1/ The average weekly discharge as measured at a given site is as follows:


week flow(cumec)
1 1000

2 900 A I, Plot the hydrograph of weekly flow


3 909
4 800
5 800 The hydrgr
6 600 1400
7 500
1200
8 500
9 800 1000
10 800
800
11 1000
12 1100 600
13 1100 400
14 1200
200
15 1000
16 900 0
17 800 0 5 10 15 20
18 500
19 400
20 400
21 300
22 300
23 400
24 400
25 500
26 500
II / Plot the flow duration curve
p= η*γ*Q*H but η = .85, γ = 9.81KN/m3, H = 50m
week Q Q in assending rank % excedence
1 1000 300 10 100
2 900 300 10 100
3 909 400 9 90
4 800 400 9 90
5 800 400 9 90
6 600 400 9 90
7 500 500 8 80
8 500 500 8 80
9 800 500 8 80
10 800 500 8 80
11 1000 500 8 80
12 1100 600 7 70
13 1100 800 6 60
14 1200 800 6 60
15 1000 800 6 60
16 900 800 6 60
17 800 800 6 60
18 500 900 5 50
19 400 900 5 50
20 400 909 4 40
21 300 1000 3 30
22 300 1000 3 30
23 400 1000 3 30
24 400 1100 2 20
25 500 1100 2 20
26 500 1200 1 10

B Determine the power that can be developed per m 3, the maximum power, average power and total energ
during 26 weeks.
I/ the power developed per m3
For Q = 300m3/sec , volume = 300*7*24*3600 = 181.44Mm 3, the power developed is eq
P = 125.1MW. So for 1m3 of volume, the value of power is 0.69W.
II/ The maximum power
Pmax = 0.417*Qmax = 0.417*1200 = 500.4MW
III/ The average power
Pave is the power corresponding to 50% time exceedance
Pave = 375.3MW (from the above table)
IV/ Total energy out put during 26 weeks
Etot = Pave * t = 375.3*103*26*7*24 = 163.93*107 KWh

2 Given
day flow(m3/sec H = 20m
su 26 η = 80%
man 35 Max allowble fluctuation of pond level is 1m
tus 40 Plant works for 6 days in aweek.
wed 50 Required
thu 45 I/ The capacity of the pond required to give a maximum uniform out pu
fri 40 II/ The weekly energy out put from the plant
sat 30

Solution
I/ The capacity of the pond required to give a maximum uniform out put
Day flow Q(m3/sec) Vol.(Mm3) commu.vol(Mm3) Demand(Mm3)
su 26 2.2464 2.2464 3.2832
man 35 3.024 5.2704 6.5664
tus 40 3.456 8.7264 9.8496
wed 50 4.32 13.0464 13.1328
thu 45 3.888 16.9344 16.416
fri 40 3.456 20.3904 19.6992
sat 30 2.592 22.9824 22.9824

There fore, the capacity of pond required = max negative balance volume + max positive balance volume, with out c
Vpond = 1.296 + 0.6912 = 1.998 Mm3 ≈ 2 Mm3
II/ The weekly out put
P = ηγQH but H = (20+19)/2 = 19.5 m
uniform draw off, Q = 22.9824*106/(7*24*3600) = 38m3/sec
Average flow = 38*7/6 = 44.3m3/sec
P = ηγQH = .80*9.81*44.3*19.5 = 6779.5KW
Energy = P * t = 6779.5 * 6*24 = 976248 KWh
Y
NT

the hydrograph of weekly flow

The hydrgraph of weekly flow


1400

1200

1000

800 The hydrgraph of weekly flow

600

400

200

0
0 5 10 15 20 25 30
= .85, γ = 9.81KN/m3, H = 50m
P = 0.417*Q (MW)
125.1 FDC
125.1 1400
166.8
1200
166.8
166.8 1000
166.8 FDC
800
208.5
208.5 600
208.5 400
208.5
208.5 200
250.2 0
333.6 0 20 40 60 80 100 120
333.6
333.6
333.6 PDC
333.6
375.3 600
375.3
500
379.053
417 400
417 PDC
417 300
458.7 200
458.7
500.4 100
7676.553
0
0 20 40 60 80 100 120

ximum power, average power and total energy produced

600 = 181.44Mm 3, the power developed is equal to


alue of power is 0.69W.

me exceedance
e above table)
93*107 KWh

of pond level is 1m

d required to give a maximum uniform out put;


put from the plant

balance Vol(Mm3)
-1.0368
-1.296
-1.1232
-0.0864
0.5184
0.6912
0

me + max positive balance volume, with out considering sign.