minimum amount of reinforcement in each of the two directions at right angles
within each surface zone should be provided as per clause 8.1 of IS 3370 (Part 2):2009.
Definition of surface zones is clearly shown in Figure 1 and Figure 2 of IS 3370 (Part 2):
2009. For slabs, minimum of 10 mm dia bars shall be used to avoid any deformation of
lesser diameter bars under loads prior to construction.
h) All buildings shall have a minimum 1 meter wide, 100 mm thick plinth protection
paving in M15 grade concrete or stone slabs/tiles. All plinth protection shall be
supported on well compacted strata.
i) All pipes and ducts laid below the structural plinth and road works shall be surrounded
with concrete of grade M15 having minimum 150 mm thick concrete or D/4 (D = outer
dia. of pipe) thickness whichever is more with proper reinforcement.
j) Use of pressure relief valves to reduce uplift pressure due to ground water table shall
not be allowed.
k) Detailing of the reinforcement shall be considered as per latest Indian code of practices
and special publications as applicable.
Page 117
Quality Assurance & Quality Control Manual
l) Sliding layer or slip layer shall be provided between sub base and structural slab (Raft).
Polythene sheets of 500 microns shall be provided as sliding layer as per IS specification.
m) Water tightness testing of water retaining structures shall be done in accordance with IS:
3370, (Part I) - 2009. It is described in Clause 10.22 of this document. The depth of water
for testing shall be up to the soffit of the covering slab.
The following minimum thicknesses shall be used for different reinforced concrete members,
irrespective of design requirements:
(i) Walls for liquid retaining structures : 250 mm
(ii) Roof slabs for liquid retaining structures : 150 mm
(Other than flat slabs)
(iii) Bottom slabs for liquid retaining structures : 300 mm
(iv) Floor slabs including roof slabs, walkways,
Canopy slabs : 125 mm
(v) Walls of cables / pipe trenches,
Baffle walls, Underground pits etc. : 200 mm
(vi) Column footings : 300 mm
(vii) Parapets : 100 mm
(viii) Precast trench cover, chajja and all fascias : 125 mm
(ix) Column Dimensions
a) Exceptional case (Based on any specific requirements)
i) To match with width of Block masonry wall : 200mm
ii) To match with width of Brick masonry wall : 230mm
b) In general case : 300 mm
(x) Beams (To match with width of Block masonry wall) : 200 mm
(xi) Launder Base Slab : 200 mm
(xii) Launder Vertical Wall, Baffle Wall, Gutter Slab : 150 mm
(xiii) Grade Slabs : 150 mm
Page 118
Quality Assurance & Quality Control Manual
thereafter keep the Engineer informed of orders for and delivery dates of all materials.
Materials shall be transported, handled and stored in such a manner as to prevent deterioration,
damage or contamination failing which such damaged materials will be rejected and shall not
be used on any part of the Works under this contract.
22.4.1 Samples and Tests of Materials
The Contractor shall submit samples of such materials as may be required by the Engineer and
shall carry out the specified tests directed by the Engineer at the Site, at the supplier's premises
or at a laboratory approved by the Engineer.
Samples shall be submitted and tests carried out sufficiently early to enable further samples to
be submitted and tested if required by the Engineer.
The Contractor shall give the Engineer seven days' notice in writing of the date on which any of
the materials will be ready for testing or inspection at the supplier's premises or at a laboratory
approved by the Engineer. The Engineer shall attend the test at the appointed place within
seven days of the said date on which the materials are expected to be ready for testing or
inspection according to the Contractor, failing which the test may proceed in his absence unless
instructed by the Engineer to carry out such a test on a mutually agreed date in his presence.
The Contractor shall in any case submit to Engineer within seven days of every test such
number of certified copies (not exceeding six) of the test results as the Engineer may require.
Approval by the Engineer as to the placing of orders for materials or as to samples or tests shall
not prejudice any of the Engineer's powers under the Contract.
The provisions of this clause shall also apply to materials supplied under any nominated sub-
contract.
22.3 Standards
Materials and workmanship shall comply with the relevant Indian Standards (with
amendments) current on the date of submission of the tender.
Where the relevant standard provides for the furnishing of a certificate to the Engineer, at his
request, stating that the materials supplied comply in all respects with the standard, the
Contractor shall obtain the certificate and forward it to the Engineer.
The specifications, standards and codes listed below are considered to be part of this
specification. All standards, specifications, codes of practices referred to herein shall be the
latest editions including all applicable official amendments and revisions.
In case of discrepancy between the Specification and the Standards referred to herein, the
Specification shall govern.
a) Materials
IS: 269 - Specification for 33 grade ordinary Portland cement
IS: 278 - Specification for Galvanized Steel Barbed wire & Fencing
IS: 383 - Spec. for coarse and fine aggregates from natural sources for concrete
IS: 428 - Specification for distemper, oil emulsion, colour as required
Page 119
Quality Assurance & Quality Control Manual
IS: 432 - Specification for mild steel and medium tensile steel bars and hard
drawn steel wire for concrete reinforcement (Parts 1 & 2)
IS: 455 - Specification for Portland slag cement
IS: 458 - Specification for precast concrete pipes (with and without reinft.)
IS: 650 - Specification for standard sand for testing of cement
IS: 651 - Specification for salt glazed stoneware pipes and fittings
IS: 808 - Specification for dimensions for hot rolled steel beam, column channel
and angle sections
IS: 814 - Specification for covered electrodes for manual metal arc welding of
Carbon and Carbon Manganese steel
IS: 1003 - Specification for timber panelled and glazed shutters (Parts 1 & 2)
IS: 1038 - Specification for steel doors, windows and ventilators
IS: 1077 - Specification for common burnt clay building bricks
IS: 1398 - Specification for packing paper, water proof, bitumen laminated
IS: 1489 - Specification for Portland pozzolana cement (Parts 1 & 2)
IS: 1566 - Specification for hard drawn steel wire fabric for concrete reinft.
IS: 1580 - Specification for bituminous compounds for water proofing and caulking
purposes
IS: 1786 - Specification for high strength deformed steel bars and wires for concrete
reinforcement
IS: 1852 - Specification for rolling and cutting tolerances for hot rolled steel products
IS: 1948 - Specification for aluminium doors, windows and ventilators
IS: 1977 - Specification for Low Tensile structural steel (Ordinary quality)
IS: 2062 - Specification for steel for general structural purposes (Hot Rolled Low,
Medium and High Tensile Structural Steel).
IS: 2185 - Specification for concrete masonry units (Parts 1, 2 & 3)
IS: 2202 - Specification for wooden flush door shutters (Parts 1 & 2)
IS: 2645 - Specification for integral cement water proofing compounds
IS: 2721 - Specification for Galvanized Steel Chain Link Fence Fabric
IS: 2750 - Specification for steel scaffoldings
IS: 2835 - Specification for flat transparent sheet glass
IS: 3384 - Spec. for bitumen primer for use in waterproofing and damp proofing
IS: 3502 - Specification for steel chequered plates
IS: 4021 - Specification for timber door, window and ventilator frames
IS: 4350 - Specification for concrete porous pipes for under drainage
IS: 4351 - Specification for steel door frames
IS: 4990 - Specification for plywood for concrete shuttering work
IS: 8112 - Specification for 43 grade ordinary Portland cement
IS: 9862 - Ready mixed paint, brushing, bituminous, black, lead free, acid, alkali,
water and chlorine resisting
IS: 10262 - Recommended guidelines for concrete mix design
IS: 12269 - Specification for 53 grade ordinary Portland cement
IS: 12330 - Specification for sulphate resisting Portland cement
Page 120
Quality Assurance & Quality Control Manual
IS: 12709 - Glass fibre reinforced plastics (GRP) pipes, joints and fittings for use
for potable water supply
b) Tests
IS: 516 - Method of test for strength of concrete
IS: 1182 - Recommended practice for radiographic examination of fusion-welded
butt joints in steel plates
IS: 1199 - Methods of sampling and analysis of concrete
IS: 2386 - Methods of test for aggregates for concrete (Parts 1 to 8)
IS: 2720 - Methods of test for soils (Parts 1 to 39)
IS: 2911 - Code of Practice for design and construction of Pile foundations (Part 4)
IS: 3025 - Methods for sampling and test (physical and chemical) for water and
wastewater (Parts 1 to 56)
IS: 3495 - Method of test for burnt clay building bricks (Parts 1 to 4)
IS: 3613 - Acceptance tests for wire flux combination for submerged arc welding
IS: 4020 - Methods of tests for wooden flush doors shutters: Type tests
IS: 4031 - Methods of physical tests for hydraulic cement (Parts 1 to 15)
IS: 5807 - Method of test for clear finishes for wooden furniture (Parts 1 to 6)
IS: 7318 - Approval tests for welders when welding procedure approval is not
required (Parts 1 and 2)
IS: 13311 - Methods of Non-destructive testing of Concrete- Part 1 & Part 2
c) Codes of Practice for design / detailing
IS: 456 - Code of practice for plain and reinforced concrete
IS: 783 - Code of practice for laying of concrete pipes
IS: 800 - Code of practice for general construction in steel
IS: 806 - Code of practice for use of steel tubes in general building construction
IS: 816 - Code of practice for use of metal arc welding for general construction in
mild steel
IS: 817 - Code of practice for training and testing of metal arc welders
IS: 875 - Code of practice for design loads (other than earthquake) for building
structures (Parts 1 to 5)
IS: 1081 - Code of practice for fixing and glazing of metal (steel and aluminum)
doors, windows and ventilators
IS: 1172 - Code of practice for basic requirements for water supply, drainage and
sanitation
IS: 1477 - Code of practice for painting of ferrous metals in buildings (Parts 1 & 2)
IS: 1597 - Code of practice for construction of stone masonry (Parts 1 & 2)
IS: 1742 - Code of practice for building drainage
IS: 1893 - Criteria for earthquake resistant design of structures
IS: 1904 - Code of Practice for Design and Construction of Foundation in Soils:
General Requirements.
IS: 2065 - Code of practice for water supply in buildings
IS: 2212 - Code of practice for brickwork
Page 121
Quality Assurance & Quality Control Manual
IS: 2338 - Code of practice for finishing of wood and wood based materials
(Parts 1 & 2)
IS: 2394 - Code of practice for application of lime plaster finish
IS: 2395 - Code of practice for painting, concrete, masonry and plaster surfaces
(Parts 1 & 2)
IS: 2470 - Code of practice for installation of septic tanks (Parts 1 & 2)
IS: 2502 - Code of practice for bending and fixing of bars for concrete reinft.
IS: 2571 - Code of practice for laying in-situ cement concrete flooring
IS: 2595 - Code of practice for radiographic testing
IS: 2751 - Recommended practice for welding of mild steel plain and deformed
bars for reinforced construction
IS: 2911 - Code of Practice for design and construction of Pile foundations
IS: 2974 - Code of practice for design and construction of machine foundations
(Parts 1 to 4)
IS: 3114 - Code of practice for laying of Cast Iron pipes
IS: 3370 - Code of practice for concrete structures for the storage of liquids
(Parts 1 to 4)
IS: 3414 - Code of practice for design and installation of joints in buildings
IS: 3558 - Code of practice for use of immersion vibrators for consolidating
concrete
IS: 3658 - Code of practice for liquid penetrant flaw detection
IS: 3935 - Code of practice for composite construction
IS: 4000 - Code of practice for High strength bolts in steel structures
IS: 4014 - Code of practice for steel tubular scaffolding (Parts 1 & 2)
IS: 4111 - Code of practice for ancillary structures in sewerage system (Parts 1 to 5)
IS: 4127 - Code of practice for laying of glazed stoneware pipes
IS: 4326 - Code of practice for Earthquake Resistant Design and Construction of
Buildings
IS: 4353 - Recommendations for submerged arc welding of mild steel and low alloy
steels
IS: 5329 - Code of practice for sanitary pipe work above ground for buildings
IS: 5334 - Code of practice for magnetic particle flaw detection of welds
IS: 5822 - Code of practice for laying of welded steel pipes for water supply
IS: 7215 - Tolerances for fabrication of steel structures
IS: 9595 - Recommendations for metal arc welding of carbon and carbon
manganese steel
IS: 10005 - SI units and recommendations for the use of their multiples and of certain
other units
SP: 16 - Design Aids for Reinforced Concrete To IS: 456
SP: 34 - Handbook on Concrete Reinforcement and Detailing
SP: 38 - Handbook of Typified Design of Structures with Steel Roof Trusses
Page 122
Quality Assurance & Quality Control Manual
d) Construction Safety
IS: 3696 - Safety code for scaffolds and ladder (Parts 1 & 2)
IS: 3764 - Safety code for Excavation work
IS: 7205 - Safety code for erection of structural steel work
An area adjacent to all mechanical Plant shall be provided as maintenance lay down
area;
Fixed runways, lifting eyes or other means shall be provided to permit the removal of
Plant that may be required to be removed during the course of its normal operational
life for maintenance or any other purpose;
Areas where leakage is likely to occur whether in normal use or during maintenance
shall be provided with covered drainage channels which shall direct spillage either to a
suitable plant drain or to a sump from where it can be pumped to plant drain;
22.4.1 Orientation
The works shall be laid out within the confines of the Site in order to interface to the existing
infrastructure of roadways and inlet and outlet pipe work. Underground services requiring to
be relocated in order to accommodate the proposed site layout shall, with the approval of the
Engineer, be relocated by the Contractor.
Page 123
Quality Assurance & Quality Control Manual
Page 124
Quality Assurance & Quality Control Manual
1:2:4 (1 cement : 2 coarse : 4 graded stone aggregate 16mm thick nominal size) and top
layer of 18mm thick metallic concrete hardener consisting of mix 1:2 (1 cement : 2 stone
aggregate 6mm nominal size) by volume & mixed with metallic hardening compound of
approved quality @ 3 kg/m2. Including cement slurry and rounding off edges. In
chemical building alum storage area and preparation area, battery room and areas
coming in contact with acid / alkali spillage / fumeto be provided with Acid resistant
tiles. Dado of acid / alkali resistant tiling as per IS:4457 shall be provided to a height of
2100 mm set in potassium silicate mortar and joints pointed with resin bonded mortar
13) The flooring in Operator's room, Security room, Control room, MCC cum Electrical
Panel room shall be in 18 mm thick mirror polished, machine cut granite slab of
approved shade and pattern placed in cement mortar (1:4). 150mm high skirting shall be
provided in these areas.
14) Toilet areas shall have 450 mm x 450 mm x 25 mm thick polished Anti-Skid resistant
ceramic /Kota stone tiles placed in cement mortar 1:4 to give an overall thickness of 50
mm. 2100 mm high dado, in 250 mm x 250 mm x 6 mm thick glazed tiles (approved
make, shade and pattern) placed in cement mortar 1:3 shall also be provided in these
areas.
15) The flooring along with skirting in administration cum laboratory building shall be 18
mm thick mirror polished, machine cut granite slab of approved shade and pattern
placed in cement mortar (1:4). 150mm high skirting shall be provided in these areas.
Granite stone shall be provided for laboratory platforms fixed over double sandwiched
cuddappah support as directed and the edges of granite is to be embedded into the wall.
16) The toilet facilities shall include at least :
(i) 2 Nos. Water closets with white Vitreous china clay European Type
(ii) 2 Nos. Urinals of sizes 600 mm x 400 mm x 300 mm flat back type in Vitreous china clay
separated by a marble partition of size 680 mm x 300 mm.
(iii) 2 Nos. wash basins of size 510 mm x 400 mm in Vitreous china clay with inlet, outlet and
Overflow arrangements.
(iv) 2 Nos. mirror of size 400 mm x 600 mm wall mounted type fitted over wash basins.
(v) 2 Nos. plastic liquid soap bottles
(vi) 2 Nos. chromium plated brass towel rails minimum 750 mm long.
(vii) All stopcocks, valves and pillar cocks shall be heavy duty chromium plated brass.
(viii) All fittings such as `P' or `S' traps, floor traps, pipes, downtake pipes etc.
(ix) The sewage from toilet blocks shall be led to the wet well of terminal sewage pumping
station if present or included under this contract or to the closest gravity sewer or with
soak pit with septic tank with necessary arrangements.
17) All staircases shall have granite/concrete tiles for treads and risers of approved make
and shade and half tile skirting to be provided. All concrete stairs shall have aluminium
nosing over 2 mm thick rubber strip of width same as nosing for the full length of the
tread. Nosing shall be fixed with countersunk screws.
Page 125
Quality Assurance & Quality Control Manual
18) Stairways shall be provided to permit access between different levels within buildings.
Staircase shall be minimum 1200mm wide, minimum Tread = 250 mm, maximum Riser
= 175 mm and maximum 15 number of steps per flight unless specified otherwise.
Staircases in general shall not be steeper than 40°. Staircases having space constraints
may be steeper than 400. The maximum vertical run for a single flight of stairs shall be
3.0 M.
19) All roof tops and overhead tanks shall be made accessible with ladder provision.
Vertical step ladders fitted with landing point extensions will be permitted where
considered appropriate by the Engineer to access areas not frequently visited.
20) Steel staircases shall be constructed of standard channel stringers with M.S. grating
treads 25mm thick with non skid nosing. Steel Ladders shall be minimum 600mm wide
and shall not exceed 6m of straight run. The ladders shall be painted with epoxy paint.
21) All hand railing shall be provided with 6063-T6 Aluminium Alloy 40mm Outer
Diameter of 3mm wall thickness with an ultimate tensile strength of at least 207 MPa
and yield strength of at least 172 MPa. The minimum height of hand railing shall be
1.2m and maximum spacing of verticals shall be 1.2 m. Number of horizontal rails shall
be 3 (1 top, 1 intermediate and 1 bottom) with a 146x80 x12 thk toe plate at the bottom
along with necessary accessories..
22) The reinforced concrete roofs shall be made waterproof by application of an approved
roof polythene / bitumen membrane / brick bat coba/chemical or Tarfelt. The finished
roof surface shall have adequate slope to drain quickly the rain water to R.W down take
inlet points.
23) All roof floors shall have minimum 750 mm height solid concrete block parapet wall.
24) For roofing drainage, cast iron oru PVC rainwater down takes with C.I. bell mouth or
uPVC bend and C.I. or uPVC grating at top shall be provided. For roof areas up to 40 sq
m minimum two nos. 100 mm diameter down take pipes shall be provided. For every
additional area of 40 sq m or part thereof, at least one no. 100 mm dia. down take pipe
shall be provided.
25) Top surfaces of chajjas and canopies shall be made waterproof by providing a screed
layer of adequate slope or application of an approved roof membrane and sloped to
drain the rain water.
26) Building plinth shall be minimum 450 mm above average finished ground level around
building or high flood level whichever is more.
27) All doors, windows, rolling shutters shall have lintels above. Chajja protection to lintels
on external walls shall be such as to prevent the rain water splashing into the building.
Chajja projection of minimum 750 mm for rolling shutters, 600 mm for doors and
windows shall be provided to prevent the rain water splashing into the building. Chajja
shall be projected 300 mm on either side from size of doors/windows/rolling shutters.
Page 126
Quality Assurance & Quality Control Manual
28) All windows and ventilators shall have 25 mm thick Kota stone sills bedded in cement
mortar (1:3).
29) All Aluminium Doors, windows and Ventilators sections shall have powdered coated to
a minimum of 50-60 microns with exterior durable polyester grade powder of approved
quality.
30) All doors, windows and ventilators shall be made of aluminium confirming to latest
version of IS: 1948. All fixtures for doors, windows and ventilators shall also be of
aluminium. Aluminium grills shall be provided in all the windows and ventilators with
necessary coatings. Doors shall be in two panel and both panels shall be
glazed/unglazed. Minimum weight of aluminium doors & windows shall be as follows
I. Single Glazed Window: (Weights indicated shall be aluminum)
a) Openable
Outer Frame : Weight 0.70 kg/m
Shutter Frame : Weight 0.97 kg/m
Intermediate Mullion : Weight0.97 kg/m
Beading : Weight 0.31 kg/m
b) Fixed Louvers windows/ventilators
Outer Frame : Weight 0.46 kg/Rmt
II. Double Glazed Window
Outer Frame : Weight 0.72 kg/Rmt
Shutter Frame : Weight 0.97 kg/Rmt
Intermediate Mullion : Weight0.98 kg/Rmt
Beading : Weight 0.31 kg/Rmt
III. Sliding Windows
Bottom & Top Frame : Weight 0.70 kg/m
Shutter Frame : Weight 0.42 kg/m
Interlocking Section : Weight 0.47 kg/m
IV. Aluminium Door
Outer Frame : Weight 2.508 kg/Rmt
Shutter Frame : Weight 2.508 kg/Rmt
Bottom Stile : Weight 2.508 kg/Rmt
Glazing shall be 5.5wired mm thick glass as per IS: 2835 for Doors and windows.
Glass louvers shall be provided for ventilators with frame weight of 0.46kg/m.
31) Openings of the windows & ventilators shall be minimum 25% of the external wall area.
32) Ventilator shall be provided where height of floor is more than 3m.
33) All windows and ventilators shall have wire mesh. Frame of doors, windows and
ventilators shall be of aluminium of standard rolled section. Doors, Windows and
Ventilators shall be of size as per schedule to be submitted by the Contractor for
approval of Engineer. The minimum size shall be as per below:
Page 127
Quality Assurance & Quality Control Manual
Page 128
Quality Assurance & Quality Control Manual
45) Material of construction for Advanced Sludge Treatment Units shall be in RCC (M-30)
grade concrete.
46) Anaerobic Sludge Digesters and Sludge Tank with Gas Holders shall be built in RCC. A
top dome of digesters and Gas Holders shall be made of Steel with full Epoxy Coating as
per the specification given in Clause 10.21 of this Part-10 and top surface Ring Beam and
top 2m wall of the digester shall also be coated with Epoxy Coating. Contractor may
submit his proposal for the alternative materials which can be used for digester dome
and gas holder along with all technical details. Employer will approve the type of
material which shall be used for the construction of gas holders and digester domes
depending upon the durability, corrosion resistivity, strength, ease in operation,
functional requirements, economy, etc.(if included in this contract)
47) All concrete structures in contact with sewage and/or sludge upstream of the Aeration
Basins shall be provided with full interior corrosion protection linings and/or coatings
of appropriate material and thickness. This also applies to all concrete structures in
contact with any type of sewage sludge anywhere in the plant. For Aeration Basins,
interior lining shall extend from the top of wall down to 1.0 meter below the lowest
operating water level.
48) For structures containing water or process liquid, the top of the wall shall be atleast 0.5m
higher than the maximum water surface level calculated at high flood level and peak
plant flow. Finished Ground level will be 0.5m above the High flood level.
49) If the High flood level is more than Ground Level then road shall be constructed on the
Earthen Embankments/Engineered Embankment. Earthen Embankments/ Engineered
Embankment shall be constructed with side slope of atleast 2 horizontal to 1 vertical.
Stone pitching shall be provided at both sides of the embankment as per IS: 8237. Top
width of embankment shall be taken as 6.0m. Top level of embankment shall be 0.5m
above high flood level. Good quality of filling materials can be used for embankment
construction as approved by Engineer/as suggested in relevant Geotechnical
Investigation Report recommendations as applicable.
50) Engineered Embankments for plant structures in Swampy/Water logged areas shall be
considered in compliance with relevant Geotechnical Investigation Report
recommendations as applicable.
51) All requirements for Engineered Embankments and all other associated works
connected to this system (i.e. like, all controlled filling requirements, Type & suitability
of materials, Methodologies, Testing, Protective systems, Aprons, Proper slopes,
Stability, Specifications, Quality control, and all other requirements pertaining to this
system of works, etc.,) shall be considered in compliance with relevant Geotechnical
Investigation Report recommendations as applicable. Also to enlist the services of an
experienced & specialized agency for all related design aspects considerations,
equipment specifications, and implementation methodology, etc., as an advice for the
same (Refer to 46 & 47).
Page 129
Quality Assurance & Quality Control Manual
Page 130
Quality Assurance & Quality Control Manual
Foul Drainage
The foul drainage system shall accept discharge from toilets, washrooms, offices and the
laboratory. The foul drainage system shall be conveyed to either wetwell of the terminal sewage
pumping station wherever exist or proposed under this contract or nearest public sewer
wherever exist or with septic tank and soak pit arrangement.
Cable and Pipe work Trenches
Cable and pipework trenches shall generally be constructed in reinforced concrete.
All floor cut-outs and cable ducts, etc. shall be covered with M25 precast concrete covers (Heavy
Duty) or MS grating as per direction of Engineer in outdoor areas and M.S. chequered plates,
suitably painted of adequate thickness in indoor areas. All uncovered openings shall be
protected with hand railing. The pipe, cable trenches shall be suitably sloped to drain off
rainwater to a suitable location.
Layout of trenches outside the buildings shall allow space for construction of future trenches
where necessary with due consideration for planning for future developments. This aspect shall
be brought to the notice of the Engineer while planning the works.
Page 131
Quality Assurance & Quality Control Manual
Main Gate
Proposed treatment plant shall have one main gate to access the plant irrespective of existing
gate at the premises of existing plant site. Minimum width of main gate shall be 6.5m. Main gate
shall have 1.5m wide wicket gate. Main gate shall have as external framework of GI pipes and
internal framework of MS flats. Gate shall be fixed on RCC columns. The design and pattern of
gate with drawing shall be submitted for approval of the Engineer. The gate shall have all
necessary hinges, locking arrangement, rolling arrangement and painting complete, as
approved by the Engineer.
Landscaping
The site shall be landscaped once the Works are substantially complete. Landscaping area shall
be marked in the layout plan of STP site.
Landscaping shall include planting of suitable trees and development of lawn/grassed areas.
Landscaping in general shall meet ecological and environmental conditions of the site. Road
widths shall determine the size of the tree height and spread to be selected for planting. Trees
suitable for local conditions shall be selected as approved by the Engineer. Medicinal and fruit
trees shall be avoided. Landscaping shall be maintained in good condition till the completion of
the contract.
Area for landscaping will be equal to total area of project site minus area for the treatment plant
units and the area required for roads, sidewalks and drains.
Tree Planting
Pits dug a few days in advance of actual planting shall be allowed to weather and be filled with
top soil mixed with manure. Size of the pit shall be as per standard requirement. Only one tree
shall be planted in each pit. A guard made of bamboo with wire mesh or bricks or M.S. ring as
approved by Engineer, shall be provided.
Page 132
Quality Assurance & Quality Control Manual
Application Methodology
For Concrete Structures- Mechanical grinding or other suitable surface preparation is
recommended for obtaining best results on concrete. Compressed air is used to remove residual
Page 133
Quality Assurance & Quality Control Manual
dust or use brush to remove dust completely. Compressed air should be oil free. Apply only to
dry surface.
For Steel Structures- Steel structures which are to receive Shalipoxy-CTE coating should be
prepared by sandblasting or power tool or mechanical cleaning to a commercial Grey metal
finish. If moisture or other contaminants contaminate prepared surface, they should be
reblasted. Use suitable Shali Zinc Epoxy primer over the prepared surface.
Mix (by volume) 4 parts of Component A to 1 part of Component B by stirring thoroughly for at
least 3 minutes. Allow the mix to stand for 10 minutes before application.
Apply two coats of Shalipoxy-CTE by brush, roller or spray. First coat should be allowed to dry
tack before application of second coat. The second coat should be applied within 72 hours, wipe
first coat with MIBK and wipe dry with cloth before second coat.
Covering capacity of Shalipoxy-CTE for concrete structure shall be 4 m2 per litre per coat and
for Steel structures it shall be 6 m2 per litre per coat.
Page 134
Quality Assurance & Quality Control Manual
Master Seal SP120 is two component products, Master Seal SP120 Base and Master Seal SP120
Hardener. Both these products are mixed in ration 1:1 (by weight) Mix both the components for
3 minutes with a slow speed drill and wing style mixing paddle at 300-400 rpm until a
homogeneous colour is achieved. Keep the paddle below the surface to avoid entrapping air.
This shall be applied in two coats, each at a W.F.T. of 150 microns. The second coat applied after
first coat has dried (4-6 hours) and at right angles to it. Should the application of second coat be
delayed, abrade the previous coat to give an adequate mechanical key and wipe with SOLVENT
NO 2 before application.
Properties of Master Seal SP120 are given below:
Colour : Black viscous liquid
Solids by volume : 100%
Mixed Density: 1.65 Kg/l at 27 C
Pot Life : At 25 C 60 Minutes
At 40 C 30 Minutes
Over Coating Time : 12 Hours at 25 C
Mixing Ratio : Part A : part B =1:1 (by Weight)
Curing Time : 5 days
Dry Film Thickness , in two Coats : 300 Microns
10.21.4 Nitocote ET550 or equivalent
Nitocote ET 550 is aEpoxy tar based high performance resin coatingThixotropic pitch extended
epoxy amine adduct formulation containing reinforcing inert fillers and special blend of
solvents. The product is supplied as a two-component system comprising a special blend of an
epoxy resins and a separate low viscosity amine hardener.Nitocote ET 550 is applied as a two
coat application. It is generally applied at a wet film thickness of 265 micron per coat (175
microns DFT per coat). The product shall exhibit excellent bond strength with the substrate
when tested as per specification.
Application Methodology
All surfaces to be treated with Nitocote ET550 must be clean and free from dust or loose
material.
Concrete Structure- All laitance must be removed by grit blasting or other suitable removal
methods. The general standard of surface preparation should be in accordance with ACI 503R-
89, Chapter 5 paragraph 5.4. Following the preparation of a concrete structure, care should be
taken to ensure that any surface irregularities are filled with Nitomortar FC
Steel Structures- Any metal surface should be grit blasted to a bright finish, meeting the
requirements of Swedish Standards SA 21/2. BS4232, First Quality .All metal surfaces should
be coated immediately after preparation.
Mixing
Nitocote ET550 should always be mixed in an open, well ventilated area. The contents of the
base shall be stirred thoroughly to disperse any settlement. The entire contents of the hardener
Page 135
Quality Assurance & Quality Control Manual
shall be poured into the base container ensuring that the sides and bottom of the container are
well scraped. The two components should be mixed mechanically using a mixing paddle fitted
on a heavy duty, slow speed electric drill. The mixing should be carried out continuously for 3-5
minutes, until a uniform consistency is achieved.
Application: Brush application
Nitocote ET550 should be applied in two coats. The thoroughly mixed material should be
applied with a suitable brush. The first coat must be firmly applied and be well scrubbed into
the surface, ensuring a uniform coating with a wet film thickness not less than 265 microns, be
allowed to dry for not less than 16 hours at 20°C. The second coat should be applied as above,
again achieving a wet film thickness of 265 microns. The number of coats to achieve a total wet
film application of 530 microns.
Page 136
Quality Assurance & Quality Control Manual
releasing compounds, oil, grease, dirt, chalk, or previously applied coatings. Laitance must,
therefore, be removed by sweep blasting or other means prior to coatings application. Ensure
that the concrete is sufficiently dry to receive coatings; use a moisture meter. The 6% maximum
moisture content shall be permissible. A primer coat of a solvent-free epoxy primer must be
applied at a thickness of 40-50microns before application of the topcoat.
Steel Structures- All surfaces to be coated must be clean and free from dust or loose material.
Interzone 954 can be applied directly to blasted steel as per SSPC/SP-6, a minimum surface
profile of 50- 75 microns is recommended.
Previously Painted Surfaces - Remove all rust, rust scale, other corrosion products, loose or
heavy chalk and loose or scaling paint by 'Hand or Power Tool Cleaning" (SSPC-SP2 or 3
respectively / AS 1627 St2 or St3). 'Feather' thick edges of existing coating. Sand or sweep blasts
any glossy areas until dull. Spot prime bare areas as recommended.
Mixing
The mixing ratio of Base (Part A) to Curing Agent (Part B) is 4:1. Material is supplied in two
containers as a unit. Always mix a complete unit in the proportions supplied. The product, once
mixed, must be used within the working pot life specified.
1. Agitate Base (Part A) with a power agitator
2. Combine entire contents of Curing Agent (Part B) with the Base (Part A) and mix
thoroughly using a power agitator.
Application: Airless Spray Application
Airless spray is the preferred method of application as air spray techniques will not produce
satisfactory film build without the need for "multiple pass" applications. The pump should have
a minimum ratio of 45:1. It is also advisable to check that adequate air volume is present.
Airless Spray
Tip Range: 0.53-0.66mm (21-26 thou)
Total Output: Minimum 176kg/cm2
Fluid Pressure: 2500 p.s.i
Page 137
Quality Assurance & Quality Control Manual
Chemical Test
Specimens Immersed for 30 days in
1) H2SO4 1% No attack ASTM-C 210-92
2) NaOH 1 % No attack ASTM-C 210-92
3) Deioninsed water No attack ASTM-C 210-92
4) Period of Exposure to methane at 2.0 kg/sq.cm pressure for 720 hours
*No attack means no signs of swelling, scratches or peeling of coating specimen
Application Methodology
Surface Preparation
Concrete Structure- Surfaces must be clean, dry and free from curing compounds, laitance,
releasing compounds, oil, grease, dirt, chalk, or previously applied coatings. Laitance must,
therefore, be removed by sweep blasting or other means prior to coatings application. Ensure
that the concrete is sufficiently dry to receive coatings; use a moisture meter. The 6% maximum
moisture content shall be permissible. A primer coat of a solvent-free epoxy primer must be
applied at a thickness of 40-50microns before application of the topcoat.
Steel Structures- All surfaces to be coated must be clean and free from dust or loose material.
Inter zone 954 can be applied directly to blasted steel as per SSPC/SP-6, a minimum surface
profile of 50- 75 microns is recommended.
Previously Painted Surfaces - Remove all rust, rust scale, other corrosion products, loose or
heavy chalk and loose or scaling paint by 'Hand or Power Tool Cleaning" (SSPC-SP2 or 3
respectively / AS 1627 St2 or St3). 'Feather' thick edges of existing coating. Sand or sweep blasts
any glossy areas until dull. Spot prime bare areas as recommended.
Mixing
The mixing ratio of Base (Part A) to Curing Agent (Part B) is 4:1. Material is supplied in two
containers as a unit. Always mix a complete unit in the proportions supplied. The product, once
mixed, must be used within the working pot life specified.
1. Agitate Base (Part A) with a power agitator
2. Combine entire contents of Curing Agent (Part B) with the Base (Part A) and mix
thoroughly using a power agitator.
Application: Airless Spray Application
Airless spray is the preferred method of application as air spray techniques will not produce
satisfactory film build without the need for "multiple pass" applications. The pump should have
a minimum ratio of 45:1. It is also advisable to check that adequate air volume is present.
Airless Spray
Tip Range: 0.53-0.66mm (21-26 thou)
Total Output: Minimum 176kg/cm2
Fluid Pressure: 2500 p.s.i
Page 138
Quality Assurance & Quality Control Manual
2 Adhesive bond strength Not less than 10MPa (10 N/mm2) ISO 4624
Page 139
Quality Assurance & Quality Control Manual
recorded against the subsequent intervals of 24 hours over a period of seven days. The total
drop in surface level over a period of seven days shall be taken as an indication of the water
tightness of the structure, which for all practical purposes shall not exceed 40 mm. Also there
shall be no indications of the leakages around the opening or on the walls.
If the structure does not satisfy the condition of test and the daily drop in water level is
decreasing, the period of test may be extended for a further period of seven days and it the
specified limit is then reached the structure may be considered as satisfactory.
The external faces of structure shall not show any signs of leakage and shall remain apparently
dry over the period of observation of seven days after allowing a seven day period for
absorption after filling.
In case the drop in level exceeds the permissible level limit and signs of leakage with the
stipulated period of test, the Contractor shall carry out such additional works and adopt such
measures as may be directed by the Engineer to reduce the leakage within the permissible
limits. The entire rectification work that shall be carried out in this connection shall be at the
Contractor's cost. The water required for subsequent testing shall be supplied to the Contractor
free of cost, if the same is available near the site. Contractor shall have to make arrangement for
filling emptying the structure at his own cost.
If the test results are unsatisfactory, the Contractor shall ascertain the cause and make all
necessary repairs and repeat the water retaining structures test procedures, at his own cost.
Should the re-test results still be unsatisfactory after the repairs, the structure will be
condemned and the Contractor will dismantle and reconstruct the structure, to the original
specification, at his own cost.
During testing and during defect liability period the impression marks created due to seepage
shall be rectified and made good.
No separate payment shall be made for water tightness test and the cost thereof shall deem to
be covered in the rates quoted of different items of work of Treatment Plant.
Page 140
Quality Assurance & Quality Control Manual
Page 141