UNIT – I
Introduction to Energy auditing
1. (a) Explain concept of energy audit? types of energy audit 5M
(b) Consider a company using 3 energy forms- oil, gas, and electricity. the annual energy
Consumption is tabulated below in various energy units. 5M
UNIT – II
UNIT – III
UNIT – IV
1. (a) What is meant by demand side management and list out its benefits? 5M
(b) Discuss about multi-utility power exchange model in detail. 5M
2. (a) Define DSM and explain the benefits of DSM 5M
(b) Explain about the concept of ‘time of day pricing’ 5M
3. Explain in detail about the different techniques of DSM with necessary examples 10M
4. Explain detail about the following 10M
(a) Load priority technique
(b) strategic conservation
5. (a) Define load management and explain its importance 5M
(b) Discuss in brief about peak clipping and peak shifting 5M
6. Explain briefly about Energy efficient equipments 10M
7. (a)What is load management? Explain its importance 5M
(b)Write short notes on load priority techniques. 5M
8. (a) Write short notes on strategic conservation 5M
(b) Explain the significance of load management in detail 5M
9. (a) Explain concept and features of DSM 5M
(b) Write short notes on 5M
(i) valley filling (ii)load shifting (iii)strategic load growth
10. (a) Define DSM 2M
(b) write benefits of DSM 2M
(c) Define load management 2M
(d) Discuss about valley filling 2M
(e) discuss about peak clipping 2M
UNIT – V
UNIT – I
A). MINISTRY OF POWER, GOVT OF INDIA B). MINISTRY OF POWER, GOVT OF A.P
C). MINISTRY OF POWER, GOVT OF T.N D). MINISTRY OF POWER, GOVT OF U.P
17.
18.
A). 2001, 1st March, 2002 B). 2001, 1st March, 2001
C). 2002, 1st March, 2001 D). 2002, 1st March, 2002
21. Develop and recommend to the Central Government the norms for processes and_______
__________. [ ]
A). Energy Standards B).Energyconsumption Standards
C). Consumption Standards D). Energyconservation Standards
23._________ targets high energy end use equipments and appliances to lay down minimum energy
performance standards. [ ]
A). Standards & Rating Scheme B). Standards & Billing Scheme
C). Standards & Labeling Scheme D). Both a and b
Energy auditing & Demand side management Page 1
QUESTION BANK 2016
24. The Ministry of Power and BEE have taken up an innovative scheme to target___. [ ]
A). Children B). Parents C).Both A And B D).employes
36.Energy Audit is fundamental part of energy management program(EMP) it will identify the areas
of wasteful & inefficient use of ----------- [ ]
A) power B) Energy C) reactive power D) none
Energy auditing & Demand side management Page 1
QUESTION BANK 2016
37.In one company addition insulation permitted to increase temperature with additional cost Rs 25000
Savings per annum are Rs 60000 pay back period is [ ]
A) 8 months B) 10 months C) 5 months D) none
38. One BTU is --------- joules [ ]
A) 1059 joules B) 1050 joules C) 1060 joules D) none
39.--------- is a parameter to monitor and compare energy consumption of specific products
manufactured by industry [ ]
A) cost index B) energy index C) power index D) none
40.---------is a parameter can be used to monitor and assess energy [ ]
A) cost index B) energy index C) power index D) none
UNIT – II
17. Which of the following States in India does not have proven coal reserve? [ ]
(A) Andhra Pradesh (B) Madhya Pradesh (C) Kerala (D) West Bengal
18.When the reactive power compensation exceeds 800kvar the capacitor is installed on [ ]
(A) LV side B) HV side C) either HV or LV D) None
19.Hormonics are caused due to [ ]
(A) Non –linear loads (B)sudden change in load
C)linear lods (D) none
20. Effect of harmonics depends on [ ]
(A) harmonic source B) harmonic source location
(C) network characteristics (D) all the above
21. Power factor can be improved by installing a device in parallel with load which draws [ ]
(A) lagging reactive power (B) leading reactive power (C) active power (D) None
22. Synchronous condenser is a [ ]
A) over excited synchronous motor on no load (B) under excited synchronous motor
(C) over excited synchronous motor on load (D) None
23. The most economical power factor for a consumer is generally [ ]
(A)0.9 lag (B) 0.95 lag (C) unity (D) 0.8 lag
24. Phase advancers are used to improve power factor for [ ]
A) synchronous motor (B) transmission line (C) induction motor (D) None
25. Capacitors improve only [ ]
A) distortion p.f B)displacement p.f (C) true p.f (D) all the above
26. Reactive Power is required for [ ]
(A) Inductive load (B)Resistive load (C)Capacitive load (D)All of the above
27. The most economical power factor for a consumer is generally [ ]
(A)0.9 lag (B) 0.95 lag (C) unity (D) 0.8 lag
28. Phase advancers are used to improve power factor for [ ]
A) synchronous motor (B) transmission line (C) induction motor (D) None
29. Static capacitors are rated in terms of [ ]
(A) KVAR (B)KW
(C) KVA (D) KWH
30. ___________are the most commonly used prime mover for various equipments in industrial
applications. [ ]
A). Induction Motors B). Synchronous Motors
C). A.C Motors D). D.C Motors
31. The two parameters of importance in a motor are _____ and _________. [ ]
A). Efficiency, Voltage B). Power Factor,Load
C). Efficiency,Power Factor D). Efficiency,Speed
32. The efficiencies of induction motors remain almost constant between __ loading. [ ]
A). 50% to 90% B).60% to 80% C).20% to 70% D). 50% to 100%
33. ________connected in parallel with the motor are typically used to improve
the power factor. [ ]
A).Regulator B).Inductors C).Resistors D). Capacitors
34. Use of thinner gauge, lower loss core steel reduces eddy current losses. Longer core adds more
steel to the design, which reduces losses due to lower operating flux densities. We can reduce
_______ [ ]
A).Core Losses B).Cu Losses C).Friction &Windage Losses D).Total loss
35. Use of more copper and larger conductors increases cross sectional area of windings. This
lowers resistance (R) of the windings and reduces losses due to current flow (I). We can
reduce _____. [ ]
A).Core Losses B).Cu Losses C).Friction &Windage Losses D).Total loss
36. ________penalty or bonus rates, as levied by most utilities, are to contain reactive
power drawn from grid. [ ]
A). Power Factor B).Apparent Power C).Real Power D).Reactive Power
37. In all industrial electrical distribution systems, the major loads are [ ]
A). Resistive And Capacitive. B). Capacitive And Inductive.
C). Capacitive. D). Resistive And Inductive.
38. The solution to improve the power factor is to ________ power factor correction capacitors to
the plant power distribution system. [ ]
A).Subtact B).Multiply C). Add D). Divide
39. The advantages of PF improvement by capacitor addition Reactive component of the network
is_________and Voltage level at the load end is ________. [ ]
A)Reduced, Reduced B) Reduced, Increased
C) Increased, Increased D) Increased, Reduced
40. Cost benefits of PF improvement________ KVA (Maximum demand) charges in utility bill
and ________ distribution losses (KWH) within the plant network. [ ]
A)Reduced, Reduced B) Reduced ,Increased
C) Increased, Increased D) Increased, Reduced
UNIT – III
5. ______is the total power drawn by lamps and ballasts in a lighting circuit under
assessment [ ]
A)Lumen B) Luminaire C) Lux D)Circuit Watt
7. ___are used for starting high intensity Metal Halide and Sodium vapour lamps. [ ]
A) Igniters B) Switch C) Starter D) Generator
8. Retrofit by replacing incandescent lamps with ____ lamps, which use one-tenth the electricity
of incandescent lamps and have a lifespan of more than 100,000 hours. [ ]
A)CFL B)LED C) FL D) INCANDESENT
A) B) C) D)
A). Low frequency (LF)B).Frequency C). High frequency (HF) D).No Frequency
11. Which of the following will need the highest level of illumination ? [ ]
(A) Proof reading (B) Bed rooms (C) Hospital wards (D) Railway platforms
12.Which of the following will need lowest level of illumination ? [ ]
(A) Displays (B) Fine engraving (C) Railway platform (D) Auditoriums.
13.One lumen per square meter is the same as [ ]
(A) One lux (B) One candela (C) One foot candle (D) One lumen meter
14.Light waves travel with a velocity of [ ]
(A) 3 x 1010cm/s (B) 3 x 1012cm/s (C) 3 x 1015 cm/s (D) 3 x 1018 cm/s.
15.Radiant efficiency of the luminous source depends on [ ]
(A) shape of the source (B) temperature of the source
(C) wavelength of light rays (D) all of the above.
16.The unit of luminous flux is [ ]
(A) steradian (B) candela (C) lumen (D) lux.
17. What device is similar to an RTD but has a negative temperature coefficient? [ ]
A) Strain gauge. B) Thermistor.
C) Negative-type RTD D) Thermocouple
A) both D.C. and A.C. B) D.C. only C) A.C. only D) any of the above
26. An induction wattmeter can be used for [ ]
A) both D.C. and A.C. B) D.C. only
C) A.C. only D) any of the above
27. The pressure coil of a wattmeter should be connected on the supply side of the current coil
When [ ]
A) load impedance is high B) load impedance is low
C) supply voltage is low D) none of the above
28. In a low power factor wattmeter the pressure coil is connected [ ]
A) to the supply side of the current coil B) to the load side of the current coil
C) in any of the two meters at connection D) none of the above
29. In a low power factor wattmeter the compensating coil is connected [ ]
A) in series with current coil B) in parallel with current coil
C) in series with pressure coil D) in parallel with pressure coil
30. In a 3-phase power measurement by two wattmeter method, both the watt meters had
identical readings. The power factor of the load was [ ]
34. The ______________ is moved toward the relay electromagnet when the [ ]
relay is on.
A) Armature B) Coil C) NO contact D) NC contact
35.When a relay is NOT energized: [ ]
A) There is an electrical path through the NO contacts
B) There is an electrical path through the NC contacts
C) Neither the NO or the NC contacts have an electrical path
D) Both the NO and the NC contacts have an electrical path
36. The first company to build PLCs was _____________. [ ]
UNIT – IV
2. The need to implement ___ in the Country, especially in Agriculture Sector, Municipal
Sector and Small & Medium Enterprises was also emphasized upon. [ ]
A) GSM B)DSM C) ASM D) MSM
5. _____ also assumes significance given that the Municipalities consume 10% of energy overall
and the cost input of energy is as high as 60% of the costs incurred by the municipalities[ ]
6. Energy costs constitute up to _____ percent of an Indian municipality's total cost of pumping
water to its residents. [ ]
A) 50-70 B)40-70 C) 60-70 D) 20-70
7. The electricity bills of the municipalities accounts for a significant part of its expenditure,
given that an estimated 10%of electricity is consumed for urban water pumping. [ ]
8. ___ is a concept in which a power utility, such as an vertically integrated SEB or an unbundled
distribution utility, manages the demand for power among some or all its customers to meet its
current or future needs. [ ]
A) GSM B)DSM C) ASM D) MSM
10. In India, ____ can be achieved through energy efficiency, which is the reduction of
kilowatt hours (kWh) of energy consumption or demand load management, which is the
reduction of kilowatts (kW) of power demand or the displacement of demand to off-peak
times. [ ]
12. The government of India launched Energy Conservation Building Code (ECBC) on _____to
set minimum energy standards for commercial buildings. [ ]
A)27th May, 2001 B) 27th May, 2007 C)27th May, 2002 D) 27th May, 2005
14. _______ are statutory bodies set up by states to implement energy conservation measures at
state level. [ ]
A) State Designated Agencies (SDAS). B) National Designated Agencies (NDAS).
C) India Designated Agencies(IDAS). D) System Designated Agencies (SDAS).
15. In terms of electricity saved, given that most of the pilot projects as well as other studies
project potential savings of 45-50% by mere replacement of _______,the overall electricity
savings (from 20 million pumps) is estimated at 62.1 billion units annually. [ ]
A) Sufficient Pumps B) Efficient Motors C) Efficient Pumps D) Inefficient Pumps
18. Time of day rates,off-peak rates, seasonal rates, thermal storage, etc.,comes under___ [ ]
19. Encourage energy audits and offer low interest loans comes under________. [ ]
A) Peak Clipping B) Valley Filling C) Strategic Conservation D) Load Shifting
22. In force field analysis of energy action-planning, one of the actions below do not fall under
positive force? [ ]
A) High Price Of Energy B) Energy Efficient Technology Available
C) Top Management Commitment D) Lack Of Awareness
23. To assess the existing situation of a plant, good energy saving strategy plan starts
with_________. [ ]
A) Energy Audit B) Training C) Seminar D) Planning
24. The results of the energy audit would depend on. [ ]
A). Experience Of The Auditor B). Availability And Completeness Of Data.
C). Only A D).Both A And B
25. Publishing a formal statement of energy policy that can be used to define company activities
in energy matters is the role of __________. [ ]
A) Top Management B) Middle Management
C) Energy Auditor D) Energy Manager
30. Which one of them is a positive force towards achieving goal of reduced energy
consumption? [ ]
A) Insufficient Financial Resources To fund B) Competing Corporate Priorities
C) Tax On Energy Consumption D) Absence Of Corporate Energy Policy
31. When an energy efficient programe is carried out as a part of a strategy to manage electricity
is called [ ]
UNIT – V
16.The primary reason for low power factor is supply system is due to installation of [ ]
A) induction motors B) synchronous motors
C) single phase motors D) d.c. motors
17. The effect of electric shock on human body depends on which of the following [ ]
A) current B) voltage
C) duration of contact D) all of the above
18. If an induction machine is run at above synchromous speed, it acts as [ ]
24.For a power plant the expenditure on which of the following items is expected to be almost
Negligible [ ]
A)Fixed charges B)Taxes C)Insurance D)Maintenance
25.In a steam power station which of the following is not a fixed cost [ ]
A)Interest on capital c cost of land and buildings B)Salaries of high officials
C)fuel and lubricating oil cost D)Insurance charges
26.In which of the following power plants the depreciation charges are high [ ]
A)Steam power plant B)Hydro power plant
C)Nuclear power plant D)diesel power plant
27.Salvage Value of a plant [ ]
A) is always positive B) is always zero
C) is always negative D)None
28.Annual installment towards depreciation increases with the decrease in
interest rate in case [ ]
A)straight line depreciation B)sinking fund depreciation
C)Reducing balance depreciation D)All the above
29.Annual depreciation of the plant is proportion to the earning capacity of the plant in case[ ]
A) straight line depreciation B)sinking fund depreciation
30.Annual estimated depreciation charges for a plant are heavy during early years in case [ ]
A) Diminishing value method B) sinking fund depreciation
C) straight line depreciation D) None
31.Company can raise funds through [ ]
A)Fixed deposits B)shares
C)Bonds D)Any of the above
32. Annual operating expenditure of a power plant consists of [ ]
A) fixed charges B) semi-fixed charges
C) running charges D) all of the above
33. In ______ fuel transportation cost is least. [ ]
A) nuclear power plants B) diesel generating plants
C) steam power stations D)None
34. is the reserved generating capacity available for service under emergency conditions
which is not kept in operation but in working order, [ ]
A) Hot reserve B) Cold reserve C) Spinning reserve D) Firm power
35._______ industry has the least power consumption per tonne of product. [ ]
A) Soap B) Sugar C) Vegetable oil D) Caustic soda
36 . With reference to a power station which of the following is not a fixed cost ? [ ]
A) Fuel cost B) Interest on capital
C) Insurance charges D) Depreciation
37._______ is invariably used as base load plant. [ ]
A) Diesel engine plant B) Nuclear power plant
C) Gas turbine plant D) Pumped storage plant
39.Which of the following power plants need the least period for installation ? [ ]
A) Thermal power plant B) Diesel power plant
C) Nuclear power plant D) Hydro-electric power plant
40.In which of the following power plants the maintenance cost is usually high ? [ ]
A) Nuclear power plant B) Hydro-electric power plants
C) Thermal power plants D) Diesel engine power plants