Minutes

Download as pdf or txt
Download as pdf or txt
You are on page 1of 145

List of OCC Members

1. Chief Engineer (L D), GETCO, Gotri Fax No.


0265-2352019
2. Chief Engineer (Generation), GSECL, Vadodara 0265-2344734/2338847
3. Superintendent Engineer (CP & SS), GETCO, Vadodara 0265-2337918, 2338164
4. Chief Engineer (L D), MPPTCL, Jabalpur 0761-2664343
5. Chief Engineer (O&M:Gen), MPPGCL, Jabalpur 0761-2664572/2668050
6. Chief Engineer (L D), MSETCL, Kalwa 022–27601769
7. Chief Engineer (PP), MSEDCL, Mumbai
8. Chief Engineer (Works),MSPGCL, Mumbai 022-26473896
9. Superintending Engineer (LD), MSETCL Ambazari 07104-220275
10. Chief Engineer (L D), CSPTCL /Raipur 0771-2574174
11. Chief Engineer (O&M:GEN), CSPGCL, Raipur 0771-2574425
12. Executive Director, PGCIL Raipur
13. General Manager, POSOCO, Mumbai 022-28202630
14. General Manager (WRTS-I), Powergrid, Nagpur 0712-2641366
15. General Manager (O & M),WRTS-II, PGCIL,Vadodara 0265-2487542
16. Chief Engineer (Transmission), NPCIL, Mumbai 25580741/25563350
17. Station Director, TAPS, Tarapur 1 & 2 02525-282125/244125
18. Station Director, TAPS, Tarapur 3 & 4 02525-244021/244169
19. Station Director, KAPP, Kakrapar 02626-231231
20. General Manager (OS), NTPC, Mumbai 022-28216692
21. General Manager, NTPC, Korba 07759- 237462/237552
22. General Manager (OS), NTPC, HQ-II Raipur 0771-2544550
23. General Manager, NTPC, Vindhyachal, M.P. 07805 –247711
24. General Manager, NTPC, SIPAT, CG 07752-246504
25. General Manager NTPC LARA
26. General Manager NTPC Solapur
27. General Manager, NTPC, Kawas, Surat 0261-2860290
28. General Manager, NTPC, Gandhar 02642-287402
29. General Manager, NTPC, Mouda 07115-281221/281219
30. CLD TPC, Mumbai 022-25541908/67175385
31. Head (O), Dahanu TPS, Dahanu 02528-222039
32. Sr V P Reliance Transmission, Pune 0124-3917982/020-
30471555
33. Vice President (Generation), Torrent Power Ltd, Ahmedabad 079-27506679
34. Executive Director, Sugen CCPP, Torrent Power Ltd, Surat. 02621-661151
35. Vice President (O &M), APL Mundra , Gujarat 02838-266364
36. Head Operation CGPL Mundra
37. Vice President (Opn), Jindal Power Ltd.,Raigarh 07767-281993/281995
38. AGM(OS) NSPCL Delhi 011-26717363,26717366
39. GENERAL MANAGER ( POWER), RGPPL, Ratnagiri 02359-241071/ 241011
40. Member (Power), NCA, Indore 0731-2559888
41. Chief Engineer (PM & C), NHDC, Bhopal 0755 4030188/4030130
42. E. E. Elect. (Ponda), Goa 0832-2313780
43. Executive Engineer DD (UT), Daman 0260-/2230771/2250889/2230550
44. Executive Engineer DNH (UT), Silvassa 0260-2642338
45. Secretary, CERC, New Delhi 011-24360010/23753923
46. CEO, JSW Energy ltd. 011-46032343/26183546
47. VP-Power Infra-Essar Hazira Surat 0261-6688498/022-67082198
48. Chief Electrical Distribution Engineer CR 022-22621060
49. Vice President EPTCL Hazira Surat 0261-6682747
50. COO, Korba West Power Co. Ltd. Raigarh
51. VP(COMML) Essar Power MP Ltd MP
52. GM Torrent power grid ltd. Ahmedabad, Gujarat
53. Adani Power Maharashtra Ltd Tiroda
54. CGM, R K M Powergen Pvt Ltd
55. ED, Athena Chattishgarh Power Ltd.
56. Head(O&M) Dhariwal Infra Ltd C’pur
57. Head Operation Jaypee Nigrie STPP Singrauli.
58. VP(O&M), GCEL, Chhattishgarh
59. Head Operation DB Power, Chhattishgarh.
60. Head operation Hindustan Power, Anuppur MP
61. Head operation GMR, Warora Energy ltd.
62. Head O&M, Sterlite Grid Ltd Bhopal
63. Head Operation Balco, Chhattishgarh.
64. Head(O& M), SKS, SPGCL, Raigarh
65 AVP,O&M Electrical,RIPL,Amravati
Minutes of the 522nd OCC Subcommittee meeting held on 21st
August 2019

The 522nd meeting of Operation & Co-ordination sub-Committee (OCC) of Western


Regional Power Committee (WRPC) was held on 21st August 2019 at WRPC,
Mumbai. The list of participants is enclosed at Annexure-I.
Shri Satyanarayan S, Member Secretary, WRPC extended a warm welcome to all
the participants of the 522nd OCC meeting. He informed that he has joined as
Member Secretary, WRPC on 16/08/2019.
He informed the OCC forum that the 39th WRPC meeting is scheduled to be
conducted in the last week of November or first week of December 2019 hence he
requested all entities to forward agenda items for discussion in WRPC
subcommittee meetings before taking up in WRPC Board meeting. He also
stressed the importance of offline and online study of power system and stated
that a separate study group/meetings should be held for system studies and
analysis.
After the opening remarks, the agenda items were taken up for discussion in the
meeting.

1 Confirmation of the Minutes


Minutes of 521st meeting of Operation & Coordination Sub-Committee
(OCC) of WRPC held on 16th July 2019 at WRPC Mumbai, were issued
vide letter No. WRPC/OPN/OCC-Minutes/2019-20/9936 dated
08.08.2019.
No comments received.
OCC subcommittee confirmed the 521st OCC minutes without any
modification.

2 Review of System Operation (July 2019)


2.1 a) Frequency Particulars.
The frequency profile for the last three months was as under:

Particulars Frequency Date Time


50.32 Hz 15th July 2019 15:50:50hrs
Maximum instantaneous
Minimum instantaneous 49.64 Hz 04th July 2019 00:06:50 hrs

50.01 Hz
Average

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 1
% time
01st – 01st –
01st – 30th
31stMay,201 31stJuly,201
Range June,2019
9 9
(% time)
(% time) (% time)

72.60 70.34 68.27


< 49.9 Hz
8.26 9.87 7.09
IEGC band (49.9 < f < 50.05 Hz)
19.14 19.79 24.64
> 50.05 Hz

OCC sub-committee noted as above.

b) State-wise Power Scenarios of the Region & PSP


System operation during the month of July 2019 was satisfactory. The
regional demand was 52619 MW. The corresponding peak shortfall was
in the range of 110.27 MW (peak deficit of 0.21%). The energy
requirement during the said period was 31717MUs.
The power supply position (Provisional) for the month of July 2019 was
as follows:

Peak Demand - Availability/Unrestricted Requirement (in MW)


GUJ MP CG MAH GOA DD DNH ESIL WR
Requirement 17577 10097 4746 20568 566 350 826 868 52619

Availability 17577 10097 4736 20561 566 350 826 868 52509

Shortfall 0.00 0.00 9.95 7.20 0.00 0.00 0.00 0.00 110.27

Reason for short - - FC FC - - - - FC


fall *
% Shortfall 0.00 0.00 0.21 0.04 0.00 0.00 0.00 0.00 0.21

*FC-frequency Correction; ULS-Unscheduled Load Shedding; SCS-Scheduled load shedding;


TC-Transmission constraint; CS-capacity Shortage; SC-Sign change

Energy - Availability/ Requirement etc.(Ex-Bus) in (MUs)


GUJ MP CG MAH GOA DD DNH ESIL WR
Net Actual Energy 10076 5637 2509 12172 336 230 576 177
Supplied 31715
10077 5637 2509 12172 336 230 576 177 31717
Unrestricted Requirement
1.08 0.00 0.00 0.26 0.00 0.0 0.00 0.00 1.34
Shortfall in MU
0.01 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.00
% Shortfall

Revised PSP for the month of July 2019 is attached at Annexure-2.1B.


The Sub-Committee noted as above.

2.2 Inter-Regional Exchanges (July-2019)

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 2
There was a net inter-regional export of 8093 MUs from WR to other regions
against the net export schedule of 7875 MUs.
The Sub-Committee noted the same.
2.3 Voltage Profile
Voltage profile at some of 765/400 kV sub-stations furnished by WRLDC
is enclosed at Annexure-2.3.
The Sub-Committee noted the same.

2.4 U/F Relay Operations


As per WRLDC records the system frequency didn’t touch49.4Hz(which
is revised Stage-I frequency after 8th NPC decision) and no UFR operation
was reported to WRLDC.
The Sub-Committee noted as above.

2.5 Power Cuts / Load Restrictions


Details of Power Cuts and Regulatory measures as furnished by the State
utilities are given in Annexure-2.5.
The Sub-Committee noted as above.

2.6 Details of Generating Units under Forced outages


Details of generating units under forced outages are given in Annexure-
2.6.

The Sub-Committee noted as above.

2.7 Details of Generating Units under Planned outages


The details of generating units under Planned Outages are given at
Annexure-2.7.
The Sub-Committee noted the same.

2.8 Presentation on operational aspects by SLDCs & RLDC.


WRLDC gave brief presentations on operational aspects of WR grid for
last month, however, due to less available time, presentations of SLDCs
could not be presented in the meeting. The presentations are attached at
Annexure-2.8.

OCC subcommittee noted the same.

2.9 List of New Grid Elements added / list of elements


decommissioned.
The list of New Elements added in WR Grid is attached at Annexure-2.9.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 3
The Sub-Committee noted the same.

2.10 Submission of failure analysis of grid elements


Under regulation 27 of CEA (Grid Standards) Regulations, 2010, failure
analysis of equipment failure and tower collapse is to be submitted to
RPC and Authority.
All the constituents are requested to report incidences of equipment
failure and tower collapse to RPC and Authority as and when such
incidences take place.
The Sub-Committee noted the same.

2.11 Coal stock position


In prevailing situation of scarcity of coal in the region, it is important to
monitor the coal stocks on monthly basis in OCC forum so that deviation
of load and generation can be kept minimum. To sensitize all the
constituents of WR above the issue of coal scarcity and its impact on load
generation, latest CEA coal stock position is attached at Annexure-2.11-
a.

The Sub-Committee noted the same.

3 Operational Planning
3.1 Proposed planned maintenance programme of generating
units
Maintenance programme of generating units for the month of August
2019 and September 2019 was discussed.
The finalized list of maintenance programme of generating units for the
months August 2019 and September 2019 given in Annexure 3.1.
OCC Discussion:
NTPC representative stated that AOH of VSTPS 11 has been pre poned
and requested to consider the unit under AOH from 22.08.19 to 25.09.19
as the bottom ash hopper , LP turbine bellow and HRH (L) strainer are in
bad condition and needs urgent repairs else there is a possibility of unit
going out under forced outage. Further he stated that the boiler license
also needs to be renewed before 22.08.2019.
SE,SLDC Gujarat stated that Gujarat demand picks up in September and
already two units of CGPL are also under planned outage hence he
requested NTPC to plan the outage as per the original schedule in
December 2019.Maha Discom representative agreed with the views of
GETCO.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 4
Considering the possibility that the NTPC Unit will likely to go on forced
outage,OCC after deliberation agreed to forced preponement of NTPC
unit.
CGPL representative informed that one unit would be brought onbar in
the month of August 2019.
M.S, WRPC stated that the power demand in states like Gujarat
,Maharashtra and Madhya Pradesh increases in September and hence
NTPC should try to get the unit on bar at earliest.After, completing over
hauling. Also CGPL must bring atleast one unit on bar as stated by CGPL.
OCC Subcommittee noted the same.

3.2 Outage programme of Transmission Lines/Elements.


Transmission element outages were discussed through VC on 20/08/19.
The list of OCC approved outages for transmission elements outage to be
availed during the month of September 2019 is given at Annexure 3.2.
The Sub-Committee noted the same.

3.3 Anticipated power supply position for the months -


August 2019 & September 2019.

Details of anticipated restricted & un-restricted demands for the months


of August 2019 & September 2019 are given in Annexure 3.3.
Maharashtra, Gujarat, MP & Chhattisgarh updated the anticipated data.
The Sub-Committee noted the information.

4 Operational Statistics for the month of June 2019


The details of actual generation, demand, drawl of power from the grid,
exchanges, etc. are given in the following Annexures:
Annexure 4.1 - Actual generation and requirement.
Annexure 4.2 - Peak demand data.
Annexure 4.3 - Integrated operation of the system and operation of
Inter-state tie-lines.
Annexure 4.4 – Details of level of major reservoirs in the Western
Region.
The Sub-Committee noted the above information.

5 System Disturbances in Western Region


There was no major grid disturbance in the Western Region during the
month of July 2019.The details of minor incidences during the month
received from WRLDC are enclosed at Annexure-5.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 5
The Sub-Committee noted as above.

6 Healthiness status of SERs/DRs of equipment


The updated status of Constituents who have furnished the status of the
healthiness of SER/DRs in their systems is given at Annexure-6.
WRPC enquired about entities who have not submitted the status of
SERs/DRs of equipment in the system. Constituents assured to submit
the status on time.
The Sub-Committee noted as above.

7 Status of completion of ongoing schemes in WR


7.1 Status of Commissioning of Reactors
7.2 Status of Transmission schemes - 765/400 kV and above
7.3 Status of Commissioning of new Generating units in WR
The updated status of the above items is at Annexure-7.
The Sub-Committee noted the above information.

8 Miscellaneous Operational Items


8.1 Quarterly review of Crisis Management Plan (CMP) and
Physical &Cyber Security (P&CS) in the power sector
All constituents are requested to submit the current status of CMP and
P&CS report (constituent wise) for the fourth quarter (January to March
2018) as per format enclosed at Annexure-8.1.
OCC Discussion:
MS, WRPC informed the agenda position on CMP and P&CS report.
S. No Entity Remarks
1 Maharashtra Cybersecurity under upgradation. Report will be submitted in 2
months.
2 Chhattisgarh Submitted on 03.06.2019.
3 Gujarat SCADA PMU report will be submitted by the end of month. MIS audit
is under tender process.
4 Madhya Pradesh Audit is over.
5 NSPCL Audit would take more time.
6 CGPL Submitted on 15.07.2019
7 Adani Report will be submitted by August 2019
8 TATA Submitted on 08.06.2019.
9 RKM power Submitted on 03.06.2019.
10 NCA The report will be submitted after cybersecurity to be conducted by
SSNL.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 6
11 TAPS12 Informed that plant equipment is not connected to outside world
internet as a safety measure by govt of India.
12 NTPC NTPC had to conduct the audit
13 EPTCL SCADA is independent.
14 RIPL Submitted on 11.06.19

MS,WRPC requested all entities to submit the contact details of officials


to be contacted during crisis. WRLDC representative informed that
contact details are on the website of WRLDC and may be updated every
month.
MS, WRPC observed that in the report submitted by TATA power problem
areas were identified. He requested TATA representative to submit plans
for elimination of identified problems. Also physical security aspects of
the same may be mentioned. TATA power representative informed that
the submitted report was a first check report and the final report would
be submitted based on the actions taken to address the observations.
MS,WRPC requested all entities to address physical,Cyber and disaster
management aspects of the respective organization and submit the
details to WRPC.
The Sub-committee noted the same.

8.2 Monitoring of Schemes funded from PSDF


Agenda:
As per the decision being taken in NPC meetings, RPC may follow up with
the utilities regularly in OCC to expedite the completion of various
approved schemes by giving due priority. Accordingly, WRPC has been
taking up this issue in the OCC forum for discussion.
In this matter, the details related to State-wise sanctioned grant and
disbursement amount for the approved schemes to be funded from PSDF
are attached at Annexure-8.2A.
Also, as per the procedure, the utilities are required to furnish the
information in the prescribed format by the first week of every month on
regular basis to Member Convener, PSDF project monitoring group (AGM,
NLDC, POSOCO) with a copy to NPC & WRPC division. A copy of the
prescribed format is attached at Annexure–8.2B.
OCC Discussion:
MS, WRPC requested all utilities to submit the detailed status of all the
projects put up for approval and sanctioned under PSDF project.
He informed that Western Region is one of the highest contributor to
PSDF fund and utilities may submit proposals eligible under PSDF
scheme to WRPC and NLDC. He informed that a PSDF scheme meeting
would be conducted in the month of October 2019 and all proposals
would be put up before WRPC.
OCC Sub-committee noted as above.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 7
8.3 State-wise details for Installation of capacitors to be
furnished to WRPC
In accordance with the provision in clause 1.5 (ii) of IEGC, “RPC shall file
monthly report on installation of capacitors by states vis-a-vis the
requirement/targets, as decided in the RPC”
SLDC’s /DISCOMs are therefore requested to expedite the matter and
ensure to furnish the status of capacitor report in format attached at
Annexure 8.3 on monthly basis regularly. SLDC’s are also requested to
compile the details of various utilities and send the compiled report of
entire state by 8th day of every month.

OCC Discussion:
WRLDC representative informed that low voltages are observed at only
some pockets of WR.
MS, WRPC informed that low voltage phenomenon are observed only at
a few nodes and that too only in some seasons. He suggested that a
separate system studies meeting can be conducted before the next WRPC
meeting to study voltage and loading issues if any.
The Sub-Committee noted the same.

8.4 Ratification of projected demand and generation of WR for


the quarter Q3 2019-20.

The load generation data for the period of October 2019 to December
2019(Q-3) is to be ratified for POC charge calculation.

The generation projection and demand sheet are enclosed at Annexure


8.4.
Discussion:
WRLDC representative informed
1. Meeting to ratify projected demand is going to be conducted on 29 th
August 2019.
2. Except Goa data has been received from all states.
3. Data from KSK, SSP yet to be received.
KSK representative informed that requisite data would be furnished
immediatly.

The Sub-Committee noted the same

8.5 Agenda from SLDC Chhattisgarh

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 8
Inclusion of 400KV Raita-Jagdalpur line along with 315 MVA
8.5.1
lCTs(2No.) and Line Reactors at 400/220 KV Jagdalpur substation
in the exception list of grid elements of WR.
A 400 KV line between 400 KV Raita and 400 KV Jagdalpur substation
has been established and in service since 08th September 2017. This line
has a length of about 320Kms and passes through hilly terrain and dense
forest area in Bastar region, as such the number of trappings of this line
has been more. Since its FTC on 08.09.2017 there have been 20 No.
trappings of this line till date (3 Nos in 2017-18,12 Nos in 2018-19 and
5 Nos till this date during the current year).

Presently NMDC and part of CG Grid is connected to 400/220 KV


substation at Jagdalpur substation and in the event of any tripping of
this line, restoration of line takes more time in getting charging code from
WRLDC and the supply of area specially NMDC which is connected
radially to Jagdalpur substation, is getting affected.

Since the power flow in this 400 KV Raita-Jagdalpur line is within State
and both ends are owned by CSPTCL, hence it may please be included in
the exception list of WRLDC. Along with Inclusion of 400KV Raita-
Jagdalpur line, 2 ICTs of 315 MVA, 2 Nos 80 MVA line reactors at
400/220 KV Jagdalpur substation may also be included in the
exception list of important grid elements of WR so that charging of above
elements in case of tripping may be done in short period of time and
interruption time may be minimized. However, for planned outages of
more than 2 days, outage approval will be taken in the OCC meetings.

OCC Discussion:

SE(Opn), SLDC Chhattisgarh informed that 400 KV D/C Raita-Jagdalpur


was envisaged for supply to NMDC steel plant. However, due to delay of
works by NMDC, only one ckt was charged at 400KV and another ckt
was charged at 220KV feeding to Chhattisgarh grid. As power flow of the
D/c is within the state and both ends are owned by CSPTCL, he
requested for inclusion of line along with 2 no. of ICTs of 315 MVA, 2
Nos 80 MVA line reactors in the exception list of important grid
elements of WR.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 9
GM, WRLDC informed that the mentioned elements may be added to the
exception list but SLDC Chhattisgarh have to take OCC approval if
outage duration is more than two days (48 hrs) .

WRLDC representative informed that if the transmission elements


complete a loop then their continuation in the exception list would be
reviewed.

It was agreed to include above elements in exception list subject to


conditions stated by WRLDC.

OCC subcommittee noted the same.

9 WRLDC Agenda Items


9.1 Load Crash in WR on 15th Aug 19 and Submission of
Forecast data by WR Beneficiaries

On 15th Aug 19, due to Independence Day and Raksha Bandhan large
demand crash was observed in WR. Difference of around 10 GW was
observed between 14th Aug and 15th Aug 19 demands. Frequency is above
IEGC band for considerable time and persistent high voltages were
observed in the grid. There had been large mismatch between forecasted
demand submitted by SLDCs and actual demand. The WR demand and
grid frequency are shown below.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 10
All the available bus reactors are taken into service and generators are
instructed to absorb MVAR. Large number of HV transmission lines are
opened on high voltage to regulate voltage.

Demand forecasting is one of the critical factors for reliable and economic
operation of power system. Accurate forecast holds a great saving potential
for beneficiaries. As per IEGC, WR beneficiaries viz. Maharashtra, Gujarat,
Madhya Pradesh, Chhattisgarh, Goa, DD and DNH are mandated to do
demand forecast and share the data to WRLDC.

The forecasted demand submitted by beneficiaries and actual demand are


compared and RMSE (Root Mean Square Error) has been computed for last
one month (15 Jul to 15 Aug 19). The average RMSE of demand forecasting
is tabulated below.

State Average RMSE Error of Demand


Forecast
(15 Jul to 15 Aug 19)
Maharashtra 8%
Gujarat 6%
Madhya 5%
Pradesh
Chhattisgarh 9%

Beneficiaries like Maharashtra, MP and Chhattisgarh were not submitting


the demand forecast to WRLDC regularly. Status of demand forecast to
WRLDC in last one month (15 Jul to 15 Aug 19) is tabulated below

State Non-Receipt of Demand forecast


(No. of days)
Maharashtra 11
Gujarat 0
Madhya 15
Pradesh

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 11
Chhattisgarh 14

Beneficiaries like Goa, DD and DNH are not submitting demand forecast
data to WRLDC.

1. Submission of demand forecast to WRLDC regularly by Maharashtra,


MP and Chhattisgarh.
2. Maharashtra, Gujarat, Madhya Pradesh and Chhattisgarh to apprise
actions being taken to improve forecast.
3. Goa, DD and DNH to submit demand forecast to WRLDC as mandated
in IEGC.
Apart from above beneficiaries like Gujarat, Maharashtra and MP having
high RE installations may apprise OCC about status of RE forecasting.
OCC Discussion:
WRLDC representative informed that as decided in OCC, constituents
are submitting demand forecast and WRLDC is aggregating at regional
level.In addition, WRLDC also performs independent demand forecast
based on the state demand at regional level.
Two days before Independence Day an advisory was issued by WRLDC
to constituents regarding likely drop in demand.Due to Independence
Day, the drop in demand was high. Also, heavy rains were observed in
Madhya Pradesh on the same day and generally rains were widespread
in WR.
Due to large drop in demand high voltages were persisting in the grid.
Nearly 42 EHV lines were opened on high voltage and generation was
backdown in ISGS including nuclear power stations. There was over
injection by ISGS stations of around 2200 MW as the schedules were
below technical minimum.Madhya Pradesh under drawl was around
700-800 MW and running all machines at ISP and OSP to avoid dam
over flow.There had been black out at Ukai due to tripping of all
emanating lines on high voltage.
WRLDC representative opined that One day-ahead forecast will not
suffice demand management, even intra-day forecast should also be
done.He requested that Constituents may tie up with weather
forecasting agencies for consideration of weather parameters in demand
forecast. Apart from demand forecast, there is a need to do the
availability forecast to ensure generation availability during peak hours.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 12
He suggested that many state generating stations were considering
technical minimum as 70%. Atleast on low demand days SLDCs may
schedule these stations upto 55% to avoid high frequency and under
drawls.
SE(Opn),Gujarat SLDC,GETCO informed that SLDC was doing day
ahead as well as intra-day demand forecast.The error in day ahead forecast
was more when compared to intra-day forecast error.

AEE,MP SLDC,MPPTCL informed that following generation reduction


measures were done by them.
1. To control under drawl three thermal machines were taken under
RSD.One unit each at ISP and OSP were also taken out.
2. Even at JP Nigrie that is low at merit order the generation was back
down to control under drawl.
3. On 15th Aug 19, the wind generation was 400-600 MW high when
compared with forecast.

CE,Maharashtra SLDC,MSETCL informed that they took measures to


ensure that on Independence Day Maharashtra deviation from schedule
was maintained within the limits and further they helped grid conditions
at high frequencies by overdrawing from ISTS.
As regard to the forecast of demand, SLDC Maharashtra receives three
demand forecast within Mumbai DISCOMs and one forecast for the rest
of Maharashtra as a whole. The received forecasts were aggregated at
SLDC. The demand forecast for Maharashtra on Independence day
couldn’t be sent to WRLDC due to some issues. Further Koyna
generation was also regulated accordingly.

SE(Opn),Chhattisgarh SLDC,CSPTCL informed that the share of


Chhattisgarh in ISGS stations was less compared to big states like
Maharashtra, Gujarat and MP.However they had scheduled under URS
which helped the grid.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 13
He informed that Chhattisgarh is having less share in ISGS stations, in
some cases of low demand period Chhattisgarh is unable to procure power
from ISGS due to surrender of power by states with larger share. He
requested the forum to consider benefit if one state facilitates a generating
station to be on bar by providing technical minimum schedule, the same
schedule may be continued for some period of time as the beneficiary
supported the grid by keeping generator on bar.

NTPC representative informed that only Gujarat and Chhattisgarh


provided scheduled generation technical minimum or above and
Maharashtra and MP had given zero or less schedule causing the over
injection on 15th August 2019. Furrher representative from Sipat,NTPC
stated that during the low demand period the machine was scheduled at
24% where as the technical minimum is 55% due to which the boiler was
unstable, he requested consider the revision of SG to t=Technical minimum
atleast units can generate stable.

MS, WRPC stated that


I. it was extremely difficult to forecast the load under extreme
conditions like Heavy rains, Independence Day falling on the same
day.Demand crasheds to 60-65% on extreme low demand days are
seen in past also requiring the opening of EHV lines.
II. State SLDCs may present methodologies adopted for demand
forecasting in the next OCC meeting and shall be discussed in detail.
III. Further, regarding Chhattisgarh's suggestion of scheduling of power
to states who are providing schedule to maintain technical minimum
of the generator he suggested that the same needs to be discussed in
detail in CCM and requested Chattisgarh to provide a detail agenda
item in the forthcoming CCM.
OCC Subcommittee noted the same.

9.2 Primary Frequency Response

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 14
The average primary response of generators for the last three events are
shown below.

Event-
Event-41 Event-43
42

WR-
ER-1337 NR-1500
2975
Average
S.N 16-05- 19-05- Respons
Generator/Station 05-07-2019
o 2019 2019 e as % of
03:56 Ideal
19:10 10:35

49.99 50.02 49.91

50.05 49.82 49.84

0.06 -0.2 -0.07

1 SKS (2x300) 100% 67% 67% 78%

2 KSTPS-II(3x500) 67% 34% 107% 69%

GMR Warora
3 49% 56% 100% 68%
(2x300)

4 KSTPS-I (3x200) 79% 47% 65% 64%

5 NSPCL (2x250) 27% 58% 100% 62%

APML
6 66% 35% 63% 55%
Tiroda(5x660)

JPL Tamnar
7 75% 33% 21% 43%
(Stage II)(4x600)

8 CGPL(5x830) 5% 39% 80% 41%

9 DB Power(2x600) 28% 26% 69% 41%

Kawas
10 87% 25% 0% 37%
(4x106+2x116)

11 Lanco (2x300) 11% 98% 0% 36%

12 VSTPS-III(2x500) 70% 0% 0% 35%

13 RKM (3x360) 34% 43% 8% 28%

14 Balco (4x300) 32% 11% 0% 22%

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 15
15 Mouda-I(2x500) 0% 28% 10% 13%

16 JP NIGRIE(2x600) 26% 0% 10% 12%

17 MB Power(2x600) 3% 0% 20% 8%

18 SIPAT-I(3x660) 6% 6% 10% 8%

19 SIPAT-II(2x500) 0% 15% 0% 8%

20 JPL I (4x250) 21% 0% 0% 7%

21 VSTPS-IV(2x500) 0% 0% 12% 6%

22 KSK(3x600) 0% 0% 15% 5%

Essar
23 0% 0% 12% 4%
Mahan(2x600)

24 MCPL (1x300) 0% 5% 0% 2%

25 Mouda-II (2x660) 0% 4% 0% 1%

GMR
26 0% 0% 1% 0%
Raipur(2x685)

27 VSTPS-II(2x500) 0% 0% 0% 0%

28 VSTPS-V(1x500) 0% 0% 0% 0%

29 KSTPS-III(1x500) 0% 0% 0% 0%

30 SASAN(6x660) 0% 0% 0% 0%

31 TRN (2x300) 0% 0% 0% 0%

32 Jhabua (1x600) 0% 0% 0% 0%

33 SSP-CBPH (5x50) 0% 0% 0% 0%

34 VSTPS-I (6x210) 0% 0% 0% 0%

Data non-current/Zero Generation

Based on the “report of the expert group to review and suggest


measures for bringing power system operation closer to national
reference frequency”, the minimum frequency response expected is at
least 40% of ideal response.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 16
Generating stations whose frequency response is below 40% may apprise
OCC, actions being taken to improve the frequency response.

OCC Discussion:

WRLDC informed that


 Generators not responding to frequency events may take up the
matter with O&M to improve primary frequency response
 It was observed some of the generators were over injecting beyond
normative DC leaving no margins for primary frequency response.
 Generators were advised to take up the matter seriously and improve
the primary response.

DGM,VSTPS,NTPC informed that the primary response of VSTPS-IV was


not adequate and this would be investigated and rectified during
overhauling of units.Further, there was some randomness in the response,
such as in one of the events, response of VSTPS-III was 70% and for rest of
the events the response was not adequate. VSTPS will be looking into the
issues.
As regards, Inadequate response from VSTPS-I, he informed that these
machines are 30 years old with LMZ make turbine systems. Hence
response is bound to be minimal.
OCC Subcommittee noted the same.

9.3 Reliability and Adequacy of Transmission system for SSP


Evacuation

Sardar Sarovar Plant has an installed capacity of 1450 MW


(RBPH: 6x200 MW + CHPH: 5x50 MW). CHPH units are connected at 220
kV level whereas RBPH units are connected at 400 kV level. With heavy
inflow of water, following heavy rainfall in the upper catchment area of
Sardar Sarovar Dam on the Narmada river, RBPH units started generation
nearly after two years.

The peak generation at SSP is around 1330 MW. The evacuating lines
from SSP and the peak power flow pattern under full load generation at
SSP from 9 Aug-11 Aug’19 are as under:

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 17
S No. Line Lengt Conductor Peak Power Flow
h type (MW)

1 400 kV SSP-Asoj 83 Twin 586


Moose

2 400 kV SSP-Kasor 146 Twin 394


Moose

3 400 kV SSP- 236 Twin 290


Dhule-1 Moose

4 400 kV SSP- 236 Twin 290


Dhule-2 Moose

5 400 kV SSP- 178 Twin 0


Rajgarh-1 Moose
(Out of service since
11.06.2019 due to
tower collapse)

6 400 kV SSP- 178 Twin 0


Rajgarh-2 Moose
(Out of service since
11.06.2019 due to
tower collapse)

It may be seen that the loading of evacuating lines is highly skewed.

 High loading on 400 kV SSP-Asoj & SSP-Kasor lines


 Light loading on SSP-Dhule D/C

To control line loading on 400 kV SSP-Asoj following circuits are kept open.

S.No Element Ownership Date Time Reason

To control
400 kV POWERGR
09-08- loading on
1 Khandwa-Dhule- ID-WR2 12:25
2019 400KV SSP-
1 (PGCIL)
Asoj

400 kV Rajgarh- POWERGR


09-08- To control
2 Kasor-I & II FSC ID-WR2 12:58
2019 loading on
@ Rajgarh (PGCIL)

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 18
400KV SSP-
Asoj

To control line
400 kV-Asoj- 10-08-
3 Gujarat 19:52 loading of
Kosamba-1 2019
SSP-Asoj

To control line
400 kV-Kasor- 10-08- loading of
4 Gujarat 21:05
Chorania-1 2019 400KV SSP-
Asoj

To control
POWERGR
400 kV- 12-08- loading on
5 ID-WR2 10:12
Vadodara-Asoj-1 2019 400KV SSP-
(PGCIL)
Asoj

To control
POWERGR
400 kV- 12-08- loading on
6 ID-WR2 10:13
Vadodara-Asoj-2 2019 400KV SSP-
(PGCIL)
Asoj

With increase in Gujarat demand the loading on 400 kV SSP-Asoj would


further increase and may exceed 650 MW. To control line loading on 400
kV SSP-Asoj following measures are suggested.

1. Due to 1000/1 A CTs on 400 kV SSP-Asoj and 400 kV SSP-Kasor at


SSP, Asoj and Kasor the line loading is limited to 690 MW/ckt.
Replacement of 1000/1 A CT with 2000/1 A CT would enhance line
loading limit to 874 MW (As per CEA planning criteria, Ambient Temp
as 75 Deg).
2. Although bus split arrangement at SSP (with 400 kV SSP-Rajgarh D/C
in service) reduce line loading on 400 kV SSP-Asoj, the bus split
arrangement would reduce reliability during forced outages and limit
planned outages at SSP and connecting substations. The split
arrangement to be considered as last resort only during dam spill over.

OCC Discussion:
WRLDC informed that at present 400 kV SSP-Rajgarh D/C was under
forced outage due to tower collapse. It was expected to come in a week time.
Based on earlier system studies high Loading on 400 kV SSP-Asoj can be
reduced if SSP-Asoj and Asoj –Chorania lines are bypassed at Asoj and
made SSP- Chorania.Hence,Gujarat SLDC may also study the feasibility of

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 19
bypassing of the lines at Asoj and making the line directly from SSP-
Chorania.Also for this there is a requirement to replacing of 1000/1 A CT
with 2000/1 A CT on 400 kV SSP-Asoj at both ends would enhance line
loading limits
SE(Opn),Gujarat SLDC,GETCO informed that SLDC would study feasibility
of bypassing of the SSP-Asoj and Asoj –Chorania lines at Asoj and making
the line directly from SSP-Chorania as per earlier study and regarding
replacement of 1000/1 A CT with 2000/1 A CT on 400 kV SSP-Asoj at both
ends shall be discussed in Gujarat PCM.

MS, WRPC informed that MP may apprise the status of restoration of


400 kV SSP-Rajgarh D/C to WRPC, Secretariat.
OCC Subcommittee noted the same.

9.4 Reliability of hotline communication of WRLDC with NTPC


stations

NTPC has discontinued operation from their Regional office control room
at Mumbai wef 01.07.2019 and requested WRLDC to
coordinate/communicate directly with NTPC stations. It is therefore
mandatory to maintain reliability of hotline phones integrated with Orange
exchange at WRLDC. It is also to be noted that these phones are to be kept
in generation control room and not switchyard control room since all
communication with WRLDC will take place from Generation control room
of NTPC. The hotline phones at Kawas and Khargone are not working and
needs to be restored.

NTPC may confirm the availability of hotline phones at generation control


room.

OCC Discussion:

a) NTPC informed that hot line phones were being shifted from switchyard
stations to generator control rooms at Mouda ,Khargoen, Solapur and
Lara out of these,Solpur and Khargone were already shifted and hotline
can be used by WRLDC.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 20
b) Hot lines phones at older switchyard stations of Vindyachal,
Gandhar,Korba and Kawas are already being manned by NTPC
employees and may be used by WRLDC immediately.

OCC Subcommittee noted the same.

9.5 Status of DR/EL submission for GD/GI events in Jul 2019

 DR and Report submission status for Jul 2019 events is attached as


annexure 9.5A.
 Utilities who have not submitted the details are requested to submit
the data immediately to WRLDC/WRPC.
OCC Discussion:

WRLDC informed that


 In July’19 there were 12 GD/DI events, only few utilities submitted
complete DR and EL for events. All utilities are requested to upload DR,
EL and events reports in tripping portal.
OCC Subcommittee noted the same.

9.6 Updated “Operating Procedure for Western Regional Grid”

In 520th OCC held on 13 Jun 19 WRLDC requested WR entities to provide


the feedback and suggestions for updating Operating Procedure for
Western Regional Grid for the year 2019. Accordingly, in compliance with
IEGC-5.1(f) document titled “Operating Procedure for Western Regional
Grid” was prepared and updated on 19 July 2019. The document is
available at following link.
https://www.wrldc.in/content/363_1_Procedures.aspx

The significant changes in the report are as under


 Revised action plan for credible contingencies
 Updated list of EHV feeders to be opened to control high voltage
 Updated list of EHV feeders to be opened for emergency measures
 Updated SPS document of WR
 Reliability circulars on network reconfiguration to control fault level
 Updated list of units mandated to provide primary frequency response

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 21
Highlights on following topics have been included in the document
 Security Constrained Economic Dispatch.
 CERC (Terms and Conditions of Tariff) Regulations, 2019
 CERC (Fees and Charges of RLDC and other related matters) Regulations,
2019.
 CERC Suo Motu order on Pilot Project on 05-Minute Scheduling,
Metering, Accounting and Settlement for Thermal/Hydro, and on Hydro
as Fast Response Ancillary Services (FRAS).
 Operator Manual on Web Based Outage Software
 Operator Manual on Web Based Tripping Portal
 CERC (Deviation Settlement Mechanism and related matters) (Fifth
Amendment) Regulations, 2019
 Supplementary Procedure for facilitating short circuit testing at NHPTL
Bina
 MOP order for opening Letter of Credit
 Submission of Steady State and dynamic models/data of
Conventional/RE Generators/FACTS Devices for System Studies
OCC Subcommittee noted the same.

9.7 Local Area Oscillation at Marwa TPS (2x500MW) on 7th Aug


2019

On 07th Aug 2019, oscillations in WR Grid near Marwa were observed for
around 2 mins 40 sec i.e. from 10:22:35hrs to 10:25:15hrs. The forced
oscillations died out with the tripping of Marwa Unit-1 (500 MW). The
frequency of oscillation was 1.1 Hz with damping ratio of 0.4 %. As
informed were triggered due to issue with IP control valve and that resulted
in fluctuation in generation at Marwa Unit-1 from 143MW to 435MW. Due
to this event the fluctuations were observed at Sipat, NSPCL and Korba
West, Korba.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 22
Chhattisgarh to update on following
 Sudden reduction of power from 390MW to 265MW (about 125MW) with
in 2minute, 52 seconds prior to the event to be clarified.
 As reported of by CSPGCL that IP control valve problem occurred. Exact
details with root cause shall be submitted.
 It is understood that PSS is not in service at Marwa which a serious non-
compliance of clause 5.2(k) of IEGC and CEA Technical Standard for
Construction of Electrical Plants and Electric Lines (10.2. G.I). CSPGCL
to expedite the tuning of PSS on urgent basis and take it in service.
 Prior to synchronization the Unit-1 (500 MW) at Marwa the root cause
shall be identified.
OCC Discussion:
CSPGCL informed that on 7th Aug 19, 10:22 Hrs. the machine was running
in CMC mode, suddenly the load set point was reduced without operator’s
intervention.Due to reduction in load set point, the pressures are varied
from 136 to 170 kg/Cm2 and IP control valve had come to 50% and started
throttling. Thereafter due to HP control valve oscillations started.Reason
for sudden reduction of load set point without human intervention was
taken up with O&M BHEL.
During discussion it was clarified that since this is a distuebance from
turbine mechanical power, PSS would not be able to damp them for this
type of disturbance.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 23
 BHEL visited the site and shall send the detailed reports shortly. The
reports shall be shared with WRPC and WRLDC
CGPL representative informed that similar problem was observed in
Neyveli thermal power plant where malfunction was observed in
excitation system.
WRLDC informed that
 On query raised by WRLDC regarding PSS tuning it was informed that
after commissioning of units the PSS was taken into service with default
settings PSS.
OCC Subcommittee noted the same.
High Loading on 220kV Jhanor(NTPC)-Haldarwa-D/C line
9.8
When Jhanor generation is more than 300 MW, the system becomes N-1
non-compliant with Jhanor-Haldarwa carrying 150MW each. For 29% of
the time lines were N-1 non-compliant during the Apr’19 to Jun’19. Many
reliability measures like bus split at Jhanor and generation reduction had
to be taken to facilitate the shutdown of one line in past. Also, in some of
the occasions, the 400/220kV GPEC ICT, 400kV GPEC-Jhanor line, 220kV
Kawas-Haldarwa, 220kV Kakarapar-Haldarwa one ckt has been opened to
control the loading.

Remedial Actions:

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 24
LILO of 220kV Haldarwa-Jagadia S/C line at Jhanor would relieve the
loading. The LILO has been agreed in 36th SCM of WR.

As per 35th WRPC &TCC discussions:

In the 35th WRPC meeting, GETCO had intimated that the works
associated with line have been already completed. However, the 220 kV
bays at Jhanor are expected by Sept 2018, therefore the LILO of 220 kV
Haldarwa–Jagadia S/C line at Jhanor S/s would be completed by Sept,
2018.
OCC Discussion:
Gujarat SLDC informed that the works associated with line was already
completed.Panel for Bus Bar protection was arrived at site. Issue with Bus
Bar protection scheme was also resolved. LILO of 220kV Haldarwa-Jagadia
S/C line at Jhanor will be charged by Oct’19 end.
OCC Subcommittee noted the same.
High Loading of Boisar-Boisar T/C lines
9.9

These lines become N-1 non-compliant when total loading on these lines is
above 600MW (Considering N-1 loading of 300MW/ckt). For 52% of the
time lines were N-1 non-compliant during the Apr’19 to Jun’19. These ckts
are mostly loaded above 200MW each and managed with load trimming
scheme implemented by MSETCL. With the commissioning of 4th ICT at
Boisar, the loading on the ckts have further increased. One ICT is kept
open to control the loading on 220kV Boisar-Boisar ckts.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 25
43rd SCM: MSETCL stated that additional (4th) Ckt. between Boisar (PG)–
Boisar (M) by making LILO of Boisar–Borivali at Boisar (PG) is scheduled
for June, 2018.
OCC Discussion:
Maharashtra SLDC informed that (4th) Ckt. between Boisar(PG)–Boisar
(M) by making LILO of Boisar–Borivali at Boisar (PG) shall be completed
by Oct’19 end.
OCC Subcommittee noted the same.

9.10 High Loading of 220kV Pune-Talegaon D/c lines

When total loading on these lines is equal or above 260MW (N-1 loading
considered as 250MW), the corridor becomes N-1 non-compliant. For more
than 95% of the time lines were N-1 non-compliant during the Apr’19 to
Jun’19. Further one ICT at Pune PG is kept out to control the line loading.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 26
43rd SCM: 220kV Talegaon (PG)–Talegaon (M)–Urse–Chinchwad 220 kV
D/C is planned & is under implementation. This line has been completed
up to Urse S/s. Thus, Pune (PG) and Talegaon(M) have 4 no. of 220 kV
lines. However, 2 no. of Talegaon (PG) – Talegaon (M) are kept open to
restrict the loading on 220kV Urse–Chinchwad. It was intimated that Urse–
Chinchwad 220 kV D/C and Pune (PG)–Hingewadi 220 kV D/C would be
completed by Dec 2018.
OCC Discussion:
Maharashtra SLDC informed that delay of 220 kV Urse–Chinchwad D/C
and 220 kV Pune (PG)–Hingewadi D/C was due to severe ROW issues. STU
can only apprise the present status.
MS,WRPC suggested that this issue can be taken up for progress in TRM
Meeting.
OCC Subcommittee noted the same.

9.11 High Loading of 400/220kV Wardha ICTs

ICTs at Wardha were N-1 non-compliant when total loading is above


420MW. For 77% of the time ICTs were N-1 non-compliant during the
quarter.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 27
OCC Discussion:

WRLDC informed that earlier at Wardha there were three ICTs. Thereafter
one ICT was shifted to Kolhapur.at present the ICTs at Wardha were N-1
non-compliant for 77% of the time in Q1 of 2019.
Since loading was adequate,there is a need to enhance the capacity of ICT
and may be taken up in SCM.
OCC Subcommittee noted the same.

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 28
10
Additional Agenda

(i)
Activities to be taken up shortly

Member Secretary,WRPC informed that the following activities are


proposed to be taken up subsequently for better operation and
coordination of grid activities:

1. A separate Study group meeting &KAPP islanding to be conducted


before the next WRPC.
2. A separate Mumbai islanding meeting to be convened.
3. TRM meeting to be convened before the next WRPC meeting.
4. He suggested to carry out studies by offline study group so that
better outage planning can be carried out.

(ii) Renewal of Maintenance contract of PSSE software for


constituents of WR
PSSE Software was procured centrally by POWERGRID to have uniform
software for power system studies. Accordingly all WR utilities involved
in system studies were provided licensees as per requirement.
The license of PSSE study software needs to be renewed and it was
suggested that NLDC may negotiate with M/s Siemens for all entities of
W.R and he requested all entities to provide the number of license keys
to be required by each one of them to WRLDC.
It was decided that WRLDC would coordinate with NLDC and submit
proposal in next OCC meeting for WRPC approval.

The sub-committee noted the same.


(iii) Appreciation of Services

a) MS,WRPC informed that shri Vasant Pande SE MSLDC,


Maharashtra and Shri Deepak Kolhe EE MSLDC, Maharashtra
are retiring(In June 19 and July 19).
He informed that they have been associated with OCC of
Mahasrashtra grid for more than two decades. He placed on record
appreciation of OC for their contribution.
b) MS,WRPC informed that Shri A.Balan has taken over as MS,SRPC
Bangalore. He placed on record appreciation of OCC for Shri
A.Balan’s contribution.
11
Date and venue of next OCC meeting

523nd OCC meeting will be conducted on 17 th September 2019 at SLDC


Maharashtra, Kalwa, Navi Mumbai.

The sub-committee noted the same.


.***********

Minutes of 522nd OCC of WRPC meeting held on 21st August, 2019 Page 29
LIST OF PARTICIPANTS OF 522nd OCC MEETING OF WRPC HELD AT WRPC, MUMBAI ON 21.08.2019

Sl.No. Organisation, Name & Designation Mobile No. E-mail Address

I WRPC
1 Shri Satyanarayan S., M.S. [email protected]
2 Shri J.K. Rathod, S.E. (Opn.) 9987910799 [email protected]
3 Shri K.B. Jagtap, S.E.(Comml.) 8652776033 [email protected]
4 Shri D.N. Gawali, E.E. 9930666765 [email protected]
5 Shri P. Peddi Reddy, A.D.-I 7840894702 [email protected]
6 Shri B. Venkata Sandeep, A.D.-I 8527622170 [email protected]
7 Shri Anil Goutam, A.D.-I 7065203211 [email protected]

II CSPTCL/CSPGCL
8 Shri Y. Krishna Rao, S.E.(Opn.) 9826518820 [email protected]
9 Shri Lav Kaushik, A.E. 9862693585 [email protected]
10 Shri Satish Kr. Choudhary, A.E. 8120008729 [email protected]

III GETCo. / GSECL


11 Shri M.G. Gadhvi, S.E. 9925208661 [email protected]
12 Shri G.J. Mistry, D.E. 9925213180 [email protected]

IV MSETCL / MSEDCL/MahaGenco/MSPGCL
13 Shri Anil V. Kolap, C.E. 7030964444 [email protected]
14 Shri P.S. Sharma, S.E. 9769213861 [email protected]
15 Shri E.S. Moze, S.E. 8879770737 [email protected]
16 Shri Ghodke Gopichand, E.E. 7030250444 [email protected]
17 Shri S.M. Vhatkar, Dy. E.E. 9022273307 [email protected]

V MPPTCL/MPPGCL
18 Shri Rajendra Singh, A.E. 9425804662 [email protected]

VI POSOCO/WRLDC
19 Shri K. Muralikrishna, Sr.G.M. 9869450219 [email protected]
20 Shri Sachala Mishra, G.M. 9869450223 [email protected]
21 Smt. Pushpa S., G.M. (S.O.) 9869404482 [email protected]
22 Shri Vivek Pandey, Sr. D.G.M. 9869404673 [email protected]
23 Ms. Chitrankshi G., Ch. Mgr. 9869004892 [email protected]
24 Shri Vishal Puppala, Dy. Mgr. 9702691034 [email protected]
25 Shri Pradeep Sanodiya, Dy. Mgr. 8452045338 [email protected]
26 Shri M. Venkateswara Rao, Dy. M. 8452928806 [email protected]
27 Shri Srinivas Chitturi, Dy. Mgr. 9869416078 [email protected]

VII POWERGRID
28 Shri Utpal Sharma, Sr. G.M. 9436302980 [email protected]
29 Shri Manoj Kumar Tripathi, Sr. D.G.M. 8275025586 [email protected]
30 Shri Sanjoy Das, D.G.M. 9429976244 [email protected]

VIII NTPC
31 Shri Madan Vaishnav, Sr. Mgr. 9429892138 [email protected]
32 Shri Abhay G. Sahu, D.G.M. 9423137986 [email protected]
33 Shri Ritesh Agarwal, Sr. Mgr. 9453022496 [email protected]
34 Shri Madhookar R., Mgr. 9403780572 [email protected]

IX Elect. Deptt. Daman & Diu


35 Shri Jay Solanki, J.E. 9898540640 [email protected]
X NSPCL
36 Shri Manish Shivhare, Mgr. 9425553619 [email protected]

XI NPCIL
37 Shri Samir Pathan, SO/E 9409309743 [email protected]
38 Shri Dinesh Kumar, ASCE 8007992695 [email protected]
39 Shri S.K. Maiti, SCE 9428821925 [email protected]

XII APML/ADTPS
40 Shri Manoj Taunk, G.M. 9099005517 [email protected]
41 Shri Deepak Sankhe, G.M. 9325119791 [email protected]

XIII TATA POWER


42 Shri Kiran Desale, Head PD & ABT 9223553342 [email protected]
43 Shri Sushanta K. Sahoo, Head -Opn. 9099006553 [email protected]

XIV N.H.P.T.L.
44 Shri Narendra K., Dy. Mgr. 9644001990 [email protected]

XV STERLITE
45 Shri Prashant Karpe, Mgr. 8390152777 [email protected]

XVI ESSAR POWER


46 Shri P.S. Bhattacharya, G.M. 9926430705 [email protected]
47 Shri Ashish Kakroo, Sr. Mgr. 9687668725 [email protected]

XVII RATTAN INDIA


48 Shri Amit Panchalwar, D.G.M. 9503229333 [email protected]

XVIII JPVL NIGRIE


49 Shri Navin Tinguria, Sr.G.M. 8349788717 [email protected]

XIX M.B. POWER


50 Shri Gajanan Jagtap, A.G.M. 9644009817 [email protected]

XX KSK MPCL
51 Shri Ramakant Upadhyay, Mgr. 7869916080 [email protected]

XXI VEDANTA POWER


52 Shri Abhishek Patel, Dy. Mgr. 9981501406 [email protected]

XXII TORRENT POWER SUGEN


53 Shri Pramod G. Patel, G.M. 9824370005 [email protected]
54 Shri Ronak Naik, Mgr. 9227410210 [email protected]

XXIII RGPPL
55 Ms. Kanchan Priya, Mgr. 9650999320 [email protected]

XXIV RELIANCEADA
56 Shri Karnesh Ghagare, Sr. Mgr. 9322093216 [email protected]

XXV DHARIWAL INFRA


57 Shri Pundlik Wanwe, D.G.M. 9421590572 [email protected]
Anaulagnak 2.1

jaUlaa[- 2019 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa


(piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)
FREQUENCY PARTICULARS DURING July 2019
(AS PER FREQUENCY REPORT OF WRLDC)
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat

1.1 MAXIMUM FREQUENCY 50.16 Hz. BETWEEN 1300 Hrs & 1400 Hrs on 07.07.2019
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.83 Hz. BETWEEN 0000 Hrs & 0100 Hrs Hrs. on 04..07.2019
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 50.01 Hz.
AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak

2.1 MAXIMUM FREQUENCY 50.32 on 15th July. At 15:50:50 hrs


AiQaktma AavaRi%t

2.2 MINIMUM FREQUENCY 49.64 on 4th July at 0:06:50 hrs


nyaUnatma AavaRi%t

3. %AGE OF TIME WHEN FREQUENCY WAS jaUlaa[- 2019 jaUna 2019 maa[- 2019
AavaRi%t ka samaya p`itSat maoM

3.1 Below 49.9 Hz. 7.09 9.87 8.26


49.9 hT\ja sao kma
3.2 BETWEEN 49.9 Hz. AND 50.05 Hz. 68.27 70.34 72.60
49.9 hT\ja AaOr 50.05 hT\ja ko baIca mao
3.3 ABOVE 50.05 Hz. 24.64 19.79 19.14
50.05 hT\ja ko ऊपर
4.1 NO. OF TIMES FREQUENCY TOUCHED 49.20 Hz. 0 0 0

4.2 NO. OF TIMES FREQUENCY TOUCHED 49.00 Hz. 0 0 0

4.3 NO. OF TIMES FREQUENCY TOUCHED 48.8 Hz. 0 0 0


piScama xao~Iya ivaVut saimait
ef 3, ema Aa[- DI saI xao~, AMQaorI pUva-, mauMba[- 400 093
FROM : SUPERINTENDING ENGINEER (OPERATION),WRPC,MUMBAI.
Date: 07/08/2019
TO : CHIEF ENGINEER (GRID MANAGEMENT),CEA,NEW DELHI.(FAX NO.011-26109750)

HIGHLIGHTS OF THE POWER SUPPLY POSITION OF WESTERN REGION PROVISIONAL


FOR THE MONTH OF July 2019
File no: WRPC/Opn./PSP/2018-19/
(A) GENERATION DETAILS OF WESTERN REGION

HVDC
CONSTITUENT GUVNL MPPGCL CSEB MSPGCL GOA DAMAN DNH ESIL&BARC DRAWAL WESTERN
& DIU REGION
(1) GENERATION GROSS (MUs)
Thermal Coal+Gas Based 5915.13 2220.69 1790.54 7465.85 14.40 0.00 0.00 0.00 0.00 17406.61
Hydro 27.68 201.10 28.00 324.69 0.00 0.00 0.00 0.00 0.00 581.46
Wind Injection 2002.11 692.45 0.00 1436.63 0.00 0.00 0.00 0.00 0.00 4131.19
Solar Injection 237.15 145.55 22.37 137.49 0.00 1.07 0.00 0.00 0.00 543.63
Bio Mass Injection 8.19 1.67 6.53 0.00 0.00 0.00 0.00 0.00 0.00 16.39
TOTAL 8190.26 3261.46 1847.44 9364.66 14.40 1.07 0.00 0.00 0.00 22679.28

(2) ACTUALDEMAND MET (GR. MW ) 17577 10097 4736 20583 566 350 826 868 52509

(B) ENERGY AVAILABILITY/ REQUIREMENT ETC.(EX-BUS) IN (MUs)

HVDC
CONSTITUENT GUVNL MPPGCL CSEB* MSPGCL GOA DAMAN DNH ESIL&BARC DRAWAL WESTERN
& DIU REGION
1. OWN GEN
Thermal Coal+Gas Based 5441.15 2163.61 1800.49 7052.80 14.12 0.00 0.00 0.00 0.00 16472.16
Hydro 27.27 199.57 27.93 318.84 0.00 0.00 0.00 0.00 0.00 573.61
Wind Injection 1962.06 657.83 0.00 1407.90 0.00 0.00 0.00 0.00 0.00 4027.79
Solar Injection 232.41 138.27 21.25 134.74 0.00 1.05 0.00 0.00 0.00 527.72
Bio Mass Injection 8.03 1.59 6.53 0.00 0.00 0.00 0.00 0.00 0.00 16.14
Total 7670.92 3160.87 1856.19 8914.28 14.12 1.05 0.00 0.00 0.00 21617.43
2 (I).Total drawl from ISTS Grid (at 2405.39 2687.78 1007.59 3236.84 328.04 224.18 578.01 181.94 1.52 10651.30
State Peripheri Excluding Tr. Losses)
2 (II) B.Total drawl from ISTS Grid ( 2480.30 2771.48 1038.96 3337.64 338.26 231.17 596.01 187.60 1.57 10981.42
Including Tr. Losses)

3. NET IMPORT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4. NET EXPORT 0.00 3.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.81
5 TOTAL AVAILABILITY (EXC ISTS TRANS. LOSSES) / TOTAL AVAILABILITY / NET ACTUAL ENERGY SUPPLIED (INC. ISTS TRAN.LOSSES)

5 (I) . TOTAL AVAILABILITY


(EXCL. ISTS TRANS. LOSSES) 10076 5845 2864 12151 342 225 578 182 1.52 32264.92
5 (II). TOTAL AVAILABILITY / NET
ACTUAL ENERGY SUPPLIED (INCL
ISTS TRANS. LOSSES) 10151.22 5928.54 2895.15 12251.92 352.38 232.22 596.01 187.60 1.57 32595.03
6. SHORTFALL
6 (I). SHORTFALL (MU) 1.08 0.00 0.00 0.26 0.00 0.00 0.00 0.00 0.00 1.34
6 (II). SHORTFALL (%) 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Freq. correction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Un Sch.Load Shedding 1.08 0.00 0.00 0.26 0.00 0.00 0.00 0.00 0.00 1.34
Sch.Load Shedding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7. Unrestricted Requirment 10077 5845 2864 12151 342 225 578 182 1.52 32266

AVERAGE WR GRID POOL LOSS 3.02

Page 1 of 1
(C) DEMAND AVAILABILITY/UNRESTRICTED REQUIREMENT IN (MW)

1. REQUIREMENT 17577 10097 4746 20568 566 350 826 868 2 52619
2. AVAILABILITY 17577 10097 4736 20561 566 350 826 868 2 52509
3. SHORTFALL 0.00 0.00 9.95 7.20 0.00 0.00 0.00 0.00 0.00 110.27
4. % SHORTFALL 0.00 0.00 0.21 0.04 0.00 0.00 0.00 0.00 0.00 0.21
The details of calculations for Unrestricted Requirment
Demand met at Unrestricted max 17577 10097 4736 20561 566 350 826 868 2 52509
Freq. correction 0 0 10 7 0 0 0 0 0 110
Un Sch.Load Shedding 0 0 0 0 0 0 0 0 0 0
Sch.Load Shedding 0 0 0 0 0 0 0 0 0 0
Unrestricted Demand 17577 10097 4746 20568 566 350 826 868 2 52619
Min. Registered Demand 10316 5836 2661 12867 36081

(D) Details of Gross generation, Declared Capacity, Scheduled generation & Injection from CS and dedicated Stations

C.S. Station & Gross Injection


Dedicated Stations Generation
(MUs) (MUs)
Korba 1463.84 1390.65
Korba-III 196.49 186.67
Vindhyachal-I 777.56 738.68
Vindhyachal-II 339.46 322.48
Vindhyachal-III 694.71 659.98
Vindhyachal-IV 702.89 667.74
Vindhyachal-V 345.91 328.61
Kawas 86.77 85.04
Gandhar 90.67 88.86
Sipat I 1339.44 1285.86
Sipat II 717.31 688.61
MAUDA-I 540.54 518.92
MAUDA-II 360.75 346.32
Lara 91.52 87.86
Gadarwada 197.65 189.74
SOLAPUR -4.18 -3.97
NSPCL 243.98 234.22
RGPPL 372.73 365.27
Kakrapar 310.41 290.86
Tarapur II (3&4) 802.34 738.16
Tarapur I (1&2) 206.29 187.72
SSP 24.31 24.07
OTHER IPPS 10654.29 10015.03
Pench -0.06 -0.06
Total 20555.60 19437.31

(F) Total Drawal by the Constituents

Constituents Actual total drawal from


grid excluding grid loss

(MUs)
GUJARAT 2405.39
MADHYA PRADESH 2687.78
CHHATISHGARH 1007.59
MAHARASHTRA 3236.84
GOA(WR) 328.04
DD 224.18
DNH 578.01
ESIL 178.59
BARC 3.35
HVDC DRAWAL 1.52
TOTAL 10651.30

(G) FREQUENCY REGIME OF WESTERN REGION GRID

1.Intantaneous (Hz) 2. Integrated (Hz) 3. Average (Hz)


Maximum Freq. 50.32 50.16
50.01
Munimum Freq. 49.64 49.83

3. Percentage Time when the Frequency was


4.
4.1NoNO.
of Occasions
OF TIMES when Frequency was
3.1 Below 49.9 Hz. 7.09 FREQUENCY TOUCHED
49.20
4.2 Hz.OF TIMES
NO. 0.00
3.2 BETWEEN 49.9 Hz. AND 50.05 Hz. 68.27 FREQUENCY TOUCHED
49.00 Hz.OF TIMES
4.3 NO. 0.00
3.3 ABOVE 50.05 Hz. 24.64 FREQUENCY TOUCHED
48.8 Hz. 0.00
Net Import / export of Energy in the Region
Actual Energy import (MU) -8159

Sch Energy import (MU) -7875

Page 1 of 1
व युतदाब परे खा जुलाई 2019
Voltage Profile during the month of July'2019 सं नक Annex-2.3

दनांक भोपाल खंडवा इटारसी दमोह नागदा इंदौर वा लयर रायपरु रायगढ़
Date Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior Raipur Raigarh
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 415 406 421 413 413 405 423 415 416 407 414 406 413 396 425 420 428 419
2 416 407 423 414 415 406 425 415 417 408 416 406 411 396 426 422 429 421
3 416 408 423 414 416 407 425 415 417 407 416 406 411 395 428 423 430 425
4 417 406 423 416 416 407 426 416 418 410 417 408 415 396 427 422 429 424
5 416 407 423 414 415 407 425 415 417 408 416 407 409 395 424 420 427 423
6 415 407 424 415 415 407 425 416 416 409 416 408 407 394 425 421 428 424
7 418 405 425 413 416 405 427 413 419 409 418 408 411 394 427 420 430 422
8 415 406 422 413 414 406 423 415 417 407 416 406 412 395 424 419 427 422
9 415 406 422 412 414 406 425 414 416 406 415 405 413 398 424 419 427 423
10 413 403 420 410 411 403 423 412 415 404 413 403 412 392 424 418 427 422
11 414 402 421 411 413 402 423 411 415 405 414 404 412 390 422 416 426 420
12 413 403 420 412 411 403 421 410 414 405 413 404 411 393 422 416 425 420
13 412 403 420 412 410 403 422 410 414 405 413 404 414 390 420 417 425 420
14 413 402 420 413 411 403 424 409 415 407 413 406 414 393 420 416 425 420
15 413 403 421 412 411 403 421 411 415 403 414 404 414 394 420 415 424 420
16 414 403 421 411 412 403 421 411 416 403 414 403 415 394 419 414 424 419
17 413 401 421 409 411 400 420 408 415 403 413 402 412 393 419 413 424 418
18 412 402 419 410 410 401 419 410 414 404 412 403 412 396 421 414 425 419
19 413 402 419 409 411 399 422 410 413 403 413 402 412 393 422 416 425 421
20 412 401 419 407 409 399 420 409 411 401 411 400 410 392 421 414 424 417
21 414 402 420 411 412 401 423 409 415 405 414 404 410 390 421 415 424 418
22 411 400 419 407 409 399 420 408 414 402 413 400 408 389 419 414 423 417
23 410 398 417 406 408 397 418 407 414 402 411 399 409 390 418 414 421 416
24 415 400 421 409 411 399 425 410 417 405 412 400 415 394 421 415 426 417
25 413 407 421 414 411 405 423 415 417 410 413 404 415 397 421 415 423 417
26 414 407 421 413 412 406 424 417 418 410 415 406 413 400 422 417 424 419
27 416 400 423 415 414 407 426 417 420 412 417 400 414 400 424 419 427 421
28 417 407 424 416 415 407 426 417 421 413 416 408 412 395 425 420 427 421
29 413 400 423 412 412 403 423 415 419 400 413 400 409 392 423 418 426 420
30 416 407 424 417 414 407 425 416 420 413 415 408 411 391 425 421 427 423
31 416 409 423 415 415 408 428 420 419 411 417 408 412 399 425 420 428 422
418 398 425 406 416 397 428 407 421 400 418 399 415 389 428 413 430 416
दनांक भलाई वधा धुले परल बोईसर कलवा कराड़ असोज दे हगाम
Date Bhilai Wardha Dhule Parli Boisar Kalwa Karad Asoj Dehgam
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 415 427 421 436 419 431 410 427 410 434 408 429 411 414 404 421 407
2 421 417 426 422 439 422 431 409 427 413 434 413 428 413 416 405 420 408
3 423 417 428 420 437 421 430 411 426 410 433 407 430 413 416 403 420 406
4 421 416 428 422 439 426 430 413 426 409 433 408 428 414 416 406 421 410
5 420 414 429 418 439 426 429 408 423 411 430 410 428 408 416 403 421 406
6 420 415 428 421 440 427 431 413 426 410 432 409 428 410 419 405 422 406
7 421 414 430 419 440 423 431 411 427 414 433 412 429 415 419 408 422 412
8 418 413 426 417 437 420 428 407 425 406 431 404 430 412 416 403 419 405
9 419 413 430 416 435 417 429 406 421 406 427 405 430 414 416 401 418 404
10 418 412 427 419 432 418 427 422 420 408 428 404 430 414 413 401 418 404
11 416 410 426 417 435 417 427 416 422 403 429 403 431 416 414 399 417 402
12 416 410 427 416 438 423 430 410 422 413 430 414 429 426 415 394 418 402
13 414 410 426 420 438 424 430 413 424 410 432 409 428 419 415 403 418 403
14 414 409 424 418 436 422 429 410 422 411 428 412 429 416 414 406 417 408
15 415 408 424 418 436 420 429 409 423 407 430 403 429 412 414 403 417 405
16 414 407 426 416 436 418 428 408 421 406 427 403 429 412 414 400 416 403
17 413 407 426 416 435 417 428 406 420 403 426 399 429 409 415 402 418 405
18 415 408 423 414 434 418 428 408 420 406 427 403 429 413 414 407 417 408
19 416 411 425 417 437 418 427 410 420 409 426 404 428 410 413 407 417 406
20 415 409 425 418 436 411 427 407 420 401 422 400 426 410 412 399 417 405
21 415 409 426 419 430 415 428 410 418 407 425 405 426 414 413 405 417 408
22 413 408 425 416 432 410 428 407 420 401 426 398 429 410 415 400 420 405
23 412 407 423 416 431 411 426 407 417 400 423 397 425 414 412 401 417 405
24 415 408 424 416 433 415 429 408 421 405 429 400 430 409 414 401 418 405
25 415 409 426 416 436 420 429 407 421 406 428 404 429 412 415 402 417 404
26 416 412 426 419 431 416 430 410 420 409 426 407 429 416 414 402 418 406
27 419 414 427 420 432 416 431 413 424 411 431 409 416 416 415 404 419 407
28 419 415 429 421 432 418 428 418 423 412 431 412 416 416 416 406 420 409
29 418 413 426 419 435 415 431 412 424 408 430 406 416 416 415 402 421 406
30 420 415 429 417 438 423 433 412 424 411 431 409 428 416 418 407 421 409
31 420 415 427 417 433 400 432 409 425 409 431 406 430 414 419 405 421 408
423 407 430 414 440 400 433 406 427 400 434 397 431 408 419 394 422 402
दनांक कासोर जेतपुर अमरे ल वापी मापुसा कला मगरवाड़ा हज़ीरा बीना इंदौर
Date Kasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira Bina Indore
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 765Kv 765Kv
अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 423 413 416 406 419 408 421 403 436 406 424 408 428 410 423 404 788 768 770 754
2 424 414 417 404 420 408 421 406 433 405 424 409 427 414 422 404 789 770 774 755
3 422 413 417 407 421 409 421 403 434 405 423 406 425 410 421 403 790 770 774 755
4 424 414 418 408 420 409 420 401 432 405 422 406 426 408 420 404 793 769 776 758
5 424 413 415 403 417 405 417 402 432 401 419 405 423 411 419 399 787 770 771 753
6 424 415 417 406 421 410 420 403 431 404 422 405 427 409 422 402 786 769 775 756
7 424 418 419 408 422 409 421 409 432 408 424 412 427 416 422 405 792 765 777 755
8 424 413 415 405 419 408 420 402 433 407 423 405 425 407 422 399 790 768 773 753
9 423 412 415 405 417 408 416 399 434 404 418 404 422 406 419 399 791 772 773 754
10 422 411 413 405 417 407 415 401 437 407 418 402 421 404 417 394 789 761 770 749
11 422 409 415 401 417 405 416 396 438 410 418 399 422 402 416 396 790 762 770 750
12 423 410 415 402 418 405 417 404 438 415 417 409 422 412 421 399 786 765 770 752
13 422 411 414 402 418 397 418 402 438 410 420 406 422 410 420 401 789 762 770 752
14 420 413 413 403 414 408 416 405 434 413 419 408 422 412 419 400 789 764 769 749
15 420 411 412 404 415 405 417 400 434 408 420 404 422 407 419 402 794 769 771 754
16 420 409 413 401 416 395 415 398 434 408 418 402 422 406 418 400 793 770 772 752
17 421 411 415 407 418 409 414 397 434 406 417 401 421 404 420 399 791 766 770 749
18 420 412 415 406 416 406 414 400 433 407 417 404 421 406 418 403 786 770 773 756
19 419 410 415 406 417 410 415 402 432 404 418 405 421 410 418 402 788 767 774 754
20 419 410 414 404 418 409 414 395 431 404 417 397 421 403 419 400 787 764 770 747
21 422 413 416 402 419 396 414 401 432 413 418 403 420 407 420 403 789 764 775 754
22 424 410 419 406 422 411 416 395 436 409 418 398 421 401 421 401 783 763 771 748
23 420 411 416 405 419 410 411 394 432 407 415 397 418 403 417 402 782 761 769 746
24 420 411 416 408 421 412 414 397 435 406 417 401 420 405 418 403 791 766 776 751
25 419 408 416 404 419 407 416 398 434 408 419 403 421 405 418 401 792 771 777 757
26 423 410 416 404 419 408 415 401 435 412 419 405 421 410 420 402 789 772 776 758
27 421 412 414 403 418 407 418 404 433 409 421 408 425 412 420 406 793 774 780 763
28 423 412 418 403 421 406 418 406 437 417 421 409 424 414 420 404 792 768 780 758
29 423 413 415 402 418 406 418 402 436 410 420 406 424 411 421 402 787 766 771 752
30 425 416 415 404 419 408 420 404 438 415 423 409 425 412 420 402 790 769 776 759
31 426 415 419 405 425 410 419 403 436 413 421 406 426 410 421 400 792 772 774 759
426 408 419 401 425 395 421 394 438 401 424 397 428 401 423 394 794 761 780 746
दनांक सासन सतना तमनार कोटरा वडोदरा दग
ु वा लयर सपत सयो न वधा
Date Sasan Satna Tamnar Kotra Vadodara Durg Gwalior Sipat Seoni Wardha
765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
अ धकतम युनतम अ धकतम युनतम अ धकतम अ धकतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम अ धकतम युनतम
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 774 764 784 768 797 789 797 788 788 765 799 787 794 765 785 777 796 783 802 782
2 775 765 785 768 795 787 795 785 791 768 796 787 795 766 785 777 797 784 800 782
3 776 765 788 768 796 787 797 787 791 767 794 788 796 766 786 778 798 785 802 782
4 777 765 787 768 800 787 801 787 793 775 801 788 797 766 786 778 798 785 801 784
5 775 765 783 769 798 786 797 786 792 772 798 783 793 768 785 774 797 779 801 772
6 776 764 783 768 799 790 800 789 797 775 800 788 790 768 786 777 798 782 802 784
7 782 763 788 766 800 788 801 787 792 775 800 785 797 761 787 775 800 780 804 774
8 778 767 788 771 799 786 800 785 791 768 800 782 798 764 785 772 796 779 798 775
9 779 767 788 771 805 788 806 788 789 765 810 783 798 770 790 773 801 777 805 773
10 778 763 787 765 801 789 802 789 786 764 803 787 797 759 787 775 794 778 797 777
11 780 762 789 763 798 789 799 789 787 764 798 784 794 755 784 774 794 775 798 771
12 776 765 786 766 796 788 797 788 790 769 795 783 791 764 782 774 793 775 799 771
13 778 763 789 763 800 790 801 790 791 769 800 786 800 753 785 775 794 781 800 782
14 780 764 789 765 800 791 800 791 789 775 799 789 799 764 784 776 794 780 799 779
15 784 766 793 769 801 792 802 793 790 769 801 788 797 770 785 777 794 779 797 778
16 781 767 792 771 801 792 802 792 790 765 801 789 802 765 786 777 797 778 806 773
17 778 764 787 764 799 791 800 791 789 765 800 785 796 764 784 775 794 774 798 771
18 775 766 785 769 800 791 798 791 789 770 798 785 793 769 784 775 791 773 796 768
19 778 765 785 765 801 792 795 795 787 766 801 788 793 766 785 777 795 780 799 779
20 776 763 784 764 799 789 798 788 785 756 797 787 792 759 785 774 793 777 799 781
21 775 763 785 764 800 792 801 791 783 764 800 789 796 759 785 776 795 781 800 785
22 773 762 780 764 800 788 800 787 785 754 802 785 790 761 786 774 791 774 795 774
23 772 762 777 764 794 785 793 784 782 758 795 782 790 763 778 770 786 772 793 774
24 778 763 787 764 800 788 800 787 786 762 802 785 800 764 783 771 795 775 801 773
25 777 767 789 771 797 788 797 787 789 767 796 783 796 772 780 772 793 777 800 774
26 779 766 788 771 797 788 797 787 784 765 798 790 798 774 783 774 795 780 801 778
27 781 767 789 772 797 788 797 786 787 767 798 786 799 750 784 775 797 783 801 782
28 784 765 791 768 797 785 796 783 788 771 798 784 795 770 784 773 798 780 801 779
29 776 764 784 765 790 783 789 781 788 763 791 779 792 763 782 771 793 775 798 770
30 778 767 787 766 790 782 789 781 795 775 793 781 794 764 783 776 798 781 806 773
31 781 766 789 770 794 781 793 779 790 767 794 782 796 776 785 775 794 783 799 770
784 762 793 763 805 781 806 779 797 754 810 779 802 750 790 770 801 772 806 768
Annexure 2.5
piScama xao~Iya ivaVut saimait, mauMba[-
WESTERN REGIONAL POWER COMMITTEE, MUMBAI

saM. pxaoivasa / p`caalana/ ivaVut kTaOityaaM /2019-20 idnaaMk : 07.08.2019


From: AQaIxaNa AiBayaMta (p`caalana), pxaoivasa, mauMba[-
Superintending Engineer (Operation), WRPC, Mumbai
To: 1. Director (GM), 6th Floor, Sewa Bhawan, CEA, New Delhi (fax no. 011- 26109750)
2. Chief Engineer, OPM Division, CEA, New Delhi (Fax no. 011-26732337, 26107416)
ivaYaya : -jaUlaa[- 2019 ko daOrana piScama xao~ maoM ivaVut kTaOityaaM/ pabMaidyaaM
Subject: - Power Cut/Restrictions in Western Region for the month of July-2019
k : gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- Remark
Quantum of Restriction Timing kTaOtI Total
power cut From Total Energy Cut
(MW) Energy Cut (MUs /day
(MUs /day
(a) Power SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil All industries are allowed to run
Restrictions(Evening peak their units on all days of week &
Hour) on non continuous if they want to avail staggered
holiday, then they will have to
process HT/LT IndustriesM SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil stagger on notified day only &
(b) Baar inayamana Load Shedding cannot avail as per their choice.
All industries are required to
(c) Anya jaanakarI Other keep their recess timings
information SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil staggered.
1.Weekly Off SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2.Staggering of power
supply
2 kRiYa xao~ kao ivaVut AapUit-
2. Power supply to Agricultural Sector: -
ivavarNa Details sao From tk To idnaaMk p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three phase supply 01.07.2019 31.07.2019 10:00 8:00 8:12
2.2 Single Phase supply 01.07.2019 31.07.2019 16:00 16:00 16:00

3 Anya jaanakarI
3. Any other information
1. Jayotigram Yojana-24 hours.
2. There is no load shedding in Urban areas

Page 1 of 4
K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
power cut (MW) sao From tk To (MUs /day
(a) Power Restrictions(Evening NIL NIL NIL NIL
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar inayamana Load Shedding
(c) Anya jaanakarI Other information NIL NIL NIL NIL
1.Weekly Off
2.Staggering of power supply
2 kRiYa xao~ kao ivaVut AapUit-
2. Power supply to Agricultural Sector: -
ivavarNa Details sao From tk To idnaaMk p`it idna AapUit- GaMTo Supply Hours per
idnaaMk Date Date day
Max. (Hrs) Min. (Hrs) Average
(Hrs)
2.1 Three-Phase
Supply(Mixed) 01.07.2019 31.07.2019 23:43 22:46 23:38
2.2 Three-Phase
Supply(DLF) 01.07.2019 31.07.2019 23:44 23:16 23:34
2.3 Three-Phase
Supply(Irrigation) 01.07.2019 31.07.2019 09:58 09:40 09:53
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas
ivavarNa Details sao From tk To idnaaMk Aaosat p`itidna Average Supply
idnaaMk Date Date AapUit- GaMTo Hours per day
Max. (Hrs) Min. (Hrs) Average (Hrs)
3.1 Commissionary H. Qtrs. 01.07.2019 31.07.2019 23:54 23:42 23:48
3.2 District Head Qtrs. 01.07.2019 31.07.2019 23:57 23:32 23:49
3.3 Tehsil Head Qtrs. 01.07.2019 31.07.2019 23:51 23:33 23:44

Page 2 of 4
ga : maharaYT/ Maharashtra
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid

1 Power Cut/ Restriction on Industries, Load Shedding in the state etc


Details Quantum of Restriction Total Energy
power cut (MW) Timing Cut (MUs
From To /day
(a) Power Restrictions(Evening NIL NIL NIL
peak Hour) on non-continuous
process HT/LT Industries
NIL
(b) Load Shedding

(c) Other information NIL NIL NIL


NIL
1.Weekly Off

2.Staggering of power supply


-

2. Power supply to Agricultural Sector: -


Details From To Supply Hours per day
Date Date Max. Min. Average
(Hrs) (Hrs) (Hrs)
2.1 Three-Phase
Supply 01.07.2019 31.07.2019 10 8 9
2.1 Single-Phase
18 18 18
Supply 01.07.2019 31.07.2019

3. Scheduled Power cuts in Urban Areas

Details From To Average Supply


Date Date Hours per day
Max. Min. (Hrs) Average (Hrs)
(Hrs)
3.1 Commissionary H. Qtrs. 01.07.2019 31.07.2019 NIL NIL NIL
3.2 District Head Qtrs. 01.07.2019 31.07.2019 NIL NIL NIL
3.3 Tehsil Head Qtrs. 01.07.2019 31.07.2019 NIL NIL NIL

4. Any other information


Quantum in MW Avg Mus/Day
Date

3. Load Shedding due 02/07/2019 10.00 0.06


to Transmission
Constraint in real time. 03/07/2019 19.00 0.16

04/07/2019 22.00 0.20

Page 3 of 4
Ga : C%tIsagaZ, Chhattisgarh:
]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
power cut (MW) sao From tk To (MUs /day)
(a)Power Restrictions(Evening 272 MW[Max] on 21:00 22:00
peak Hour) on continuous 12/07/2019 0.0179
process HT/LT Industries M
(b) Baar inayamana Load Shedding NIL NIL NIL NIL

(c) Anya jaanakarI Other information


1.Weekly Off SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2.Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-
2. Power supply to Agricultural Sector: -
ivavarNa Details sao From tk To idnaaMk p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase NIL NIL
Supply(Mixed) 01.07.2019 31.07.2019 NIL
2.2 Three-Phase NIL NIL NIL
Supply(DLF) 01.07.2019 31.07.2019
2.3 Three-Phase
Supply(Irrigation) 01.07.2019 31.07.2019 18:00 18:00 18:00
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas
ivavarNa Details sao From tk To idnaaMk Aaosat p`itidna Average Supply
idnaaMk Date Date AapUit- GaMTo Hours per day
Max. (Hrs) Min. (Hrs) Average (Hrs)
3.1 Commissionary H. Qtrs. 01.07.2019 31.07.2019 NIL NIL NIL
3.2 District Head Qtrs. 01.07.2019 31.07.2019 NIL NIL NIL
3.3 Tehsil Head Qtrs. 01.07.2019 31.07.2019 NIL NIL NIL

**************

Page 4 of 4
संल क Annex-2.6
अिनवाय यु िनट आऊटे ज का जुलाई 2019 का िव ा रत ौरा
Details of forced unit outages during the month of July’2019

अनु यु िनट संघटक मता से तक कारण


मां क Unit Constituent मेगावॉट From To Reason
Sl.No /IPP Cap.MW समय िदनांक समय िदनांक
Time Date Time Date
जीआईपीसीएल ेज
1. GSECL 165 00:00 01-03-2018 Still out Still out No schedule
GIPCL STG 2

Coal feeding system


2. बीईसीएल BECL 1 GSECL 250 19:52 29-03-2019 Still out Still out
problem

3. गांधीनगर Gandhinagar 2 GSECL 120 21:41 12-06-2019 Still out Still out RSD
4. डीजीबीपी DGBP 2 GSECL 112 22:30 19-06-2019 Still out Still out Gas line problem.
5. ओपीजीएस OPGS 2 GSECL 150 22:47 19-06-2019 02:10 01-08-2019 Station T/F oil leakage
6. गांधीनगर Gandhinagar 2 GSECL 120 13:49 27-06-2019 00:02 17-07-2019 RSD.
7. गांधीनगर Gandhinagar 3 GSECL 210 15:31 27-06-2019 01:14 16-07-2019 RSD.
8. वानकबोरी Wanakbori 3 GSECL 210 02:45 04-07-2019 07:41 10-07-2019 RSD
9. वानकबोरी Wanakbori 4 GSECL 210 10:50 04-07-2019 18:50 12-07-2019 RSD
10. वानकबोरी Wanakbori 2 GSECL 210 12:10 04-07-2019 20:27 12-07-2019 RSD
11. वानकबोरी Wanakbori 1 GSECL 210 14:55 04-07-2019 15:51 16-07-2019 RSD.
12. डीजीबीपी DGBP 3 GSECL 375 21:33 04-07-2019 08:33 12-07-2019 RSD
13. वानकबोरी Wanakbori 6 GSECL 210 08:24 05-07-2019 03:43 10-07-2019 RSD
14. उकाई Ukai 6 GSECL 500 09:33 05-07-2019 00:00 06-07-2019 RSD
15. एसटीपीएस STPS 3 GSECL 250 10:52 05-07-2019 23:45 08-07-2019 RSD
16. उकाई Ukai 3 GSECL 200 11:25 05-07-2019 22:24 08-07-2019 RSD
17. बीईसीएल BECL 2 GSECL 250 11:02 06-07-2019 18:39 18-07-2019 Generator protection operated
18. वानकबोरी Wanakbori 5 GSECL 210 11:41 06-07-2019 04:37 10-07-2019 RSD
Withdrawn due to Statutory
19. बालको BALCO - 2 GSECL 300 23:57 09-07-2019 10:18 13-07-2019
Compliance
20. उतरण ेज GSECL 375 00:18 13-07-2019 18:26 16-07-2019 RSD
UTRAN STG II - 1
21. डीजीबीपी DGBP 3 - 1 GSECL 375 08:28 13-07-2019 19:36 16-07-2019 RSD
22. जीपेक GPEC - 2 GSECL 138 21:33 13-07-2019 Still out Still out RSD
23. डीजीबीपी DGBP 3 - 1 GSECL 375 17:10 18-07-2019 17:30 22-07-2019 STG turning gear problem
24. जीपेक GPEC - 3 GSECL 138 22:02 20-07-2019 Still out Still out RSD
25. िजसेग GSEC - 2 GSECL 351 13:40 22-07-2019 13:40 05-08-2019 Leakage in HP feed control
26. डीजीबीपी DGBP 3 - 1 GSECL 375 17:30 22-07-2019 Still out Still out Non-availability of Gas
27. वानकबोरी Wanakbori -1 GSECL 210 23:26 24-07-2019 Still out Still out RSD

28. गांधीनगरGandhinagar GSECL 210 16:33 24-07-2019 Still out Still out RSD
(GTPS)3
29. वानकबोरी Wanakbori - 2 GSECL 210 12:59 24-07-2019 Still out Still out BTL

30. उतरण ेज UTRAN STG GSECL 375 01:28 24-07-2019 23:06 04-08-2019 RSD
II 1
31. गांधीनगरGandhinagar GSECL 210 21:31 24-07-2019 04:16 07-08-2019 RSD
(GTPS)4
32. वानकबोरी Wanakbori - 5 GSECL 210 16:04 25-07-2019 Still out Still out RSD
33. वानकबोरी Wanakbori - 6 GSECL 210 00:19 25-07-2019 Still out Still out RSD
34. बीईसीएल BECL - 2 GSECL 250 20:46 26-07-2019 Still out Still out BTL
35. वानकबोरी Wanakbori - 3 GSECL 210 16:40 27-07-2019 06:53 02-08-2019 RSD
36. उकई UKAI - 5 GSECL 210 13:37 27-07-2019 17:36 01-08-2019 RSD
37. वानकबोरी Wanakbori - 4 GSECL 210 05:38 27-07-2019 14:16 05-08-2019 RSD
38. उकई UKAI - 3 GSECL 210 10:00 30-07-2019 00:00 03-08-2019 RSD
39. जीपीपीसी GPPC 2 GSPC 351 20:47 17-10-2018 Still out Still out RSD
40. जीपीपीसी GPPC 1 GSPC 351 19:15 23-05-2019 14:03 14-07-2019 Non-availability of gas
41. जीपीपीसी GPPC 1 GSPC 351 10:38 25-07-2019 Still out Still out RSD

42. िजसेग ेज GSEG STAGE GSPC 351 03:14 25-06-2019 13:18 17-07-2019 RSD.
II 1
43. एसएलपीपी SLPP 3 GIPCL 125 15:03 06-07-2019 13:15 11-07-2019 BTL
44. एसएलपीपी SLPP - 4 GIPCL 125 12:02 10-07-2019 15:26 18-07-2019 BTL
45. एसएलपीपी SLPP - 1 GIPCL 125 08:50 16-07-2019 08:27 24-07-2019 BTL
46. जीपेक GPEC 4 CLPIPL 241 16:36 06-12-2018 Still out Still out PPA expired
47. Torrent Power D Torrent Power 120 121:54 29-07-2019 23:23 01-08-2019 BTL
48. परली Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Economic shutdown

49. परली Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Economic shutdown

पायोनीर
50. MAHAGENCO 388 17:45 07-02-2017 Still out Still out RSD
Pioneer(262+126) 1
Compressor & Turbine
51. उरण Uran 7 MAHAGENCO 108 12:53 20-07-2018 Still out Still out Blade Failure.
52. डब पू ीसीएल WPCL 1 MAHAGENCO 135 04:48 25-11-2018 Still out Still out NO PPA
53. डब प ू ीसीएल WPCL 2 MAHAGENCO 135 00:00 27-11-2018 Still out Still out No schedule
54. परली Parli 6 MAHAGENCO 250 00:00 12-12-2018 Still out Still out Zero schedule
55. डब ूपीसीएल WPCL 4 MAHAGENCO 135 00:00 15-12-2018 Still out Still out RSD
56. वीआईपीएल VIPL 1 MAHAGENCO 300 00:30 29-12-2018 Still out Still out Coal shortage
57. वीआईपीएल VIPL 2 MAHAGENCO 300 00:15 17-01-2019 Still out Still out Coal Shortage
58. परली PARLI 8 MAHAGENCO 250 00:00 04-06-2019 Still out Still out No schedule
59. भुसावल Bhusawal 3 MAHAGENCO 210 18:35 28-06-2019 Still out Still out RSD
60. खपारखेड़ा Khaparkheda 5 MAHAGENCO 500 01:25 02-07-2019 22:59 13-07-2019 Generator protection operated
61. चं पुर Chandrapur 3 MAHAGENCO 210 06:48 04-07-2019 18:29 07-07-2019 BTL
62. नािसक Nasik 5 MAHAGENCO 210 15:27 04-07-2019 09:16 12-07-2019 Zero Schedule.
63. कोराडी Koradi 7 MAHAGENCO 210 21:16 05-07-2019 22:57 09-07-2019 Heavy steam leakage
64. नािसक Nasik - 3 MAHAGENCO 210 19:33 08-07-2019 20:00 12-07-2019 RSD
65. कोराडी Koradi Msedcl - 8 MAHAGENCO 660 10:28 09-07-2019 18:04 12-07-2019 Loss of fuel
66. कोराडी Koradi - 6 MAHAGENCO 210 23:34 11-07-2019 21:44 18-07-2019 zero schedule
67. कोराडी Koradi - 7 MAHAGENCO 210 23:45 11-07-2019 15:32 18-07-2019 zero schedule
Due to ACW (auxiliary
68. चं पूर Chandrapur - 9 MAHAGENCO 500 17:00 13-07-2019 05:53 20-07-2019
cooling water pump) leakage.
69. उरण Uran B0 1 MAHAGENCO 120 00:17 21-07-2019 11:21 23-07-2019 Boiler Maintenance
70. कोराडी Koradi-2 -10 MAHAGENCO 660 18:20 20-07-2019 21:45 23-07-2019 BTL

71. कोराडी Koradi MSEDCL - MAHAGENCO 660 00:15 26-07-2019 Still out Still out Air heater probelm
8
72. कोराडी Koradi - 7 MAHAGENCO 210 15:47 27-07-2019 Still out Still out No schedule.
73. कोराडी Koradi - 6 MAHAGENCO 210 15:32 27-07-2019 Still out Still out No schedule.
74. चं पुर Chandrapur 3 MAHAGENCO 210 08:05 30-07-2019 09:07 02-08-2019 No schedule.
75. कोराडी Koradi - 10 MAHAGENCO 660 23:38 30-07-2019 Still out Still out No schedule.
76. सातपुरा Satpura II 7 MPPGCL 210 11:30 29-05-2019 01:07 12-07-2019 Vacuum low
77. िसंगाजी Singaji 1 MPPGCL 600 23:49 05-06-2019 16:24 28-07-2019 COH

78. संजय गांधी टीपीएस MPPGCL 210 12:57 10-06-2019 13:23 13-07-2019 Furnace pressure very high
SGTPS 1
79. जेपी िबना JP Bina 2 MPPGCL 250 23:28 29-06-2019 09:37 04-08-2019 Boiler inspection

80. Satpura IV 2 MPPGCL 250 00:01 06-07-2019 20:14 05-08-2019 COH

81. संजय गांधी टीपीएस MPPGCL 210 14:28 08-07-2019 23:00 12-07-2019 Furnace pressure high
SGTPS - 4
82. सातपुरा Satpura II - 7 MPPGCL 210 04:40 12-07-2019 19:32 15-07-2019 BTL
83. सातपुरा Satpura II - 2 MPPGCL 210 00:52 21-07-2019 17:56 25-07-2019 BTL
Main turbine stop valve
84. एमबी पावर MB Power - 1 MPPGCL 600 01:29 25-07-2019 21:57 28-07-2019
steam leakage.
85. सातपुरा Satpura II - 6 MPPGCL 200 16:19 27-07-2019 13:22 31-07-2019 Turbine side sparking.

86. जीएमआर छ ीसगढ़


GMR Chattisgarh
685 06:11 22-06-2019 20:23 18-07-2019 Coal shortage
GMR_CHHATISGARH 1 Energy Ltd

87. एमआर वारोरा


GMR WARORA
300 00:11 20-07-2019 04:09 23-07-2019 Main steam leakages
GMR WARORA - 2 (GWEL)
88. टो े Trombay 6 TPC 500 00:00 06-03-2016 Still out Still out Economic shutdown

89. आरजीपीपीएल RGPPL-1A RGPPL 320 13:30 8-07-2014 Still out Still out Less requisition
90. आरजीपीपीएल RGPPL 2B RGPPL 320 21:00 02-07-2019 Still out Still out Less gas availability
91. आरजीपीपीएल RGPPL 2A RGPPL 320 21:00 02-07-2019 Still out Still out Less gas availability
अमरावती टीपीपी
Rattan Power
92. AMRAVATI 270 00:00 29-06-2019 05:34 22-07-2019 No Schedule
India Ltd
TPP(INDIABULL)-2
अमरावती टीपीपी
Rattan Power
93. AMRAVATI 270 03:00 29-06-2019 12:10 19-07-2019 No Schedule.
India Ltd
TPP(INDIABULL)-5
अमरावती टीपीपी
Rattan Power
94. AMRAVATI 270 16:00 30-06-2019 04:51 23-07-2019 RSD
India Ltd
TPP(INDIABULL)-1
अमरावती टीपीपी
Rattan Power
95. AMRAVATI 270 00:00 01-07-2019 01:00 19-07-2019 NO schedule
India Ltd
TPP(INDIABULL)-3
अमरावती टीपीपी
Rattan Power
96. AMRAVATI 270 17:45 01-07-2019 09:15 19-07-2019 NO schedule
India Ltd
TPP(INDIABULL)-4
अमरावती टीपीपी
Rattan Power
97. AMRAVATI 270 08:00 25-07-2019 Still out Still out Zero schedule
India Ltd
TPP(INDIABULL)-1
अमरावती टीपीपी
Rattan Power
98. AMRAVATI 270 18:00 25-07-2019 Still out Still out Zero schedule
India Ltd
TPP(INDIABULL)-3
अमरावती टीपीपी
Rattan Power
99. AMRAVATI 270 02:00 25-07-2019 Still out Still out RSD
India Ltd
TPP(INDIABULL)-2
अमरावती टीपीपी
Rattan Power
100. AMRAVATI 270 01:09 26-07-2019 Still out Still out Zero schedule
India Ltd
TPP(INDIABULL)-4
अमरावती टीपीपी
Rattan Power
101. AMRAVATI 270 20:00 26-07-2019 Still out Still out Zero schedule
India Ltd
TPP(INDIABULL)-5
एपीएमएल ितरोडा APML Due to APH-2A Gear Box
102. ATIL 660 20:02 21-07-2019 06:26 24-07-2019
Tiroda-2 abnormal sound
Condenser tube leakage/Coal
103. जेपीएल ेज JPL Stg-I 2 JPL 250 21:15 30-08-2018 Still out Still out shortage since 00:00hrs of 02-
09-2018
104. जेपीएल ेज JPL Stg-I 1 JPL 250 00:00 24-10-2018 Still out Still out Coal shortage
Condenser Tube Leakage/
105. जेपीएल ेज JPL Stg-II 1 JPL 600 02:07 16-03-2019 Still out Still out
Coal shortage
106. जेपीएल ेज JPL Stg-I 3 JPL 250 16:07 02-07-2019 14:18 15-07-2019 Condenser tube leakage
107. जेपीएल ेज JPL Stg-II 4 JPL 600 04:35 03-07-2019 Still out Still out Coal shortage
108. ईपीजीएल EPGL -2 ESSAR 600 20:25 24-10-2017 Still out Still out Coal shortage
109. ए ार(महान)Essar(Mahan) I ESSAR 600 15:55 22-06-2019 Still out Still out AIR Pre-Heater-issue
Essar Mahan
110. व डनार VADINAR - 1 600 19:48 24-07-2019 02:27 01-08-2019 Cooling water tube leakage
(EMPCL)
20-07-
111. जीपे क जीटी GPEC GT 3 TPGL 138 11:36 10-12-2018 20:57 No schedule (PPA expired)
20019
112. जीपेक जीटी GPEC GT 1 TPGL 138 12:34 10-12-2018 23:54 21-07-2019 No schedule (PPA expired)
113. जीपेक जीटी GPEC GT 2 TPGL 138 18:55 10-12-2018 09:41 20-07-2019 No schedule (PPA expired)
114. डीजीईएन DGEN-52 TPGL 400 00:05 01-05-2019 Still out Still out RSD
115. डीजीईएन DGEN-53 TPGL 400 00:40 01-05-2019 Still out Still out RSD
Stator earth fault protection
116. केड ूपीसीएल KWPCL 1 KWPCL 600 22:12 22-05-2017 Still out Still out
operated/maintenance
117. आईईपीएल IEPL I IEPL 270 21:26 28-08-2018 Still out Still out Coal Shortage

Commercial operation
declared from 00:00hrs of 20-
118. आरकेएम पावर
03-2019; kept out on less fuel;
RKMPPL 360 00:00 20-03-2019 Still out Still out
RKM Power 4 intimated that from 10-05-
2019, the reason is no
schedule due to no PPA

119. आरकेएम पावर RKMPPL 360 12:36 24-06-2019 11:52 26-07-2019 Steam leakages
RKM Power 2
120. आरकेएम पावर RKM Power RKMPPL 360 06:52 02-07-2019 Still out Still out Turbine vibration high
1
121. एसकेएस पावर SKS Power 2 SKS 300 00:18 07-07-2019 01:10 13-07-2019 Low schedule

122. एसकेएस पावर SKS Power 2 SKS 300 00:45 28-07-2019 18:29 31-07-2019 Auxiliary CT problem
For generator inspection &
123. सीजीपीएल CGPL 4 CGPL 830 01:17 15-06-2019 Still out Still out
capital overhauling
124. सीजीपीएल CGPL 5 CGPL 830 08:45 15-06-2019 Still out Still out COH

125. केएसके महानदी KMPCL 600 07:17 04-06-2019 Still out Still out ID fan Problem
KSK Mahanadi 3
126. केएसके महानदी KMPCL 600 15:30 05-07-2019 22:51 10-07-2019 Due to ID fan problem
KSK Mahanadi 4
127. धारीवाल एसटीयू DIL 300 00:01 01-07-2019 Still out Still out No schedule
Dhariwal STU 1
128. धारीवाल सीटीयू DIL 300 17:01 22-07-2019 Still out Still out Condenser tube leakage
Dhariwal CTU - 2
129. ट NPCIL 160 19:15 01-07-2019 04:41 08-07-2019 Condenser tube leakage
TAPS 2
Withdrawn due to Statutory
130. बालको BALCO - 2 BALCO 300 23:57 09-07-2019 10:18 13-07-2019
Compliance
131. बा ो BALCO - 1 BALCO 300 00:14 22-07-2019 06:22 25-07-2019 For Statutory Compliance

132. टीआरएन एनिज ACBIL 300 01:50 10-07-2019 Still out Still out Due to low schedule
TRN Energy - 1
GT 7R bushing failure,
subsequently impedance
133. वीएसटीपीएस VSTPS 7 NTPC 500 10:35 19-05-2019 18:22 03-08-2019
protection, turbine over speed
etc.
134. सोलापुर टीपीएस NTPC 660 23:30 13-06-2019 Still out Still out RSD
Solapur STPS 2
C-inspection (Major
135. गांधार Gandhar GT 3 3 NTPC 144 00:00 14-06-2019 01:28 18-07-2019
Overhauling)
136. गांधार Gandhar GT 1 1 NTPC 144 08:16 27-06-2019 00:33 10-07-2019 RSD

137. कावास Kawas GT 2B NTPC 106 09:31 27-06-2019 19:42 18-07-2019 RSD

138. गांधार Gandhar 4 NTPC 244 10:17 27-06-2019 00:23 19-07-2019 RSD
139. कावास Kawas ST 2C NTPC 106 11:06 28-06-2019 20:55 18-07-2019 RSD

140. कावास Kawas GT 2A NTPC 106 11:25 28-06-2019 15:15 18-07-2019 RSD

141. कावास Kawas GT 1A NTPC 106 15:31 28-06-2019 06:35 18-07-2019 RSD

142. मौदा NTPC 660 19:45 28-06-2019 05:41 18-07-2019 RSD.


Mouda 4
143. गडरवाड़ा Gadarwada 1 NTPC 800 11:39 29-06-2019 23:54 19-07-2019 RSD

144. गांधार Gandhar GT 2 2 NTPC 144 03:33 02-07-2019 22:30 08-07-2019 RSD

145. ससान Sasan - 4 NTPC 660 21:12 09-07-2019 19:16 21-07-2019 Turbine vibration high

146. गांधार Gandhar - GT1 NTPC 144 03:42 10-07-2019 15:31 18-07-2019 RSD

147. गांधार Gandhar - GT2 NTPC 144 02:00 13-07-2019 19:52 16-07-2019 RSD

148. कावास Kawas - 1C NTPC 106 05:16 16-07-2019 18:37 22-07-2019 RSD

149. कावास Kawas - 2C NTPC 106 04:23 20-07-2019 22:41 23-07-2019 RSD

150. मोदा Mouda II - 2 NTPC 660 19:06 19-07-2019 22:06 22-07-2019 BTL

151. िसपत SIPAT I - 2 NTPC 660 15:47 18-07-2019 08:06 23-07-2019 Water wall temperature high

152. कावास KAWAS - 2B NTPC 106 09:27 24-07-2019 Still out Still out RSD

153. कावास KAWAS - 1B NTPC 106 10:08 24-07-2019 Still out Still out RSD

154. कावास KAWAS - 2C NTPC 106 09:33 24-07-2019 Still out Still out RSD

155. कावास KAWAS - 2A NTPC 106 09:40 24-07-2019 Still out Still out RSD

156. कावास KAWAS - 1A NTPC 106 22:30 24-07-2019 08:19 05-08-2019 RSD

157. कावास Kawas - 1C NTPC 106 16:59 24-07-2019 14:20 05-08-2019 RSD

158. लारा Lara - 1 NTPC 800 20:09 24-07-2019 15:35 01-08-2019 Turbine tripped

159. मोदा Mouda II - 2 NTPC 660 01:23 27-07-2019 00:00 01-08-2019 RSD

160. मोदा Mouda I - 2 NTPC 500 13:32 31-07-2019 Still out Still out RSD
Note: Units out for more than 72 hrs are only included.
संल क Annex-2.7

िनयोिजत यु िनट आऊटे ज का जुलाई 2019 का िव ा रत ौरा


Details of planned unit outages during the month of July 2019
अनु युिनट संघटक मता से तक कारण
मां क Unit Constituent/ मेगावॉट From To Reason
Sl.No IPP Cap.MW समय िदनां क समय िदनांक
Time Date Time Date
1. डब ू पीसीएल MAHAGENCO 135 00:28 01-11-2018 Still out Still out AOH
WPCL 3
2. खपारखेड़ा MAHAGENCO 210 21:44 17-07-2019 Still out Still out AOH
Khaparkheda -4
3. कोराडी MAHAGENCO 660 17:35 19-07-2019 Still out Still out AOH.
Koradi MSEDCL -9
4. उकाई Ukai 6 GSECL 500 00:00 06-07-2019 Still out Still out AOH
Tripped on MS
drain bonnet
5. एपीएमएल ितरोडा
leakage; converted
Adani Power 660 16:09 19-06-2019 07:31 11-07-2019
APML Tiroda 4 to AOH for 35days
w.e.f. 11:55hrs/20-
06-2019
6. एपीएमएल मुँदरा
Tripped on MS
Adani Power 330 23:34 30-07-2019 Still out Still out
APML Mundra 3 AOH
7. जेपी िनगरी JP Nigrie 1 JAYPEE 660 01:30 01-07-2019 Still out Still out AOH.
8. चं पुरChandrapur - 7 MAHAGENCO 500 00:00 27-07-2019 Still out Still out AOH

9. अमरकनटक MPPGCL 210 00:38 19-07-2019 17:52 26-07-2019 AOH


Amarkantak -5
10. एसजीटीपीएस MPPGCL 210 23:05 15-07-2019 Still out Still out AOH
SGTPS -2
एसजीटीपीएस
11. MPPGCL 500 23:42 30-07-2019 Still out Still out AOH
SGTPS 5
12. केएसटीपीएस KSTPS - 7 NTPC 500 23:20 17-07-2019 Still out Still out AOH
STATE LOAD DISPATCH CENTRE
RAIPUR
CHHATTISGARH

Review of system operation during


the month of July-2019.

522nd OCC MEETING AT WRPC,


MUMBAI ON 21st August 2019.

1 2

Installed capacity of Chhattisgarh as on July-2019. Installed capacity of Chhattisgarh as on July-2019.


KORBA
EAST TPS
(1966-86)
ABV TPS GANGREL
240 MW (2016) (2004)
{2X120} 500 MW
BANGO
(1994-95) 10 MW
{2X500}
{4 x 2.5}
120 MW
{3X40}

THERMAL HYDEL
DSPM TPS 3080 MW
(2007-08)
KORBA
138.7
500 MW WEST MW
{2X250} EXT.
(2013)
500 MW MINI/ MICRO
{1X500} SIKASER HYDEL at Korba
West TPS (2003 &
KORBA (2006) 2007)
WEST TPS
(1983-86) 7 MW 1.7 MW
{2 x 0.85}
840 MW {2 x 3.5 }
{4X210}

3 4

1
Demand Pattern. Availability during monthly Peak Demand met :
% Change 4736 MW on 21.07.2019 at 23:00 Hrs
compared to
JUNE-19 JULY-19 JULY-18
previous
year
MW %
4078 MW 4736 MW 3915 MW
Max. Demand
11.06.2019 21.07.2019 31.07.2018 CSPGCL Thermal
Met
21% 2374 50%
(Ex Bus)
23:30 Hrs 23:00 Hrs 19:15
Max.
CSPGCL Hydel 119 2.51%
Unrestricted Injection
Demand at the 4103 MW 4728 MW 3977 MW 19% (Solar,Biomass,unscheduled 93 2%
time of Max. power,open access,small hydro)
Demand Met
CS Share including BSP share in
2617 MW 2661 MW 2251 MW 1375 29%
Min. Demand NSPCL
Met 22.06.2019 02.07.2019 08.07.2018 18%
22:00 Hrs 13:45 Hrs 17:00 Net Import (+) / Export (-) 745 16%

4103 MW 4728 MW 3977 MW


OD(+) / UD(-) 30 0.6%
Max.
Unrestricted 11.06.2019 21.07.2019 30.07.2018 19% Demand Met (MW) 4736
Demand 23:30 Hrs 23:00 Hrs 20:15

5 6

Daily Max Demand met in the month of Jun-19 , Jul-19 & Jul-18. Daywise Min and Max Demand met in the month of July-19,
[ Difference : Max 897 MW on 24.07.19 & Min 331 MW on 23.07.19 ]
MAX 4736 MW on 21.07.2019 at 23:00 hrs.
Average increase of 21 % compared to la 331
4750 4700 MW

JUL-
4550 2019
4400
3915 MW on
31.06.18 at 897
MW
4350 19:15 Hrs
4078 MW on 4736 MW on 4100
11.06.19 at 21.07.19 at
4150 JUNE 23:30 23:00 Hrs
-2019

MW
3800

3950
3500
3750

3200
3550

2900
3350
JUNE
-2018
3150 2600
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW

Date Date

7 8

2
Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Jul-19.
4750

SOLAR POWER INJECTION (At 132 KV)


4550

For July-2019.
4350

4150 Name of entity capacity Generation [MU]


MW

3950
UNRESTRICTED
M/s Azure 3X10 MW 2.949
DEMAND

3750
M/s Parampujya 2X50 MW 15.168

3550 RESTRICTED
DEMAND M/s Acme 30 MW 3.133

3350 Total 21.250

3150

Date

9 10

Dam level and Ex-bus generation of Bango HPS.


Purchase & Banking in July-2019

July-2019 July-2018
Total Inter State Total Inter State Purchase from
Dam level at end of Ex-bus Hydel Dam level at end of Ex-bus Hydel STOA LTA Power Exchange Banking
(Ex-CG (Ex-CG (Ex-CG (Ex-CG Periphery)
the month generation the month generation
Periphery) Periphery) Periphery)
(Meters) (MU) (Meters) (MU)
MU MU MU MU

350.40 27.84 355.50 12.96


279.08 123.49 357.96 0.68

11 12

3
Addition of new grid elements during July-2019.
Transmission elements outages-
OCC planned Vs actual availed in July-2019 S.
No NAME OF SUB NAME OF CHARGED
. DATE TIME REMARKS
STATION EQUIPMENTS & LINES

No. of 400 KV S/s 220 KV Jagdalpur-Gurur


Total No. No. of No. of Deferred Outages 1 14-Jul-19 21:23 ---
outages Jagdalpur Line.
of outages
not
Outages availed Charged first time
SLDC WRLDC Site availed.
at 18:00 Hrs from
220 KV S/s 160 MVA Transformer at
2 24-Jul-19 18:00 220 KV side and
Jagdalpur 220 KV S/s Jagdalpur.
0 0 -- -- -- 0 at 18:03 Hrs from
132 KV side.
Charged first time
at 18:15 Hrs from
220 KV S/s 40 MVA Transformer at
3 24-Jul-19 18:15 132 KV side and
Jagdalpur 220 KV S/s Jagdalpur.
at 18:25 Hrs from
33 KV side.

13 14

Grid elements failed in July -2019 and expected date of


replacement.

------- NIL -------

THANK YOU !!!


Important grid element prolonged outages in July -2019
and expected revival date.

------- NIL -------

15 16

4
Sector wise Installed Capacity
Installed
Power System Analysis of Gujarat State Capacity
(MW)
Total
Gujarat

for the month Of July-2019 31-Jul-18 27252

31-Jul-19 27002

Gujarat Energy Transmission Corporation Limited


[ An ISO 9001 : 2015 Company ]

1 2

Maximum Demand Catered & Energy Consumption

Maximum demand catered Energy consumption in


Month in MW MUS
Jul-18 15084 9139
Jun-19 18424 10658
Jul-19 17577 10551

3 4

1
RE Generation during July-19 Daily Purchase Data – July’19
Date Purchase MUs
Wind Energy 01-Jul-19 4.16
02-Jul-19 1.00
03-Jul-19 7.80
July-18 July-19 04-Jul-19 7.20
05-Jul-19 7.20
Installed capacity 5609 6046 06-Jul-19 7.20
07-Jul-19 7.20
Generation in MUS 1661 1962 08-Jul-19 7.20
09-Jul-19 8.40
10.08
Max. Generation in MW 4212 4752 10-Jul-19
11-Jul-19 9.14
12-Jul-19 9.98
Min. Generation in MW 197 29 13-Jul-19 12.99
14-Jul-19 10.80
Max. Generation in a day in MUS 89.87 107.54 15-Jul-19 12.68
16-Jul-19 12.27
17-Jul-19 15.16
Solar Energy 18-Jul-19 18.18
19-Jul-19 37.70
20-Jul-19 58.47
July-18 July-19 21-Jul-19 55.25
22-Jul-19 27.64
Installed capacity 1514 2257 23-Jul-19 29.99
24-Jul-19 25.72

Generation in MUS 126 232 25-Jul-19 22.19


26-Jul-19 19.20
27-Jul-19 18.61
Max. Generation in MW 849 1319 28-Jul-19 19.20
29-Jul-19 21.66
Max. Generation in a day in MUS 6.27 9.48 30-Jul-19
31-Jul-19
19.78
14.40
Total 538.44 6

5 6

Important grid elements prolonged outages Important grid elements prolonged outages
Sr. Name of element Out from In Reason Expected Sr. Name of element Out from In date Reason Expected
no. date date date of no. date date of
revival revival
1 400 KV breaker of 125 MVAR Bus 7.6.18 … 125 MVAR reactor in P.F. Revived 400 KV, 125 MVAR bus
3 12.9.18 Reactor breaker DCRM
Reactor at Hadala reactor Kasor
due to Y-Phase breaker pole on 20.7.19 results found abnormal.
blast. Center break isolator 19:24 hrs
also got damaged. Breaker O/H order placed.
CSD sent for repair work.
New breaker with CSD
allotted. Breaker replacement
work under progress.

2 400 KV 50 MVAR Bus reactor at 9.6.18 …. 50 MVAR reactor in P.F. due


Jetpur
to Y-PH bushing of reactor
blast.

Internal inspection carried


out by OEM engineer. Spare
reactor from Chorania S/S
shifted to Jetpur S/S. O/H
work under progress
7 8

7 8

2
Addition of new grid elements in Gujarat during July-19 Node wise Voltage details in Gujarat system during July-19

Name of 400 KV S/S No. of days when voltage No. of days when voltage
remained >420 KV remained <380 KV
Date of Charging / Asoj 0
Sr. No. Name of Line/ Equipment & Capacity 0
Commissioning
Jetpur 0 0
Ukai 31 0
1 Nil
Wanakbori 26 0
Soja 7 0
Chorania 28 0
Kansari 4 0
Amreli 28 0
Vadavi 24 0
Hadala 5 0
Varsana 16 0
Kasor 3 0
Kosamba 17 0

9 10

9 10

Major 400 KV Elements outages facilitated –July 19 Major 400 KV Elements outages facilitated –July 19
Outage of 400 KV Bus-2 at Vadodara was facilitated on 3.7.19 for general maintenance work.
Outage of 400 KV Bus-2 at Varsana with 400 KV Varsana-Hadala line was facilitated on
Outage of 400 KV Bus-2 at Mansar with 400 KV Mansar-Bhachau line was facilitated on
20.7.19 for attending line isolator problem.
6.7.19 for isolator maintenance work.

Outage of 400 KV Bus -2 at Asoj with 400 KV Asoj-Chorania line-2 was facilitated on 9.7.19 Outage of 400 KV Bus-1 at Varsana with 400 KV Varsana-Charanka line & 400 KV Varsana-
for replacement of 400kv Bus-2 Pento isolator. Hadala line was facilitated on 27.7.19 for isolator alignment and fix contact replacement work.

Continuous outage of 400 KV WTPS-Soja line was facilitated from 28.7.19 for LILO
Outage of 400 KV Bus -1 at Asoj with 400 KV Asoj-Chorania line-2 was facilitated on 12.7.19 arrangement work for LILO of 400 KV WTPS-Soja line at Dehgam S/S.
for replacement of 400kv Bus-1 Pento isolator.

Outage of 400 KV Nagda-Dehgam line 1 &2 was facilitated simultaneously on 15.7.19 &
16.7.19 on daily basis for stringing work between Loc.No.17/0 to 18/0 for 400kV Wanakbori-
Soja LILO at Dehgam line crossing work.

Outage of 400 KV Bus-1 at Asoj was facilitated on 18.07.19 & 19.7.19 on daily basis for
replacement of pantograph isolator of bus-1 of TBC

11 12

11 12

3
Major Occurrence in Gujarat System – July’19 Major Occurrence in Gujarat System – July’19
Sr. Date Location Description Loss in MW Sr. Date Location Description Loss in MW
No. Load Gen No. Load Gen
1 16.07.19 Akrimota PS At 01:14 Hrs, 220 kV Bus zone - 2 protection 0 132 3 21.07.19 Akrimota and Kutch At the time of disturbance, there was heavy 0 240
01:14 & operated due to heavy chattering and humid 15:50 Hrs Lignite Thermal PS moisture and clouds in the atmosphere. KLTPS
02:02 Hrs atmosphere in switch yard. Thereafter at 02:02 Unit No. 1 & 4 were on bar with total 91 MW
Hrs , 220 kV Bus zone - 1 protection operated. generation and ALTPS Unit No. 1 & 2 with 150
As a result, the black out occurred at Akrimota MW. The 220 kV Akrimota - Nakhatrana line
PS. After yard observation, 220 kV Bus - A was No. 2 was under planned shutdown. 220 kV D/C
taken in service at 02:26 Hrs. KLTPS - Nakhatrana line were under P/F due to
tower collapsed at Location No. 254 (S) & 239
There was 132 MW generation loss. (S).
2 16.07.19 400 kV Amreli. At 11:14 Hrs, the bus zone - 2 protection 0 0 At 15:50 Hrs, 220 kV Akrimota - Nakhatrana
11:14 Hrs activated at Amreli with the tripping of 400 kV line No. 1 tripped ( Y - ph. jumper at location
Hadala - Amreli line. It led to tripping of all No. 311 detached). At the same time, 220 kV bus
elements connected to 400 kV Bus - 2 (400 kV zone 1 & 2 protection operated at Akrimota PS
Chorania - Amreli line, 400 kV Amreli - Jetpur and 220 kV KLTPS - Kukma line No. 1 & 2
line No. 2, 400/220 kV, 315 MVA ICT - 1 & 500 tripped also. It led to black out at Akrimota and
MVA ICT - 4, 50 MVAR Bus reactor). The Kutch Lignite TPS simultaneously.
conductive tap found stick between loc. No. 118
& 119. The 400 kV BUS - 1 was healthy at that There was @ 240 Mw generation loss.
time. Hence, all elements of bus - 2 were
transferred on Bus - 1.

There was no generation / load loss. 13 14

13 14

Major Occurrence in Gujarat System – July’19


Sr. Date Location Description Loss in MW
No. Load Gen
4 28.07.19 220 kV Motipaneli At 18:27 Hrs, the 220 kV B ph. CT of 220 kV 0 170
18:27 Hrs S/S Motipaneli -Sikka line No. 2 flashed over at
Motipaneli end. It led to damage of porcelain
portion of R - ph. CT of 220 kV Motipaneli -
Sikka line No. 1. At the same time, 220 kV bus
zone - 2 protection operated. All elements

Thank you
connected to 220 kV Bus - 2 ( 220 kV Motipaneli
- Sadodar line No. 1, 220 kV Sardargadh -
Motipaneli line No. 2, 220 kV Jetpur -
Motipaneli, 220 kV Motipaneli -Patan line No. 1,
220/66 kV, 100 MVA Trf - 1 ) tripped. Also, 220
kV Moti paneli - Patan line No. 2 tripped on Z1
from both end. To restrict loading on 220 kV
Motipaneli - Sadodar line No. 2, 70 MW wind
generation curtailment was imposed..

There was 100 MW wind generation loss at


Patan wind farm and 70 MW wind generation
curtailment at Sadodar windfarm.

15

15 16

4
INSTALLED CAPACIT Y OF MP AS ON 31st July 2019
Capacity (MW)

STATE LOAD DESPATCH CENTRE A


````

MP SSGS
Particulars
Total Capacity MP Share

MP Power Transmission Company Ltd


1 Thermal Power Station 5400.0 5400.0
2 Hydel Power Station 915.0 921.6
3 Mini / Micro Hydel 5.46 5.46
Total 6320.5 6327.0
B Joint Venture Project
1 Indira Sagar 1000 1000
2 Sardar Sarovar 1450.0 826.5
3 Omkareshwar 520 520
Total 2970.0 2346.5
C Central Sector Share
1 WR (Western Region) for MP 16813.6 3719.2
2 ER (Eastern Region) for MP 2340 74
Total 19153.6 3793.2
D NVDA (Bargi Left Bank Canal + Indira Sagar Canal) 25 25
E Other State
1 Rihand HEP (UP) 300 45
2 Matatila HEP (UP) 30.6 10

Total 55
F Private Sector
1 Torrent Power, Gujrat 1530 100
2 Lanco AMK 300 300
3 Sasan 3960 1485
4 BLA IPP 90 32
5 JP Bina IPP 500 350
6 JP Nigrie 1320 495

MP SYSTEM OVERVIEW FOR


7 MB Power 1200 420
8 Jhabua 600 210
9 Essar 660 30
Total IPP 10160 3422
G RES 4653.34 4653.34
Grand Total (all sectors) 43282.39 20621.55

JULY - 2019
RES Details 4653.34 4653.34
Wind 2430.08 2430.08
Solar 2077.11 2077.11
Small Hydro (Excluding SSGS&NVDA) 25.45 25.45
BioMas 53.00 53.00
Bio-Gas 2.40 2.40
Bagass 53.80 53.80
MSW 11.50 11.50

1 2

3 4

1
ENERGY AVAILABLE DURING MAXIMUM MP SUPPLY (223.94 MU)
IN JULY-2019 on 23.07.2019 MAX. & MIN. MP DEMAND FOR JULY-2019
S.NO. PARTICULARS MU

1 STATE THERMAL 62.80


STATE DEMAND DETAILS
2 STATE HYDEL (Incl ISP & OSP) 20.58
3 IPP (STATE) 5.36
MAXIMUM DEMAND MET MINIMUM DEMAND MET
4 CENTRAL SECTOR 74.85
5 IPP (INTER STATE) 56.99 UNRES LO MINIMU
MAXIMU
TRICTE AD M
6 RAILWAY 5.59 M FREQ FREQ
D SH DEMAN
DATE TIME DEMAND UENC DATE TIME UENC
7 RENEWABLE ENERGY 9.47 DEMAN ED D
MET in Y Y
D in DIN MET in
8 OTHERS -0.06 MW
MW G MW
9 BANKING / PURCHASE / SALE -16.53
10 DEVIATION 4.88 19.07.19 07.00 9845 50.00 9845 0 5625 06.07.19 14:00 50.03
11 MP Supply Ex Aux. 223.94
12 % of MP Supply Met from Renewable Energy 4.23

5 6

SOURCES AVAILABLE DURING PEAK DEMAND 9845 MW


IN JULY-2019 on 19.07.2019 at 07:00 Hrs.
S.NO. PARTICULARS MW
1. STATE THERMAL 2620
2. STATE HYDEL 1243
3. IPP (STATE) 197
4. CENTRAL SECTOR 3011
5. IPP (INTER STATE) 2029
6. RAILWAY 241
7. RENEWABLE ENERGY 567
8. OTHERS -12
9. BANKING / PURCHASE / SALE -548
10. DEVIATION 496
11. FREQUENCY (Hz) 50.00
12. % OF MP SUPPLY MET FROM RENEWABLE ENERGY 5.76

7 8

2
9 10

BLOCK WISE % DEVIATION OF WIND GENERATION ON 28.07.19


TIME FORECASTING ACTUAL DEVIATION TIME FORECASTING ACTUAL DEVIATION TIME FORECASTING ACTUAL DEVIATION
0:15 1231 1328 7.90 8:15 1725 1770 2.59 16:15 1264 1300 2.92
0:30 1246 1411 13.25 8:30 1719 1786 3.92 16:30 1251 1355 8.27
0:45 1292 1490 15.32 8:45 1718 1764 2.68 16:45 1358 1413 4.04
1:00 1315 1401 6.50 9:00 1704 1723 1.14 17:00 1345 1342 -0.27
1:15 1344 1439 7.03 9:15 1688 1677 -0.66 17:15 1333 1247 -6.42
1:30 1366 1508 10.36 9:30 1678 1558 -7.15 17:30 1338 1195 -10.74
1:45 1445 1504 4.07 9:45 1658 1465 -11.64 17:45 1303 1150 -11.79
2:00 1453 1585 9.12 10:00 1620 1482 -8.48 18:00 1295 1132 -12.55
2:15 1490 1678 12.59 10:15 1589 1478 -6.99 18:15 1228 1114 -9.23
2:30 1507 1734 15.06 10:30 1550 1461 -5.73 18:30 1213 1123 -7.42
2:45 1517 1706 12.43 10:45 1606 1466 -8.71 18:45 1190 1082 -9.03
3:00 1536 1746 13.66 11:00 1597 1490 -6.66 19:00 1174 1029 -12.33
3:15 1720 1762 2.49 11:15 1546 1471 -4.86 19:15 1155 955 -17.25
3:30 1726 1809 4.84 11:30 1552 1425 -8.18 19:30 1140 921 -19.20
3:45 1741 1866 7.18 11:45 1556 1396 -10.29 19:45 1035 899 -13.08
4:00 1759 1877 6.67 12:00 1536 1285 -16.31 20:00 1028 868 -15.57
4:15 1786 1825 2.22 12:15 1443 1282 -11.16 20:15 1011 831 -17.75
4:30 1796 1763 -1.86 12:30 1433 1342 -6.35 20:30 1007 783 -22.29
4:45 1822 1800 -1.25 12:45 1416 1263 -10.80 20:45 1002 748 -25.38
5:00 1828 1829 0.03 13:00 1356 1306 -3.71 21:00 1004 734 -26.90
5:15 1842 1686 -8.48 13:15 1360 1358 -0.19 21:15 867 663 -23.58
5:30 1841 1749 -4.99 13:30 1341 1379 2.83 21:30 872 637 -26.99
5:45 1843 1712 -7.08 13:45 1276 1387 8.73 21:45 885 653 -26.25
6:00 1842 1660 -9.85 14:00 1261 1416 12.32 22:00 892 651 -27.03
6:15 1846 1677 -9.16 14:15 1245 1462 17.45 22:15 898 679 -24.38
6:30 1837 1712 -6.81 14:30 1261 1442 14.33 22:30 807 722 -10.51
6:45 1828 1708 -6.61 14:45 1309 1437 9.76 22:45 691 745 7.82
7:00 1825 1697 -7.05 15:00 1301 1442 10.82 23:00 698 681 -2.32
7:15 1816 1674 -7.81 15:15 1345 1417 5.42 23:15 704 699 -0.69
7:30 1805 1709 -5.33 15:30 1333 1383 3.73 23:30 715 645 -9.78
7:45 1739 1748 0.52 15:45 1321 1344 1.71 23:45 724 611 -15.64
8:00 1733 1802 4.01 16:00 1297 1349 3.96 0:00 735 638 -13.14

11 12

3
POWER SUPPLY POSITION AT COMMISSIONERY HEAD QUARTERS
DURING JULY 2019
Average
Peak Demand
Name of City Comm. Supply Date Time
Met in MW
Hours
Indore 23:52 422.33 24.07.19 15:00

Ujjain 23:55 83.65 23.07.19 23:00

Jabalpur 23:55 213.58 22.07.19 19:00

Rewa 23:44 58.26 29.07.19 21:30

Sagar 23:48 38.70 23.07.19 23:00

Shahdol 24:00 22.00 23.07.19 23:00

Bhopal 23:55 400.94 23.07.19 20:00

Gwalior 23:36 294.13 24.07.19 15:00

Hoshangabad 23:44 20.00 23.07.19 17:00

Morena 23:34 69.71 23.07.19 22:00

13 14

BLACK START MOCK DRILL DATES SUMMARY OF MP SYSTEM FOR THE MONTH OF
JULY 2019
NAME OF HPS 2019-20

1. Peak Demand was 9845 MW on 19.07.2019 at 07:00


Hrs.
Proposed- 20.08.19
ISP
Postpone due to heavy discharge.
2. Maximum Hydel Generation in the month of JUNE-19
is 4.05 MU ON 29.07.2019.
3. Maximum Wind injection for the month of JUNE-19
was 1877 MW ON 28.07.2019.
4. Maximum Solar injection for the month of JUNE-19
Proposed- 21.08.19
OSP
Postpone due to heavy discharge. was 929 MW ON 22.07.2019.
5. Load shedding - 0 MW.
6. Short fall - 0 MW.

15 16

4
FRL & MDDL OF HYDEL POWER STASTION OF MP
RESERVOIR RESERVOIR
S.NO LEVEL AS LEVEL AS
NAME FRL MDDL
. ON ON
31.07.18 31.07.19
1. GANDHISAGAR 1312.00 FT. 1250.00 ft. 1274.39 1266.89
2. PENCH 490.00 Mtr. 464.00 Mtr. 474.90 460.05
3. BARGI 422.76 Mtr. 403.50 Mtr. 420.55 415.90

4. TONS (BEHAR) 280.50 Mtr. 277.00 Mtr. 278.70 278.20

5. BIRSINGHPUR 477.00 Mtr. 471.00 Mtr. 475.44 475.81

6. RAJGHAT 371.00 Mtr. 361.50 Mtr. 367.84 361.95

7. DEVLONE 341.64 Mtr. 323.10 Mtr. 334.86 335.68 Thank You !


8. JHINNA 341.64 Mtr. 329.86 Mtr. 334.90 335.80
9. MADIKHEDA 346.25 Mtr. 320.05 Mtr. 334.40 335.95
10. ISP 262.13 Mtr. 243.23 Mtr. 252.67 254.17
11. OSP 196.60 Mtr. 193.30 Mtr. 192.39 192.63

17 18

5
Regional Demand Met in
Power System Operation Corporation Ltd. July.’2019
Maximum : 52509 MW
522nd OCC Meeting (18th July 2019, 15:00 hrs )
Minimum: 36081 MW
(31st July 2019, 04:00 hrs)
Increment in Average Demand compared
to July’18: 9.23%

Highest Demand(Gross)
Demand
Demand % Change w.r.t % Change Constitute (in MW) Date Time
Jul-19 Jun-19 Jul-18
Met(MW) last month w.r.t last Year Maharashtra 24146 10.10.2018 12:00
Gujarat 18424 11.06.2019 15:00

At Mumbai Average 44610 48064 40839 -7.18 9.23


MP
CSEB
14362
4736
05.01.2019
21.07.2019
09:00
23:00
Goa 621 19.06.2019 21:00
21 August’2019
st
Max 52509 56768 46314 -7.50 13.38
DD
DNH
382
824
19.06.2018
27.06.2019
17:00
17:00

Grid Operation Highlights ESIL 934 23.06.2019 19:00


Date when Max. 18-Jul-19 4-Jun-19 31-Jul-18 ~ ~
POSOCO, WRLDC
WR 57518 16.10.2018
2
15:00
WRLDC POSOCO

1 2

3 4
5 6

7 8
Maximum Energy IR Export From Western Region – 242MUs on 18th July 2019 ( Max. Demand Day)
Consumption in the
month
1203 MU
on 18th July 2019
Minimum Energy
Consumption in the
month :
938 MU
on 31st July 2019

Highest Ever Energy Consumption 1276


% Change Energy
Energy Consumption % Change
Jul-19 Jun-19 Jul-18 w.r.t last Constitute consumption (MUs) Date
MU/Day w.r.t last Year
month Maharashtra 522.1 23.05.2019
Gujarat 403 21.09.2018
Average 1071 1154 980 -7.18 9.23 MP 272.3 21.11.2018
Chhattisgarh 111.6 23.07.2019
Goa 14 05.10.2018
Max 1203 1249 1059 -3.64 13.62 DD 9.5 14.07.2018
DNH 19 12.09.2018
Essar Steel 14.8 21.02.2019
Date When Max. 18-Jul-19 6-Jun-19 31-Jul-18 ~ ~
POSOCO, WRLDC WR 1293 9
16.10.2018

9 10

50.20

Frequency in
IEGC Interregional Exchange – 2019-20 (in MUs)
Band=61.82
% of Time

Month NR ER SR Net Export


Freq <49.9 49.9-50.05 >50.05
Apr’19 3428 1414 2734 7576
% 7.09 68.27 24.64
May’19 4680 1645 1843 8168

June’19 5321 1790 696 7806

WR Demand at Max Freq time-51315 MW


All India Demand Max - 160845 MW
July’19 5132 2210 751 8093

On 15th July. At 15:50:50 hrs due


to heavy under drawls by UP  Average Export in July’19 – 261
Max. Inst. freq 50.32 (1897MW max.), Delhi (1161MW),
On 02nd July’19
Mus/day
Haryana(762MW) due to Frequency was
inclement weather condition in IEGC band
on 04th July at 00:06:50 hrs. due to  Highest Ever Export – 16768MW on
for 78.40% of Frequency
OD by TN(1200 MW), Rajasthan (400 in IEGC 29th May 2019
Min. Inst. freq 49.64 MW), AP(300 MW). The overdrawl by time Band=60.54
% of Time  Highest Energy Exported- 307 MUs
TN was due to reduction in wind
generation (maximum) on 29th May 2019
Avg Freq of the
50.01 - during the  Highest Energy Exported in 2018-19-
month 15209 MW (16th Aug 2018)
Average FVI 0.5 -
month. WR Demand at Min Freq time- 41578 MW
All India Demand Max – 168093 MW

11 12
Highest Ever

Average WR
Daily Wind Gen
in July’19-
133 Mus

• WR Max Solar Generation on 08th May’19


4121MW
• Capacity of Solar Generation increased to
Max Wind Gen in
Highest Ever 6319MW
The month of
July’19 – 205 Mus Highest Solar generation
(27th July-19) State
Cap Gen Date Time
(MW)
Guj- 108 Mus (in MW)

Mah- 73 Mus Gujarat 2201 1481 10.03.2019 12:00


MP- 35 Mus Mah 1305 1215 17.05.2019 13:00
MP 1902 1120 17.02.2019 13:00
Chh 176 153 31.12.2018 12:00
Average WR Solar Gen in
Central 735 592 26.07.2019 14:00
the month of July’19- 20
WR 6319 4121 08.05.2019 13:00
Mus/day

13 14

RE Penetration at
12:00Hrs on 13th June
2018- 24%

Highest Ever

15 16
New Elements Synchronized in July 2019 ICTs
Capacity
Generating Capacity Sync Sl. No. Owner/ Location(Const.) Station Name ICT No KV Ratio
(MVA)
Date

1 GIWEL-Sembcorp/Gujarat Naranpar(Roha) 2 220/33 100 02-07-2019


Synchronized Date of
Sl. No. Owner/ Location(Const.) Station Name Unit No. Date of COD
Capacity (MW) Synchronization 2 RUMS/MP Badwar 2 220/33 100 04-07-2019
1 IWISL/Gujarat INOX(Wind) 50 1 05-07-2019 05-07-2019

2 SECI/Gujarat GIWEL III(Wind) 73.5 1 06-07-2019 06-07-2019


Line Reactor

Capacity
Sl. No. Owner/ Location(Const.) Station Name Line Name KV Date
(MVAR)

Transmission Lines- 1 PGCIL/Maharashtra Wardha PG Wardha-Aurangabad I 400 80 01-07-2019


2 PGCIL/Maharashtra Wardha PG Wardha-Aurangabad I 400 80 01-07-2019

Added Line Length (in


Sl. No. Owner/ Location(Const.) Line Name Ckt No. KV Date of Synchronization
Km)
Bus Reactor

1 GIWEL-Sembcorp/Gujarat Naranpur(Roha)-Bhuj PS I 220 01-07-2019 63


Capacity
Sl. No. Owner/ Location(Const.) Station Name B/R No KV Date
2 RUMS/MP Badwar-Rewa II 220 04-07-2019 1 (MVAR)

Total 64 1 PGCIL/Chhattisgarh Kotra 2 400 125 03-07-2019


2 PGCIL/Chhattisgarh Dharamjaygarh 2 400 125 19-07-2019
3 PGCIL/Chhattisgarh Dharamjaygarh 3 765 330 20-07-2019
4 PGCIL/Chhattisgarh Kotra 2 765 240 25-07-2019

17 18

9.1 Load Crash in WR on 15th Aug 19


• 15th Aug 19: Independence Day and
Raksha Bandhan
• Large demand crash was observed in WR
• Difference of around 10 GW was
observed between 14th Aug and 15th Aug
19 demands
• Heavy under drawl by WR constituents
• Frequency is above IEGC band for
considerable time

Agenda •

Persistent high voltages in the grid
Large mismatch between forecasted
demand submitted by SLDCs and actual
demand

19 20
Frequency Profile on Independence Day
Load Forecast Submitted by SLDC for 15-08-2019 80% of time Freq >50 HZ
50% of time Freq > 50.05 Hz
Load Forecast Submitted by SLDC for 15-08-2019
Forecast
on 14-08-2019

Constituents Submission RMSE in State Actual


Status forecast
Gujarat Submitted 11%
MP Not Submitted
Chhattisgarh Submitted 5%
Maharashtra Not Submitted
Actual
Goa Not Submitted
DD Not Submitted
DNH Not Submitted
Forecast

21 22

9.1 Load Crash in WR on 15th Aug 19 9.1 Submission of Forecast data by WR Beneficiaries
• Actions taken • Demand forecasting is one of the critical factors for reliable and economic operation.
• To regulate high voltage all BRs were taken into • As per IEGC, beneficiaries are mandated to do demand forecast and share the data to
service
• All generators were instructed to maximize MVAR
WRLDC.
IEGC 5.3 (b) & (f)
absorption
b. The demand estimation is to be done on daily/weekly/monthly /yearly basis for current year for load -
• Lines opened on high voltage : 34 generation balance planning.
• 765 kV lines: 11 f. The monthly estimated demand by the SLDC shall be provided to RLDC and RPC for better operation
• 400 kV lines: 21 planning
• 220 kV lines: 2 • The forecasted demand submitted by beneficiaries and actual demand are compared
• Backing of generation in ISGS and state generators
• The average RMSE of demand forecasting (15 Jul to 15 Aug 19).
• Generation reduction of around 7800 MW
• Backing of generation in Central sector State Average RMSE Error of Demand Forecast
• TAPS and KAPS: 50 MW (15 Jul to 15 Aug 19)
• SSP: 150 MW Maharashtra 8%
• VSTPS : 1950 MW, Sasan: 1300 MW, Korba-I & II
Gujarat 6%
: 700 MW, Sipat-I: 650 MW, Sipat-II: 230 MW
……. Madhya Pradesh 5%
Chhattisgarh 9%

23 24
9.2 Primary Response by Generators
9.1 Submission of Forecast data by WR Beneficiaries The primary response of WR generating units during the grid events on
• Maharashtra, MP and Chhattisgarh were not submitting the demand forecast to 16-05-19 (19:10 Hrs), 19-05-19 (10:35 Hrs), 05-07-19 (03:56 Hrs)
Response Name of the station Response Name of the station
WRLDC regularly 1. Kawas (4x106+2x116)
1. GMR Raipur (2x685)
• Status of demand forecast submission to WRLDC in last one month (15 Jul to 15 Aug NIL 2. VSTPS-II (2x500) 2. Lanco (2x300)
19) 3. VSTPS-V (1x500) 3. VSTPS-III (2x500)
State Non-Receipt of Demand forecast
4. KSTPS-III (1x500)
10 to 39 % 4. RKM (3x360) Generating
(No. of days)
5. TRN (2x300) 5. Balco (4x300) stations may
Maharashtra 11
6. Jhabua (1x600) 6. Mouda-I (2x500)
Gujarat 0 7. JP NIGRIE (2x600) apprise OCC,
7. SSP-CBPH (5x50)
Madhya Pradesh 15 8. VSTPS-I (6x210) 8. Sasan (6x660) actions being
Chhattisgarh 14
taken to
• Beneficiaries like Goa, DD and DNH are not submitting demand forecast data to Response Name of the station Response Name of the station
improve the
1. MB Power (2x600) Above 1. SKS (2x300)
WRLDC. 1 to 10 % 2. SIPAT-I (3x660) 2. KSTPS-II (3x500)
40% frequency
3. SIPAT-II (2x500) 3. GMR Warora (2x300)
• OCC may like to discuss 4. JPL I (4x250) 4. KSTPS-I (3x200) response.
• Submission of demand forecast to WRLDC regularly by Maharashtra, MP and Chhattisgarh 5. VSTPS-IV (2x500) 5. NSPCL (2x250)
• Maharashtra, Gujarat, Madhya Pradesh and Chhattisgarh to apprise actions being taken to improve forecast 6. KSK (3x600) 6. APML Tiroda (5x660)
• Goa, DD and DNH to submit demand forecast to WRLDC as mandated in IEGC 7. Essar Mahan (2x600) 7. JPL Tamnar (Stage II) (4x600)
• Apart from above beneficiaries like Gujarat, Maharashtra and MP having high RE installations may apprise OCC 8. MCPL (1x300) 8. CGPL (5x830)
9. Mouda-II (2x660) 9. DB Power (2x600)
about status of RE forecasting.

25 26

Primary Frequency Response of


GMR Raipur Primary Frequency Response of
TRN

27 28
Primary Frequency Response of
Primary Frequency Response of SSP-CBPH
Jhabua

29 30

9.3 Reliability and Adequacy of Transmission system for


SSP Evacuation
• Sardar Sarovar Plant has an installed capacity
of 1450 MW (RBPH: 6x200 MW + CHPH: 5x50 MW).
• Peak generation at SSP is around 1330 MW.
S No. Line Length Conductor Peak Power Flow (MW)
type
1 400 kV SSP-Asoj 83 Twin Moose 586
2 400 kV SSP-Kasor 146 Twin Moose 394
3 400 kV SSP-Dhule-1 236 Twin Moose 290
4 400 kV SSP-Dhule-2 236 Twin Moose 290
5 400 kV SSP-Rajgarh-1 178 Twin Moose 0
(Out due to tower collapse)
6 400 kV SSP-Rajgarh-2 178 Twin Moose 0
(Out due to tower collapse)

Primary Frequency Response of • To control line loading on 400 kV SSP-Asoj


VSTPS-II following circuits are kept open
• 400 kV Khandwa-Dhule-1
• 400 kV Rajgarh-Kasor-I & II FSC @ Rajgarh
• 400 kV-Asoj-Kosamba-1
• 400 kV-Kasor-Chorania-1
• 400 kV-Vadodara-Asoj-1
• 400 kV-Vadodara-Asoj-2

31 32
9.3 Reliability and Adequacy of Transmission system for 9.4 Reliability of hotline communication of WRLDC with
SSP Evacuation NTPC stations
• Loading on 400 kV SSP-Asoj would further increase and may exceed 650 MW. • NTPC has discontinued operation from their Regional office control room at Mumbai
• To control line loading on 400 kV SSP-Asoj following measures are suggested. • WRLDC is directly coordinating/communicating with NTPC stations
• It is mandatory to maintain reliability of hotline phones integrated with Orange
• Replacement of 1000/1 A CT with 2000/1 A CT would enhance line loading limit exchange at WRLDC
of 400 kV SSP-Asoj to 874 MW (As per CEA planning criteria, Ambient Temp as 75 • It was observed that these hot line phones are kept in switchyard control room.
Deg). • Since all communication with WRLDC take place from Generation control room it is
• Bus split arrangement would reduce reliability during forced outages and limit necessary that these phones are to be kept only in generation control room.
planned outages at SSP and connecting substations.
• The split arrangement to be considered as last resort only during dam spill over. • Hotline phones at Kawas and Khargone are not working and needs to be restored.

OCC members may like to deliberate. NTPC may confirm the availability of hotline phones at generation control room

33 34

9.5. Status of DR/EL submission for GD/GI events in Jul’19 9.6. Updated “Operating Procedure for Western Regional
Grid”
• Complete DR/EL data was not received for the events at • In compliance to IEGC-5.1(f) document titled “Operating Procedure for Western
• 220 kV Bemetara Regional Grid” was prepared and updated on 19 July 2019.
• 220 kV Akrimota
• 220 kV Kharghar • The document is available at following link.
• 220 kV Boisar https://www.wrldc.in/content/363_1_Procedures.aspx
• 220 kV Raigarh
• The significant changes in the report are as under
• Revised action plan for credible contingencies
• Updated list of EHV feeders to be opened to control high voltage
• Updated list of EHV feeders to be opened for emergency measures
• Updated SPS document of WR
• Reliability circulars on network reconfiguration to control fault level
• Updated list of units mandated to provide primary frequency response

OCC members may like to note.

35 36
9.7. Local Area Oscillation at Marwa TPS (2x500MW) on 7th Aug 9.8. High Loading on 220kV Jhanor(NTPC)-Haldarwa-D/C line
2019 • Generation at Jhanor > 300 MW
• System is N-1 non-compliant with Jhanor-Haldarwa carrying
07th Aug 2019
150MW each.
• Oscillations in WR Grid near Marwa
• During Apr’19 to Jun’19 : 29% of the time N-1 non-compliant
• Duration: 2 mins 40 sec i.e. from 10:22:35hrs to 10:25:15hrs
• To control line loading following reliability measures like taken
• Oscillations died out with the tripping of Marwa Unit-1 (500 MW)
• Bus split at Jhanor
• Frequency of oscillation: 1.1 Hz
• Generation reduction
• Damping ratio: 0.4 %
• 400/220kV GPEC ICT, 400kV GPEC-Jhanor line, 220kV
• Reason: Triggered due to issue with IP control valve, fluctuation
Kawas-Haldarwa, 220kV Kakarapar-Haldarwa one ckt
in generation at Marwa Unit-1 from 143MW to 435MW
opened to control the loading
• Fluctuations were observed at Sipat, NSPCL and Korba West,
Korba
• Remedial Actions:
Chhattisgarh to update on following
• LILO of 220kV Haldarwa-Jagadia S/C line at Jhanor would
• Sudden reduction of power from 390MW to 265MW (about
relieve the loading. The LILO has been agreed in 36th SCM of
125MW) with in 2minute, 52 seconds prior to the event
WR.
• Root cause of IP control valve problem
• As per 35th WRPC &TCC discussions
• PSS is not in service at Marwa, non-compliance of clause 5.2(k) of
• The LILO of 220 kV Haldarwa–Jagadia S/C line at Jhanor S/s
IEGC and CEA Technical Standards
would be completed by Sept, 2018.
• CSPGCL to expedite the tuning of PSS on urgent basis and take it
in service.
GETCO/NTPC to intimate status
CSPGCL/SLDC Chhattisgarh to update

37 38

9.9. High Loading of Boisar-Boisar T/C lines 9.10.High Loading of 220kV Pune-Talegaon D/c lines
• Total loading on Boisar-Boisar T/C > 600MW • Total loading on 220kV Pune-Talegaon D/c lines > 260MW
• N-1 non-compliant • N-1 non-compliant
• Apr’19 to Jun’19 : 52% of the time N-1 non-compliant • In Apr’19 to Jun’19 : 95% of the time lines were N-1 non-
• Loading increased further with commissioning of 4th ICT at compliant
Boisar • One ICT at Pune PG is kept out to control the line loading.
• One ICT is kept open to control the loading on 220kV Boisar-
Boisar ckts. • 43rd SCM:
• 220kV Talegaon (PG)–Talegaon (M)–Urse–Chinchwad 220
kV D/C is planned & is under implementation.
• In 43rd SCM: MSETCL informed that additional (4th) Ckt. • This line has been completed up to Urse S/s.
between Boisar (PG)–Boisar (M) is planned by making LILO of • Thus, Pune (PG) and Talegaon(M) have 4 no. of 220 kV
Boisar–Borivali at Boisar (PG) is scheduled for June, 2018. lines.
• However, 2 no. of Talegaon (PG) – Talegaon (M) are kept
• Maharashtra to apprise the present status open to restrict the loading on 220kV Urse–Chinchwad.

• Maharashtra to apprise the status

39 40
9.11. High Loading of 400/220kV Wardha ICTs
• ICTs at Wardha were N-1 non-compliant when total loading is above 420MW. For 77% of the time
ICTs were N-1 non-compliant during the quarter.

Outage Analysis for July’19


Calendar Month

• Committee may like to discuss

9/12/2019 Power System Operation Corporation Limited, India

41 42

WR outage Statistics July 2019


WR outage Statistics July 2019
Total Outages- OCC-520 : 1379 Name of Availed VS Availed Vs
Planned in OCC Approved Availed
Post OCC: 32 Constituent Planned Approved
PGCIL WR-1 227 109 57 25% 52%
PGCIL WR-2 378 177 101 27% 57%
Maharashtra 314 138 42 13% 30%
Availed Vs Proposed 20% Gujarat 77 21 16 21% 76%
Madhya Pradesh 39 31 11 28% 35%
Chhattisgarh 31 21 11 35% 52%
Availed Vs Approved 49%
NTPC 47 13 8 17% 62%
Other Utilites 298 55 31 10% 56%
Western Region 1411 565 277 20% 49%

9/12/2019 Power System Operation Corporation Limited, India 12-Sep-19 Power System Operation Corporation Limited, India

43 44
Hydro generation & Reservoir Level

45 46

47 48
49 50

51 52
53 54

55 56
57 58

59 60
61 62
Commissioning of New Elements-July'19 Annexure 2.9
a)Generating Units

Date of
Sl. No. Owner/ Location(Const.) Station Name Capacity (MW) Unit No. Date of COD
Synchronization

1 IWISL/Sujarat INOX(Wind) 50 1 05/07/2019 05/07/2019

2 SECI/Gujarat GIWEL III(Wind) 73.5 1 06/07/2019 06/07/2019

b)Transmission Lines

Date of Added Line Length (in


Sl. No. Owner/ Location(Const.) Line Name Ckt No. KV
Synchronization Km)
1 GIWEL-Sembcorp/Gujarat Naranpur(Roha)-Bhuj PS I 220 01/07/2019 63
2 RUMS/MP Badwar-Rewa II 220 04/07/2019 1
Total 64
c)ICTs
Capacity
Sl. No. Owner/ Location(Const.) Station Name ICT No KV Ratio Date
(MVA)

1 GIWEL-Sembcorp/Gujarat Naranpar(Roha) 2 220/33 100 02/07/2019

2 RUMS/MP Badwar 2 220/33 100 04/07/2019

d)Line Reactor
Capacity
Sl. No. Owner/ Location(Const.) Station Name Line Name KV Date
(MVAR)
1 PGCIL/Maharashtra Wardha PG Wardha-Aurangabad I 400 80 01/07/2019

2 PGCIL/Maharashtra Wardha PG Wardha-Aurangabad I 400 80 01/07/2019

e)Bus Reactor
Capacity
Sl. No. Owner/ Location(Const.) Station Name B/R No KV Date
(MVAR)
1 PGCIL/Chhattisgarh Kotra 2 400 125 03/07/2019
2 PGCIL/Chhattisgarh Dharamjaygarh 2 400 125 19/07/2019
3 PGCIL/Chhattisgarh Dharamjaygarh 3 765 330 20/07/2019
4 PGCIL/Chhattisgarh Kotra 2 765 240 25/07/2019

f) Spare Elements Charged


Capacity
Sl. No. Owner/ Location(Const.) Station Name Element KV Date
(MVA/MVAR)
NIL

g) FACTS Devices

Capacity
Sl. No. Owner/ Location(Const.) Station Name Element No KV
(MVAR)
NIL
(As on 15.08.2019)
CENTRAL ELECTRICITY AUTHORITY
FUEL MANAGEMENT DIVISION
DAILY COAL STOCK REPORT
COAL STOCK POSITION FOR COAL LINKAGE BASED THERMAL POWER STATIONS IN THE COUNTRY

Actual Stock Critical(*)/Sup


PLF % Normative Requirement er Critical(**)
Mode of Capacity PLF % (Apr-
Region/State Name of Thermal Power Station Sector (June, Stock Reqd. for the day (In In '000 Tonnes' In Days as per Trigger Reasons for critical coal stock/Remarks
Transport (MW) June,19)
2019) (Days) '000 Tonnes') level & other
Indigenous Import Total conditions

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Northern
Haryana
1 RAIL INDIRA GANDHI STPP JV 1500 38.7 30.2 25 12.99 297.14 349.37 646.51 33
2 RAIL MAHATMA GANDHI TPS P 1320 73.8 57.3 25 13.91 291.97 0 291.97 21
3 RAIL PANIPAT TPS S 920 41.0 39.9 25 8.06 197.3 0 197.3 24
4 RAIL RAJIV GANDHI TPS S 1200 58.0 26.1 25 10.88 507.71 0 507.71 47
5 RAIL YAMUNA NAGAR TPS S 600 92.8 80.2 25 8.65 171.42 0 171.42 20
Punjab
6 RAIL GH TPS (LEH.MOH.) S 920 40.7 17.7 30 7.41 264.15 0 264.15 36
7 RAIL GOINDWAL SAHIB TPP P 540 57.0 38.8 30 5.1 186.08 0 186.08 36
8 RAIL RAJPURA TPP P 1400 86.3 75.6 30 14.61 250.78 24.34 275.12 19
9 RAIL ROPAR TPS S 840 45.3 15.7 25 7.42 268.13 0 268.13 36
10 RAIL TALWANDI SABO TPP P 1980 68.6 67.1 25 17.8 475.24 10.51 485.75 27
Rajasthan
Total coal stock (Linkage + Captive) available with the
11 RAIL CHHABRA TPP S 2320 55.9 61.9 30 15.01 0.99 0 0.99 0
plant as on 30.05.2019 is 2,05,600 Tonnes.
12 RAIL KAWAI TPS P 1320 67.7 71.5 30 10.04 15.25 0 15.25 2 CIL Supply 111% of prorata ACQ.
13 RAIL KOTA TPS S 1240 85.6 76.9 30 12.08 148.58 0 148.58 12
14 RAIL SURATGARH TPS S 1500 68.1 46.8 30 12.2 125.9 0 125.9 10
Uttar Pradesh
15 PITHEAD ANPARA C TPS P 1200 91.6 85.1 15 13.59 15.13 0 15.13 1 CIL Supply 130% of prorata ACQ.
16 PITHEAD ANPARA TPS S 2630 80.6 87.1 15 33.39 412.23 0 412.23 12
17 RAIL BARKHERA TPS P 90 20.5 23.2 25 0.91 2.78 0 2.78 3 Coal supply as per payment
18 RAIL DADRI (NCTPP) C 1820 60.7 56.5 30 16.29 627.02 7.76 634.78 39
19 RAIL HARDUAGANJ TPS S 605 68.8 66.0 25 5.64 44.75 0 44.75 8
20 RAIL KHAMBARKHERA TPS P 90 17.0 21.7 30 0.92 0.55 0 0.55 1 Coal supply as per payment
21 RAIL KUNDARKI TPS P 90 27.7 34.7 30 0.89 1.04 0 1.04 1 Coal supply as per payment
22 RAIL LALITPUR TPS P 1980 71.1 57.5 30 18.33 13.54 0 13.54 1 CIL Supply 125% of prorata ACQ.
23 RAIL MAQSOODPUR TPS P 90 25.8 24.9 30 0.89 0.78 0 0.78 1 Coal supply as per payment
24 RAIL MEJA STPP JV 660 58.7 48.1 25 5.66 240.73 0 240.73 43
25 RAIL OBRA TPS S 1094 44.8 40.8 20 10.99 80.6 0 80.6 7
26 RAIL PARICHHA TPS S 1140 54.2 44.5 30 10.28 77.33 0 77.33 8
27 RAIL PRAYAGRAJ TPP P 1980 63.6 54.2 25 17.67 146.08 0 146.08 8
28 PITHEAD RIHAND STPS C 3000 85.4 91.2 15 36.56 548.6 0 548.6 15
29 RAIL ROSA TPP Ph-I P 1200 83.7 78.0 25 15.18 65.48 0 65.48 4 CIL Supply 135% of prorata ACQ.
30 PITHEAD SINGRAULI STPS C 2000 90.1 89.0 15 24.98 491.52 0 491.52 20
31 RAIL TANDA TPS C 440 63.5 63.1 25 6.39 229.03 0 229.03 36
32 RAIL UNCHAHAR TPS C 1550 65.8 68.2 25 17.78 199.54 8.09 207.63 12
33 RAIL UTRAULA TPS P 90 31.6 27.1 30 0.89 0.86 0 0.86 1 Coal supply as per payment

Total of Northern Region 39349 24 393.39 6398.23 400.07 6798.3 17 0


Actual Stock Critical(*)/Sup
PLF % Normative Requirement er Critical(**)
Mode of Capacity PLF % (Apr-
Region/State Name of Thermal Power Station Sector (June, Stock Reqd. for the day (In In '000 Tonnes' In Days as per Trigger Reasons for critical coal stock/Remarks
Transport (MW) June,19)
2019) (Days) '000 Tonnes') level & other
Indigenous Import Total conditions

Western
Chhatisgarh
34 RAIL AKALTARA TPS P 1800 62.5 70.3 15 18.76 46.28 0.04 46.32 2 CIL Supply 79% of prorata ACQ.
35 RAIL BALCO TPS P 600 66.5 62.4 15 7.85 1.46 0 1.46 0 ** CIL Supply 70% of prorata ACQ.
36 ROAD BANDAKHAR TPP P 300 87.2 88.2 15 5.26 136.11 0 136.11 26
37 RAIL BARADARHA TPS P 1200 74.8 71.0 15 11.26 94.64 0 94.64 8
38 RAIL BHILAI TPS JV 500 72.0 74.4 20 5.14 286.03 0 286.03 56
39 RAIL BINJKOTE TPP P 600 70.5 60.5 20 8.02 134.02 0 134.02 17
40 RAIL DSPM TPS S 500 88.8 91.5 15 7.03 13.65 0 13.65 2 CIL Supply 92% of prorata ACQ.
41 PITHEAD KORBA-II S 200 0.0 0.0 15 2.56 0 0 0 0 Plant under shutdown
42 PITHEAD KORBA-III S 240 35.7 36.7 15 3.39 39.56 0 39.56 12
43 PITHEAD KORBA STPS C 2600 95.1 91.1 15 33.31 111.53 0 111.53 3 CIL supply to NTPC 87 % of prorata ACQ
44 PITHEAD KORBA-WEST TPS S 1340 70.7 72.5 15 19.2 436.89 0 436.89 23
45 RAIL MARWA TPS S 1000 61.2 53.6 15 8.59 22.74 0 22.74 3 Bridge Linkage
46 RAIL NAWAPARA TPP P 600 52.7 62.8 15 6.37 0.14 0 0.14 0 CIL Supply 96% of prorata ACQ.
47 RAIL PATHADI TPP P 600 76.1 75.3 15 6.91 7.57 0 7.57 1 CIL Supply 77% of prorata ACQ.
48 PITHEAD SIPAT STPS C 2980 80.3 87.5 15 34.56 0 0 0 0 CIL supply to NTPC 87 % of prorata ACQ
49 RAIL TAMNAR TPP P 2400 44.1 41.8 20 24.33 13.55 0 13.55 1 CIL Supply 80% of prorata ACQ.
50 RAIL UCHPINDA TPP P 1440 22.6 21.4 15 12.36 11.54 0 11.54 1 ** CIL Supply 70% of prorata ACQ.
Gujarat
51 RAIL GANDHI NAGAR TPS S 630 53.0 63.0 30 5.54 229.44 10.25 239.69 43
52 RAIL SABARMATI (C STATION) P 60 0.0 0.0 30 0.46 0 0 0 0 Plant under shutdown
53 RAIL SABARMATI (D-F STATIONS) P 362 82.1 80.4 30 4.4 31.58 62.35 93.93 10
54 RAIL UKAI TPS S 1110 73.9 81.6 30 9.27 416.29 0 416.29 45
55 RAIL WANAKBORI TPS S 1470 58.8 65.8 30 12.79 610.67 0 610.67 48
Madhya Pradesh
56 PITHEAD AMARKANTAK EXT TPS S 210 96.5 98.9 15 3.12 10.14 0 10.14 3 CIL supply to MPPGCL is 83% of prorata ACQ
57 RAIL ANUPPUR TPP P 1200 74.3 75.4 25 13.86 60 0 60 4 CIL Supply 95% of prorata ACQ.
58 RAIL BINA TPS P 500 67.3 67.1 25 5.96 177.81 0 177.81 30
59 RAIL GADARWARA TPP C 800 36.6 36.6 20 6.86 335.93 0 335.93 49
60 RAIL SANJAY GANDHI TPS S 1340 62.4 66.7 20 12.06 156.03 0 156.03 13
61 RAIL SATPURA TPS S 1330 41.1 50.3 20 12.45 119.35 0 119.35 10
62 RAIL SEIONI TPP P 600 61.8 59.6 20 6.36 16.95 0 16.95 3 CIL Supply 96% of prorata ACQ.
63 RAIL SHREE SINGAJI TPP S 2520 34.5 44.1 20 21.92 253 0 253 12
64 PITHEAD VINDHYACHAL STPS C 4760 84.4 87.4 15 72.74 768.07 0 768.07 11
Maharashtra
65 RAIL AMARAVATI TPS P 1350 60.0 40.1 20 10.6 557.49 0 557.49 53

66 RAIL BHUSAWAL TPS S 1210 65.8 69.1 20 15.5 89.59 0 89.59 6 CIL supply to MAHAGENCO is 88% of prorata ACQ

67 RAIL BUTIBORI TPP P 600 0.0 0.0 20 4.95 59.73 0 59.73 12


CHANDRAPUR(MAHARASHTRA
68 RAIL S 2920 77.5 76.9 20 27.75 138.33 0 138.33 5 CIL supply to MAHAGENCO is 88% of prorata ACQ
) STPS
69 RAIL DAHANU TPS P 500 80.7 83.2 25 5.88 153.02 52.08 205.1 35
70 RAIL DHARIWAL TPP P 600 74.0 70.8 20 4.36 52.44 0.43 52.87 12
71 RAIL GMR WARORA TPS P 600 86.8 87.5 20 8.09 14.24 0 14.24 2 CIL Supply 81% of prorata ACQ.

72 RAIL KHAPARKHEDA TPS S 1340 70.6 73.3 25 17.67 64.35 0 64.35 4 CIL supply to MAHAGENCO is 88% of prorata ACQ

73 RAIL KORADI TPS S 2400 53.7 52.4 25 23.28 281.36 0.42 281.79 12

74 RAIL MAUDA TPS C 2320 73.3 67.8 20 21.71 499.7 213.56 713.26 33

75 RAIL NASIK TPS S 630 80.0 68.8 25 6.59 77.18 0 77.18 12

76 RAIL PARAS TPS S 500 92.0 95.3 25 10.24 54.66 0 54.66 5 CIL supply to MAHAGENCO is 88% of prorata ACQ

77 RAIL PARLI TPS S 1170 2.8 7.0 25 11.23 238.66 0 238.66 21


78 RAIL SOLAPUR C 1320 8.8 6.3 25 11.33 523.26 194.01 717.27 63
79 RAIL TIRORA TPS P 3300 80.0 85.6 20 45.04 78.31 0 78.31 2 CIL Supply 88% of prorata ACQ.
80 ROAD WARDHA WARORA TPP P 540 0.0 0.0 20 5.21 40.64 0 40.64 8
Total of Western Region 57092 20 632.12 7463.93 533.14 7997.08 13 2
Actual Stock Critical(*)/Sup
PLF % Normative Requirement er Critical(**)
Mode of Capacity PLF % (Apr-
Region/State Name of Thermal Power Station Sector (June, Stock Reqd. for the day (In In '000 Tonnes' In Days as per Trigger Reasons for critical coal stock/Remarks
Transport (MW) June,19)
2019) (Days) '000 Tonnes') level & other
Indigenous Import Total conditions

Southern
Andhra Pradesh
DAMODARAM SANJEEVAIAH
81 RAIL S 1600 60.4 62.3 20 16.93 63.8 49.66 113.46 5 CIL Supply 92% of prorata ACQ.
TPS
82 RAIL Dr. N.TATA RAO TPS S 1760 79.4 80.2 20 24.14 77.12 0 77.12 3 CIL Supply 91% of prorata ACQ.
83 RAIL PAINAMPURAM TPP P 1320 86.9 81.8 20 17.35 36.18 89.15 125.33 3 CIL Supply 75% of prorata ACQ.
84 RAIL RAYALASEEMA TPS S 1650 59.8 63.5 25 15.7 35.58 0 35.58 2 CIL Supply 91% of prorata ACQ.
85 RAIL SIMHADRI C 2000 54.9 61.5 25 19.38 363.33 0 363.33 19
Supply kept in abeyance by MCL due to APERC order
86 RAIL VIZAG TPP P 1040 40.5 40.0 25 10.8 7.49 0 7.49 1 dated 31.01.2018
Karnataka
87 RAIL BELLARY TPS S 1700 26.0 32.2 30 13.73 351.48 0 351.48 26
88 RAIL KUDGI STPP C 2400 15.3 25.8 30 18.69 508.98 19.91 528.89 28
89 RAIL RAICHUR TPS S 1720 60.1 77.5 30 14.53 128.52 0 128.52 9
90 RAIL YERMARUS TPP S 1600 0.0 0.0 30 13.66 799.37 0 799.37 59
Tamil Nadu
91 INTER MODAL METTUR TPS S 840 86.0 87.3 30 9.73 120.06 69.57 189.63 18
92 INTER MODAL METTUR TPS - II S 600 78.7 81.4 30 5.5 112.64 52.85 165.49 29
93 INTER MODAL NORTH CHENNAI TPS S 1830 64.6 73.0 30 17.92 81.32 77.11 158.44 6 Coal supply as per payment

94 RAIL TUTICORIN (JV) TPP JV 1000 35.3 34.7 30 11.08 77.4 45.28 122.68 10
95 INTER MODAL TUTICORIN TPS S 1050 77.2 81.3 30 10.73 135.16 51.08 186.24 17
96 INTER MODAL VALLUR TPP JV 1500 54.5 55.1 30 14.41 52.99 0 52.99 4 CIL supply to NTPC 87% of prorata ACQ
Telangana
97 PITHEAD KAKATIYA TPS S 1100 83.7 89.7 15 8.96 190.62 0 190.62 21
98 RAIL KOTHAGUDEM TPS S 420 61.6 66.6 20 7.81 209.12 0 209.12 27
99 RAIL KOTHAGUDEM TPS (NEW) S 1000 86.5 90.5 20 10.85 288.06 0 288.06 27

100 RAIL KOTHAGUDEM TPS (STAGE-7) S 800 86.5 90.5 20 6.29 223.79 0 223.79 36
101 PITHEAD RAMAGUNDEM STPS C 2600 81.6 82.4 15 32.08 420.98 0 420.98 13
102 RAIL SINGARENI TPP S 1200 94.8 93.0 15 18.03 116.83 0 116.83 6
Total of Southern Region 30730 25 318.30 4400.82 454.61 4855.44 15 0
Eastern
Bihar
103 RAIL BARH II C 1320 87.3 89.6 20 18.44 503.52 0 503.52 27
104 PITHEAD KAHALGAON TPS C 2340 86.0 77.3 15 34.06 213.27 0 213.27 6
105 RAIL MUZAFFARPUR TPS JV 610 71.7 74.0 20 6.44 100.96 0 100.96 16
106 RAIL NABI NAGAR TPP JV 750 77.2 72.4 20 7.46 43.66 0 43.66 6 CIL supply to NTPC 87 % of prorata ACQ
Jharkhand
107 RAIL BOKARO `B` TPS C 210 3.2 13.4 20 1.62 43.35 0 43.35 27
108 RAIL BOKARO TPS `A` EXP C 500 79.1 78.4 20 4.98 51.95 0 51.95 10
109 RAIL CHANDRAPURA(DVC) TPS C 630 70.5 73.3 20 4.93 295.64 0 295.64 60
110 RAIL KODARMA TPP C 1000 82.8 85.7 20 7.8 182.05 0 182.05 23
111 RAIL MAITHON RB TPP JV 1050 61.7 75.9 20 10.79 404.38 0 404.38 37
112 ROAD TENUGHAT TPS S 420 58.2 64.5 20 6.07 67.22 0 67.22 11
Odisha
113 RAIL DERANG TPP P 1200 59.4 48.3 20 12.94 285.81 0 285.81 22
114 PITHEAD IB VALLEY TPS S 420 80.8 86.3 15 12.99 232.55 0 232.55 18
115 RAIL KAMALANGA TPS P 1050 69.8 76.5 20 9.74 36.78 0.49 37.27 4 CIL supply 87% of prorata ACQ

116 PITHEAD TALCHER (OLD) TPS C 460 97.5 98.2 15 5.72 34.76 0 34.76 6
117 PITHEAD TALCHER STPS C 3000 77.8 83.8 15 38.26 36.62 0 36.62 1 CIL supply to NTPC 87 % of prorata ACQ
Actual Stock Critical(*)/Sup
PLF % Normative Requirement er Critical(**)
Mode of Capacity PLF % (Apr-
Region/State Name of Thermal Power Station Sector (June, Stock Reqd. for the day (In In '000 Tonnes' In Days as per Trigger Reasons for critical coal stock/Remarks
Transport (MW) June,19)
2019) (Days) '000 Tonnes') level & other
Indigenous Import Total conditions

West Bengal
118 RAIL BAKRESWAR TPS S 1050 75.0 87.7 20 8.02 9.82 0 9.82 1 CIL supply to WBPDCL is 100 % of prorata ACQ
119 RAIL BANDEL TPS S 330 62.6 49.1 20 3.21 30.4 0 30.4 9
120 RAIL BUDGE BUDGE TPS P 750 97.5 96.2 20 10.41 211.18 0 211.18 20
121 RAIL D.P.L. TPS S 660 48.3 53.7 25 5.47 18.02 0 18.02 3 CIL supply is 114 % of prorata ACQ
122 RAIL DURGAPUR STEEL TPS C 1000 79.8 82.6 20 13.3 24.73 0 24.73 2 CIL supply to DVC is 130 % of prorata ACQ
123 RAIL DURGAPUR TPS C 210 15.5 12.6 20 2.28 67.31 0 67.31 30
124 PITHEAD FARAKKA STPS C 2100 61.4 73.6 15 27.03 337.33 0 337.33 12
125 RAIL HALDIA TPP P 600 92.2 87.9 20 9.23 70 0 70 8
126 RAIL KOLAGHAT TPS S 1260 50.9 44.8 25 13.12 35.99 0 35.99 3 CIL supply to WBPDCL is 100% of prorata ACQ
127 RAIL MEJIA TPS C 2340 69.9 74.1 20 21.68 267.95 0 267.95 12
128 RAIL RAGHUNATHPUR TPP C 1200 55.4 49.8 15 11.42 31.55 0 31.55 3 CIL supply to DVC is 130% of prorata ACQ
129 RAIL SAGARDIGHI TPS S 1600 59.5 55.0 20 13.05 19.05 0 19.05 1 CIL supply to WBPDCL is 100% of prorata ACQ
130 RAIL SANTALDIH TPS S 500 99.3 94.5 20 5.5 8.4 0 8.4 2 CIL supply to WBPDCL is 100% of prorata ACQ
131 RAIL SOUTHERN REPL. TPS P 135 41.5 48.0 20 1.24 53.37 0 53.37 43
132 RAIL TITAGARH TPS P 240 0.0 0.0 20 2.06 14.02 0 14.02 7
Total of Eastern Region 28935 19 329.26 3731.64 0.49 3732.13 11 0
North Eastern
Assam
133 RAIL BONGAIGAON TPP C 750 63.5 64.2 20 5.25 195.78 0 195.78 37
Total of North Eastern
750 20 5.25 195.78 0 195.78 37 0
Region

Region-wise/All India total 156856 22 1678.32 22190.4 1388.31 23578.73 14 2

As per trigger level and other conditions


Total Stock Total Stock (in
Pithead Plants
Capacity Daily Req ('000 T) Days)
Mode No. of Plants
(MW) ('000 T)

(*) No. of plants with Critical Stock (<5 Days) 0 Pithead 18 33180 436.5 4299.8 10
(**) No. of plants with Super Critical Stock (<3 Days) 0 Non-Pithead 115 123676 1241.8 19278.9 16
Non-Pithead TOTAL 133 156856 1678.3 23578.7 14
(*) No. of plants with Critical Stock (<7 Days) 0
(**) No. of plants with Super Critical Stock (<4 Days) 2
Total 2

NOTE:
(i) % Materialisation (including Deemed Delivery) as per CIL is for the period 01.04.2019 to 05.06.2019
(ii) Power Plants having less coal stock due to outstanding dues/ supply more than committed quantity/ not lifting offered coal/Bridge linkage/New Linkage are not shown as having critical /supercritical coal stock.
(iii) Daily coal requirement is based on the maximum of the requirement for average actual consumption of the plant for last 7 days or requirement for installed capacity of plant at 55%PLF.
(iv) Stock resticted to 70% Domestic and 30% Imported ratio.
C:Central Sector; S: State Sector; P: Private Sector; JV: Joint Venture
ANNEXURE 3.1

DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING August 2019 & September 2019

Capacity Outage Plan


S. No. Unit No. Reason

(MW) From To

1 GUJARAT

1.1 UNOSUGEN 40 382.5 24-Aug-19 30-Aug-19 Annual Overhaul

2 MADHYAPRADESH

3 CHHATTISHGARH

3.1 Korba East 5 AOH


120 28-Aug-19 1-Oct-19

4 MAHARASHTRA

5 Central Sector and IPPs


5.1 Vindhyachal 11 500 23-Aug-19 15-Sep-19 AOH. NTPC Vindhyachal is requested to
complete AOH on or before 15/09/2019 as
Peak demand of Western region is expected by
15th September 2019.

5.2 KSK Mahanadi 4 660 01-Sep-19 22-Sep-19 AOH


Transmission element outage planning for the month of September 2019 Annexure 3.2
Sr. Request OCC Number Name of Requesting Line / Element D reason From time to Time Remarks Tag EntityType OCC-Remarks
No Type Agency
1 PLANNED OCC_522 POWERGRID_WR2 GWALIOR - 765KV B/R 1 D For alignment of isolator and rectification of interlock 01/Sep/2019 9:00 01/Sep/2019 18:00 Outage BUS REACTOR
problem in isolator. Dia to be kept open
2 PLANNED OCC_522 MSETCL LONIKHAND-II - 400KV - BUS 2 Daily 400kV online Busbar Relay Testing / (Bus bar 01/Sep/2019 09:00 01/Sep/2019 19:00 Bus will be in service. Only Bus bar
protection out) protection required out of service.
3 PLANNED OCC_522 MSETCL LONIKHAND-II - 400KV - BUS 1 Daily 400kV online Busbar Relay Testing / (Bus bar 01/Sep/2019 09:00 01/Sep/2019 19:00 Bus will be in service. Only Bus bar
protection out) protection required out of service.
4 PLANNED OCC_522 MEGPTCL 765KV-AKOLA (2)-EKTUNI-2 Daily Annual Maintenance of Line, Line equipments 01/Sep/2019 08:00 02/Sep/2019 18:00 Annual Maintenance of Line, Line
equipments
5 PLANNED OCC_522 ACBIL ACBIL - 400KV - BUS 2 D Erection of bay equipment for New 200 MVA 400/132 01/Sep/2019 8:00 04/Sep/2019 18:00 Erection of bay equipment for New 200 Outage
KV ICT MVA 400/132 KV ICT
6 PLANNED OCC_522 POWERGRID_WR2 220KV-VAPI-KHARADPADA-DNH-1 C Tower Shifting due to Bullet train project 01/Sep/2019 8:00 05/Sep/2019 18:00 Outage AC TRANSMISSION DNH consent required
LINE CIRCUIT
7 PLANNED OCC_522 POWERGRID_WR2 220KV-VAPI-BHILOSA-DNH-1 C Tower Shifting due to Bullet train project 01/Sep/2019 8:00 05/Sep/2019 18:00 Outage AC TRANSMISSION DNH consent required
LINE CIRCUIT
8 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-HALDARWA-1 C For NHSRCL (Bullet Train) Diversion work 01/Sep/2019 8:00 08/Sep/2019 18:00 Outage AC TRANSMISSION Outage period shall be
LINE CIRCUIT squeezed
9 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-HALDARWA-2 C For NHSRCL (Bullet Train) Diversion work 01/Sep/2019 8:00 08/Sep/2019 18:00 Outage AC TRANSMISSION Outage timing shall be
LINE CIRCUIT squeezed
10 PLANNED OCC_522 MSETCL 400KV-DHULE-MS-BABLESHWAR-1 Daily PID testing work 01/Sep/2019 08:00 10/Sep/2019 18:00 AR required in non auto
11 PLANNED OCC_522 MSETCL 400KV-DHULE-MS-BABLESHWAR-2 Daily PID testing work 01/Sep/2019 08:00 10/Sep/2019 18:00 AR required in non auto
12 PLANNED OCC_522 MSETCL 220KV-WARDHA-PUSAD-1 Daily PID works 01/Sep/2019 07:00 30/Sep/2019 17:00 Except sundays.
13 PLANNED OCC_522 POWERGRID_WR2 400KV-BHINMAL-ZERDA D For Live line OPGW Stringing works 01/Sep/2019 7:00 30/Sep/2019 19:00 Outage
14 PLANNED OCC_522 POWERGRID_WR1 PARLI NEW - 765KV B/R 1 D Faulty Aircell replacement work and AMP works 02/Sep/2019 7:00 02/Sep/2019 14:00 BUS REACTOR
15 PLANNED OCC_522 KTL-Sterlite 400KV-INDORE-KHANDWA-2 C Overhead stringing of U/C 400 kV DC Quad Khargone 02/Sep/2019 8:00 02/Sep/2019 18:00 Contruction
TPP-Khandwa POOL TL
16 PLANNED OCC_522 CGPL 400KV CGPL Mundra Bachau-1 line at CGPL end D LA testing & terminal equipments tightness 02/Sep/2019 8:00 02/Sep/2019 20:00 Voltage
Regulation
17 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-ITARSI-1 D Residual Life Assesment test and AMP of Line Reactor 02/Sep/2019 9:00 02/Sep/2019 18:00 Outage AC TRANSMISSION
and Line terminal equipment. A/R OFF of ckt-2 and dia LINE CIRCUIT
to be kept open at both ends.
18 PLANNED OCC_522 POWERGRID_WR2 400KV-GWALIOR-MORENA-1 D For Point to point testing and NTAMC integration, dia to 02/Sep/2019 9:00 02/Sep/2019 18:00 Outage AC TRANSMISSION
be kept open LINE CIRCUIT
19 PLANNED OCC_522 POWERGRID_WR2 SATNA - 220KV - BUS 2 D For AMP Works 02/Sep/2019 9:00 02/Sep/2019 18:00 Outage BUS
20 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-ITARSI-1 L/R@ JABALPUR - 400KV D Residual Life Assesment test and AMP of Line Reactor 02/Sep/2019 9:00 02/Sep/2019 18:00 Outage AC TRANSMISSION
and Line terminal equipment. A/R OFF of ckt-2 and dia LINE CIRCUIT
to be kept open at both ends.
21 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 1200/400KV-ICT-1 AND 400KV-BUS-2 at D For CSD Commissioning Works 02/Sep/2019 9:15 02/Sep/2019 18:00 Outage TRANSFORMER
BINA 400KV
22 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 1200/400KV-ICT-1 AND 400KV-BINA-2 at D For CSD Commissioning Works, dia to be kept open. 02/Sep/2019 9:15 02/Sep/2019 18:00 Outage TRANSFORMER
BINA 400KV
23 PLANNED OCC_522 POWERGRID_WR2 220KV-BHUJ-VADVA-1 D Jumper Connection under Extension of Bhuj S/s for 02/Sep/2019 10:00 02/Sep/2019 18:00 Outage AC TRANSMISSION Vadva Consent required
new 400/220KV 500MVA ICT-3 , Ouatge of 220kV Bus- LINE CIRCUIT
1 is also required.
24 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-JABALPUR-REWA-2 AND REWA - D For AMP Works 02/Sep/2019 10:00 02/Sep/2019 18:00 Outage Bay
400KV - BUS 2 at REWA - 400KV
25 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 220KV - BUS 1 D Jumper Connection under Extension of Bhuj S/s for 02/Sep/2019 10:00 02/Sep/2019 18:00 Outage BUS
new 400/220KV 500MVA ICT-3, Ouatge of 220kV
Desalpar line is also required.
26 PLANNED OCC_522 POWERGRID_WR2 JABALPUR - 765KV B/R 2 D Swapping of Oil leakage Reactor with spare reactor & 02/Sep/2019 10:00 02/Sep/2019 18:00 Outage BUS REACTOR
also carry out the AMP work, dia to be kept open

27 PLANNED OCC_522 KTL-Sterlite 400KV-INDORE-KHANDWA-1 C Overhead stringing of U/C 400 kV DC Quad Khargone 02/Sep/2019 8:00 03/Sep/2019 18:00 Contruction
TPP-Khandwa POOL TL
28 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV BETUL-ICT-1 AND BETUL - C 400 KV Online PDM system upgradation. 02/Sep/2019 18:00 03/Sep/2019 17:30 Outage Bay
400KV - BUS 2 at BETUL - 400KV
29 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - BETUL - 400KV B/R 1 AND 400KV/220KV C 400 KV Online PDM system upgradation. 02/Sep/2019 18:00 03/Sep/2019 17:30 Outage Bay
BETUL-ICT-1 at BETUL - 400KV
30 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - BETUL - 400KV B/R 1 AND BETUL - 400KV C 400 KV Online PDM system upgradation. 02/Sep/2019 18:00 03/Sep/2019 17:30 Outage Bay
- BUS 1 at BETUL - 400KV
31 PLANNED OCC_522 POWERGRID_WR2 BETUL - 400KV B/R 1 C 400 KV Online PDM system upgradation, B/R-1 outage 02/Sep/2019 18:00 03/Sep/2019 17:30 Outage BUS REACTOR
along with 400kV Bus-2 and ICT-1 is required.

32 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV BETUL-ICT-1 C 400 KV Online PDM system upgradation, ICT-1 outage 02/Sep/2019 18:00 03/Sep/2019 17:30 Outage TRANSFORMER
along with 400kV Bus-2 and B/R is required.

33 PLANNED OCC_522 NTPC 400KV-KORBA-NTPC-ESSAR MAHAN-1 D For Shunt reactor erection work, by NTPC opportunity 02/Sep/2019 8:00 04/Sep/2019 18:30 For Shunt reactor erection work, by AC TRANSMISSION Consented For Shunt reactor
work permit to be issued to POWERGRID & 400kV NTPC opportunity work permit to be LINE CIRCUIT erection work, by NTPC
Korba-Vindhyachal-2 AR to be keep in non auto mode. issued to POWERGRID & 400kV Korba- opportunity work permit to
Vindhyachal-2 AR to be keep in non auto be issued to POWERGRID &
mode. 400kV Korba-Vindhyachal-2
AR to be keep in non auto
mode.

34 PLANNED OCC_522 POWERGRID_WR2 BETUL - 400KV - BUS 2 C 400 KV Online PDM system upgradation, Bus outage 02/Sep/2019 18:00 04/Sep/2019 17:30 Outage BUS
along with ICT-1 and B/R is required.
35 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - BANASKANTHA - 400KV B/R 1 AND FUTURE D Extension bay construction work 02/Sep/2019 9:00 05/Sep/2019 16:00 Outage Bay
at Banaskantha - 400KV
36 PLANNED OCC_522 MP_SLDC 400KV-INDORE-MP-NAGDA-1 C For replacement of Line Isolators of 400 KV Nagda, 02/Sep/2019 9:00 05/Sep/2019 18:00
Line will be kept OFF.
37 PLANNED OCC_522 MP_SLDC 400KV Bus Reactor II with transfer Bus at 400KVs/s C For Replacement of PG Isolator of Transfer Bus of 400 02/Sep/2019 9:00 06/Sep/2019 18:00 After completion of work 400kv bus
Satpura kv Bus Reactor -II reactor -II wiil be charged from Tie
Breaker
38 PLANNED OCC_522 GWEL 400KV-BHADRAWATI-GWEL-1 daily Annual maintenance and relay testing( 400KV- 02/Sep/2019 9.00AM 06/Sep/2019 19:00 GWEL shall not bid in PX
BHADRAWATI-GWEL -2 AR in non auto mode) during sd period
39 PLANNED OCC_522 MP_SLDC 400KV-BHOPAL-MP-BINA-MP-2 C For Main CB Replacement Work at Bina end 02/Sep/2019 8:00 07/Sep/2019 17:00
40 PLANNED OCC_522 MP_SLDC 400KV/220KV MALWA(SSTPS)-ICT-1 C Oil filteration work,X'mer /Breaker testing & 02/Sep/2019 8:00 07/Sep/2019 18:00
Maintenance work
41 PLANNED OCC_522 MSETCL 220KV-WARDHA-BADNERA-1 Daily For PID work, Shifting of auto reclose switch to non 02/Sep/2019 08:00 14/Sep/2019 17:00 For PID work
auto mode

42 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARDHA-AKOLA-2 AND AKOLA - C For Breaker Replacement Work at Akola 03/Sep/2019 9:00 12/Sep/2019 18:00 Bay Protection under taking /
400KV - BUS 2 at AKOLA - 400KV CEA safety to be submitted
43 PLANNED OCC_522 POWERGRID_WR2 765KV-SATNA-ORAI-1 D For AMP Works, dia to be kept open at both ends. 03/Sep/2019 9:00 03/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
44 PLANNED OCC_522 GETCO 400KV-KASOR-CHORANIA-1 Daily Replacement of pantograph isolator on 400 kV Main 03/Sep/2019 6:00 03/Sep/2019 19:00
Bus-01
45 PLANNED OCC_522 CGPL 400KV CGPL Mundra Bachau-2 line at CGPL end D LA testing & terminal equipments tightness 03/Sep/2019 8:00 03/Sep/2019 20:00 Voltage
Regulation
46 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV DEHGAM-ICT-3 D Replacement of Shut off Valve placed between main 03/Sep/2019 9:00 03/Sep/2019 13:00 Outage TRANSFORMER
tank & Conservator.Dia will be kept open on both ends.

47 PLANNED OCC_522 MSETCL 400KV-DHULE-DHULE-MS-1 Daily Routine maintenance and testing work 03/Sep/2019 09:00 03/Sep/2019 17:00 CB DCRM testing work
48 PLANNED OCC_522 MSETCL 400KV-WARDHA-WARORA-1 Daily Attending the issues of 400 KV releted to SCADA and 03/Sep/2019 09:00 03/Sep/2019 17:00 400 KV Warora- IEPL Ckt is in service.
Protection in co-ordination with M/s Sifang and
testing work
49 PLANNED OCC_522 MSETCL 400KV-WARDHA-WARORA-1 Daily Routine Maintenance & Dignostic testing work Nut Bolt 03/Sep/2019 09:00 03/Sep/2019 17:00 400KV WARORA-IEPL Line is in ckt
Tightning work
50 PLANNED OCC_522 MP_SLDC 220KV Gwalior(PGCIL)-Malanpur-I D For line maintenance work 03/Sep/2019 9:00 03/Sep/2019 17:00
51 PLANNED OCC_522 MP_SLDC 400KV-SEONI-Kirnapur-1 D For bay equipment maintenance and testing work 03/Sep/2019 9:00 03/Sep/2019 18:00
52 PLANNED OCC_522 POWERGRID_WR1 BUS COUPLER BAY - AURANGABAD - 220KV - BUS 1 D For AMP works. 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
AND AURANGABAD - 220KV - BUS 2 at AURANGABAD -
220KV
53 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV PARLI NEW-ICT-1 D For Spare Change Over and AMP Works 03/Sep/2019 9:00 03/Sep/2019 18:00 TRANSFORMER
54 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-RAIPUR-PS (DURG)-GMR D FOR AMP WORKS. 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
CHHATTISGARH-1 AND FUTURE at RAIPUR-PS (DURG) -
400KV
55 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-DHARAMJAYGARH-JHARSUGUDA- D FOR AMP WORKS. 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
1 AND DHARAMJAYGARH - 765KV - BUS 2 at
DHARAMJAYGARH - 765KV
56 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-BHADRAWATI-PARLI-1 AND PARLI - D For bay AMP works 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
400KV - BUS 1 at PARLI - 400KV
57 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-PARLI-SOLAPUR-1 AND 400KV- D To change Bph CT bellow due to low oil level. 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
ALKUD-SOLAPUR-1 at Solapur - 400KV
58 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-WARDHA-NIZAMABAD-2 AND D For AMP work 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
WARDHA - 765KV - BUS 1 at Wardha - 765KV
59 PLANNED OCC_522 POWERGRID_WR2 BOISAR - 400KV - BUS 1 D For AMP Works 03/Sep/2019 9:00 03/Sep/2019 18:00 Outage BUS
60 PLANNED OCC_522 POWERGRID_WR2 BINA - 400KV B/R 1 D For CSD Commissioning Works, dia to be kept open 03/Sep/2019 9:00 03/Sep/2019 18:00 Outage BUS REACTOR

61 PLANNED OCC_522 POWERGRID_WR1 RAIPUR - 400KV - BUS 1 D Firmware upgradation of Bus-bar relay 03/Sep/2019 9:30 03/Sep/2019 17:30 BUS
62 PLANNED OCC_522 POWERGRID_WR2 220KV-DAMOH-DAMOH-MP-2 D For AMP of Terminal Equipments, line outage is required 03/Sep/2019 9:30 03/Sep/2019 18:00 Outage

63 PLANNED OCC_522 CSPTCL 400 KV Khedamara-Raita-I Line at 400 KV S/s Daily Commissioning and Testing of TEPI module carrier 03/Sep/2019 10:00 03/Sep/2019 16:00
Khedamara. protection in FOTE (Fibre Optic Terminal Equipment).

64 PLANNED OCC_522 POWERGRID_WR2 400KV-RANCHODPURA-KANSARI-1 D For AMP Works at Kansari 03/Sep/2019 10:00 03/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
65 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 220KV - BUS 2 D Jumper Connection under Extension of Bhuj S/s for 03/Sep/2019 10:00 03/Sep/2019 18:00 Outage BUS
new 400/220KV 500MVA ICT-3
66 PLANNED OCC_522 POWERGRID_WR2 400KV-NAGDA-SHUJALPUR-1 L/R@ NAGDA - 400KV D Retrofitting of Vizimax make CSD Realy & AMP work. 03/Sep/2019 10:00 03/Sep/2019 18:00 Outage LINE REACTOR

67 PLANNED OCC_522 MSETCL 400KV-CHANDRAPUR-BHADRAWATI-3 Daily 1) Making cut out on control panel for installation the 03/Sep/2019 11:00 03/Sep/2019 13:00 During this outage period, the 400KV Outage consented in OCC-
contact multiplier relay. 2) Fixing of contact multiplier CHD-PGCIL Bhadrawati Ckt. No.- I, II 522 by POWERGRID
relay and wiring work. and IV bays/lines will be in service.

68 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV PUNE-PG-ICT-1 AND PUNE- D For AMP Works 03/Sep/2019 9:00 03/Sep/2019 18:00 Bay
PG - 400KV - BUS 2 at PUNE-PG - 400KV
69 PLANNED OCC_522 GETCO KASOR - 400KV - BUS 1 C Replacement of pantograph isolators of 400 kV Kasor- 03/Sep/2019 6:00 04/Sep/2019 19:00
Chorania feeder bay and 400 kV TBC bay Main Bus-01
at 400 kV Kasor S/S.
70 Planned OCC_522 GETCO 400 kV Bus Coupler at 400 kV Kasor S/S C Replacement of pantograph isolators of 400 kV Kasor- 03/Sep/2019 6:00 04/Sep/2019 19:00
Chorania feeder bay and 400 kV TBC bay Main Bus-01
at 400 kV Kasor S/S.
71 PLANNED OCC_522 GETCO 400KV/220KV AMRELI-ICT-1 C Bay Maintenance and Condition monitoring 03/Sep/2019 8:00 04/Sep/2019 18:00
72 PLANNED OCC_522 BDTCL 765KV/400KV BHOPAL-ICT-1 D AMP and testing works 03/Sep/2019 8:00 04/Sep/2019 18:00 with main and tie bays open
73 PLANNED OCC_522 MP_SLDC 220KV ICT-I at 220KV S/s Sukha Jabalpur C For bay equipment maintenance and testing work 03/Sep/2019 9:00 04/Sep/2019 17:00
74 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIPUR-PS (DURG)-CHAMPA-1 AND D FOR AMP WORKS. 03/Sep/2019 9:00 04/Sep/2019 17:30 701 Bay
CHAMPA - 765KV - BUS 1 at CHAMPA - 765KV
75 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV SEONI-ICT-1 AND 765KV- D For AMP Works 03/Sep/2019 9:00 04/Sep/2019 18:00 Bay
BILASPUR-SEONI-1 at SEONI - 765KV
76 PLANNED OCC_522 POWERGRID_WR2 400KV-BETUL-MOUDA-2 C 400 KV Online PDM system upgradation, A/R OFF of 03/Sep/2019 18:00 04/Sep/2019 17:30 Outage AC TRANSMISSION
ckt-1 & Outage of 400kV Bus-2 and 400kv Betul- LINE CIRCUIT
Khandwa-1 is also required.
77 PLANNED OCC_522 POWERGRID_WR2 400KV-KHANDWA-BETUL-1 C 400 KV Online PDM system upgradation, A/R OFF of 03/Sep/2019 18:00 04/Sep/2019 17:30 Outage AC TRANSMISSION
ckt-2 & Outage of 400kV Bus-2 and 400kv Betul- LINE CIRCUIT
Mouda-2 is also required.
78 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-KHANDWA-BETUL-1 AND 400KV- C 400 KV Online PDM system upgradation. 03/Sep/2019 18:00 04/Sep/2019 17:30 Outage Bay
BETUL-MOUDA-2 at BETUL - 400KV
79 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-KHANDWA-BETUL-1 AND BETUL - C 400 KV Online PDM system upgradation. 03/Sep/2019 18:00 04/Sep/2019 17:30 Outage Bay
400KV - BUS 1 at BETUL - 400KV
80 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-BETUL-MOUDA-2 AND BETUL - C 400 KV Online PDM system upgradation. 03/Sep/2019 18:00 04/Sep/2019 17:30 Outage Bay
400KV - BUS 2 at BETUL - 400KV
81 PLANNED OCC_522 NTPC MOUDA - 400KV B/R 2 C Annual Maintenance: Annual testing-IR, TanDelta, 03/Sep/2019 8:00 05/Sep/2019 18:00 400 BUS REACTOR
DGA, CT testing, isolator testing, breaker testing etc

82 PLANNED OCC_522 NTPC VSTPS-TIE LINE#2 (BETWEEN STAGE-IV TO STAGE-V) Annual Bay Maintenance 03/Sep/2019 8:00 05/Sep/2019 18:30
(Stage-IV/ Bay No. 404) at VSTPS end.
83 PLANNED OCC_522 NTPC VSTPS TIE BAY (Stage-IV/ Bay No. 405) at VSTPS end. Annual Bay Maintenance 03/Sep/2019 8:00 05/Sep/2019 18:30

84 PLANNED OCC_522 GETCO 400KV-DEHGAM-RANCHODPURA-1 Daily Bay and Line Maintenance 03/Sep/2019 8:00 06/Sep/2019 18:00
85 PLANNED OCC_522 POWERGRID_WR2 SATNA-STATCOM - 38.5KV - BUS 1 D Insulation Coating on 38.5KV Bus 03/Sep/2019 9:00 07/Sep/2019 18:00 Outage BUS
86 PLANNED OCC_522 Odhisha Proj 400KV-RAIGARH-JHARSUGUDA-1 D AR to be non auto moderequired for PID Testing of 03/Sep/2019 8:00 15/Sep/2019 18:00 AC TRANSMISSION
Porcelain Insulator by Odhisha Proj LINE CIRCUIT
87 PLANNED OCC_522 Odhisha Proj 400KV-RAIGARH-JHARSUGUDA-3 D AR to be non auto moderequired for PID Testing of 03/Sep/2019 8:00 15/Sep/2019 18:00 AC TRANSMISSION
Porcelain Insulator by Odhisha Proj LINE CIRCUIT
88 ERPC 400KV-RAIGARH-JHARSUGUDA-1 ODB For PID Testing of Porcelain Insulator. Only Auto reclose 03/Sep/2019 8:00 15/Sep/2019 18:00

89 ERPC 400KV-RAIGARH-JHARSUGUDA-3 ODB For PID Testing of Porcelain Insulator. Only Auto reclose 03/Sep/2019 8:00 15/Sep/2019 18:00

90 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-SASAN-VINDHYACHAL(PS)-1 AND D For AMP Works 04/Sep/2019 9:00 04/Sep/2019 17:30 Outage
VINDHYACHAL(PS) - 765KV - BUS 1
91 PLANNED OCC_522 POWERGRID_WR2 765KV-JABALPUR-ORAI-2 D Taking Oil sample from 765KV ABB make Bushing , 04/Sep/2019 10:00 04/Sep/2019 12:00 Outage AC TRANSMISSION
A/R OFF of ckt-1 and dia to be kept open at both ends LINE CIRCUIT

92 PLANNED OCC_522 CGPL 400KV CGPL Mundra Jetpur-1 line at CGPL end D LA testing & terminal equipments tightness 04/Sep/2019 8:00 04/Sep/2019 20:00 Voltage
Regulation
93 PLANNED OCC_522 SASAN POWER MAIN BAY 400-10 - 400KV-SASAN-REWA at SASAN D Annaul Maintenance 04/Sep/2019 8:00 04/Sep/2019 20:00
LIMITED
94 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV, 125MVR Bus Reactor AND D Con - CT Oil Smapling 04/Sep/2019 9:00 04/Sep/2019 13:00 Missed in Bay
DHARAMJAYGARH - 400KV - BUS 2 at data base
DHARAMJAYGARH - 765KV
95 PLANNED OCC_522 NSPCL 220KV-NSPCL-BHILAI STEEL PLANT-3 D Annual Maintennace 04/Sep/2019 9:00 04/Sep/2019 16:00 Annual Maintennace
96 PLANNED OCC_522 MSETCL 400KV-DHULE-DHULE-MS-2 Daily Routine maintenance and testing work 04/Sep/2019 09:00 04/Sep/2019 17:00 CB DCRM testing work
97 PLANNED OCC_522 MSETCL 132KV-MANSAR-MS-PENCH-1 Daily Routine maint work 04/Sep/2019 09:00 04/Sep/2019 17:00 NIL
98 PLANNED OCC_522 MP_SLDC 220KV Gwalior(PGCIL)-Malanpur-II D For line maintenance work 04/Sep/2019 9:00 04/Sep/2019 17:00
99 PLANNED OCC_522 NCA ATR Line-1 (CHPH) for preventive work and tree cutting work below the 04/Sep/2019 9:00 04/Sep/2019 17:00 line or TF?
lines
100 PLANNED OCC_522 STL Bay-707 Main Bay of Bilaspur Line-3 @ NTPC Sipat Daily 707- Main Bay equipment maintenance @NTPC Sipat 04/Sep/2019 9:00 04/Sep/2019 18:00
Bilaspur
101 PLANNED OCC_522 GETCO 400KV-CHORANIA-KOSAMBA-1 Contin Bay Maintenance & condition monitoring work 04/Sep/2019 9:00 04/Sep/2019 18:00
uous
102 PLANNED OCC_522 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily Tower shifting work at Loc.No.10-11 for National 04/Sep/2019 09:00 04/Sep/2019 18:00 -
Highway 211 crossing
103 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 220KV-AURANGABAD-CHITEGAON-2 AND D For AMP works. 04/Sep/2019 9:00 04/Sep/2019 18:00 Bay
AURANGABAD - 220KV - BUS 1 at AURANGABAD -
220KV
104 PLANNED OCC_523 POWERGRID_WR1 765KV/400KV RAIGARH-PS-ICT-1 D For Extending 33KV Tertiary Bus of the 765/400kv 04/Sep/2019 9:00 04/Sep/2019 18:00 TRANSFORMER WRLDC Metering dept
AT-1 to new constructed 33 KV Bay, for the Aux power consent required
requirement for operation of the HVDC Raigarh
terminal of the Raigarh -Pugalur HVDC link.

105 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY-400KV-BILASPUR-LANCO-2 AND BILASPUR- D For AMP works. 04/Sep/2019 9:00 04/Sep/2019 18:00 422_Bay Missed in Bay
400KV-BUS-1 at BILASPUR - 400KV data base
106 PLANNED OCC_522 POWERGRID_WR1 400KV AC - 457 BAY - AC FILTER MAIN BAY AND 458 D FOR ISOLATOR ALLIGNMENT OF HACQ15 - FILTER 04/Sep/2019 9:00 04/Sep/2019 18:00 Missed in 400KV AC BAY station name?
TIE BAY OF AC FILTER - I SUB BANK OF AC FILTER BANK 1 data base
107 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 400KV-PARLI-Solapur-2 AND Solapur - D To change Bph CT bellow due to low oil level. 04/Sep/2019 9:00 04/Sep/2019 18:00 Bay
400KV - Bus 1 at Solapur - 400KV
108 PLANNED OCC_522 POWERGRID_WR2 220KV-KAKRAPAR 1&2-VAV-1 D For AMP Works 04/Sep/2019 9:00 04/Sep/2019 18:00 Outage AC TRANSMISSION Outage shall be deferred due
LINE CIRCUIT to 220 kV D/C Kawas -
Haldarva outage. May be
availed on 14.09.19

109 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-ITARSI-2 D Residual Life Assesment test and AMP of Line Reactor 04/Sep/2019 9:00 04/Sep/2019 18:00 Outage AC TRANSMISSION
and Line terminal equipment. A/R OFF of ckt-2 and dia LINE CIRCUIT
to be kept open at both ends.
110 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-ITARSI-2 L/R@ JABALPUR - 400KV D Residual Life Assesment test and AMP of Line Reactor 04/Sep/2019 9:00 04/Sep/2019 18:00 Outage AC TRANSMISSION
and Line terminal equipment. A/R OFF of ckt-2 and dia LINE CIRCUIT
to be kept open at both ends.
111 PLANNED OCC_522 POWERGRID_WR2 400KV-ITARSI-INDORE-MP-2 D To attend shutdown nature defects in line and 04/Sep/2019 9:00 04/Sep/2019 18:00 Outage
Retrofitting of Conventional REF Relay with Numerical
REF Relay of Siemens make (Model: 7SJ802). Dia to be
kept open at both ends.

112 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-BINA-MP-BINA-2 AND BINA-MP - D For AMP Works, line will be in service through TBC 04/Sep/2019 9:15 04/Sep/2019 17:30 Outage Bay
400KV - BUS 2 at BINA-MP - 400KV
113 PLANNED OCC_522 POWERGRID_WR1 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 L/R@ D FOR AMP WORKS. 04/Sep/2019 9:30 04/Sep/2019 17:30 LINE REACTOR
RAIGARH-PS - 765KV
114 PLANNED OCC_522 POWERGRID_WR1 RAIPUR - 400KV - BUS 2 D Firmware upgradation of Bus-bar relay 04/Sep/2019 9:30 04/Sep/2019 17:30 BUS
115 PLANNED OCC_522 POWERGRID_WR2 220KV-DAMOH-DAMOH-MP-3 D For AMP of Terminal Equipments, line outage is required 04/Sep/2019 9:30 04/Sep/2019 18:00 Outage

116 PLANNED OCC_522 CSPTCL 400 KV Khedamara-Raita-II Line at 400 KV S/s Daily Commissioning and Testing of TEPI module carrier 04/Sep/2019 10:00 04/Sep/2019 16:00
Khedamara. protection in FOTE (Fibre Optic Terminal Equipment).

117 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV TAMNAR-ICT-3 D For AMP works 04/Sep/2019 10:00 04/Sep/2019 16:00 TRANSFORMER
118 PLANNED OCC_522 MSETCL 400KV-SOLAPUR-M-SOLAPUR-1 Daily Diagnostic Testing work 04/Sep/2019 10:00 04/Sep/2019 18:00 Load will be manged on 400 kv Lamboti
Parli Line
119 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-JABALPUR-REWA-2 AND D For AMP Works 04/Sep/2019 10:00 04/Sep/2019 18:00 Outage Bay
400KV/220KV REWA-ICT-3 at REWA - 400KV
120 PLANNED OCC_522 POWERGRID_WR2 JABALPUR - 765KV B/R 1 D For AMP Works, dia to be kept open 04/Sep/2019 10:00 04/Sep/2019 18:00 Outage BUS REACTOR
121 PLANNED OCC_522 POWERGRID_WR2 400KV-NAGDA-SHUJALPUR-2 L/R@ NAGDA - 400KV D Retrofitting of Vizimax make CSD Realy & AMP work. 04/Sep/2019 10:00 04/Sep/2019 18:00 Outage LINE REACTOR
122 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV, 125MVR Bus Reactor AND FUTURE D Con - CT Oil Smapling 04/Sep/2019 14:00 04/Sep/2019 16:00 Missed in Bay
at DHARAMJAYGARH - 765KV data base
123 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-PUNE-GIS-PUNE-PG-3 AND PUNE- D For AMP Works 04/Sep/2019 9:00 04/Sep/2019 18:00 Bay
PG - 400KV - BUS 2 at PUNE-PG - 400KV
124 PLANNED OCC_522 GETCO KASOR - 400KV - Auxiliary BUS C Replacement of pantograph isolators of 400 kV TBC 04/Sep/2019 6:00 05/Sep/2019 19:00
bay of 400 kV Main Bus-01 and 400 kV Aux Bus at
400 kV Kasor S/S.
125 Planned OCC_522 GETCO 400 kV Transfer bus Coupler at 400 kV Kasor S/S C Replacement of pantograph isolator on 400 kV Main 04/Sep/2019 6:00 05/Sep/2019 19:00
Bus-01 and 400 kV TBC(Auxiliary bus) of 400 kV TBC
Coupler at 400 kV Kasor S/S
126 PLANNED OCC_522 POWERGRID_WR2 765KV-JABALPUR-ORAI-2 D FOR REPAIRING B-PH SPARE ISOLATOR AND B-PH 04/Sep/2019 9:00 05/Sep/2019 17:00 Outage
LINE EARTH SWITCH, A/R OFF of ckt-1 & dia to be
kept open at both ends, Outage proposed by NR3

127 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV DEHGAM-ICT-3 AND C Converison of isolator from mechanical ganged to 04/Sep/2019 9:00 05/Sep/2019 18:00 Outage Bay
DEHGAM - 400KV - BUS 1 at DEHGAM - 400KV Electrically operated
128 PLANNED OCC_522 POWERGRID_WR2 GWALIOR - 400KV B/R 1 D AMP work and For control of Bus Reactor from 04/Sep/2019 9:00 05/Sep/2019 18:00 Outage BUS REACTOR
STATCOM Controller
129 PLANNED OCC_522 POWERGRID_WR1 400KV-PADGHE-BOISAR-1 C Replacement of Line CT at Padghe (MSETCL) end due to 04/Sep/2019 10:00 05/Sep/2019 12:00 AC TRANSMISSION wheather line restoration will
oil leakage. LINE CIRCUIT be at 12:00hrs or 24:00hrs
of 05.09.2019
130 PLANNED OCC_522 POWERGRID_WR2 400KV-BETUL-MOUDA-1 C 400 KV Online PDM system upgradation, A/R OFF of 04/Sep/2019 18:00 05/Sep/2019 17:30 Outage AC TRANSMISSION
ckt-2 & Outage of 400kV Bus-1 and 400kv Betul- LINE CIRCUIT
Khandwa-2 is also required.
131 PLANNED OCC_522 POWERGRID_WR2 400KV-KHANDWA-BETUL-2 C 400 KV Online PDM system upgradation, A/R OFF of 04/Sep/2019 18:00 05/Sep/2019 17:30 Outage AC TRANSMISSION
ckt-1 & Outage of 400kV Bus-1 and 400kv Betul- LINE CIRCUIT
Mouda-1 is also required.
132 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-KHANDWA-BETUL-2 AND 400KV- C 400 KV Online PDM system upgradation. 04/Sep/2019 18:00 05/Sep/2019 17:30 Outage Bay
BETUL-MOUDA-1 at BETUL - 400KV
133 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-KHANDWA-BETUL-2 AND BETUL - C 400 KV Online PDM system upgradation. 04/Sep/2019 18:00 05/Sep/2019 17:30 Outage Bay
400KV - BUS 1 at BETUL - 400KV
134 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-BETUL-MOUDA-1 AND BETUL - C 400 KV Online PDM system upgradation. 04/Sep/2019 18:00 05/Sep/2019 17:30 Outage Bay
400KV - BUS 2 at BETUL - 400KV
135 PLANNED OCC_522 POWERGRID_WR2 BETUL - 400KV - BUS 1 C 400 KV Online PDM system upgradation, Bus outage 04/Sep/2019 18:00 05/Sep/2019 17:30 Outage BUS
along with 400kV Betul-Mouda-1 and 400kV Betul-
Khandwa-2 is also required.
136 NRPC Orai (765KV)-JABALPUR2 DAILY FOR REPAIRING B-PH SPARE ISOLATOR AND B-PH 04/Sep/2019 09:00 05/Sep/2019 17:00
LINE EARTH SWITCH at Orai end
137 NRPC Orai (765KV)-JABALPUR2 DAILY Taking oil samples from 765kV ABB make Bushing (dia 04/Sep/2019 10:00 04/Sep/2019 12:00
to be kept open at both ends).S/d requested by WR-II.

138 PLANNED OCC_522 POWERGRID_WR2 400KV-GWALIOR-MORENA-2 D For Point to point testing and NTAMC integration, dia to 05/Sep/2019 9:00 05/Sep/2019 18:00 Outage AC TRANSMISSION
be kept open LINE CIRCUIT
139 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-SATNA-VINDHYACHAL(PS)-2 AND D For AMP Works 05/Sep/2019 9:00 05/Sep/2019 17:30 Outage
VINDHYACHAL(PS) - 765KV - BUS 1
140 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-WARDHA-RAIPUR-PS (DURG)-2 AND D FOR AMP WORKS. 05/Sep/2019 9:00 05/Sep/2019 18:00 Bay
765KV-RAIPUR-PS (DURG)-CHAMPA-1 at RAIPUR-PS
(DURG) - 765KV
141 PLANNED OCC_522 EPTCL Main Bay - 400KV-ESSAR MAHAN-BILASPUR-1 AND C CT oil sampling 05/Sep/2019 9:00 06/Sep/2019 18:00 Bay no. 409 at PGCIL Bilaspur (Mahan
BILASPUR - 400KV - Bus 2 Bilaspur line-1 main bay) Line will be
(Bay no. 409 at PGCIL Bilaspur) charged through tie bay - 408

142 Planned OCC_522 GETCO KANSARI 400KV Bus Coupler Bay Daily Bay Maint. 05/Sep/2019 8:00 05/Sep/2019 18:00
143 PLANNED OCC_522 GETCO 400KV-APL-MUNDRA-HADALA-1 Daily Feeder Bay Water Washing work 05/Sep/2019 8:00 05/Sep/2019 18:00
144 PLANNED OCC_522 BDTCL 765KV-BHOPAL-INDORE-1 D AMP and testing works 05/Sep/2019 8:00 05/Sep/2019 18:00 with main and tie bay open
145 PLANNED OCC_522 INOX BHUJ - 220KV - BUS 1 D Rectify the Isolator Issue 05/Sep/2019 8:00 05/Sep/2019 18:00
146 PLANNED OCC_522 CGPL 400KV CGPL Mundra Jetpur-2 line at CGPL end D LA testing & terminal equipments tightness 05/Sep/2019 8:00 05/Sep/2019 20:00 Voltage
Regulation
147 PLANNED OCC_522 SASAN POWER TIE BAY 400-11 - 400KV-SASAN-REWA-VINDHYACHAL D Annaul Maintenance 05/Sep/2019 8:00 05/Sep/2019 20:00
LIMITED at SASAN
148 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV DHARAMJAYGARH-BR-3 AND D Con - CT Oil Smapling 05/Sep/2019 9:00 05/Sep/2019 11:00 Missed in Bay
DHARAMJAYGARH - 765KV - BUS 1 at data base
DHARAMJAYGARH - 765KV
149 PLANNED OCC_522 NSPCL 220KV-NSPCL-BHILAI STEEL PLANT-4 D Annual Maintennace 05/Sep/2019 9:00 05/Sep/2019 16:00 Annual Maintennace
150 PLANNED OCC_522 MSETCL 400KV-WARDHA-KORADI-II-1 Daily Routine Maintenance & Dignostic testing work Nut Bolt 05/Sep/2019 09:00 05/Sep/2019 17:00 400KV WARORA-IEPL Line is in ckt
Tightning work
151 PLANNED OCC_522 MSETCL 400KV-EKTUNI-BABLESHWAR-2 Daily Quarterly Maintenance work & Relay Testing 05/Sep/2019 09:00 05/Sep/2019 17:00 -
152 PLANNED OCC_522 NCA ATR Line-2 (CHPH) for preventive work and tree cutting work below the 05/Sep/2019 9:00 05/Sep/2019 17:00
lines
153 PLANNED OCC_522 STL Bay-708 Tie bay of Bilaspur Line-3 & GT-2 @ NTPC Daily 708-Tie Bay equipment maintenance@NTPC Sipat 05/Sep/2019 9:00 05/Sep/2019 18:00
Sipat Bilaspur
154 PLANNED OCC_522 GETCO 400KV-CHARAL-KOSAMBA-1 Contin Bay Maintenance & condition monitoring work 05/Sep/2019 9:00 05/Sep/2019 18:00
uous
155 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - AURANGABAD - 400KV B/R 1 AND D For AMP works. 05/Sep/2019 9:00 05/Sep/2019 18:00 Bay
400KV/220KV AURANGABAD-ICT-1 at AURANGABAD -
400KV
156 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV SEONI-ICT-3 D For AMP Works 05/Sep/2019 9:00 05/Sep/2019 18:00 TRANSFORMER
157 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-PARLI-SOLAPUR-1 AND 400KV- D For bay AMP works 05/Sep/2019 9:00 05/Sep/2019 18:00 Bay
BHADRAWATI-PARLI-1
158 PLANNED OCC_522 POWERGRID_WR1 Main Bay - Solapur - 400KV B/R 1 AND Solapur - D Bay AMP works. 05/Sep/2019 9:00 05/Sep/2019 18:00 Bay
400KV - Bus 1 at Solapur - 400KV
159 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/440KV WARDHA-ICT-2 AND D For AMP work 05/Sep/2019 9:00 05/Sep/2019 18:00 Bay
WARDHA - 400KV - BUS 1 at Wardha - 765KV
160 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-BINA-JABALPUR-2 AND BINA - D For AMP Works 05/Sep/2019 9:15 05/Sep/2019 17:30 Outage Bay
765KV - BUS 1 at BINA - 765KV
161 PLANNED OCC_522 POWERGRID_WR1 RAIPUR - 400KV - BUS 3 D Firmware upgradation of Bus-bar relay 05/Sep/2019 9:30 05/Sep/2019 17:30 BUS
162 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV DAMOH-ICT-3 D For AMP Works, dia to be kept open on both sides. 05/Sep/2019 9:30 05/Sep/2019 18:00 Outage
163 PLANNED OCC_522 MEGPTCL 765KV-AKOLA (2)-KORADI-III-1 L/R@ KORADI-III - Daily Bushing errection work for 709 LR R-ph 05/Sep/2019 10:00 05/Sep/2019 14:00 Bushing errection work for 709 LR R-ph
765KV

164 PLANNED OCC_522 CSPTCL 400 KV Khedamara-Raita-III Line at 400 KV S/s Daily Commissioning and Testing of TEPI module carrier 05/Sep/2019 10:00 05/Sep/2019 16:00
Khedamara. protection in FOTE (Fibre Optic Terminal Equipment).

165 PLANNED OCC_522 TPL-DGEN 400KV-NAVSARI-DGEN-1 D testing and Change over of 400 kv bus isolators. 05/Sep/2019 10:00 05/Sep/2019 17:00 online AC TRANSMISSION
400 KV BUS-2 isolator closing and then finally 400 kv LINE CIRCUIT
Bus-1 isolator Opening Operation.

166 PLANNED OCC_522 TPL-DGEN 400KV-NAVSARI-DGEN-2 D testing and Change over of 400 kv bus isolators. 05/Sep/2019 10:00 05/Sep/2019 17:00 online AC TRANSMISSION
400 KV BUS-1 isolator closing and then finally 400 kv LINE CIRCUIT
Bus-2 isolator Opening Operation.

167 PLANNED OCC_522 TPL-DGEN 400KV-DGEN-VAGHODIYA-1 D testing and Change over of 400 kv bus isolators. 05/Sep/2019 10:00 05/Sep/2019 17:00 Bay is connected to 400 KV bus only. Not online AC TRANSMISSION
400 KV BUS-1 isolator closing and then opening connected to line side. LINE CIRCUIT
operation.
400 KV BUS-2 isolator closing and then opening
operations.
400 KV Line side isolatioe Closing and then opening
operation.

168 PLANNED OCC_522 TPL-DGEN 400KV-DGEN-VAGHODIYA-2 D testing and Change over of 400 kv bus isolators. 05/Sep/2019 10:00 05/Sep/2019 17:00 Bay is connected to 400 KV bus only. Not online AC TRANSMISSION
400 KV BUS-1 isolator closing and then opening connected to line side. LINE CIRCUIT
operation.
400 KV BUS-2 isolator closing and then opening
operations.
400 KV Line side isolatioe Closing and then opening
operation.

169 PLANNED OCC_522 TPL-DGEN DGEN - 400KV B/R 1 D testing and Change over of 400 kv bus isolators. 05/Sep/2019 10:00 05/Sep/2019 17:00 online BUS REACTOR
400 KV BUS-1 isolator closing and then finally 400 kv
Bus-2 isolator Opening Operation.

170 PLANNED OCC_522 POWERGRID_WR2 400KV-MAGARWADA-NAVSARI-1 D AMP works at Navsari GIS, Isolator Drive card 05/Sep/2019 10:00 05/Sep/2019 17:00 Outage AC TRANSMISSION
replacement, CVT replacement B phase, A/R OFF of ckt- LINE CIRCUIT
2.
171 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-SHUJALPUR-SHUJALPUR-MP-1 D For AMP Works, line will be in service through TBC 05/Sep/2019 10:00 05/Sep/2019 18:00 Outage Bay
AND SHUJALPUR - 220KV - BUS 1 at SHUJALPUR -
220KV
172 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-DHARAMJAYGARH-JABALPUR-1 AND D For erection of Guy wire arrangement on Future Bay 05/Sep/2019 10:00 05/Sep/2019 18:00 Outage Bay
FUTURE at JABALPUR - 765KV Isolator
173 PLANNED OCC_522 LANCO 400 KV Bus 1 at Lanco pathadi D Annual Maintanence 05/Sep/2019 8:00 06/Sep/2019 18:00 Lanco shall not bid in PX
during shutdown period
174 PLANNED OCC_522 LANCO 400 KV Bus Coupler bay at Lanco Pathadi D Annual Maintanence 05/Sep/2019 8:00 06/Sep/2019 18:00 Lanco shall not bid in PX
during shutdown period
175 PLANNED OCC_522 GETCO 400KV/220KV AMRELI-ICT-2 Contin Bay Maintenance and Condition monitoring 05/Sep/2019 8:00 06/Sep/2019 18:00
uous
176 PLANNED OCC_522 NTPC 400KV-KORBA-NTPC-RAIPUR-4 D For Bay PM, opportunity work permit to be issued to 05/Sep/2019 8:00 06/Sep/2019 18:30 For Bay PM, opportunity work permit to AC TRANSMISSION Consented. work permit
POWERGRID & 400kV Korba-Raipur-3 AR to be keep in be issued to POWERGRID & 400kV LINE CIRCUIT may please be issued to
non auto mode. Korba-Raipur-3 AR to be keep in non POWERGRID & 400kV Korba-
auto mode. Raipur-3 AR to be keep in
non auto mode.

177 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV CHAMPA-ICT-3 AND FUTURE D FOR AMP WORKS. 05/Sep/2019 9:00 06/Sep/2019 17:30 711 Bay
at CHAMPA - 765KV
178 PLANNED OCC_522 NTPC 220KV/6.6KV KAWAS-ST-1 C CT replacement. Dismanteling of Old CTs and erection 05/Sep/2019 9:00 07/Sep/2019 18:00 220 TRANSFORMER
and commissioning of new CT along with testing.

179 PLANNED OCC_522 POWERGRID_WR1 765KV-BILASPUR-RAJNANDGAON-RRWTL-1 L/R@ D For Implementation of Spare selection scheme for 710 05/Sep/2019 9:00 07/Sep/2019 18:00 710_LR LINE REACTOR
BILASPUR - 765KV LR
180 PLANNED OCC_522 GETCO VADAVI - 400KV Reactor 50 MVAR Contin Breaker replacement work 05/Sep/2019 8:00 30/Sep/2019 18:00 The Outage is on Continuous Basis Protection under taking /
uous during the outage the Reactor is out of CEA safety to be submitted
service
181 PLANNED OCC_522 POWERGRID_WR2 INDORE-MP - 400KV - BUS 2 C FOR BUS - 2 ISOLATOR RETROFITTING WORK OF 06/Sep/2019 9:00 08/Sep/2019 18:00 Outage BUS
ASOJ # 1 LINE ( LINE SHALL REMAIN CHARGED
THROUGH TBC )
182 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 06/Sep/2019 9:30 06/Sep/2019 17:30 Bay
AND RAIGARH-PS - 765KV - BUS 2 at RAIGARH-PS -
765KV
183 PLANNED OCC_522 POWERGRID_WR1 BUS SECTIONALISER BAY - 765KV DHARAMJAYGARH- D Con - CT Oil Smapling 06/Sep/2019 11:30 06/Sep/2019 14:00 Missed in Bay
BUS 1 AND DHARAMJAYGARH - 765KV - BUS 3 at data base
DHARAMJAYGARH - 765KV
184 PLANNED OCC_522 POWERGRID_WR1 BUS SECTIONALISER BAY - 765KV DHARAMJAYGARH- D Con - CT Oil Smapling 06/Sep/2019 14:30 06/Sep/2019 17:00 Missed in Bay
BUS 2 AND DHARAMJAYGARH - 765KV - BUS 4 at data base
DHARAMJAYGARH - 765KV
185 PLANNED OCC_522 POWERGRID_WR2 400KV-VADINAR-BACHAU-1 D DFT Measurement work for RTV Coating in T-point 06/Sep/2019 8:00 06/Sep/2019 13:00 Outage
Isolators, dia to be kept open and A/R OFF of ckt-2

186 PLANNED OCC_522 CGPL 400KV CGPL Mundra Bachau-3 line at CGPL end D LA testing & terminal equipments tightness 06/Sep/2019 8:00 06/Sep/2019 20:00 Voltage
Regulation
187 PLANNED OCC_522 SASAN POWER MAIN BAY 400-12 - 400KV-SASAN-VINDHYACHAL at D Annaul Maintenance 06/Sep/2019 8:00 06/Sep/2019 20:00
LIMITED SASAN
188 PLANNED OCC_522 POWERGRID_WR2 VINDHYACHAL(PS) - 765KV B/R 1 D For Reactor AMP Works, dia to be kept open 06/Sep/2019 9:00 06/Sep/2019 17:30 Outage
189 PLANNED OCC_522 STL NTPC Sipat-Bilaspur Line-3 @NTPC Sipat Bilaspur Daily Line equipment maintenance@NTPC Sipat 06/Sep/2019 9:00 06/Sep/2019 18:00
190 PLANNED OCC_522 MP_SLDC 220KV Pandhurna-Kamleshwar D For bay equipment maintenance and testing work 06/Sep/2019 9:00 06/Sep/2019 18:00
191 PLANNED OCC_522 POWERGRID_WR1 400KV AC - 463 BAY - POLE 1 - CONVERTER DIA MAIN D FOR AMP WORKS. 06/Sep/2019 9:00 06/Sep/2019 18:00 Missed in 400KV AC BAY
BAY - I data base
192 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-WARDHA-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 06/Sep/2019 9:00 06/Sep/2019 18:00 BAY
AND RAIPUR-PS (DURG) - 765KV - BUS 2 at RAIPUR-PS
(DURG) - 765KV
193 PLANNED OCC_522 POWERGRID_WR1 765KV-Solapur-Raichur-1 L/R@ Solapur - 765KV D Reactor AMP works, Neutral jumper made to twin 06/Sep/2019 9:00 06/Sep/2019 18:00 LINE REACTOR
conductor and To change Imax make Auxiliary & Limit
switches for Reactor CB.
194 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV SEONI-ICT-1 AND D For AMP Works 06/Sep/2019 9:00 06/Sep/2019 18:00 Bay
400KV/220KV SEONI-PG-ICT-1 at SEONI-PG - 400KV

195 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-REWA-1 D Residual Life Assesment test and AMP of Line Reactor 06/Sep/2019 9:00 06/Sep/2019 18:00 Outage AC TRANSMISSION
and Line terminal equipment LINE CIRCUIT
196 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-REWA-1 L/R@ JABALPUR - 400KV D Residual Life Assesment test and AMP of Line Reactor 06/Sep/2019 9:00 06/Sep/2019 18:00 Outage AC TRANSMISSION
and Line terminal equipment LINE CIRCUIT
197 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-KORADI-II-KORADI-III-2 AND Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 06/Sep/2019 09:30 06/Sep/2019 10:00 1) 400KV Koradi-II Koradi-III Ckt.-II will
KORADI-II - 400KV - BUS 2 at KORADI-II - 400KV remain in service through Tie Bay 405.
2) Outage subject to weather Condition &
availablity of Kit.

198 PLANNED OCC_522 POWERGRID_WR1 RAIPUR - 400KV - BUS 4 D Firmware upgradation of Bus-bar relay 06/Sep/2019 9:30 06/Sep/2019 17:30 BUS
199 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV DAMOH-ICT-1 AND DAMOH D For AMP Works 06/Sep/2019 9:30 06/Sep/2019 18:00 Outage
- 400KV - BUS 2
200 PLANNED OCC_522 MSETCL TIE BAY - 400KV/11.5KV KORADI-II-ST-2 AND 400KV- Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 06/Sep/2019 10:00 06/Sep/2019 10:30 1)Station Transformer II will remain in
KORADI-II-KORADI-III-1 at KORADI-II - 400KV service through Main Bay 407 & Koradi-
II CKt-I will remain service through Main
Bay 409
2) Outage subject to weather Condition &
availablity of Kit.

201 PLANNED OCC_522 CSPTCL 400 KV Raita-Marwa-I Line at 400 KV S/s Raita as well Daily Commissioning and Testing of TEPI module carrier 06/Sep/2019 10:00 06/Sep/2019 16:00
as 400 KV Marwa end. protection in FOTE (Fibre Optic Terminal Equipment).

202 PLANNED OCC_522 POWERGRID_WR2 JABALPUR - 400KV B/R 2 D For AMP Works, dia to be kept open 06/Sep/2019 10:00 06/Sep/2019 16:00 Outage BUS REACTOR
203 PLANNED OCC_522 MEGPTCL MAIN BAY - AKOLA - 765KV B/R 1 AND AKOLA - Daily Commissioning activity of CBS Lite 06/Sep/2019 10:00 06/Sep/2019 18:00 Commissioning activity of CBS Lite
765KV - BUS 2 at AKOLA - 765KV
204 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-KORADI-II-KORADI-III-1 AND Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 06/Sep/2019 10:30 06/Sep/2019 11:00 1)400KV Koradi-II Koradi-III Ckt.-I will
KORADI-II - 400KV - BUS 2 at KORADI-II - 400KV remain service through Tie Bay 408.
2) Outage subject to weather Condition &
availablity of Kit.

205 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-WARDHA-KORADI-II-1 AND Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 06/Sep/2019 11:00 06/Sep/2019 11:30 1)400KV Wardha(PG) line will remain
KORADI-II - 400KV - BUS 2 at KORADI-II - 400KV service through Tie Bay 411.
2) Outage subject to weather Condition &
availablity of Kit.

206 PLANNED OCC_522 POWERGRID_WR2 400KV-VADINAR-BACHAU-2 D DFT Measurement work for RTV Coating in T-point 06/Sep/2019 14:00 06/Sep/2019 18:00 Outage
Isolators, dia to be kept open and A/R OFF of ckt-1

207 PLANNED OCC_522 POWERGRID_WR1 400KV-PUNE-GIS-PUNE-PG-2 D Replacement of Clamp & connectors 06/Sep/2019 9:00 06/Sep/2019 18:00 A/R to be kept in non Auto mode for ckt-I AC TRANSMISSION
, dia to be kept open for relay testing LINE CIRCUIT
works
208 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV - BUS 1 D Extension bay construction work 06/Sep/2019 9:00 07/Sep/2019 16:00 Outage BUS
209 PLANNED OCC_522 CSPTCL 315 MVA ICT -I at 400 KV S/s Khedamara. Daily Annual Maintenance Programme and Extension of 220 06/Sep/2019 9:00 07/Sep/2019 17:00
KV LA structure height.
210 PLANNED OCC_522 MP_SLDC 220KV ICT-II at 220KV S/s Sukha Jabalpur C For bay equipment maintenance and testing work 06/Sep/2019 9:00 07/Sep/2019 17:00
211 PLANNED OCC_522 POWERGRID_WR2 GWALIOR - 400KV B/R 3 D AMP work and For control of Bus Reactor from 06/Sep/2019 9:00 07/Sep/2019 18:00 Outage BUS REACTOR
STATCOM Controller
212 PLANNED OCC_522 POWERGRID_WR2 400KV-RANCHODPURA-CHORANIA-2 bay at Vadavi C For CB Overhauling works, line will be in service 06/Sep/2019 10:00 13/Sep/2019 18:00 Outage AC TRANSMISSION
through TBC. LINE CIRCUIT
213 PLANNED OCC_522 EPTCL Tie Bay - 400KV-ESSAR MAHAN-BILASPUR-2 AND C CT oil sampling & Testing of Spare CB interrupter 07/Sep/2019 9:00 09/Sep/2019 18:00 Bay no. 411 at PGCIL Bilaspur) (Mahan
FUTURE Bilaspur line-2 Tie Bay) Line will be
(Bay no. 411 at PGCIL Bilaspur) charged through Main bay - 412

214 PLANNED OCC_522 POWERGRID_WR1 765KV-RAIGARH-PS-TAMNAR-1 D For Replacement of Broken Insulator at various 07/Sep/2019 8:00 07/Sep/2019 18:00 Ckt-2 AR to be keep in non auto mode AC TRANSMISSION JPL Stg-2 / TRN consent
locations & SS AMP works. Ckt-2 AR to be keep in non during outage period.Dia to be kept open LINE CIRCUIT required. JPL Stg-2/TRN
auto mode required. for relay testing works shall not bid in PX during sd
period

215 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-DHARAMJAYGARH-JHARSUGUDA-4 D FOR AMP WORKS. 07/Sep/2019 9:00 07/Sep/2019 18:00 Bay
AND 765KV/400KV DHARAMJAYGARH-ICT-2 at
DHARAMJAYGARH - 765KV

216 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV REWA-ICT-3 AND REWA - D For AMP Works 07/Sep/2019 10:00 07/Sep/2019 18:00 Outage Bay
400KV - BUS 1 at REWA - 400KV
217 PLANNED OCC_522 GETCO 400KV-HADALA-VARSANA-1 Daily Feeder Bay Water Washing work 07/Sep/2019 8:00 07/Sep/2019 18:00
218 PLANNED OCC_522 CGPL 400KV CGPL Mundra Bachau-4 line at CGPL end D LA testing & terminal equipments tightness 07/Sep/2019 8:00 07/Sep/2019 20:00 Voltage
Regulation
219 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - CHAMPA - 765KV B/R 1 AND CHAMPA - D FOR RTAMC/ NTAMC SIGNAL VALIDATION 07/Sep/2019 9:00 07/Sep/2019 13:00 703 Bay
765KV - BUS 2 at CHAMPA - 765KV
220 PLANNED OCC_522 GETCO 400kV Kosamba - Zanor line Daily Bay Maintenance & condition monitoring work 07/Sep/2019 9:00 07/Sep/2019 18:00
221 PLANNED OCC_522 MP_SLDC 400KV-Damoh-KATNI-1 D For line maintenance work 07/Sep/2019 9:00 07/Sep/2019 18:00
222 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV AURANGABAD-ICT-2 AND D For AMP works. 07/Sep/2019 9:00 07/Sep/2019 18:00 Bay
AURANGABAD - 400KV - BUS 2 at AURANGABAD -
400KV
223 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-PARLI-SOLAPUR-1 AND PARLI - D For bay AMP works 07/Sep/2019 9:00 07/Sep/2019 18:00 Bay
400KV - BUS 2 at PARLI - 400KV
224 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 765KV-PUNE-PG-Solapur-1 AND Solapur - D To change Imax make Auxiliary and Limit switches in 07/Sep/2019 9:00 07/Sep/2019 18:00 Bay
765KV - Bus 2 at Solapur - 765KV SIEMENS make CB.
225 PLANNED OCC_522 MSETCL MAIN BAY - 400KV/11.5KV KORADI-II-ST-3 AND Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 07/Sep/2019 09:30 07/Sep/2019 10:00 1)Station Transformer III will remain in
KORADI-II - 400KV - BUS 1 at KORADI-II - 400KV service through Tie Bay 405.
2) Outage subject to weather Condition &
availablity of Kit.

226 PLANNED OCC_522 MSETCL TIE BAY (405) OF STN T/F-3 & KORADI 3 CKT-2 Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 07/Sep/2019 10:00 07/Sep/2019 10:30 Station Transformer III will remain in
service through Main Bay 404 & Koradi-
II CKt-II will remain service through Main
Bay 406

227 PLANNED OCC_522 CSPTCL 400 KV Raita-Marwa-II Line at 400 KV S/s Raita as well Daily Commissioning and Testing of TEPI module carrier 07/Sep/2019 10:00 07/Sep/2019 16:00
as 400 KV Marwa end. protection in FOTE (Fibre Optic Terminal Equipment).

228 PLANNED OCC_522 MSETCL 400KV-KALA-KUDUS-2 Daily 1. Annual maint. work. 07/Sep/2019 10:00 07/Sep/2019 17:00 400KV Kala-Kudus Ckt-1 will be in
2. Diagnostics testing work of CB, CT etc. service

229 PLANNED OCC_522 MEGPTCL MAIN BAY - AKOLA - 765KV B/R 1 AND AKOLA - Daily Commissioning activity of CBS Lite 07/Sep/2019 10:00 07/Sep/2019 18:00 Commissioning activity of CBS Lite
765KV - BUS 2 at AKOLA - 765KV
230 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-SHUJALPUR-SHUJALPUR-MP-2 D For AMP Works, line will be in service through TBC 07/Sep/2019 10:00 07/Sep/2019 18:00 Outage Bay
AND SHUJALPUR - 220KV - BUS 1 at SHUJALPUR -
220KV
231 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV NAVSARI-ICT-3 D For AMP Works, dia to be kept open on both sides 07/Sep/2019 10:00 07/Sep/2019 18:00 Outage TRANSFORMER
232 PLANNED OCC_522 MSETCL MAIN BAY - 400KV/11.5KV KORADI-II-ST-2 AND Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 07/Sep/2019 10:30 07/Sep/2019 11:00 1)Station Transformer II will remain in
KORADI-II - 400KV - BUS 1 at KORADI-II - 400KV service through Tie Bay 408.
2) Outage subject to weather Condition &
availablity of Kit.

233 PLANNED OCC_522 MSETCL TIE BAY - 400KV-WARDHA-KORADI-II-1 AND FUTURE Daily Dew Point Measurement of SF6 Gas of Circuit Breaker 07/Sep/2019 11:00 07/Sep/2019 11:30 1) 400KV Wardha(PG) line will remain
at KORADI-II - 400KV service through Main Bay 412.
2) Outage subject to weather Condition &
availablity of Kit.

234 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-BACHAU-VARSANA-2 AND 400KV- D DFT measurement for RTV Coating on CB Interrupter. 07/Sep/2019 11:00 07/Sep/2019 13:00 Outage
VADINAR-BACHAU-1
235 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIPUR-PS (DURG)-CHAMPA-2 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 07/Sep/2019 14:00 07/Sep/2019 17:30 704 Bay
CHAMPA - 765KV - BUS 1 at CHAMPA - 765KV
236 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-VADINAR-BACHAU-1 AND BACHAU D DFT measurement for RTV Coating on CB Interrupter. 07/Sep/2019 15:00 07/Sep/2019 17:00 Outage
- 400KV - BUS 2
237 PLANNED OCC_522 KTL-Sterlite 400KV-KHANDWA-RAJGARH-1 C Overhead stringing of U/C 400 kV DC Quad Khargone 07/Sep/2019 8:00 08/Sep/2019 18:00 Contruction
TPP-Khandwa POOL TL
238 PLANNED OCC_522 KTL-Sterlite 400KV-KHANDWA-KHARGONE-1 C Overhead stringing of U/C 400 kV DC Quad Khargone 07/Sep/2019 8:00 08/Sep/2019 18:00 Construction
TPP-Khandwa POOL TL
239 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV BACHAU-ICT-1 AND D DFT Measurement work for RTV Coating in bus 08/Sep/2019 8:00 08/Sep/2019 10:00 Outage
BACHAU - 220KV - BUS 1 Isolators, ICT-1 will be in service through TBC and
220kV Bus-2 are also required
240 PLANNED OCC_522 POWERGRID_WR2 BACHAU - 220KV - BUS 2 D DFT Measurement work for RTV Coating in bus 08/Sep/2019 8:00 08/Sep/2019 18:00 Outage
Isolators, Bus outage along with 220kV Bays of ICT-1,
ICT-2 and Morbi lines are also required
241 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV BACHAU-ICT-2 AND D DFT Measurement work for RTV Coating in bus 08/Sep/2019 11:00 08/Sep/2019 13:00 Outage
BACHAU - 220KV - BUS 1 Isolators, ICT-2 will be in service through TBC and
220kV Bus-2 are also required
242 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-MORBI-1 AND BACHAU - D DFT Measurement work for RTV Coating in bus 08/Sep/2019 15:00 08/Sep/2019 17:00 Outage
220KV - BUS 1 Isolators, Morbi line will be in service through TBC and
220kV Bus-2 are also required
243 PLANNED OCC_522 MP_SLDC 400KV-BHOPAL-MP-BINA-MP-1 D For bay equipment maintenance and testing work at 08/Sep/2019 8:00 08/Sep/2019 18:00
Bhopal end
244 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 400KV - BUS 1 D Jumper Connection under Extension of Bhuj S/s for 08/Sep/2019 10:00 08/Sep/2019 18:00 Outage BUS
new 400/220KV 500MVA ICT-3
245 PLANNED OCC_522 POWERGRID_WR1 765KV-RAIGARH-PS-TAMNAR-2 D For Replacement of Broken Insulator at various 08/Sep/2019 8:00 08/Sep/2019 18:00 Ckt-1 AR to be keep in non auto mode AC TRANSMISSION JPL Stg-2 / TRN consent
locations & Ckt-1 AR to be keep in non auto mode during outage period.Dia to be kept open LINE CIRCUIT required. JPL Stg-2/TRN
required. for relay testing works shall not bid in PX during sd
period

246 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-DHARAMJAYGARH-RANCHI-2 AND D FOR AMP WORKS. 08/Sep/2019 9:00 08/Sep/2019 18:00 Bay
765KV-DHARAMJAYGARH-JHARSUGUDA-2 at
DHARAMJAYGARH - 765KV
247 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV JABALPUR-ICT-1 D For AMP Works, dia to be kept open on both sides 08/Sep/2019 10:00 08/Sep/2019 18:00 Outage TRANSFORMER
248 PLANNED OCC_522 POWERGRID_WR2 765KV-GWALIOR-ORAI-1 D For alignment of isolator and rectification of interlock 08/Sep/2019 9:00 08/Sep/2019 18:00 Outage AC TRANSMISSION
problem in isolator, A/R OFF of Gwalior-Satna, dia to LINE CIRCUIT
be kept open at both ends.
249 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-LALPAR-GUJARAT-BACHAU-1 AND D DFT Measurement work for RTV Coating in bus 09/Sep/2019 8:00 09/Sep/2019 10:00 Outage
BACHAU - 220KV - BUS 1 Isolators, Lalpar line will be in service through TBC and
220kV Bus-2 are also required
250 PLANNED OCC_522 POWERGRID_WR2 BACHAU - 220KV - BUS 2 D DFT Measurement work for RTV Coating in bus 09/Sep/2019 8:00 09/Sep/2019 18:00 Outage at a time?
Isolators, Bus outage along with 220kV Bays of Lalpar,
Chardwa-2 and Chardwa-1 lines are also required

251 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-CHARADVADA-2 AND D DFT Measurement work for RTV Coating in bus 09/Sep/2019 11:00 09/Sep/2019 13:00 Outage
BACHAU - 220KV - BUS 1 Isolators, Chardwa-2 line will be in service through TBC
and 220kV Bus-2 are also required
252 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-CHARADVADA-1 AND D DFT Measurement work for RTV Coating in bus 09/Sep/2019 15:00 09/Sep/2019 17:00 Outage
BACHAU - 220KV - BUS 1 Isolators, Chardwa-1 line will be in service through TBC
and 220kV Bus-2 is also required
253 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 400KV - BUS 2 D Jumper Connection under Extension of Bhuj S/s for 09/Sep/2019 10:00 09/Sep/2019 18:00 Outage BUS
new 400/220KV 500MVA ICT-3
254 PLANNED OCC_522 POWERGRID_WR2 INDORE-MP - 400KV - BUS 1 C FOR BUS - 1 ISOLATOR RETROFITTING WORK OF 09/Sep/2019 9:00 11/Sep/2019 18:00 Outage BUS
ASOJ # 1 LINE ( LINE SHALL REMAIN CHARGED
THROUGH TBC )
255 PLANNED OCC_522 CGPL CGPL MUNDRA 400KV BUS REACTOR D Reactor PM and Testing 09/Sep/2019 8:00 10/Aug/2019 20:00 Voltage
Regulation
256 PLANNED OCC_522 GETCO 220KV-KAWAS-ICHCHAPUR-1 Daily Bay Maintenance & condition monitoring work 09/Sep/2019 8:00 13/Sep/2019 18:00
257 PLANNED OCC_522 MP_SLDC 400KV-NAGDA-Badnawar-2 D For line maintenance work 09/Sep/2019 8:00 09/Sep/2019 18:00
258 PLANNED OCC_522 MP_SLDC 220KV Gwalior(PGCIL)-Mahalgaon-I D For line maintenance work 09/Sep/2019 9:00 09/Sep/2019 17:00
259 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-SASAN-VINDHYACHAL(PS)-2 AND D For AMP Works 09/Sep/2019 9:00 09/Sep/2019 17:30 Outage
VINDHYACHAL(PS) - 765KV - BUS 1
260 PLANNED OCC_522 RRWTL Bay-701 Main Bay of Warora Line-1 Daily Annual maintenance of bay equipments 09/Sep/2019 9:00 09/Sep/2019 18:00
261 PLANNED OCC_522 MSETCL BUS COUPLER BAY - PARLI M - 400KV - BUS 1 AND Daily Back up protection relay testing work & Bay 09/Sep/2019 09:00 09/Sep/2019 18:00 -
PARLI M - 400KV - BUS 2 at PARLI M - 400KV Maintenance work.
262 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARDHA-AURANGABAD-2 AND D For AMP works. 09/Sep/2019 9:00 09/Sep/2019 18:00 Bay
AURANGABAD - 400KV - BUS 2 at AURANGABAD -
400KV
263 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-RAIPUR-PS (DURG)-GMR D FOR AMP WORKS. 09/Sep/2019 9:00 09/Sep/2019 18:00 BAY
CHHATTISGARH-2 AND FUTURE at RAIPUR-PS (DURG) -
400KV
264 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV DHARAMJAYGARH-ICT-2 D FOR AMP WORKS. 09/Sep/2019 9:00 09/Sep/2019 18:00 Bay
AND DHARAMJAYGARH - 765KV - BUS 1 at
DHARAMJAYGARH - 765KV
265 PLANNED OCC_522 POWERGRID_WR1 765KV-Solapur-Raichur-2 L/R@ Solapur - 765KV D To change multiple base LA with single base LA and 09/Sep/2019 9:00 09/Sep/2019 18:00 LINE REACTOR
Reactor CB AMP.
266 PLANNED OCC_522 POWERGRID_WR1 WARDHA - 765KV - BUS 2 D Spare CVT B ph erection work 09/Sep/2019 9:00 09/Sep/2019 18:00 Bus
267 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV SATNA-ICT-1 D For AMP Works, dia to be kept open 09/Sep/2019 9:00 09/Sep/2019 18:00 Outage TRANSFORMER
268 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - ITARSI - 400KV B/R 3 AND ITARSI - 400KV D For Retrofitting of existing Siemens make 7SV512 LBB 09/Sep/2019 9:00 09/Sep/2019 18:00 Outage
- BUS 2 relay with Alstom make P442 relay.
269 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 09/Sep/2019 9:30 09/Sep/2019 17:30 Bay
AND 765KV-RAIGARH-PS-CHAMPA-1 at RAIGARH-PS -
765KV
270 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-SIPAT-RAIPUR-2 AND RAIPUR - D For bay AMP works at Raipur SS 09/Sep/2019 9:30 09/Sep/2019 17:30 Bay
400KV - BUS 1 at RAIPUR - 400KV
271 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-DAMOH-KATNI-2 AND DAMOH - D For AMP Works 09/Sep/2019 9:30 09/Sep/2019 18:00 Outage
400KV - BUS 1
272 PLANNED OCC_522 MSETCL 400KV-KALA-KUDUS-1 Daily 1. Annual maint. work. 09/Sep/2019 10:00 09/Sep/2019 17:00 400KV Kala-Kudus Ckt-2 will be in
2. Diagnostics testing work of CB, CT etc. service

273 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - PADGHE-PG - 765KV - BUS 1 AND FUTURE D For AMP works 09/Sep/2019 10:00 09/Sep/2019 17:00 Bay
at PADGHE-PG - 765KV
274 PLANNED OCC_522 MEGPTCL TIE BAY - 702 OF BUS REACTOR AND 765/400kV Daily Commissioning activity of CBS Lite 09/Sep/2019 10:00 09/Sep/2019 18:00 Commissioning activity of CBS Lite
1500MVA ICT @ AKOLA 2
275 PLANNED OCC_522 POWERGRID_WR2 400KV-VADODARA-PIRANA-1 D For AMP Works, A/R OFF of ckt-2 & dia to be kept open 09/Sep/2019 10:00 09/Sep/2019 18:00 Outage AC TRANSMISSION
at both ends. LINE CIRCUIT
276 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-CHAMPA-DHARAMJAYGARH-1 AND D FOR AMP WORKS. 09/Sep/2019 9:00 10/Sep/2019 17:30 715 Bay
CHAMPA - 765KV - BUS 3 at CHAMPA - 765KV
277 PLANNED OCC_522 POWERGRID_WR1 765KV-BILASPUR-RAJNANDGAON-RRWTL-2 L/R@ D For Implementation of Spare selection scheme for 713 09/Sep/2019 9:00 10/Sep/2019 18:00 713_LR LINE REACTOR
BILASPUR - 765KV LR
278 PLANNED OCC_522 POWERGRID_WR2 GWALIOR - 400KV B/R 2 D AMP work and For control of Bus Reactor from 09/Sep/2019 9:00 10/Sep/2019 18:00 Outage BUS REACTOR
STATCOM Controller
279 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-CGPL-BACHAU-3 AND BACHAU - C For replacement of defective interrupter in R-phase. 09/Sep/2019 8:00 11/Sep/2019 18:00 Outage
400KV - BUS 1
280 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-DEHGAM-KHANPUR-2 AND C Overhauling of R-ph CB under ABB Supervision, Line 09/Sep/2019 9:00 12/Sep/2019 18:00 Outage Bay
DEHGAM - 220KV - BUS 1 at DEHGAM - 220KV will remain in service through TBC.
281 PLANNED OCC_522 MSETCL 400KV-KORADI-BHUSAWAL-1 Contin Restringing of conductor of all three phases of 400 kV 09/Sep/2019 08:00 13/Sep/2019 18:00 400 kV Akola- Bhusawal, 400 kV Akola-
uous Koradi- Bhusawal line due to conversion of Metergauge Nandgaonpeth & 400 kV Koradi-
to Broadgauge of Akot-Akola Railway line and also for Nandgaonpeth are in service.
maintenance works of line.

282 PLANNED OCC_522 MP_SLDC 400KV Main Bus-I at 400KV S/s Bina C For PG Isolator Replacement Work at Bina end 09/Sep/2019 8:00 18/Sep/2019 17:00
283 PLANNED OCC_522 MSETCL 400KV-SSP-DHULE-MS-1 Daily On Line PID Testing 09/Sep/2019 08:00 21/Sep/2019 16:00 on linet testing
284 PLANNED OCC_522 MSETCL 400KV-SSP-DHULE-MS-2 Daily PID on line testing 09/Sep/2019 08:00 21/Sep/2019 16:00 On line PID testing
285 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV BACHAU-ICT-2 AND D DFT Measurement work for RTV Coating in bus 10/Sep/2019 8:00 10/Sep/2019 10:00 Outage
BACHAU - 220KV - BUS 1 Isolators, ICT-2 will be in service through TBC and
220kV Bus-1 are also required
286 PLANNED OCC_522 POWERGRID_WR2 BACHAU - 220KV - BUS 1 D DFT Measurement work for RTV Coating in bus 10/Sep/2019 8:00 10/Sep/2019 18:00 Outage
Isolators, Bus outage along with 220kV Bays of ICT-2 ,
Lalpar and Chardwa-2 lines are also required

287 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-LALPAR-GUJARAT-BACHAU-1 AND D DFT Measurement work for RTV Coating in bus 10/Sep/2019 11:00 10/Sep/2019 13:00 Outage
BACHAU - 220KV - BUS 1 Isolators, Lalpar line will be in service through TBC and
220kV Bus-1 are also required
288 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-CHARADVADA-2 AND D DFT Measurement work for RTV Coating in bus 10/Sep/2019 15:00 10/Sep/2019 17:00 Outage
BACHAU - 220KV - BUS 1 Isolators, Chardwa-2 line will be in service through TBC
and 220kV Bus-1 are also required
289 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 765KV - BUS 1 D RTV Coating STAGE-4 10/Sep/2019 10:00 10/Sep/2019 18:00 Outage BUS
290 PLANNED OCC_522 POWERGRID_WR1 400KV-PUNE-GIS-PUNE-PG-3 D Replacement of Clamp & connectors 10/Sep/2019 9:00 10/Sep/2019 18:00 A/R to be kept in non Auto mode for ckt- AC TRANSMISSION
IV , dia to be kept open for relay testing LINE CIRCUIT
works
291 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-SEONI-WARDHA-1 AND FUTURE at D For AMP Works 10/Sep/2019 9:00 11/Sep/2019 18:00 Bay
SEONI - 765KV
292 PLANNED OCC_522 POWERGRID_WR2 NAVSARI - 400KV - BUS 1 D Low SF6 Busbar Trip Logic Implementation for Busbar 10/Sep/2019 9:00 11/Sep/2019 18:00 Outage BUS
1 at GIS Navsari
293 PLANNED OCC_522 TPL-DGEN TBC BAY - DGEN - 400KV - BUS 1 AND DGEN - 400KV - D Preventive maintenance of 414 89C isolator alongwith 10/Sep/2019 8:00 10/Sep/2019 18:00 outage BAY
TRANSFER BUS 1 at DGEN - 400KV its earth switch. Transfer bus and transfer bay outage
required.
294 PLANNED OCC_522 TPL-DGEN DGEN-400KV-TRANSFER BUS-1 D Preventive maintenance of 414 89C isolator alongwith 10/Sep/2019 8:00 10/Sep/2019 18:00 outage BUS
its earth switch. Transfer bus and transfer bay outage
required.
295 PLANNED OCC_522 POWERGRID_WR1 400KV-KORBA-NTPC-BIRSINGPUR-1 D For line APM works & 400KV-KORBA-NTPC- 10/Sep/2019 8:00 10/Sep/2019 18:00 For line APM works & 400KV-KORBA- AC TRANSMISSION
BIRSINGPUR-2 AR to be keep in non auto mode during NTPC-BIRSINGPUR-2 AR to be keep in LINE CIRCUIT
outage time. non auto mode during outage time.

296 PLANNED OCC_522 INOX Bay No. 205 at Bhuj PS D Breaker DCRM & Travel time Test 10/Sep/2019 8:00 10/Sep/2019 20:00
297 PLANNED OCC_522 MSETCL 400KV-WARORA-CHANDRAPU-II-1 Daily Attending the issues of 400 KV releted to SCADA and 10/Sep/2019 09:00 10/Sep/2019 17:00 Load will be managed on 400KV
Protection in co-ordination with M/s Sifang and Chandrapur Ckt-2
testing work
298 PLANNED OCC_522 POWERGRID_WR2 765KV-JABALPUR-ORAI-1 D FOR AMP of line side Equipment at Orai end, A/R OFF 10/Sep/2019 9:00 10/Sep/2019 17:00 Outage
of ckt-2 & dia to be kept open at both ends, Outage
proposed by NR3
299 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-SASAN-VINDHYACHAL(PS)-2 AND D For AMP Works 10/Sep/2019 9:00 10/Sep/2019 17:30 Outage
FUTURE AT VINDHYACHAL-PS
300 PLANNED OCC_522 RRWTL Bay-702 Tie bay of Warora Line-1 & Raipur Line-2 Daily Annual maintenance of bay equipments 10/Sep/2019 9:00 10/Sep/2019 18:00
301 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-AKOLA-AURANGABAD-1 AND D For AMP works. 10/Sep/2019 9:00 10/Sep/2019 18:00 Bay
AURANGABAD - 400KV - BUS 1 at AURANGABAD -
400KV
302 PLANNED OCC_522 POWERGRID_WR1 400KV-WARDHA-MOUDA-1 D Shutdown Rectification Work and 400KV Wardha- 10/Sep/2019 9:00 10/Sep/2019 18:00 Wardha-Mauda-2 to be kept in Non-Auto AC TRANSMISSION
Mauda-2 in Non-Auto Mode. Mode. LINE CIRCUIT
303 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARORA-PG-PARLI-2 AND PARLI - D For bay AMP works 10/Sep/2019 9:00 10/Sep/2019 18:00 Bay
400KV - BUS 1 at PARLI - 400KV
304 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 765KV/400KV Solapur-ICT-1 AND Solapur - D Bay AMP works & To change Imax make Auxiliary and 10/Sep/2019 9:00 10/Sep/2019 18:00 Bay
765KV - Bus 2 at Solapur - 765KV Limit switches in SIEMENS make CB.

305 PLANNED OCC_522 POWERGRID_WR2 TBC BAY - RAJGARH - 220KV - BUS 1 AND FUTURE at D For Circuit breaker & CT Testing 10/Sep/2019 9:00 10/Sep/2019 18:00 Outage Bay
RAJGARH - 220KV
306 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV SATNA-ICT-2 D For AMP Works, dia to be kept open 10/Sep/2019 9:00 10/Sep/2019 18:00 Outage TRANSFORMER
307 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 10/Sep/2019 9:30 10/Sep/2019 17:30 Bay
AND 765KV-RAIGARH-PS-CHAMPA-1 at RAIGARH-PS -
765KV
308 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-SIPAT-RAIPUR-3 AND 400KV-SIPAT- D For bay AMP works at Raipur SS 10/Sep/2019 9:30 10/Sep/2019 17:30 Bay
RAIPUR-1 at RAIPUR - 400KV
309 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV DAMOH-ICT-2 AND DAMOH D For AMP Works 10/Sep/2019 9:30 10/Sep/2019 18:00 Outage
- 400KV - BUS 2
310 PLANNED OCC_522 POWERGRID_WR1 Tie Bay - 765KV-AURANGABAD-PADGHE-PG-2 AND D For AMP works 10/Sep/2019 10:00 10/Sep/2019 17:00 Bay
FUTURE
311 PLANNED OCC_522 MEGPTCL TIE BAY - 702 OF BUS REACTOR AND 765/400kV Daily Commissioning activity of CBS Lite 10/Sep/2019 10:00 10/Sep/2019 18:00 Commissioning activity of CBS Lite
1500MVA ICT @ AKOLA 2
312 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-SHUJALPUR-RAPP-1 AND D For AMP Works 10/Sep/2019 10:00 10/Sep/2019 18:00 Outage Bay
SHUJALPUR - 400KV - BUS 1 at SHUJALPUR - 400KV

313 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV PIRANA-ICT-1 D For 33KV RTV coating work, dia to be kept open on 10/Sep/2019 10:00 10/Sep/2019 18:00 Outage TRANSFORMER
both sides.
314 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-KALWA-PUNE-PG-1 AND PUNE-PG - D For AMP Works 10/Sep/2019 9:00 10/Sep/2019 18:00 Bay
400KV - BUS 1 at PUNE-PG - 400KV
315 PLANNED OCC_522 GETCO 400KV/220KV AMRELI-ICT-3 Contin Bay Maintenance and Condition monitoring 10/Sep/2019 8:00 11/Sep/2019 18:00
uous
316 PLANNED OCC_522 TPL-DGEN 400KV/220KV DGEN-ICT-1 C ICT 1 routine energisation testing during RSD and 10/Sep/2019 10:00 11/Sep/2019 17:00 ICT No load charging only, Not connected outage TRANSFORMER
shutdown for energy conservation after one day at 220 KV side.
energization
317 PLANNED OCC_522 KWPCL 400KV-KWPCL-RAIGARH-PS-2 Daily Bay : 406 Relay & PLCC Testing & BCU commissioning 10/Sep/2019 8:00 12/Sep/2019 18:00
work and Line Maintenance work
318 PLANNED OCC_522 NTPC VSTPS-TIE LINE#2 (BETWEEN STAGE-V TO STAGE-III) Annual Bay Maintenance 10/Sep/2019 8:00 12/Sep/2019 18:30
(Stage-V/ Bay No. 422) at VSTPS end.
319 PLANNED OCC_522 NTPC VSTPS TIE BAY (Stage-V/ Bay No. 423) at VSTPS end. Annual Bay Maintenance 10/Sep/2019 8:00 12/Sep/2019 18:30

320 PLANNED OCC_522 MSETCL 220KV-WARDHA-BHUGAON-1 Daily Tightening of jumper nut bolt at loc. No.02, 04 and 10/Sep/2019 10:00 14/Sep/2019 18:00 NA
other work.
321 PLANNED OCC_522 MSETCL BUS COUPLER BAY - PADGHE - 400KV - BUS 1 AND Daily Bay Maintenance Work 10/Sep/2019 09:00 10/Sep/2019 18:00 Bay Maintenance Work
PADGHE - 400KV - BUS 2 at PADGHE - 400KV
322 NRPC Orai (765KV)-JABALPUR1 DAILY FOR AMP of line side Equipment at Orai end 10/Sep/2019 09:00 10/Sep/2019 17:00
323 ERPC 765 kV New Ranchi Dharamjaygarh CKT- I ODB For 1 no. Insulator changing work, tightning of keeper, 10/Sep/2019 9:00 10/Sep/2019 18:00
CC ring, Jumper etc
324 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-CHARADVADA-1 AND D DFT Measurement work for RTV Coating in bus 11/Sep/2019 8:00 11/Sep/2019 10:00 Outage
BACHAU - 220KV - BUS 1 Isolators, Chardwa-1 line will be in service through TBC
and 220kV Bus-1 are also required
325 PLANNED OCC_522 POWERGRID_WR2 BACHAU - 220KV - BUS 1 D DFT Measurement work for RTV Coating in bus 11/Sep/2019 8:00 11/Sep/2019 13:00 Outage
Isolators, Bus outage along with 220kV Bays of TBC
and Chardwa-1 lines are also required
326 PLANNED OCC_522 POWERGRID_WR2 TBC BAY - BACHAU - 220KV - BUS 1 AND FUTURE D DFT Measurement work for RTV Coating in bus 11/Sep/2019 11:00 11/Sep/2019 13:00 Outage
Isolators, Outage of 220kV Bus-1 are also required
327 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV - BUS 2 D Extension bay construction work 11/Sep/2019 9:00 12/Sep/2019 16:00 Outage BUS
328 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-1 D Tightening of nut & bolt of CGL make circuit breaker to 11/Sep/2019 10:00 11/Sep/2019 18:00 Outage Bay
AND JABALPUR - 765KV - BUS 1 at JABALPUR - 765KV avoid water droplet in side Auxilairy box of CB

329 PLANNED OCC_522 MSETCL 220KV-MAHALAXMI(KONALKATTA)-AMONA-1 Daily Routine Maintenance & Dignostic testing work 11/Sep/2019 08:00 11/Sep/2019 17:00 NA

330 PLANNED OCC_522 MSETCL 220KV-PANDURNA-KALMESHWAR-1 Daily Routine Maintenance work 11/Sep/2019 08:00 11/Sep/2019 17:00 OUTAGE PROPOSED BY LMU S/Dn
Mankapur .
331 PLANNED OCC_522 GETCO 400 kV CHORANIA-VADAVI-2 Daily Bay Maintenance 11/Sep/2019 8:00 11/Sep/2019 18:00
332 PLANNED OCC_522 POWERGRID_WR1 400KV-KORBA-NTPC-BIRSINGPUR-1 D For line APM works & 400KV-KORBA-NTPC- 11/Sep/2019 8:00 11/Sep/2019 18:00 For line APM works & 400KV-KORBA- AC TRANSMISSION
BIRSINGPUR-2 AR to be keep in non auto mode during NTPC-BIRSINGPUR-2 AR to be keep in LINE CIRCUIT
outage time. non auto mode during outage time.

333 PLANNED OCC_522 CGPL TIE BAY - CGPL - 400KV/26KV GT-1 AND CGPL - D Breaker PM and testing 11/Sep/2019 8:00 11/Sep/2019 20:00 Voltage
400KV - BUS 2 Regulation
334 PLANNED OCC_522 INOX Bay No. 208 at Bhuj PS D Breaker DCRM & Travel time Test 11/Sep/2019 8:00 11/Sep/2019 20:00
335 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV CHAMPA-ICT-1 AND 765KV- D FOR RTAMC/ NTAMC SIGNAL VALIDATION 11/Sep/2019 9:00 11/Sep/2019 13:00 705 Bay
RAIPUR-PS (DURG)-CHAMPA-2 at CHAMPA - 765KV

336 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - BANASKANTHA - 400KV B/R 1 AND FUTURE D Extension bay construction work 11/Sep/2019 9:00 11/Sep/2019 16:00 Outage Bay
at Banaskantha - 400KV
337 PLANNED OCC_522 MP_SLDC 220KV Gwalior(PGCIL)-Mahalgaon-II D For line maintenance work 11/Sep/2019 9:00 11/Sep/2019 17:00
338 PLANNED OCC_522 RRWTL Bay-703 Main Bay of Raipur Line-2 Daily Annual maintenance of bay equipments 11/Sep/2019 9:00 11/Sep/2019 18:00
339 PLANNED OCC_522 MSETCL CHANDRAPUR SWITCHING STATION - 400KV - BUS 1 Daily for Diagnostic testing & allied bay maintenance work 11/Sep/2019 09:00 11/Sep/2019 18:00 400KV BUS-1 CVT TAN DELTA & BAY
MAINTENANCE WORK
340 PLANNED OCC_522 MSETCL 400KV-PARLI-M-SOLAPUR-M-1 Daily Line and bay maintenance work 11/Sep/2019 09:00 11/Sep/2019 18:00 -
341 PLANNED OCC_522 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily Tower shifting work at Loc.No.10-11 for National 11/Sep/2019 09:00 11/Sep/2019 18:00 -
Highway 211 crossing
342 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV AURANGABAD-ICT-1 D For Spare Change Over 11/Sep/2019 9:00 11/Sep/2019 18:00 TRANSFORMER
343 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV DHARAMJAYGARH-ICT-1 D FOR AMP WORKS. 11/Sep/2019 9:00 11/Sep/2019 18:00 TRANSFORMER Balco consent required.
Balco shall not bid in PX
during sd period
344 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV SEONI-ICT-2 D For AMP Works 11/Sep/2019 9:00 11/Sep/2019 18:00 TRANSFORMER
345 PLANNED OCC_522 POWERGRID_WR1 400KV-WARDHA-MOUDA-1 D Shutdown Rectification Work and 400KV Wardha- 11/Sep/2019 9:00 11/Sep/2019 18:00 Wardha-Mauda-2 to be kept in Non-Auto AC TRANSMISSION
Mauda-2 in Non-Auto Mode. Mode. LINE CIRCUIT
346 PLANNED OCC_522 POWERGRID_WR1 220KV-WARDHA-WARDHA-M-1 D For AMP work 11/Sep/2019 9:00 11/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
347 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV INDORE-ICT-2 D For AMP Works, dia to be kept open 11/Sep/2019 9:00 11/Sep/2019 18:00 Outage TRANSFORMER
348 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV SATNA-ICT-3 D For AMP Works, dia to be kept open 11/Sep/2019 9:00 11/Sep/2019 18:00 Outage TRANSFORMER
349 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - ITARSI - 400KV B/R 2 AND FUTURE AT D For Retrofitting of existing Siemens make 7SV512 LBB 11/Sep/2019 9:00 11/Sep/2019 18:00 Outage
ITARSI relay with Alstom make P442 relay.
350 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-BINA-MP-BINA-4 AND BINA - D For AMP Works 11/Sep/2019 9:15 11/Sep/2019 17:30 Outage Bay
400KV - BUS 1 at BINA - 400KV
351 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV RAIPUR-ICT-3 AND RAIPUR - D For bay AMP works at Raipur SS 11/Sep/2019 9:30 11/Sep/2019 17:30 Bay
400KV - BUS 1 at RAIPUR - 400KV
352 PLANNED OCC_522 APMuL 400KV MAIN BUS-1 ,3-I bus ,at Adani power Daily 400KV Bus -1 ,3-I , Annual Routine Bus Maintenance 11/Sep/2019 9:30 11/Sep/2019 18:30
Mundra,Phase-3 switchyard, work, Phase-3 switchyard,
353 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-AURANGABAD-PADGHE-PG-2 AND D For AMP works 11/Sep/2019 10:00 11/Sep/2019 17:00 Bay
FUTURE at PADGHE-PG - 765KV
354 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-RAJGARH-RAJGARH-MP-1 AND D For Circuit breaker Testing, line will be in service 11/Sep/2019 10:00 11/Sep/2019 17:00 Outage Bay
RAJGARH - 220KV - BUS 1 at RAJGARH - 220KV through TBC
355 PLANNED OCC_522 POWERGRID_WR2 400KV-VADODARA-PIRANA-2 D For AMP Works, A/R OFF of ckt-1 & dia to be kept open 11/Sep/2019 10:00 11/Sep/2019 18:00 Outage AC TRANSMISSION
at both ends. LINE CIRCUIT
356 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-SHUJALPUR-RAPP-1 AND D For AMP Works 11/Sep/2019 10:00 11/Sep/2019 18:00 Outage Bay
SHUJALPUR - 400KV B/R 2 at SHUJALPUR - 400KV
357 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-1 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 11/Sep/2019 14:00 11/Sep/2019 17:30 706 Bay
CHAMPA - 765KV - BUS 2 at CHAMPA - 765KV
358 PLANNED OCC_522 CSPTCL 315 MVA ICT -II at 400 KV S/s Khedamara. Daily Extension of 220 KV LA structure height. 11/Sep/2019 9:00 12/Sep/2019 17:00
359 PLANNED OCC_522 POWERGRID_WR2 400KV/32KV GWALIOR-STATCOM-ICT-1 D For fine tunning of CSD in coupling Transformer and 11/Sep/2019 9:00 13/Sep/2019 18:00 Outage TRANSFORMER
Point to point testing
360 PLANNED OCC_522 GETCO 400KV-APL-MUNDRA-VARSANA-1 Daily Replacement of Fix contact Rod & L clamp of 89A 12/Sep/2019 7:00 12/Sep/2019 14:00 Outage to be taken with Main Bus-1
Isolator at Varsana end.
361 PLANNED OCC_522 GETCO VARSANA - 400KV - BUS 1 Daily Replacement of Fix contact Rod & L clamp of 89A 12/Sep/2019 7:00 12/Sep/2019 19:00
Isolator at Varsana s/s.
362 PLANNED OCC_522 GETCO 400KV-APL-MUNDRA-VARSANA-2 Daily Replacement of Fix contact Rod & L clamp of 89A 12/Sep/2019 14:00 12/Sep/2019 19:00 Outage to be taken with Main Bus-1
Isolator at Varsana end.
363 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 12/Sep/2019 9:30 12/Sep/2019 17:30 Bay
AND RAIGARH-PS - 765KV - BUS 2 at RAIGARH-PS -
765KV
364 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-SATNA-BINA-1 AND 765KV-BINA- D For AMP Works 12/Sep/2019 9:15 12/Sep/2019 17:30 Outage Bay
INDORE-1 at BINA - 765KV
365 PLANNED OCC_522 MP_SLDC 400KV Bus Reactor II Bay with 400 kv Main Bus -I at C For Replacement of PG Isolator of Main Bus -I of 400 12/Sep/2019 9:00 14/Sep/2019 18:00 400 kv Bus Reactor II will be in service
400KV s/s satpura KV Bus Reactor -II Bay through Tie Breaker
366 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIPUR-PS (DURG)-CHAMPA-1 AND D FOR AMP WORKS. 12/Sep/2019 9:00 12/Sep/2019 18:00 Bay
RAIPUR-PS (DURG) - 765KV - BUS 1 at RAIPUR-PS
(DURG) - 765KV
367 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 400KV-SOLAPUR-M-Solapur-1 AND Solapur D Bay AMP works. 12/Sep/2019 9:00 12/Sep/2019 18:00 Bay
- 400KV - Bus 2 at Solapur - 400KV
368 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-1 AND D Tightening of nut & bolt of CGL make circuit breaker to 12/Sep/2019 10:00 12/Sep/2019 18:00 Outage Bay
FUTURE at JABALPUR - 765KV avoid water droplet in side Auxilairy box of CB

369 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV PIRANA-ICT-2 D For 33KV RTV coating work, dia to be kept open on 12/Sep/2019 10:00 12/Sep/2019 18:00 Outage TRANSFORMER
both sides.
370 PLANNED OCC_522 POWERGRID_WR2 NAVSARI - 400KV - BUS 2 D Low SF6 Busbar Trip Logic Implementation for Busbar 12/Sep/2019 9:00 13/Sep/2019 18:00 Outage BUS
1 at GIS Navsari
371 PLANNED OCC_522 GETCO 400KV-AMRELI-HADALA-1 Daily Feeder Bay Water Washing work 12/Sep/2019 8:00 12/Sep/2019 18:00
372 PLANNED OCC_522 MEGPTCL TIE BAY - 765KV-TIRODA-KORADI-III-2 AND TIRODA - Daily Testing & Maintenance of bay Equipments 12/Sep/2019 08:00 12/Sep/2019 18:00 Testing & Maintenance of bay Equipments
765KV B/R 1 at TIRODA - 765KV
373 PLANNED OCC_522 PGCIL ODISHA 400KV Sundergarh-Raigarh Ckt #2 TL Maintenance works 12/Sep/2019 8:00 12/Sep/2019 18:00
374 PLANNED OCC_522 Odhisha Proj 400KV-RAIGARH-JHARSUGUDA-3 D TL Maintenance works by Odhisha Proj 12/Sep/2019 8:00 12/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
375 PLANNED OCC_522 NTPC 400KV-KORBA-NTPC-BHILAI-1 D For Bay PM, opportunity work permit to be issued to 12/Sep/2019 8:00 12/Sep/2019 18:30 Working code may please be provided to AC TRANSMISSION consented.Working code may
POWERGRID. POWERGRID and AR in non Auto mode LINE CIRCUIT please be provided to
required for Ckt-II. POWERGRID and AR in non
Auto mode required for Ckt-
II.

376 PLANNED OCC_522 CGPL MAIN BAY - 400KV-CGPL-BACHAU-1 AND CGPL - D Breaker PM and testing 12/Sep/2019 8:00 12/Sep/2019 20:00 Voltage
400KV - BUS 2 Regulation
377 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-CHAMPA-2 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 12/Sep/2019 9:00 12/Sep/2019 13:00 707 Bay
CHAMPA - 765KV - BUS 1 at CHAMPA - 765KV
378 PLANNED OCC_522 POWERGRID_WR2 400KV-TARAPUR 3&4-BOISAR-2 D Main-I relay replacement & For tripping and A/R Trials 12/Sep/2019 9:00 12/Sep/2019 14:00 Outage AC TRANSMISSION
of Main-I relay (Line will be out of service). A/R OFF of LINE CIRCUIT
ckt-1 and dia to be kept open at both ends.

379 PLANNED OCC_522 RRWTL Bay-704 Main bay of Warora Line-2 Daily Annual maintenance of bay equipments 12/Sep/2019 9:00 12/Sep/2019 18:00
380 PLANNED OCC_522 GETCO 400kV Veloda-Zerda Line Daily Bay maintenance work at Veluda end 12/Sep/2019 9:00 12/Sep/2019 18:00
381 PLANNED OCC_522 MSETCL CHANDRAPUR SWITCHING STATION - 400KV - BUS 2 Daily for Diagnostic testing & allied bay maintenance work 12/Sep/2019 09:00 12/Sep/2019 18:00 for Diagnostic testing & allied bay
maintenance work
382 PLANNED OCC_522 MSETCL 220KV-WARDHA-PUSAD-1 Daily For Routine Maintainance Work 12/Sep/2019 09:00 12/Sep/2019 18:00 nil
383 PLANNED OCC_522 POWERGRID_WR1 400KV AC - 465 BAY - POLE 2 - CONVERTER DIA MAIN D FOR AMP WORKS. 12/Sep/2019 9:00 12/Sep/2019 18:00 Missed in 400KV AC BAY
BAY - I data base
384 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-PARLI-PUNE-PG-2 AND 400KV- D For bay AMP works 12/Sep/2019 9:00 12/Sep/2019 18:00 Bay
WARORA-PG-PARLI-2 at PARLI - 400KV
385 PLANNED OCC_522 POWERGRID_WR1 765KV-BILASPUR-RAJNANDGAON-RRWTL-2 L/R@ D For Implementation of Spare selection scheme for 713 12/Sep/2019 9:00 12/Sep/2019 18:00 713_LR LINE REACTOR
BILASPUR - 765KV LR
386 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV SEONI-ICT-1 D For AMP Works 12/Sep/2019 9:00 12/Sep/2019 18:00 TRANSFORMER
387 PLANNED OCC_522 POWERGRID_WR1 400KV-WARDHA-MOUDA-2 D Shutdown Rectification Work and 400KV Wardha- 12/Sep/2019 9:00 12/Sep/2019 18:00 Wardha-Mauda-1 to be kept in Non-Auto AC TRANSMISSION
Mauda-1 in Non-Auto Mode. Mode. LINE CIRCUIT
388 PLANNED OCC_522 POWERGRID_WR1 765KV-WARDHA-AURANGABAD-1 D For LA Stool Replacement work and 12/Sep/2019 9:00 12/Sep/2019 18:00 Dia to be kept open and AR in non Auto AC TRANSMISSION
Commissioning/Interfacing of DTPC with Relays and mode for Ckt2 LINE CIRCUIT
NGR Replacement
389 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - SATNA - 400KV B/R 1 AND SATNA - 400KV D For installation of additional compressor 12/Sep/2019 9:00 12/Sep/2019 18:00 Outage Bay
- BUS 1 at SATNA - 400KV
390 PLANNED OCC_522 POWERGRID_WR2 INDORE - 765KV B/R 2 D AMP WORKS AND FOR TAKING OUT Y-PHASE 12/Sep/2019 9:00 12/Sep/2019 18:00 Outage BUS REACTOR
REACTOR OUT OF SERVICE FOR MOG REPLACEMENT
WORKS, dia to b be kept open
391 PLANNED OCC_522 POWERGRID_WR2 220KV-BINA-SHIVPURI-1 D For AMP &Tighting of terminal equipment , Line outage 12/Sep/2019 9:15 12/Sep/2019 17:30 Outage AC TRANSMISSION
is required LINE CIRCUIT
392 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-MP-ASOJ-2 D For taking line Reactor out of service for Dry out of 12/Sep/2019 10:00 12/Sep/2019 12:00 Outage AC TRANSMISSION
Reactor at Asoj, dia to be kept open at both ends. LINE CIRCUIT
393 PLANNED OCC_522 MSETCL 400KV-KORADI-II-KORADI-III-1 Daily Testing of High teed relay 12/Sep/2019 10:00 12/Sep/2019 17:00 400KV Koradi-II - Koradi-III Ckt. 2 will
remain in service as alternate source

394 PLANNED OCC_522 POWERGRID_WR2 BUS COUPLER BAY - RAJGARH - 220KV - BUS 1 AND D For Circuit breaker and CT Testing 12/Sep/2019 10:00 12/Sep/2019 17:00 Outage Bay
RAJGARH - 220KV - BUS 2 at RAJGARH - 220KV

395 PLANNED OCC_522 POWERGRID_WR1 400KV-KOLHAPUR-MS-KOLHAPUR GIS-2 D FOR AMP WORKS. 12/Sep/2019 10:00 12/Sep/2019 18:00 A/R to be kept in non Auto mode for ckt-I AC TRANSMISSION
, dia to be kept open for relay testing LINE CIRCUIT
works
396 PLANNED OCC_522 GETCO 400KV/220KV AMRELI-ICT-4 Contin Bay Maintenance and Condition monitoring 12/Sep/2019 8:00 13/Sep/2019 18:00
uous
397 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-MP-ASOJ-2 L/R@ ASOJ - 400KV D For Drying Out of Reactor 12/Sep/2019 10:00 19/Sep/2019 12:00 Outage LINE REACTOR
398 ERPC 400KV Sundergarh-Raigarh Ckt #2 ODB TL Maintenance works 12/Sep/2019 8:00 12/Sep/2019 18:00
399 ERPC RANCHI-SIPAT-D/C ODB FOR RECTIFICATION OF SAG BETWEEN LOC NO 5/0 12/Sep/2019 9:00 12/Sep/2019 17:00
AND 6/0 OF 400KV NEW RANCHI-PATRATU-D/C

400 PLANNED OCC_522 POWERGRID_WR2 VADODARA - 400KV - BUS 1 D For Busbar SF6 Gas Zone testing & AMP 13/Sep/2019 10:00 13/Sep/2019 18:00 Outage BUS
401 PLANNED OCC_522 GETCO 400KV-APL-MUNDRA-VARSANA-1 Daily Replacement of Fix contact Rod & L clamp of 89B 13/Sep/2019 7:00 13/Sep/2019 14:00 Outage to be taken with Main Bus-2
Isolator at Varsana end.
402 PLANNED OCC_522 GETCO VARSANA - 400KV - BUS 2 Daily Replacement of Fix contact Rod & L clamp of 89B 13/Sep/2019 7:00 13/Sep/2019 19:00
Isolator at Varsana end.
403 PLANNED OCC_522 GETCO 400KV-APL-MUNDRA-VARSANA-2 Daily Replacement of Fix contact Rod & L clamp of 89B 13/Sep/2019 14:00 13/Sep/2019 19:00 Outage to be taken with Main Bus-2
Isolator at Varsana end.
404 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-BINA-INDORE-1 AND BINA - 765KV D For AMP Works 13/Sep/2019 9:15 14/Sep/2019 17:30 Outage Bay
- BUS 2 at BINA - 765KV
405 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-CHAMPA-1 AND D FOR AMP WORKS. 13/Sep/2019 9:30 13/Sep/2019 17:30 Bay
RAIGARH-PS - 765KV - BUS 1 at RAIGARH-PS - 765KV

406 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARDHA-AKOLA-1 AND AKOLA - C For Breaker Replacement Work at Akola 13/Sep/2019 9:00 22/Sep/2019 18:00 Bay at Akola ? Or at Wardha?
400KV - BUS 2 at AKOLA - 400KV
407 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV - BUS 1 D Extension bay construction work 13/Sep/2019 9:00 13/Sep/2019 16:00 Outage BUS
408 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-2 D For AMP Works 13/Sep/2019 9:00 13/Sep/2019 17:30 Outage
AND VINDHYACHAL(PS) - 765KV - BUS 1
409 PLANNED OCC_522 POWERGRID_WR1 400KV-KORBA-NTPC-BHILAI-2 C Auto reclosure relay retrofitting work at Bhilai SS 13/Sep/2019 9:30 14/Sep/2019 17:30 AR in non Auto mode required for Ckt-I. AC TRANSMISSION
LINE CIRCUIT
410 PLANNED OCC_522 GETCO KANSARI - 400KV - BUS 1 Daily Bus & Bay Maint. 13/Sep/2019 8:00 13/Sep/2019 18:00
411 PLANNED OCC_522 Odhisha Proj 400KV-RAIGARH-JHARSUGUDA-4 D TL Maintenance works by Odhisha Proj 13/Sep/2019 8:00 13/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
412 PLANNED OCC_522 POWERGRID_WR2 BUS COUPLER BAY - BACHAU - 220KV - BUS 1 AND D For AMP Works 13/Sep/2019 8:00 13/Sep/2019 18:00 Outage
BACHAU - 220KV - BUS 2
413 PLANNED OCC_522 CGPL MAIN BAY - 400KV-CGPL-BACHAU-2 AND CGPL - D Breaker PM and testing 13/Sep/2019 8:00 13/Sep/2019 20:00 Voltage
400KV - BUS 2 Regulation
414 PLANNED OCC_522 MP_SLDC 220KV Sabalgarh-Adani D For line maintenance work 13/Sep/2019 9:00 13/Sep/2019 17:00
415 PLANNED OCC_522 RRWTL Bay-705 Tie bay of Warora Line-2 & Raipur Line-1 Daily Annual maintenance of bay equipments 13/Sep/2019 9:00 13/Sep/2019 18:00
416 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-CHAMPA-DHARAMJAYGARH-1 AND D FOR AMP WORKS. 13/Sep/2019 9:00 13/Sep/2019 18:00 Bay
765KV/400KV DHARAMJAYGARH-ICT-1 at
DHARAMJAYGARH - 765KV
417 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV RAIPUR-PS (DURG)-ICT-2 D FOR AMP WORKS. 13/Sep/2019 9:00 13/Sep/2019 18:00 TRANSFORMER
418 PLANNED OCC_522 POWERGRID_WR1 400KV-WARDHA-MOUDA-2 D Shutdown Rectification Work and 400KV Wardha- 13/Sep/2019 9:00 13/Sep/2019 18:00 Wardha-Mauda-1 to be kept in Non-Auto AC TRANSMISSION
Mauda-1 in Non-Auto Mode. Mode. LINE CIRCUIT
419 PLANNED OCC_522 POWERGRID_WR1 765KV-WARDHA-AURANGABAD-2 D Commissioning/Interfacing of DTPC with Relays and 13/Sep/2019 9:00 13/Sep/2019 18:00 Dia to be kept open at Aurangabad end, AC TRANSMISSION
NGR Replacement. and AR in non Auto mode for Ckt1 LINE CIRCUIT

420 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV SEONI-PG-ICT-2 AND D For AMP Works 13/Sep/2019 9:00 13/Sep/2019 18:00 Bay
SEONI-PG - 400KV - BUS 2 at SEONI-PG - 400KV
421 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - SATNA - 400KV B/R 1 AND 400KV/220KV D For installation of additional compressor 13/Sep/2019 9:00 13/Sep/2019 18:00 Outage Bay
SATNA-ICT-1 at SATNA - 400KV
422 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - ITARSI - 400KV B/R 2 AND ITARSI - 400KV D For Retrofitting of existing Siemens make 7SV512 LBB 13/Sep/2019 9:00 13/Sep/2019 18:00 Outage
- BUS 1 relay with Alstom make P442 relay.
423 PLANNED OCC_522 MSETCL 400KV-KORADI-II-KORADI-III-2 Daily Testing of Distance Protection Scheme 13/Sep/2019 10:00 13/Sep/2019 17:00 400KV Koradi-II - Koradi-III Ckt. 1 will
remain in service as alternate source

424 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-RAJGARH-RAJGARH-MP-2 AND D For Circuit breaker Testing, line will be in service 13/Sep/2019 10:00 13/Sep/2019 17:00 Outage Bay
RAJGARH - 220KV - BUS 1 at RAJGARH - 220KV through TBC
425 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-PIRANA-T-PIRANA-2 AND FUTURE at D Dew point measurement of CT by TPGL 13/Sep/2019 10:00 13/Sep/2019 18:00 Outage Bay
PIRANA - 400KV
426 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-NAGDA-SHUJALPUR-2 AND D For AMP Works 13/Sep/2019 10:00 13/Sep/2019 18:00 Outage Bay
SHUJALPUR - 400KV B/R 1 at SHUJALPUR - 400KV
427 PLANNED OCC_522 KWPCL 400KV-KWPCL-RAIGARH-PS-1 Daily Bay : 403 Relay & PLCC Testing & BCU commissioning 13/Sep/2019 8:00 14/Sep/2019 18:00
work and Line Maintenance work
428 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 765KV B/R 1 D CSD Commissionng at (with tie & main bays) (Bay 13/Sep/2019 9:00 14/Sep/2019 18:00 Outage BUS REACTOR
No.714 & 715), Dia to be kept open.
429 PLANNED OCC_522 MSETCL 400KV-CHANDRAPUR-BHADRAWATI-1 Contin For replacement of old S & S power make 400KV R, Y & 13/Sep/2019 09:00 15/Sep/2019 18:00 During this outage period, the 400KV Consented. Working code
uous B-ph PG-1 Isolator (400KV Main Bus-1 Isolator) during CHD-PGCIL Bhadrawati Ckt. No.- II, III may please be provided on
bus outage. and IV bays/lines will be in service. line to PGCIL and AR in non
auto mode for circuit-II.
Outage of POWERGRID
Elements may please be
routed through concern site.

430 PLANNED OCC_522 MSETCL 400KV/11.5KV CHANDRAPUR-GCR-ST-5 Contin Permission for shifting of 400KV STN T/F No.- V bay on 13/Sep/2019 09:00 15/Sep/2019 18:00 During, this outage 400KV HVDC Ckt.
uous TBC-II bay. No.- 1 will be in service. The 400KV STN
T/F No.-V bay will be shift on TBC-2 bay
required as the work of replacement of
bus conductor of Main Bus-1 is to be
carried out in STN-5 bay.

431 PLANNED OCC_522 MSETCL 400KV-CHANDRAPUR-GCR-CHANDRAPUR HVDC-2 Contin 1) For replacement of old damaged quadraple bus 13/Sep/2019 09:00 15/Sep/2019 18:00 During, this outage 400KV HVDC Ckt.
uous conductor of Main Bus-I in HVDC- II and 400KV STN No.- 1 will be in service. The outage on
T/F No.- 5 bay section span. 2) Tightening of nut bolts 400KV HVDC Ckt. No.-2 bay is required
& hardware of Main Bus-I. as the work of replacement of bus
conductor of Main Bus-1 is to be carried
out in HVDC Ckt. N.-2 bay.

432 PLANNED OCC_522 MSETCL CHANDRAPUR - 400KV - BUS 1 Contin 1) For replacement of old damaged quadraple bus 13/Sep/2019 09:00 15/Sep/2019 18:00 During outage, all connected
uous conductor of Main Bus-I in HVDC- II and 400KV STN bays/feeders of Main Bus-I will be shifted
T/F No.- 5 bay section span. 2) Tightening of nut bolts to Main Bus-II by using the TBC-I & TBC-
& hardware of Main Bus-I. II bay. After shifting of all bays/feeders
connected to Main Bus-I on 400KV Main
Bus-II, then after the 400KV Bus Coupler
bay will be kept off.

433 PLANNED OCC_522 POWERGRID_WR2 400KV-VADINAR-BACHAU-1 D For fixing Bird diverter, A/R OFF of ckt-2, dia to be kept 13/Sep/2019 8:00 21/Sep/2019 18:00 Outage
open.
434 NRPC NTPC RIHAND 400KV BUS - 5 CONTI Rihand 400 KV Bus-5: for annual maintenance of bay 13/Sep/2019 08:30 13/Sep/2019 18:30
NUOU equipment's
S
435 ERPC 400KV Sundergarh-Raigarh Ckt # 4 ODB TL Maintenance works 13/Sep/2019 8:00 13/Sep/2019 18:00
436 PLANNED OCC_522 GETCO 400KV-HADALA-VARSANA-1 Daily Replacement of Fix contact Rod & L clamp of 89A 14/Sep/2019 7:00 14/Sep/2019 17:00 Outage to be taken with Main Bus-1
Isolator at Varsana end.
437 PLANNED OCC_522 GETCO VARSANA - 400KV - BUS 1 Daily Replacement of Fix contact Rod & L clamp of 89A 14/Sep/2019 7:00 14/Sep/2019 17:00
Isolator .
438 PLANNED OCC_522 POWERGRID_WR2 VADODARA - 400KV - BUS 2 D For Busbar SF6 Gas Zone testing & AMP 14/Sep/2019 10:00 14/Sep/2019 18:00 Outage BUS
439 PLANNED OCC_522 GETCO 400KV-HADALA-CHORANIA-1 Daily Feeder Bay Water Washing work 14/Sep/2019 8:00 14/Sep/2019 18:00
440 PLANNED OCC_522 GETCO 400kV Veloda-Vadavi Line Daily Bay maintenance work at Veluda end 14/Sep/2019 9:00 14/Sep/2019 18:00
441 PLANNED OCC_522 POWERGRID_WR2 BOISAR - 400KV - BUS 2 D For AMP Works 14/Sep/2019 9:00 14/Sep/2019 18:00 Outage BUS
442 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-NAVSARI-1 C For NHSRCL (Bullet Train) Diversion work 14/Sep/2019 8:00 19/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
443 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-NAVSARI-2 C For NHSRCL (Bullet Train) Diversion work 14/Sep/2019 8:00 19/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
444 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-CHAMPA-1 AND D FOR AMP WORKS. 14/Sep/2019 9:30 14/Sep/2019 17:30 Bay
RAIGARH-PS - 765KV - BUS 1 at RAIGARH-PS - 765KV

445 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-2 D Tightening of nut & bolt of CGL make circuit breaker to 14/Sep/2019 10:00 14/Sep/2019 18:00 Outage Bay
AND JABALPUR - 765KV - BUS 1 at JABALPUR - 765KV avoid water droplet in side Auxilairy box of CB

446 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV - BUS 2 D Extension bay construction work 14/Sep/2019 9:00 14/Sep/2019 16:00 Outage BUS
447 PLANNED OCC_522 STL 765KV-BILASPUR-RAJNANDGAON-RRWTL-2 Daily SCADA point to point testing with interlock at Bilaspur 14/Sep/2019 9:00 14/Sep/2019 18:00
end
448 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV/400KV VADODARA-ICT-3 AND D For AMP Works 14/Sep/2019 10:00 14/Sep/2019 18:00 Outage Bay
VADODARA - 765KV - BUS 2 at VADODARA - 765KV
449 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-CHAMPA-DHARAMJAYGARH-2 AND D FOR AMP WORKS. 14/Sep/2019 9:00 15/Sep/2019 17:30 721 Bay
CHAMPA - 765KV - BUS 3 at CHAMPA - 765KV
450 PLANNED OCC_522 MSETCL BUS COUPLER BAY - BHUSAWAL - 400KV - BUS 1 AND Daily CT tan-Delta and routine bay maintenance. 14/Sep/2019 06:00 14/Sep/2019 18:00 nil
BHUSAWAL - 400KV - BUS 2 at BHUSAWAL - 400KV

451 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV BACHAU-ICT-1 AND D For AMP Works, ICT-1 will be in service through TBC 14/Sep/2019 8:00 14/Sep/2019 18:00 Outage
BACHAU - 220KV - BUS 1
452 PLANNED OCC_522 CGPL MAIN BAY - 400KV-CGPL-BACHAU-3 AND CGPL - D Breaker PM and testing 14/Sep/2019 8:00 14/Sep/2019 20:00 Voltage
400KV - BUS 2 Regulation
453 PLANNED OCC_522 MSETCL 220KV-BOISAR-BOISAR-M-1 Daily REPLACEMENT OF MISSING EARTH-WIRE 14/Sep/2019 09:00 14/Sep/2019 17:00 -
454 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-AURANGABAD-BOISAR-1 AND D For AMP works. 14/Sep/2019 9:00 14/Sep/2019 18:00 Bay
765KV/400KV AURANGABAD-ICT-1 at AURANGABAD -
400KV
455 PLANNED OCC_522 POWERGRID_WR1 765KV-WARDHA-AURANGABAD-3 L/R@ WARDHA - D NGR Replacement, and AMP works 14/Sep/2019 9:00 14/Sep/2019 18:00 Dia to be kept open and AR in non Auto LINE REACTOR
765KV mode for Ckt4
456 PLANNED OCC_522 Odhisha Proj 765KV-RAIPUR-PS (DURG)-JHARSUGUDA-1 D BPI erection works at T-point by Odhisha Proj 14/Sep/2019 9:00 14/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
457 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV SATNA-ICT-1 AND SATNA - D For installation of additional compressor 14/Sep/2019 9:00 14/Sep/2019 18:00 Outage Bay
400KV - BUS 2 at SATNA - 400KV
458 PLANNED OCC_522 POWERGRID_WR2 765KV-GWALIOR-JAIPUR-2 L/R@ GWALIOR - 765KV D For Bay AMP Works 14/Sep/2019 9:00 14/Sep/2019 18:00 Outage LINE REACTOR
459 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-JABALPUR-ITARSI-4 AND FUTURE AT D For Retrofitting of existing Siemens make 7SV512 LBB 14/Sep/2019 9:00 14/Sep/2019 18:00 Outage
ITARSI relay with Alstom make P442 relay. AT ITARSI

460 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-SATNA-BINA-2 AND 765KV/400KV D For AMP Works 14/Sep/2019 9:15 14/Sep/2019 17:30 Outage Bay
BINA-ICT-2 at BINA - 765KV
461 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-PIRANA-T-PIRANA-2 AND PIRANA - D Dew point measurement of CT by TPGL 14/Sep/2019 10:00 14/Sep/2019 18:00 Outage Bay
400KV - BUS 2 at PIRANA - 400KV
462 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-KALWA-PUNE-PG-1 AND D For AMP Works 14/Sep/2019 9:00 14/Sep/2019 18:00 Bay
400KV/220KV PUNE-PG-ICT-3 at PUNE-PG - 400KV
463 ERPC 765kV Raipur-I at Sundargarh ODB BPI erection works at T-point 14/Sep/2019 9:00 14/Sep/2019 18:00
464 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-RANCHODPURA-1 D For fixing of Bird Diverter in the line. A/R OFF of circuit- 15/Sep/2019 8:00 17/Sep/2019 18:00 Outage
2 and dia to be kept open at both ends.
465 PLANNED OCC_522 POWERGRID_WR2 220KV-BOISAR-NALASOPARA-1 D For AMP & 220kv Bus-II CVT replacement and also 15/Sep/2019 9:00 15/Sep/2019 18:00 Outage BUS Please reschedule outage on
Outage With 220kv Boisar-Nalasopara Line & 220kv 15.09.2019
Boisar-Boisar-1 Line
466 PLANNED OCC_522 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-1 D For AMP & 220kv Bus-II CVT replacement and also 15/Sep/2019 9:00 15/Sep/2019 18:00 Outage BUS Please reschedule outage on
Outage With 220kv Boisar-Nalasopara Line & 220kv 15.09.2019
Boisar-Boisar-1 Line
467 PLANNED OCC_522 POWERGRID_WR2 BOISAR - 220KV - BUS 2 D For AMP & 220kv Bus-II CVT replacement and also 15/Sep/2019 9:00 15/Sep/2019 18:00 Outage BUS Please reschedule outage on
Outage With 220kv Boisar-Nalasopara Line & 220kv 15.09.2019
Boisar-Boisar-1 Line
468 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-BACHAU-RANCHODPURA-1 AND D DFT measurement for RTV Coating on CB Interrupter. 15/Sep/2019 8:00 15/Sep/2019 10:00 Outage
400KV/220KV BACHAU-ICT-1
469 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV BHUJ-ICT-2 D CSD Commissionng at 708 & 709. Dia to be kept open. 15/Sep/2019 9:00 16/Sep/2019 18:00 Outage TRANSFORMER

470 PLANNED OCC_522 GETCO 400KV-ASOJ-WANAKBORI-1 Daily 400 kV Bus1 Pantograph Isolator replacement work 15/Sep/2019 7:00 15/Sep/2019 18:00

471 PLANNED OCC_522 GETCO ASOJ - 400KV - BUS 1 Daily 400 kV Bus1 Pantograph Isolator replacement work of 15/Sep/2019 7:00 15/Sep/2019 18:00
400 kV Asoj - Wanakbori Line
472 PLANNED OCC_522 MP_SLDC 400KV Bus Reactor II Bay with 400 kv Main Bus -II at C For Replacement of PG Isolator of Main Bus -II of400 15/Sep/2019 9:00 17/Sep/2019 18:00 400 kv Bus Reactor II will be in service
400kv S/S Satpura KV Bus Reactor -II Bay through Tie Breaker
473 PLANNED OCC_522 POWERGRID_WR2 400KV-BINA-SHUJALPUR-2 D For AMP Works by Bina, dia to be kept open at both 15/Sep/2019 9:00 15/Sep/2019 18:00 Outage AC TRANSMISSION
ends and ckt-1 AR off LINE CIRCUIT
474 PLANNED OCC_522 POWERGRID_WR2 400KV-BINA-SHUJALPUR-2 L/R@ BINA - 400KV D For AMP of Line reactor & Line Reactor will be out of 15/Sep/2019 9:00 15/Sep/2019 18:00 Outage LINE REACTOR
service along with line.
475 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV RAIGARH-PS-ICT-2 D FOR AMP WORKS. 15/Sep/2019 9:30 15/Sep/2019 17:30 TRANSFORMER
476 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-2 AND D Tightening of nut & bolt of CGL make circuit breaker to 15/Sep/2019 10:00 15/Sep/2019 18:00 Outage Bay
FUTURE at JABALPUR - 765KV avoid water droplet in side Auxilairy box of CB

477 PLANNED OCC_522 POWERGRID_WR2 400KV-PADGHE-BOISAR-1 D Main-I relay replacement & For tripping and A/R Trials 15/Sep/2019 9:00 15/Sep/2019 14:00 Outage AC TRANSMISSION
of Main-I relay (Line will be out of service), dia to be LINE CIRCUIT
kept open at both ends.
478 PLANNED OCC_522 POWERGRID_WR2 400KV-BANASKANTHA-VELODA-1 D For CT Oil Sampling and AMP Works, A/R OFF of ckt-2 15/Sep/2019 9:00 15/Sep/2019 16:00 Outage AC TRANSMISSION
and dia to be kept open at both ends LINE CIRCUIT
479 PLANNED OCC_522 Odhisha Proj 765KV-RAIPUR-PS (DURG)-JHARSUGUDA-2 D BPI erection works at T-point by Odhisha Proj 15/Sep/2019 9:00 15/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
480 PLANNED OCC_522 POWERGRID_WR2 765KV-SATNA-GWALIOR-2 D For alignment of isolator and rectification of interlock 15/Sep/2019 9:00 15/Sep/2019 18:00 Outage AC TRANSMISSION
problem in isolator, dia to be kept open at both ends. LINE CIRCUIT

481 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-BINA-JABALPUR-3 AND BINA - D For AMP Works 15/Sep/2019 9:15 15/Sep/2019 17:30 Outage Bay
765KV - BUS 2 at BINA - 765KV
482 PLANNED OCC_522 POWERGRID_WR1 400KV-KORBA-NTPC-BHILAI-1 C Diversion work of line due to ash dyke of Maruti Clean 15/Sep/2019 8:00 22/Sep/2019 18:00 Working code may please be provided to AC TRANSMISSION Consented. Working code
Project Power Limited (MCCPL).Erection work of two POWERGRID and AR in non Auto mode LINE CIRCUIT may please be provided to
nos.new towers,dismantling work of 02 nos. old required for Ckt-II. POWERGRID and AR in non
towers,de-stringing & stringing works Auto mode required for Ckt-
II.

483 PLANNED OCC_522 ATIL Mundra - Sami line -1 Daily Auto recloser off consition for PID of SRI insulator at 15/Sep/2019 8:00 30/Sep/2019 19:00 Whether line shall remain in
Kutch area service or Not?
484 PLANNED OCC_522 ATIL Mundra - Sami line -2 Daily Auto recloser off consition for PID of SRI insulator at 15/Sep/2019 8:00 30/Sep/2019 19:00 Whether line shall remain in
Kutch area service or Not?
485 ERPC 765kV Raipur-II at Sundargarh ODB BPI erection works at T-point 15/Sep/2019 9:00 15/Sep/2019 18:00
486 PLANNED OCC_522 POWERGRID_WR2 765KV-INDORE-VADODARA-1 D For AMP Works, dia to be kept open at both ends. 16/Sep/2019 9:00 16/Sep/2019 18:00 Outage
487 PLANNED OCC_522 POWERGRID_WR2 765KV-INDORE-VADODARA-1 L/R@ INDORE - 765KV D FOR REPLACEMENT OF LA BASE STOOL 16/Sep/2019 9:00 16/Sep/2019 18:00 Outage LINE REACTOR

488 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV CHAMPA-ICT-2 AND 765KV- D FOR RTAMC/ NTAMC SIGNAL VALIDATION 16/Sep/2019 14:00 16/Sep/2019 17:30 708 Bay
RAIGARH-PS-CHAMPA-2 at CHAMPA - 765KV

489 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-2 AND D For AMP Works, at Vindhyachal (P) 16/Sep/2019 9:00 16/Sep/2019 17:30 Outage
FUTURE AT VINDHYACHAL-PS
490 PLANNED OCC_522 MSETCL 400KV-BABLESHWAR-PADGHE-PG-1 Daily Quarterly Maintenance work & Relay Testing and for 16/Sep/2019 09:00 17/Sep/2019 17:00 -
string replacement
491 PLANNED OCC_522 EPTCL 400KV-GANDHAR-HAZIRA-2 C Bellow replacement in R Ph 400 kV AIS CT. 16/Sep/2019 8:00 16/Sep/2019 18:00 Bellow replacement in R Ph 400 kV AIS
CT.
492 PLANNED OCC_522 GETCO 400 kV VADAVI-KANSARI Daily Bay Maintenance 16/Sep/2019 8:00 16/Sep/2019 18:00
493 PLANNED OCC_522 GETCO 400KV-MANSAR-CHORANIA Daily 89-B & 89-L Line isolator Isolator mechanical & 16/Sep/2019 8:00 16/Sep/2019 18:00 Maint work
electrical setting work & Bay Maintenance work
494 PLANNED OCC_522 GETCO MANSAR - 400KV - BUS 2 Daily 89-B & 89-L Line isolator Isolator mechanical & 16/Sep/2019 8:00 16/Sep/2019 18:00
electrical setting work & Bay Maintenance work of
Chornia bay
495 PLANNED OCC_522 GETCO MANSAR - 400KV - TRANSFER BUS Daily 89-B & 89-L Line isolator Isolator mechanical & 16/Sep/2019 8:00 16/Sep/2019 18:00
electrical setting work & Bay Maintenance work of
Chornia bay
496 PLANNED OCC_522 CGPL 400KV-CGPL-BACHAU-3 L/R@ CGPL - 400KV D Breaker PM and testing 16/Sep/2019 8:00 16/Sep/2019 20:00 Voltage
Regulation
497 PLANNED OCC_522 POWERGRID_WR2 400KV-BANASKANTHA-VELODA-2 D For CT Oil Sampling and AMP Works, A/R OFF of ckt-1 16/Sep/2019 9:00 16/Sep/2019 16:00 Outage AC TRANSMISSION
and dia to be kept open at both ends LINE CIRCUIT
498 PLANNED OCC_522 MSETCL 400KV-WARORA-CHANDRAPU-II-2 Daily Attending the issues of 400 KV releted to SCADA and 16/Sep/2019 09:00 16/Sep/2019 17:00 Load will be managed on 400KV
Protection in co-ordination with M/s Sifang and Chandrapur Ckt-1
testing work
499 PLANNED OCC_522 MSETCL 220KV-WARDHA-BADNERA-1 Daily For measurement of C& Tan delta of R, Y & B phase CT 16/Sep/2019 09:00 16/Sep/2019 17:00 nil
and Circuit Breaker CRM
500 PLANNED OCC_522 MP_SLDC 220KV Malanpur-Auraiya D For line maintenance work 16/Sep/2019 9:00 16/Sep/2019 17:00
501 PLANNED OCC_522 RRWTL Bay-706 Main Bay of Raipur Line-1 Daily Annual maintenance of bay equipments 16/Sep/2019 9:00 16/Sep/2019 18:00
502 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV BILASPUR-ICT-2 AND D For AMP works. 16/Sep/2019 9:00 16/Sep/2019 18:00 404_Bay Bay
BILASPUR - 400KV - BUS 1 at BILASPUR - 400KV
503 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-WARDHA-RAIPUR-PS (DURG)-4 D FOR AMP WORKS. 16/Sep/2019 9:00 16/Sep/2019 18:00 Bay
AND RAIPUR-PS (DURG) - 765KV - BUS 2 at RAIPUR-PS
(DURG) - 765KV
504 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-DHARAMJAYGARH-JHARSUGUDA- D FOR AMP WORKS. 16/Sep/2019 9:00 16/Sep/2019 18:00 Bay
4 AND DHARAMJAYGARH - 765KV - BUS 2 at
DHARAMJAYGARH - 765KV
505 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-SEONI-BINA-1 AND FUTURE at SEONI D For AMP Works 16/Sep/2019 9:00 16/Sep/2019 18:00 Bay
- 765KV
506 PLANNED OCC_522 POWERGRID_WR1 Tie Bay - 765KV-Solapur-PARLI NEW-1 AND D Bay AMP works & To change Imax make Auxiliary and 16/Sep/2019 9:00 16/Sep/2019 18:00 Bay
765KV/400KV Solapur-ICT-2 at Solapur - 765KV Limit switches in SIEMENS make CB.

507 PLANNED OCC_522 POWERGRID_WR1 400KV-AURANGABAD-BOISAR-2 L/R@ AURANGABAD - D For AMP works. 16/Sep/2019 9:00 16/Sep/2019 18:00 Line remain in service LINE REACTOR
400KV
508 PLANNED OCC_522 POWERGRID_WR1 400KV-PARLI-M-PARLI-1 D For protection testing and Line terminal AMP works & 16/Sep/2019 9:00 16/Sep/2019 18:00 Ckt-2 AR to be keep in non auto mode AC TRANSMISSION
Ckt-2 AR to be keep in non auto mode during outage during outage period.Dia to be kept open LINE CIRCUIT
period. for relay testing works
509 PLANNED OCC_522 POWERGRID_WR1 765KV-WARDHA-AURANGABAD-4 L/R@ WARDHA - D NGR Replacement, and AMP works 16/Sep/2019 9:00 16/Sep/2019 18:00 Dia to be kept open and AR in non Auto LINE REACTOR
765KV mode for Ckt3
510 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV DEHGAM-ICT-2 AND D Replacement of Isolator Gear Box. 16/Sep/2019 9:00 16/Sep/2019 18:00 Outage Bay
DEHGAM - 400KV - BUS 2 at DEHGAM - 400KV
511 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-SATNA-BINA-2 AND SATNA - 400KV D For installation of additional compressor 16/Sep/2019 9:00 16/Sep/2019 18:00 Outage Bay
- BUS 1 at SATNA - 400KV
512 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-KHANDWA-1 L/R@ INDORE - 400KV D For AMP Works 16/Sep/2019 9:00 16/Sep/2019 18:00 Outage LINE REACTOR

513 PLANNED OCC_522 POWERGRID_WR2 765KV-BINA-GWALIOR-1 L/R@ GWALIOR - 765KV D For Bay AMP Works 16/Sep/2019 9:00 16/Sep/2019 18:00 Outage LINE REACTOR
514 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV/400KV BINA-ICT-2 AND BINA - D For AMP Works 16/Sep/2019 9:15 16/Sep/2019 17:30 Outage Bay
765KV - BUS 2 at BINA - 765KV
515 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-RAIPUR-RAIPUR-PS (DURG)-2 AND D For bay AMP works at Raipur SS 16/Sep/2019 9:30 16/Sep/2019 17:30 Bay
FUTURE at RAIPUR - 400KV
516 PLANNED OCC_522 POWERGRID_WR1 765KV/400KV RAIGARH-PS-ICT-1 D FOR AMP WORKS. 16/Sep/2019 9:30 16/Sep/2019 17:30 TRANSFORMER
517 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-DAMOH-BIRSINGPUR-2 AND D For AMP Works 16/Sep/2019 9:30 16/Sep/2019 18:00 Outage
DAMOH - 400KV - BUS 1
518 PLANNED OCC_522 POWERGRID_WR2 BUS COUPLER BAY - VADODARA - 220KV - BUS 1 AND D For AMP Works 16/Sep/2019 10:00 16/Sep/2019 16:00 Outage Bay
VADODARA - 220KV - BUS 2 at VADODARA - 400KV

519 PLANNED OCC_522 MP_SLDC 400KV-INDIRASAGAR-NAGDA-1 D For line maintenance work 16/Sep/2019 10:00 16/Sep/2019 17:00
520 PLANNED OCC_522 MSETCL 400KV-ALKUD-SOLAPUR-1 Daily Quarterly maintenance work 16/Sep/2019 10:00 16/Sep/2019 17:30 Load will be managed on 400KV ALKUD-
KOLHAPUR LINE
521 PLANNED OCC_522 MSETCL ALKUD - 400KV - BUS 1 Daily Quarterly maintenance work 16/Sep/2019 10:00 16/Sep/2019 17:30 Load will be managed on Bus II
522 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-PIRANA-T-PIRANA-1 AND FUTURE at D Dew point measurement of CT by TPGL 16/Sep/2019 10:00 16/Sep/2019 18:00 Outage Bay
PIRANA - 400KV
523 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV REWA-ICT-2 AND REWA - D For AMP Works 16/Sep/2019 10:00 16/Sep/2019 18:00 Outage Bay
400KV - BUS 1 at REWA - 400KV
524 PLANNED OCC_522 KWPCL Tie Bay - 400KV/11.5KV KWPCL-ST-1 AND 400KV- Daily Bay : 405 Relay Testing & SCADA Re Configuration 16/Sep/2019 8:00 17/Sep/2019 18:00
KWPCL-RAIGARH-PS-2
525 PLANNED OCC_522 POWERGRID_WR2 220KV-KAKRAPAR 1&2-HALDARWA-1 D For Online PID work; Shutdown not required 16/Sep/2019 9:00 17/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
526 PLANNED OCC_522 MSETCL 400KV-RGPPL-NEW KOYNA-2 Daily Earth Wire replacement ,Routine maint. Work & Faulty 16/Sep/2019 08:00 18/Sep/2019 18:00 Load can be managed on Dabhol-New
string replacement Work Koyna -I line
527 PLANNED OCC_522 NTPC 765 KV ICT-2 Main Bay-6 at NTPC Sipat For PM (ICT-2 Will remain charged through it's Tie Bay) 16/Sep/2019 8:00 18/Sep/2019 18:00

528 PLANNED OCC_522 MSETCL 400KV-BHUSAWAL-AKOLA-1 Contin Restringing of conductor of all three phases of 400 kV 16/Sep/2019 08:00 20/Sep/2019 18:00 400 kV Koradi- Bhusawal, 400 kV Akola-
uous Akola- Bhusawal line due to conversion of Metergauge Nandgaonpeth & 400 kV Koradi-
to Broadgauge of Akot-Akola Railway line and also for Nandgaonpeth are in service.
maintenance works of line.

529 PLANNED OCC_522 MP_SLDC 400KV-NAGDA-Badnawar-1 C For replacement of 400KV line gantry Beam and disc 16/Sep/2019 8:00 21/Sep/2019 18:00
insulators replacement work
530 PLANNED OCC_522 MSETCL 400KV-CHANDRAPU-II-NANDED-2 Daily For PID Work,Shifting of auto reclose switch to non auto 16/Sep/2019 08:00 30/Sep/2019 17:00 nil
mode.

531 PLANNED OCC_522 MSETCL 400KV-CHANDRAPUR-GCR-PARLI-M-3 Daily For PID Work,Shifting of auto reclose switch to non auto 16/Sep/2019 08:00 30/Sep/2019 17:00 nil
mode.

532 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-RANCHODPURA-1 D For AMP Works at Vadavi end, A/R OFF of ckt-2 and 16/Sep/2019 10:00 16/Sep/2019 18:00 Outage AC TRANSMISSION
dia to be kept open at both ends. LINE CIRCUIT
533 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV BHUJ-ICT-1 D CSD Commissionng at 711 & 712. Dia to be kept open. 17/Sep/2019 9:00 18/Sep/2019 18:00 Outage TRANSFORMER

534 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-JABALPUR-GADARWARA-1 AND D Tightening of nut & bolt of CGL make circuit breaker to 17/Sep/2019 10:00 17/Sep/2019 18:00 Outage Bay
JABALPUR - 765KV - BUS 2 at JABALPUR - 765KV avoid water droplet in side Auxilairy box of CB

535 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-CHAMPA-DHARAMJAYGARH-2 AND D FOR AMP WORKS. 17/Sep/2019 9:00 18/Sep/2019 17:30 722 Bay
765KV/400KV CHAMPA-ICT-6 at CHAMPA - 765KV

536 PLANNED OCC_522 GETCO ASOJ - 400KV - BUS COUPLER Daily 400 kV Bus1 Pantograph Isolator replacement work of 17/Sep/2019 7:00 17/Sep/2019 18:00
400 kV Bus Coupler
537 PLANNED OCC_522 GETCO ASOJ - 400KV - BUS 1 Daily 400 kV Bus1 Pantograph Isolator replacement work of 17/Sep/2019 7:00 17/Sep/2019 18:00
400 kV Bus Coupler
538 PLANNED OCC_522 GETCO 400KV VARSANA-CHARAKA LINE Daily Replacement of Fix contact Rod & L clamp of 89A 17/Sep/2019 8:00 17/Sep/2019 18:00 Outage to be taken with Main Bus-1
Isolator at Varsana end.
539 PLANNED OCC_522 GETCO VARSANA - 400KV - BUS 1 Daily Replacement of Fix contact Rod & L clamp of 89A 17/Sep/2019 8:00 17/Sep/2019 18:00
Isolator at Varsana s/s.
540 PLANNED OCC_522 CGPL MAIN BAY - 400KV-CGPL-JETPUR-1 AND CGPL - D Breaker PM and testing 17/Sep/2019 8:00 17/Sep/2019 20:00 Voltage
400KV - BUS 2 Regulation
541 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 765KV B/R 1 D For CSD Fine Tuning, dia to be kept open 17/Sep/2019 9:00 17/Sep/2019 16:00 Outage BUS REACTOR
542 PLANNED OCC_522 MP_SLDC 220KV Mahegaon-Auraiya D For line maintenance work 17/Sep/2019 9:00 17/Sep/2019 17:00
543 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-1 AND D For AMP Works, at Vindhyachal (P) 17/Sep/2019 9:00 17/Sep/2019 17:30 Outage
FUTURE AT VINDHYACHAL-PS
544 PLANNED OCC_522 RRWTL Bay-707 Main bay of Bus reactor Daily Annual maintenance of bay equipments 17/Sep/2019 9:00 17/Sep/2019 18:00 station name?
545 PLANNED OCC_522 MSETCL CHANDRAPU-II - 400KV - BUS 2 Daily for diagnostic testing and allied bay maintenance work 17/Sep/2019 09:00 17/Sep/2019 18:00 400KV BUS-2 CVT TAN DELTA & BAY
MAINTENANCE WORK
546 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-DHARAMJAYGARH-JHARSUGUDA-3 D FOR AMP WORKS. 17/Sep/2019 9:00 17/Sep/2019 18:00 Missed in Bay
AND FUTURE at DHARAMJAYGARH - 765KV data base

547 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-SEONI-WARDHA-1 AND SEONI - D For AMP Works 17/Sep/2019 9:00 17/Sep/2019 18:00 Bay
765KV - BUS 2 at SEONI - 765KV
548 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 765KV-AURANGABAD-Solapur-2 AND D Bay AMP works. 17/Sep/2019 9:00 17/Sep/2019 18:00 Bay
Solapur - 765KV - Bus 1
549 PLANNED OCC_522 POWERGRID_WR1 400KV-AURANGABAD-BOISAR-1 L/R@ AURANGABAD - D For AMP works. 17/Sep/2019 9:00 17/Sep/2019 18:00 Line remain in service LINE REACTOR
400KV
550 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-SATNA-BINA-2 AND 400KV- D For installation of additional compressor 17/Sep/2019 9:00 17/Sep/2019 18:00 Outage Bay
VINDHYACHAL-SATNA-2 at SATNA - 400KV
551 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-DEHGAM-GANDHAR-2 AND D For AMP Works 17/Sep/2019 9:00 17/Sep/2019 18:00 Outage Bay
DEHGAM - 400KV - BUS 2 at DEHGAM - 400KV
552 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-KHANDWA-2 L/R@ INDORE - 400KV D For AMP Works 17/Sep/2019 9:00 17/Sep/2019 18:00 Outage LINE REACTOR

553 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV GWALIOR-ICT-3 D For AMP Works, dia to be kept open on both sides 17/Sep/2019 9:00 17/Sep/2019 18:00 Outage TRANSFORMER
554 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - ITARSI - 400KV B/R 1 AND ITARSI - 400KV D For Retrofitting of existing ABB make RAICA LBB relay 17/Sep/2019 9:00 17/Sep/2019 18:00 Outage
- BUS 1 with Alstom make P442 relay.
555 PLANNED OCC_522 POWERGRID_WR2 765KV-BINA-GWALIOR-3 L/R@ BINA - 765KV D For AMP of Line reactor Circuit breaker and Line 17/Sep/2019 9:15 17/Sep/2019 17:30 Outage LINE REACTOR
reactor will be out of service aling with Line .
556 PLANNED OCC_522 POWERGRID_WR2 765KV-BINA-GWALIOR-3 D For Line AMP Works by Bina, dia to be kept open at 17/Sep/2019 9:15 17/Sep/2019 18:00 Outage AC TRANSMISSION
both ends LINE CIRCUIT
557 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIGARH-PS-CHAMPA-2 AND D FOR AMP WORKS. 17/Sep/2019 9:30 17/Sep/2019 17:30 Bay
FUTURE at RAIGARH-PS - 765KV
558 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-SIPAT-RAIPUR-2 AND FUTURE at D For bay AMP works at Raipur SS 17/Sep/2019 9:30 17/Sep/2019 17:30 Bay
RAIPUR - 400KV
559 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-DAMOH-BIRSINGPUR-2 AND DAMOH - D For AMP Works 17/Sep/2019 9:30 17/Sep/2019 18:00 Outage
400KV B/R 1
560 PLANNED OCC_522 POWERGRID_WR2 400KV-JABALPUR-JABALPUR-PS-2 D AMP A/R OFF of ckt-1 and dia to be kept open at both 17/Sep/2019 11:45 17/Sep/2019 18:00 Outage AC TRANSMISSION
ends. LINE CIRCUIT
561 PLANNED OCC_522 MEGPTCL 765KV-AKOLA (2)-KORADI-III-1 L/R@ KORADI-III - Daily To carry out changeover activities. 17/Sep/2019 10:00 17/Sep/2019 14:00 To carry out changeover activities.
765KV
562 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-VADODARA-JAMBUVA-1 AND D For AMP Works 17/Sep/2019 10:00 17/Sep/2019 16:00 Outage Bay
VADODARA - 220KV - BUS 1 at VADODARA - 220KV
563 PLANNED OCC_522 MP_SLDC 400KV-INDIRASAGAR-NAGDA-1 D For line maintenance work 17/Sep/2019 10:00 17/Sep/2019 17:00
564 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV RAJGARH-ICT-2 AND D For Circuit breaker Testing, ICT-2 will be in service 17/Sep/2019 10:00 17/Sep/2019 17:00 Outage Bay
RAJGARH - 220KV - BUS 1 at RAJGARH - 220KV thorugh TBC
565 PLANNED OCC_522 NTPC VSTPS BUS TRANSFER-2 BAY (Stage-II/ Bay No. 22) Annual Bay Maintenance 17/Sep/2019 8:00 18/Sep/2019 18:30

566 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV SHUJALPUR-ICT-2 C Oil leakage attending work from 220KV Side Y Phase 17/Sep/2019 10:00 18/Sep/2019 18:00 Outage TRANSFORMER
turet, dia to be kept open
567 PLANNED OCC_522 MSETCL 220KV-WARDHA-PUSAD-1 Daily Tightening of jumper nut bolt at loc. No.76 ,17,01,08,12 17/Sep/2019 10:00 21/Sep/2019 18:00 NA
and, 78 carona ring nut bolt .
568 PLANNED OCC_522 MSETCL 220KV-WARDHA-BADNERA-1 Daily For PID work, Shifting of auto reclose switch to non 17/Sep/2019 08:00 28/Sep/2019 17:00 For PID work
auto mode
569 NRPC PHAGI (765KV)-GWALIOR-WR (765KV)2 DAILY For alignment of isolator and rectification of interlock 17/Sep/2019 08:30 17/Sep/2019 18:30
problem in isolator at Gwalior
dia to be kept Open at both ends & ckt-1 A/R OFF. S/D
by WR-II

570 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-RANCHODPURA-2 D For AMP Works at Vadavi end, A/R OFF of ckt-1 and 18/Sep/2019 10:00 18/Sep/2019 18:00 Outage AC TRANSMISSION
dia to be kept open at both ends. LINE CIRCUIT
571 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-RANCHODPURA-2 D For fixing of Bird Diverter in the line. A/R OFF of circuit- 18/Sep/2019 8:00 21/Sep/2019 18:00 Outage
1 and dia to be kept open at both ends.
572 PLANNED OCC_522 MSETCL 400KV-BABLESHWAR-PADGHE-PG-2 Daily Quarterly Maintenance work & Relay Testing and for 18/Sep/2019 09:00 19/Sep/2019 17:00 -
string replacement
573 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-VINDHYACHAL(PS)-JABALPUR-1 D For AMP Works 18/Sep/2019 9:00 18/Sep/2019 17:30 Outage
AND VINDHYACHAL(PS) - 765KV - BUS 1
574 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-JABALPUR-GADARWARA-2 AND D Tightening of nut & bolt of CGL make circuit breaker to 18/Sep/2019 10:00 18/Sep/2019 18:00 Outage Bay
JABALPUR - 765KV - BUS 2 at JABALPUR - 765KV avoid water droplet in side Auxilairy box of CB

575 PLANNED OCC_522 MP_SLDC 400KV Sarni ISP Bay with 400 kv Main Bus I C For Replacement of PG Isolator of Main Bus -I of 400 18/Sep/2019 9:00 21/Sep/2019 18:00 400KV ISP feeder will remain out for 2hrs
KV Sarni-Isp Bay for getting charge through tie breaker
,than 400kv Sarni ISP feeder wiil remain
in service through Tie breaker

576 PLANNED OCC_522 POWERGRID_WR2 220KV-TARAPUR 3&4-BOISAR-1 D Main-I relay replacement & For tripping and A/R Trials 18/Sep/2019 9:00 18/Sep/2019 14:00 Outage AC TRANSMISSION Please reschedule outage on
of Main-I relay (Line will be out of service) LINE CIRCUIT 18.09.2019
577 PLANNED OCC_522 GETCO 400KV-KASOR-CHORANIA-1 Daily Replacement of pantograph isolator on 400 kV Main 18/Sep/2019 6:00 18/Sep/2019 19:00
Bus-02 at 400 kV Kasor S/S.
578 PLANNED OCC_522 MSETCL 220KV-WARDHA-WARDHA-M-1 Daily Maintenance work on line to attende the defect 18/Sep/2019 08:00 18/Sep/2019 05:00 NA
observed in monkey patrolling
579 PLANNED OCC_522 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily Line maintenance 18/Sep/2019 08:00 18/Sep/2019 16:00 -
580 PLANNED OCC_522 MP_SLDC 400KV Indore PGCIL (Hatuniya)-Pithampur-2 D For bay equipment maintenance and testing work at 18/Sep/2019 8:00 18/Sep/2019 16:00
Pithampur end
581 PLANNED OCC_522 MSETCL 400KV-CHANDRAPUR SWITCHING STATION- Contin For Conductor & Earthwire Hardware tightening work 18/Sep/2019 08:00 18/Sep/2019 17:00 For Conductor & Earthwire Hardware
CHANDRAPUR-II-1 uous tightening work
582 PLANNED OCC_522 MSETCL 220KV-TILLARI-AMONA-1 Daily Routine Maintenance & Dignostic testing work 18/Sep/2019 08:00 18/Sep/2019 17:00 NA

583 Planned OCC_522 GETCO KANSARI 400KV Transfer Bus Daily Bus Maint. 18/Sep/2019 8:00 18/Sep/2019 18:00
584 PLANNED OCC_522 APML MAIN BAY - TIRODA - 765KV B/R 1 AND TIRODA - Daily Testing & Maintenance of Bay Breaker & CT 18/Sep/2019 08:00 18/Sep/2019 18:00 Testing & Maintenance of Bay Breaker &
765KV - BUS 1 at TIRODA - 765KV CT

585 PLANNED OCC_522 CGPL MAIN BAY - 400KV-CGPL-JETPUR-2 AND CGPL - D Breaker PM and testing 18/Sep/2019 8:00 18/Sep/2019 20:00 Voltage
400KV - BUS 2 Regulation
586 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV B/R 1 D For CSD Fine Tuning, dia to be kept open 18/Sep/2019 9:00 18/Sep/2019 16:00 Outage BUS REACTOR
587 PLANNED OCC_522 MSETCL 132KV-PENCH-KANHAN-1 Daily Routine maint work 18/Sep/2019 09:00 18/Sep/2019 17:00 NIL
588 PLANNED OCC_522 RRWTL Bay-708 Tie bay of Bus reactor & Bilaspur Line-1 Daily Annual maintenance of bay equipments 18/Sep/2019 9:00 18/Sep/2019 18:00
589 PLANNED OCC_522 MSETCL 400KV-PARLI-M-SOLAPUR-M-1 Daily Diagnostic testing work 18/Sep/2019 09:00 18/Sep/2019 18:00 Load will be managed on 400 kv Lamboti-
PGCIL lINE.
590 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 18/Sep/2019 9:00 18/Sep/2019 18:00 Bay
AND RAIPUR-PS (DURG) - 765KV - BUS 1 at RAIPUR-PS
(DURG) - 765KV
591 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARORA-PG-PARLI-2 AND PARLI - D For bay AMP works 18/Sep/2019 9:00 18/Sep/2019 18:00 Bay
400KV - BUS 1 at PARLI - 400KV
592 PLANNED OCC_522 POWERGRID_WR1 Tie Bay - 765KV/400KV Solapur-ICT-1 AND 400KV- D Bay AMP works. 18/Sep/2019 9:00 18/Sep/2019 18:00 Bay
Solapur-SOLAPUR-NTPC-2 at Solapur - 400KV
593 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV WARDHA-ICT-1 AND D For AMP work 18/Sep/2019 9:00 18/Sep/2019 18:00 Bay
WARDHA - 765KV - BUS 2 at Wardha - 765KV
594 PLANNED OCC_522 POWERGRID_WR2 400KV-BHUJ-CGPL-2 D Change of Fautly input cards of M1 & M2 Relays of 18/Sep/2019 9:00 18/Sep/2019 18:00 Outage AC TRANSMISSION
line. A/R OFF of ckt-1 and dia to be kept open at both LINE CIRCUIT
ends.
595 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-GWALIOR-JAIPUR-1 AND GWALIOR D For AMP Works 18/Sep/2019 9:00 18/Sep/2019 18:00 Outage Bay
- 765KV - BUS 1 at GWALIOR - 765KV
596 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-BINA-MP-BINA-4 AND 765KV/400KV D For AMP Works 18/Sep/2019 9:15 18/Sep/2019 17:30 Outage Bay
BINA-ICT-1 at BINA - 400KV
597 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIGARH-PS-CHAMPA-2 AND D FOR AMP WORKS. 18/Sep/2019 9:30 18/Sep/2019 17:30 Bay
FUTURE at RAIGARH-PS - 765KV
598 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-KORBA-NTPC-RAIPUR-2 AND D For bay AMP works at Raipur SS 18/Sep/2019 9:30 18/Sep/2019 17:30 Bay
RAIPUR - 400KV - BUS 3 at RAIPUR - 400KV
599 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV DAMOH-ICT-3 AND DAMOH D For AMP Works 18/Sep/2019 9:30 18/Sep/2019 18:00 Outage
- 400KV - BUS 2
600 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-VADODARA-JAMBUVA-2 AND D For AMP Works 18/Sep/2019 10:00 18/Sep/2019 16:00 Outage Bay
VADODARA - 220KV - BUS 1 at VADODARA - 220KV
601 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-PITHAMPUR-RAJGARH-1 AND D For Circuit breaker Testing, line will be in service 18/Sep/2019 10:00 18/Sep/2019 17:00 Outage Bay
RAJGARH - 220KV - BUS 1 at RAJGARH - 220KV through TBC
602 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV REWA-ICT-1 AND REWA - D For AMP Works 18/Sep/2019 10:00 18/Sep/2019 18:00 Outage Bay
400KV - BUS 1 at REWA - 400KV
603 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV PUNE-PG-ICT-2 AND PUNE- D Replacement of Clamp & connectors 18/Sep/2019 9:00 18/Sep/2019 18:00 Bay
PG - 400KV - BUS 2 at PUNE-PG - 400KV
604 Planned OCC_522 GETCO 400 kV Bus Coupler at 400 kV Kasor S/S Contin Replacement of pantograph isolator on 400 kV Main 18/Sep/2019 6:00 19/Sep/2019 18:00
uous Bus-02 at 400 kV Kasor S/S.
605 PLANNED OCC_522 GETCO KASOR - 400KV - BUS 2 Contin Replacement of pantograph isolators of 400 kV Kasor- 18/Sep/2019 6:00 19/Sep/2019 19:00
uous Chorania feeder bay and 400 kV TBC bay Main Bus-02
at 400 kV Kasor S/S.
606 PLANNED OCC_522 KWPCL Tie Bay - 400KV/21KV KWPCL-GT-1 AND 400KV- Daily Bay : 402 Relay Testing & SCADA Re Configuration 18/Sep/2019 8:00 19/Sep/2019 18:00
KWPCL-RAIGARH-PS-1
607 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-BILASPUR-SEONI-2 AND SEONI - D For AMP Works 18/Sep/2019 9:00 19/Sep/2019 18:00 Bay
765KV - BUS 1 at SEONI - 765KV
608 PLANNED OCC_522 POWERGRID_WR1 765KV-DHARAMJAYGARH-JABALPUR-3 L/R@ D FOR AMP WORKS. 18/Sep/2019 9:00 19/Sep/2019 18:00 LINE REACTOR
DHARAMJAYGARH - 765KV
609 PLANNED OCC_522 POWERGRID_WR2 220KV-KAKRAPAR 1&2-HALDARWA-2 D For Online PID work; Shutdown not required 18/Sep/2019 9:00 19/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
610 PLANNED OCC_522 GETCO 400 kV/220kV VADAVI-ICT-3 Contin B-Phase , 220 kV Class Bushing Replacement due to 18/Sep/2019 8:00 28/Sep/2019 18:00 The Outage is on continuous Basis, Also
uous high Tan Delta Filtration of the Transformer due to high
key gases .
611 PLANNED OCC_522 Odhisha Proj 400KV-RAIGARH-JHARSUGUDA-2 D AR to be non auto moderequired for PID Testing of 18/Sep/2019 8:00 30/Sep/2019 18:00 AC TRANSMISSION
Porcelain Insulator by Odhisha Proj LINE CIRCUIT
612 PLANNED OCC_522 Odhisha Proj 400KV-RAIGARH-JHARSUGUDA-4 D AR to be non auto moderequired for PID Testing of 18/Sep/2019 8:00 30/Sep/2019 18:00 AC TRANSMISSION
Porcelain Insulator by Odhisha Proj LINE CIRCUIT
613 ERPC 400KV Sundergarh-Raigarh Ckt #2 ODB For PID Testing of Porcelain Insulator. Only Auto reclose 18/Sep/2019 8:00 30/Sep/2019 18:00

614 ERPC 400KV Sundergarh-Raigarh Ckt #4 ODB For PID Testing of Porcelain Insulator. Only Auto reclose 18/Sep/2019 8:00 30/Sep/2019 18:00

615 PLANNED OCC_522 POWERGRID_WR2 765KV-BHUJ-BANASKANTHA-1 D Earthing Work of Line & CSD Commissionng of Line 19/Sep/2019 9:00 19/Sep/2019 18:00 Outage AC TRANSMISSION
reactor. A/R OFF of ckt-2, dia to be kept open at both LINE CIRCUIT
ends.
616 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-2 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 19/Sep/2019 9:00 19/Sep/2019 13:00 709 Bay
CHAMPA - 765KV - BUS 2 at CHAMPA - 765KV
617 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-VINDHYACHAL-SATNA-2 AND D For installation of additional compressor 19/Sep/2019 9:00 19/Sep/2019 18:00 Outage Bay
SATNA - 400KV - BUS 2 at SATNA - 400KV
618 PLANNED OCC_522 POWERGRID_WR2 765KV-JABALPUR-GADARWARA-1 D AMP of Terminal Equipments, Dai to be kept open and 19/Sep/2019 10:00 19/Sep/2019 18:00 Outage AC TRANSMISSION
non auto mode of Ckt-II LINE CIRCUIT
619 PLANNED OCC_522 MSETCL 220KV-WARDHA-BADNERA-1 Daily Maintenance work on line to attende the defect 19/Sep/2019 8:00 19/Sep/2019 15:00 NA
observed in monkey patrolling
620 PLANNED OCC_522 GETCO 220KV-BACHAU-CHARADVADA-1 Daily Routine Bay Maint. Work 19/Sep/2019 8:00 19/Sep/2019 18:00
621 PLANNED OCC_522 MSETCL 400KV-EKTUNI-BABLESHWAR-1 Daily Quarterly Maintenance work & Relay Testing 19/Sep/2019 09:00 19/Sep/2019 17:00 -
622 PLANNED OCC_522 POWERGRID_WR2 765KV-SATNA-VINDHYACHAL(PS)-2 D For AMP Works, dia to be kept open at both ends, 19/Sep/2019 9:00 19/Sep/2019 17:30 Outage
outage of L/R is also required
623 PLANNED OCC_522 POWERGRID_WR2 765KV-SATNA-VINDHYACHAL(PS)-2 L/R@ D For AMP Works 19/Sep/2019 9:00 19/Sep/2019 17:30 Outage
VINDHYACHAL(PS) - 765KV
624 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV CHAMPA-ICT-3 AND CHAMPA - D FOR AMP WORKS. 19/Sep/2019 9:00 19/Sep/2019 17:30 423 Bay
400KV B/R 1 at CHAMPA - 400KV
625 PLANNED OCC_522 RRWTL Bay-709 Main bay of Bilaspur Line-1 Daily Annual maintenance of bay equipments 19/Sep/2019 9:00 19/Sep/2019 18:00
626 PLANNED OCC_522 MSETCL 400KV-PARLI-M-PARLI-1 Daily Distance relay testing work 19/Sep/2019 09:00 19/Sep/2019 18:00 -
627 PLANNED OCC_522 POWERGRID_WR1 400KV AC - 464 BAY - POLE 1 - CONVERTER DIA MAIN D FOR AMP WORKS. 19/Sep/2019 9:00 19/Sep/2019 18:00 Missed in 400KV AC BAY
BAY - II data base
628 PLANNED OCC_522 POWERGRID_WR1 Tie Bay - 765KV/400KV Solapur-ICT-2 AND 400KV- D Bay AMP works. 19/Sep/2019 9:00 19/Sep/2019 18:00 Bay
Solapur-SOLAPUR-NTPC-4 at Solapur - 400KV
629 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - DEHGAM - 400KV B/R 1 AND DEHGAM - D For AMP Works 19/Sep/2019 9:00 19/Sep/2019 18:00 Outage Bay
400KV - BUS 2 at DEHGAM - 400KV
630 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV KHANDWA-ICT-2 AND D For AMP Works, ICT-2 will be in service through TBC 19/Sep/2019 9:00 19/Sep/2019 18:00 Outage Bay
KHANDWA - 220KV - BUS 1 at KHANDWA - 220KV
631 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-JABALPUR-ITARSI-1 AND ITARSI - D For Retrofitting of existing ABB make RAICA LBB relay 19/Sep/2019 9:00 19/Sep/2019 18:00 Outage
400KV - BUS 1 with Alstom make P442 relay.
632 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-CHAMPA-2 AND D FOR AMP WORKS. 19/Sep/2019 9:30 19/Sep/2019 17:30 Bay
RAIGARH-PS - 765KV - BUS 2 at RAIGARH-PS - 765KV

633 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-BHOPAL-MP-DAMOH-1 AND 400KV- D For AMP Works 19/Sep/2019 9:30 19/Sep/2019 18:00 Outage
DAMOH-FUTURE-1
634 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-MP-ASOJ-2 D For taking line Reactor in service after Dry out of 19/Sep/2019 10:00 19/Sep/2019 12:00 Outage AC TRANSMISSION
Reactor at Asoj LINE CIRCUIT
635 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-RAJGARH-DHAR-1 AND RAJGARH - D For Circuit breaker Testing, line will be in service 19/Sep/2019 10:00 19/Sep/2019 17:00 Outage Bay
220KV - BUS 1 at RAJGARH - 220KV through TBC
636 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-PIRANA-T-PIRANA-1 AND PIRANA - D Dew point measurement of CT by TPGL 19/Sep/2019 10:00 19/Sep/2019 18:00 Outage Bay
400KV - BUS 2 at PIRANA - 400KV
637 PLANNED OCC_522 APML 765KV-TIRODA-KORADI-III-2 Daily Bushing dismantling work 19/Sep/2019 15:00 19/Sep/2019 22:00 Bushing dismantling work
638 PLANNED OCC_522 POWERGRID_WR1 TALEGAON - 220KV - BUS 1 D Replacement of Clamp & connectors 19/Sep/2019 9:00 19/Sep/2019 18:00 BUS
639 PLANNED OCC_522 GETCO KASOR - 400KV - Auxilary BUS Contin For replacement of pantograph isolators of 400 kV 19/Sep/2019 6:00 20/Sep/2019 19:00
uous Kasor-Chorania bay of 400 kV Aux Bus at 400 kV
Kasor S/S.
640 Planned OCC_522 GETCO 400 kV Traf.Bus Coupler at 400 kV Kasor S/S Daily For replacement of pantograph isolator on 400 kV Main 19/Sep/2019 6:00 20/Sep/2019 19:00
Bus-02 on 400 kV Trf.Bus Coupler and 400 kV
TBS(Auxilary bus) on 400 kV Kasor-Chorania bay at
400 kV Kasor S/S.

641 PLANNED OCC_522 CSPTCL 315 MVA ICT -III at 400 KV S/s Khedamara. Daily Annual Maintenance Programme . 19/Sep/2019 9:00 20/Sep/2019 17:00
642 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV BILASPUR-ICT-2 AND D For AMP works. 19/Sep/2019 9:00 20/Sep/2019 18:00 721_Bay Bay
BILASPUR - 765KV - BUS 2 at BILASPUR - 765KV
643 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV BHUJ-ICT-1 D CSD Commissionng at (Bay No. 417 & 418), Dia to be 19/Sep/2019 9:00 20/Sep/2019 18:00 Outage TRANSFORMER
kept open
644 PLANNED OCC_522 POWERGRID_WR1 400KV-BHADRAWATI-BHILAI-1 C Auto reclosure relay retrofitting work at Bhilai SS 19/Sep/2019 9:30 20/Sep/2019 17:30 AR in non Auto mode required for 400kV AC TRANSMISSION
Bhadrawati-Raipur-Ckt-I. LINE CIRCUIT
645 PLANNED OCC_522 MSETCL 400KV-RGPPL-NAGOTHANE-1 Daily Earth Wire replacement ,Routine maint. Work & Faulty 19/Sep/2019 08:00 21/Sep/2019 18:00 Load can be managed on Dabhol-
string replacement Work Nagothane -II line
646 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - GWALIOR - 400KV B/R 1 AND GWALIOR - C CB Over Hauling works 19/Sep/2019 9:00 21/Sep/2019 18:00 Outage Bay
400KV - BUS 1 at GWALIOR - 400KV
647 PLANNED OCC_522 MP_SLDC 400KV Main Bus-II at 400KV S/s Bina C For PG Isolator Replacement Work at Bina end 19/Sep/2019 8:00 30/Sep/2019 17:00
648 PLANNED OCC_522 APML 765KV-TIRODA-KORADI-III-2 L/R@ TIRODA - 765KV Contin Replacement of Reactor 19/Sep/2019 06:00 04/Oct/2019 18:00 Replacement of Reactor Element is to be corrected.
uous Outage required on 765KV-
TIRODA-KORADI-III-2 L/R@
TIRODA - 765KV

649 NRPC Orai (765KV)-GWALIOR-WR (765KV)S/C DAILY For alignment of Isolator and Rectification of Interlock 19/Sep/2019 09:00 19/Sep/2019 18:00
problem in Isolator ( dia to be kept open at both end).
S/d requested by WR-II.
650 ERPC 400 KV RANCHI-SIPAT-1 LINE AND 80 MVAR LINE ODB 1) To attend oil leakage in Line Reactor of 400 KV 19/Sep/2019 9:30 19/Sep/2019 17:00
REACTOR RANCHI-SIPAT-1 (80 MVAR).
2) Replacement of defective CAPTHOR in FSC of the
same line

651 PLANNED OCC_522 NTPC 220KV-KAWAS-VAV-1 C CT replacement. Dismanteling of Old CTs and erection 20/Sep/2019 9:00 22/Sep/2019 18:00 220 AC TRANSMISSION Already, 220 kV D/C Kawas
and commissioning of new CT along with testing. As its LINE CIRCUIT - Haldarva outage is
is DMT scheme, bay along with line outage is required requested by PGCIL. May be
for 3 days on cont basis availed in between 16.09.19
to 21.09.19

652 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-VAV-1 C For NHSRCL (Bullet Train) Diversion work & 04 No 20/Sep/2019 9:00 25/Sep/2019 18:00 Outage AC TRANSMISSION Outage timings shall be
Isolators replacement, Bay AMP works Attending Sf6 LINE CIRCUIT squeezed.
Gas leakage in B Ph CB Pole at GETCO Vav S/s

653 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-VAV-2 C For NHSRCL (Bullet Train) Diversion work & 04 No 20/Sep/2019 9:00 25/Sep/2019 18:00 Outage AC TRANSMISSION Outage timings shall be
Isolators replacement, Bay AMP works Attending Sf6 LINE CIRCUIT squeezed.
Gas leakage in B Ph CB Pole at GETCO Vav S/s

654 PLANNED OCC_522 POWERGRID_WR2 765KV-BHUJ-BANASKANTHA-2 D Earthing Work of Line & CSD Commissionng of Line 20/Sep/2019 9:00 20/Sep/2019 18:00 Outage AC TRANSMISSION
reactor. A/R OFF of ckt-1, dia to be kept open at both LINE CIRCUIT
ends.
655 PLANNED OCC_522 POWERGRID_WR1 AURANGABAD - 765KV - BUS 1 D For AMP works. 20/Sep/2019 9:00 20/Sep/2019 18:00 Bus-2 remain in service BUS
656 PLANNED OCC_522 MP_SLDC 400KV Main Bus-II at 400KV S/s Nagda C For bus equipment maintenance and disc insulator 20/Sep/2019 8:00 21/Sep/2019 18:00
replacement work at Nagda end
657 PLANNED OCC_522 GETCO MANSAR - 400KV - BUS 2 Daily 89-B & 89-L Line isolator Isolator mechanical & 20/Sep/2019 8:00 20/Sep/2019 18:00
electrical setting work & Bay Maintenance work of
Bhachau bay
658 PLANNED OCC_522 GETCO MANSAR - 400KV - TRANSFER BUS Daily 89-B & 89-L Line isolator Isolator mechanical & 20/Sep/2019 8:00 20/Sep/2019 18:00
electrical setting work & Bay Maintenance work of
Bhachau bay
659 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-SATNA-BINA-1 AND SATNA - 400KV D For installation of additional compressor 20/Sep/2019 9:00 20/Sep/2019 18:00 Outage Bay
- BUS 1 at SATNA - 400KV
660 PLANNED OCC_522 POWERGRID_WR2 765KV-JABALPUR-GADARWARA-2 D AMP of Terminal Equipments, dia to be kept open and 20/Sep/2019 10:00 20/Sep/2019 18:00 Outage AC TRANSMISSION
non auto mode of ckt#1 LINE CIRCUIT
661 PLANNED OCC_522 GETCO 400KV Kansari-Veloda Bay Daily Bay Maintenance 20/Sep/2019 8:00 20/Sep/2019 18:00
662 PLANNED OCC_522 GETCO 220KV-BACHAU-CHARADVADA-2 Daily Routine Bay Maint. Work 20/Sep/2019 8:00 20/Sep/2019 18:00
663 PLANNED OCC_522 GETCO 400KV/220KV MANSAR-ICT-1 Daily Water washing & Bay Maintenance work 20/Sep/2019 8:00 20/Sep/2019 18:00
664 PLANNED OCC_522 APML MAIN BAY - 400KV/11.5KV TIRODA-ST-5 AND TIRODA - Daily Testing & Maintenance of Bay Breaker & CT 20/Sep/2019 08:00 20/Sep/2019 18:00 Testing & Maintenance of Bay Breaker &
400KV - BUS 2 at TIRODA - 400KV CT

665 PLANNED OCC_522 MP_SLDC 400KV-Badnawar-RAJGARH-2 D For line maintenance work 20/Sep/2019 8:00 20/Sep/2019 18:00
666 PLANNED OCC_522 GETCO 400KV-KASOR-CHORANIA-1 Daily For replacement of pantograph isolator on 400 kV Aux. 20/Sep/2019 8:00 20/Sep/2019 19:00
Bus at 400 kV Kasor S/S.
667 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-3 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 20/Sep/2019 9:00 20/Sep/2019 13:00 712 Bay
CHAMPA - 765KV - BUS 2 at CHAMPA - 765KV
668 PLANNED OCC_522 MSETCL 220KV-BOISAR-NALASOPARA-1 Daily REPLACEMENT OF PID FAULTY INSULATOR STRING 20/Sep/2019 09:00 20/Sep/2019 17:00 -

669 PLANNED OCC_522 MP_SLDC 220KV Morena-Adani D For line maintenance work 20/Sep/2019 9:00 20/Sep/2019 17:00
670 PLANNED OCC_522 POWERGRID_WR2 765KV-SATNA-VINDHYACHAL(PS)-1 D For AMP Works, dia to be kept open at both ends, 20/Sep/2019 9:00 20/Sep/2019 17:30 Outage
outage of L/R is also required
671 PLANNED OCC_522 POWERGRID_WR2 765KV-SATNA-VINDHYACHAL(PS)-1 L/R@ D For AMP Works 20/Sep/2019 9:00 20/Sep/2019 17:30 Outage
VINDHYACHAL(PS) - 765KV
672 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-RAIPUR-RAIPUR-PS (DURG)-1 AND D FOR AMP WORKS. 20/Sep/2019 9:00 20/Sep/2019 18:00 Bay
RAIPUR-PS (DURG) - 400KV - BUS 1 at RAIPUR-PS
(DURG) - 400KV
673 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARDHA-MOUDA-2 AND WARDHA - D For AMP work 20/Sep/2019 9:00 20/Sep/2019 18:00 Bay
400KV - BUS 1 at Wardha - 400KV
674 PLANNED OCC_522 POWERGRID_WR1 765KV-SEONI-WARDHA-1 L/R@ SEONI - 765KV D For AMP works 20/Sep/2019 9:00 20/Sep/2019 18:00 LINE REACTOR
675 PLANNED OCC_522 POWERGRID_WR1 765KV-PUNE-PG-Solapur-1 L/R@ Solapur - 765KV D Reactor AMP works & To change Imax make Auxiliary 20/Sep/2019 9:00 20/Sep/2019 18:00 LINE REACTOR
and Limit switches for Reactor CB.
676 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV/400KV INDORE-ICT-2 AND INDORE D For AMP Works 20/Sep/2019 9:00 20/Sep/2019 18:00 Outage Bay
- 400KV - BUS 1 at INDORE - 400KV
677 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-JABALPUR-ITARSI-2 AND ITARSI - D For Retrofitting of existing ABB make RAICA LBB relay 20/Sep/2019 9:00 20/Sep/2019 18:00 Outage
400KV - BUS 2 with Alstom make P442 relay.
678 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-CHAMPA-2 AND D FOR AMP WORKS. 20/Sep/2019 9:30 20/Sep/2019 17:30 Bay
RAIGARH-PS - 765KV - BUS 2 at RAIGARH-PS - 765KV

679 PLANNED OCC_522 POWERGRID_WR2 BUS COUPLER BAY - DAMOH - 220KV - BUS 1 AND D For AMP Works 20/Sep/2019 9:30 20/Sep/2019 18:00 Outage
DAMOH - 220KV - BUS 2
680 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-MP-ASOJ-1 D For taking line reactor out of service at Asoj for Dry out 20/Sep/2019 10:00 20/Sep/2019 12:00 Outage AC TRANSMISSION
of Reactor LINE CIRCUIT
681 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV RAJGARH-ICT-1 AND D For Circuit breaker Testing, ICT-1 will be in service 20/Sep/2019 10:00 20/Sep/2019 17:00 Outage Bay
RAJGARH - 220KV - BUS 1 at RAJGARH - 220KV thorugh TBC
682 PLANNED OCC_522 MEGPTCL MAIN BAY - 400KV-KORADI-II-KORADI-III-3 AND Daily To carry out maintenance of line related equipments 20/Sep/2019 10:00 20/Sep/2019 18:00 -
KORADI-III - 400KV - BUS 2
683 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - REWA - 400KV B/R 1 AND REWA - 400KV - D For AMP Works 20/Sep/2019 10:00 20/Sep/2019 18:00 Outage Bay
BUS 1 at REWA - 400KV
684 PLANNED OCC_522 POWERGRID_WR2 PIRANA - 400KV B/R 1 D CSD wiring testing, dia to be kept open 20/Sep/2019 10:00 20/Sep/2019 18:00 Outage BUS REACTOR
685 PLANNED OCC_522 POWERGRID_WR1 765KV BUS-1 SECTIONALYZER BAY-713 AT CHAMPA D FOR RTAMC/ NTAMC SIGNAL VALIDATION 20/Sep/2019 14:00 20/Sep/2019 17:30 713 Missed in Bay
PS data base
686 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-PUNE-GIS-PUNE-PG-4 AND D For AMP Works 20/Sep/2019 9:00 20/Sep/2019 18:00 Bay
400KV/220KV PUNE-PG-ICT-2 at PUNE-PG - 400KV
687 PLANNED OCC_522 KWPCL Main Bay - KWPCL - 400KV - Bus 1 AND Daily Bay : 404 Relay Testing & SCADA Re Configuration 20/Sep/2019 8:00 21/Sep/2019 18:00
400KV/11.5KV KWPCL-ST-1
688 PLANNED OCC_522 CGPL 400KV-CGPL-BACHAU-3 L/R@ CGPL - 400KV D Breaker drive box painting 20/Sep/2019 8:00 21/Sep/2019 20:00 Voltage
Regulation
689 PLANNED OCC_522 POWERGRID_WR1 765KV-DHARAMJAYGARH-JABALPUR-1 L/R@ D FOR AMP WORKS. 20/Sep/2019 9:00 21/Sep/2019 18:00 LINE REACTOR
DHARAMJAYGARH - 765KV
690 PLANNED OCC_522 TPL-DGEN 400KV/220KV DGEN-ICT-2 C ICT 2 routine energisation testing during RSD and 20/Sep/2019 10:00 21/Sep/2019 17:00 ICT No load charging only, Not connected outage TRANSFORMER
shutdown for energy conservation after one day at 220 KV side.
energization
691 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-BINA-MP-BINA-3 AND 765KV/400KV C For CB DAC over hauling . 20/Sep/2019 9:00 22/Sep/2019 18:00 Outage Bay
BINA-ICT-2 at BINA - 400KV
692 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-MP-ASOJ-1 L/R@ ASOJ - 400KV C For Drying Out of Reactor 20/Sep/2019 10:00 27/Sep/2019 12:00 Outage LINE REACTOR
693 PLANNED OCC_522 MP_SLDC 400 KV Satna(PG)-Bina (PG)- 3 C For making LILO arrangement at 400 KV Sagar S/s 20/Sep/2019 8:00 30/Sep/2019 18:00

694 PLANNED OCC_522 INOX Bay No. 205 at Bhuj PS D RTV Coating of insulators 20/Sep/2019 8:00 25/Sep/2019 20:00
695 NRPC NTPC RIHAND 400KV BUS - 6 CONTI Rihand 400 KV Bus-6: annual maintenance of bay 20/Sep/2019 08:30 20/Sep/2019 18:30
NUOU equipments
S (code for Bus-6 not available, hence Bus-2 code
selected).

696 ERPC 765 kV New Ranchi Dharamjaygarh CKT- II ODB For 26 no. Insulator changing work at Loc 446 and 07 20/Sep/2019 9:30 20/Sep/2019 17:30
no insulator at loc 268, tightning of keeper, CC ring,
Jumper changing work at Loc no 278 etc

697 ERPC 400 KV RANCHI-SIPAT-2 LINE AND 80 MVAR LINE ODB Replacement of defective CAPTHOR in FSC of the same 20/Sep/2019 9:30 20/Sep/2019 17:00
REACTOR line
698 PLANNED OCC_522 POWERGRID_WR2 400KV-CGPL-BACHAU-3 D For providing insulation sleeve on Jumper at Loc 291 21/Sep/2019 8:00 21/Sep/2019 18:00 Outage
(DCTP), A/R OFF of ckt -4 and dia to be kept open at
both ends.
699 PLANNED OCC_522 POWERGRID_WR2 400KV-CGPL-BACHAU-3 D For work permit/online modification of PLCC Channel 1 21/Sep/2019 10:00 21/Sep/2019 12:00 Outage
at Mundra End.
700 PLANNED OCC_522 POWERGRID_WR2 400KV-CGPL-BACHAU-3 D For work permit/online modification of PLCC Channel 2 21/Sep/2019 12:15 21/Sep/2019 14:15 Outage
at Mundra End.
701 PLANNED OCC_522 POWERGRID_WR2 400KV-CGPL-BACHAU-3 D For end to end testing of PLCC signals. Line ouatge is 21/Sep/2019 14:30 21/Sep/2019 16:00 Outage
required.
702 PLANNED OCC_522 POWERGRID_WR1 AURANGABAD - 765KV - BUS 2 D For AMP works. 21/Sep/2019 9:00 21/Sep/2019 18:00 Bus-1 remain in service BUS
703 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-SATNA-BINA-1 AND 400KV- D For installation of additional compressor 21/Sep/2019 9:00 21/Sep/2019 18:00 Outage Bay
VINDHYACHAL-SATNA-1 at SATNA - 400KV
704 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV - BUS 1 D Extension bay construction work 21/Sep/2019 9:00 25/Sep/2019 16:00 Outage BUS
705 PLANNED OCC_522 GETCO 400KV/220KV MANSAR-ICT-2 Daily Water washing & Bay Maintenance work 21/Sep/2019 8:00 21/Sep/2019 18:00
706 PLANNED OCC_522 PGCIL ODISHA 400kV GIS Main Bay 430 of RAIGARH-3 at Sundargarh AMP works 21/Sep/2019 9:00 21/Sep/2019 17:00

707 PLANNED OCC_522 MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily Half yearly maintenance and diagnostic testing work 21/Sep/2019 09:00 21/Sep/2019 18:00 -
708 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 400KV-Solapur-SOLAPUR-NTPC-4 AND D Bay AMP works. 21/Sep/2019 9:00 21/Sep/2019 18:00 Bay
Solapur - 400KV - Bus 2 at Solapur - 400KV
709 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - INDORE - 400KV B/R 2 AND 765KV/400KV D For AMP Works 21/Sep/2019 9:00 21/Sep/2019 18:00 Outage Bay
INDORE-ICT-2 at INDORE - 400KV
710 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-ITARSI-INDORE-MP-1 AND ITARSI - D For Retrofitting of existing ABB make RAICA LBB relay 21/Sep/2019 9:00 21/Sep/2019 18:00 Outage
400KV - BUS 2 with Alstom make P442 relay.
711 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-PUNE-GIS-PUNE-PG-4 AND PUNE- D For AMP Works 21/Sep/2019 9:00 21/Sep/2019 18:00 Bay
PG - 400KV - BUS 1 at PUNE-PG - 400KV
712 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-AKOLA-AURANGABAD-2 AND C For Breaker Replacement Work at Akola 21/Sep/2019 9:00 30/Sep/2019 18:00 Bay
AKOLA - 400KV - BUS 1 at Wardha - 400KV
713 PLANNED OCC_522 POWERGRID_WR1 765KV-CHAMPA-DHARAMJAYGARH-1 D Line AR to be keep in non auto mode for Tower top 21/Sep/2019 9:00 30/Sep/2019 19:00 Line AR to be keep in non auto mode for AC TRANSMISSION
patrolling. Tower top patrolling. LINE CIRCUIT
714 NRPC KURUKSHETRA-CHAMPA POLE-1/800 CONTI For Pole-3 Commissioning works: For testing of bipole 21/Sep/2019 08:00 22/Sep/2019 20:00
NUOU with Pole-3 under construction with new sofware
S updated after testing in May. Some hardware
modification also need to be carried out.

715 NRPC KUREKSHETRA -CHAMPA POLE -II/800 CONTI For Pole-3 Commissioning works: For testing of bipole 21/Sep/2019 08:00 22/Sep/2019 20:00
NUOU with Pole-3 under construction with new sofware
S updated after testing in May. Some hardware
modification also need to be carried out.

716 PLANNED OCC_522 POWERGRID_WR1 PUNE-PG - 400KV - BUS 1 D Replacement of Clamp & connectors 22/Sep/2019 9:00 22/Sep/2019 18:00 BUS Please reschedule outage on
15.09.2019
717 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-CHORANIA-1 D For AMP Works at Chorania end, A/R OFF of Mansar- 22/Sep/2019 10:00 22/Sep/2019 18:00 Outage AC TRANSMISSION Outage shall be deferred due
Chorania and Bhachau-Mansar LINE CIRCUIT to 400 kV CGPL - Jetpur - 2
outage
718 PLANNED OCC_522 GETCO 400 kV VADAVI-VELUDA Daily Bay Maintenance 22/Sep/2019 8:00 22/Sep/2019 18:00
719 PLANNED OCC_522 TAPS34 400KV-TARAPUR 3&4-PADGHE-2 C CB, ES, DS, LA, CT, LA, WT, CVT Annual PM 22/Sep/2019 9:00 23/Sep/2019 18:00 CB, ES, DS, LA, CT, LA, WT, CVT Annual
PM
720 PLANNED OCC_522 MSETCL CHANDRAPUR - 400KV - BUS 1 Contin Replacement of damaged bus conductor in 400KV 22/Sep/2019 09:00 24/Sep/2019 18:00 During this outage period, the all
uous HVDC Ckt. No.-I & GTR-VI bay and Bus coupler bay feeders/circuit connected to 400KV Main
section. Bus-I will be shifted on 400KV Main Bus-
II. After shifting of all feeders/circuits,
the 400KV Bus Coupler bay will be kept
OFF.

721 PLANNED OCC_522 MSETCL 400KV-CHANDRAPUR-GCR-CHANDRAPUR HVDC-1 Contin Replacement of damaged bus conductor in 400KV 22/Sep/2019 09:00 24/Sep/2019 18:00 During, this outage 400KV HVDC Ckt.
uous HVDC Ckt. No.-I & GTR-VI bay and Bus coupler bay No.- 2 will be in service. The outage on
section. 400KV HVDC Ckt. No.-1 bay is required
as the work of replacement of bus
conductor of Main Bus-1 is to be carried
out in HVDC ckt. No.-1 bay

722 PLANNED OCC_522 MSETCL GTR - 6 @ CHANDRAPUR Contin Permission for shifting of 400KV GT - 6 bay on TBC-II 22/Sep/2019 09:00 24/Sep/2019 18:00 During, this outage 400KV HVDC Ckt.
uous bay. No.- 2 will be in service. The 400KV GT-6
bay will be shift on TBC-2 bay required
as the work of replacement of bus
conductor of Main Bus-1 is to be carried
out in GT-6 bay.

723 PLANNED OCC_522 MP_SLDC 400KV-Badnawar-RAJGARH-1 D For line maintenance work 22/Sep/2019 8:00 22/Sep/2019 18:00
724 PLANNED OCC_522 POWERGRID_WR2 765KV-BINA-INDORE-1 L/R@ BINA - 765KV D For restoration of LR R phase in place of Sapre LR and 22/Sep/2019 9:15 22/Sep/2019 17:30 Outage LINE REACTOR
Line reactor will be out of service along with Line .

725 PLANNED OCC_522 POWERGRID_WR2 765KV-BINA-INDORE-1 D For AMP Works by Bina, dia to be kept open at both 22/Sep/2019 9:15 22/Sep/2019 18:00 Outage AC TRANSMISSION
ends LINE CIRCUIT
726 PLANNED OCC_522 MP_SLDC 400KV Sarni ISP Bay with 400 kv Main Bus II at Sarni C For Replacement of PG Isolator of Main Bus -IiIof 400 22/Sep/2019 9:00 25/Sep/2019 18:00 400KVSarni ISP feeder will be in service Main bus-2 of?
KV Sarni-Isp Bay through tie breaker.After completion of
work 400 kv ISP Feeder will remain out
for 2 hrs for getting charged through 400
KV ISP Feeder Breaker,

727 PLANNED OCC_522 MSETCL 765/400KV 500MVA SPARE ICT UNIT @ EKTUNI Daily For additional safety for working conditions, it is 22/Sep/2019 10:00 22/Sep/2019 18:00 Being Spare ICT Unit, it is on NO LOAD
requested to approve shutdown on 765/400kV,
500MVA, Spare ICT Unit along with ICT-II
728 PLANNED OCC_522 MSETCL 765KV/400KV EKTUNI-ICT-2 Daily High Insulation coating work on ICT Delta formation 22/Sep/2019 10:00 22/Sep/2019 18:00 765/400kV ICT-I will be in service.

729 PLANNED OCC_522 MSETCL 400KV-RGPPL-NAGOTHANE-2 Daily Earth Wire replacement ,Routine maint. Work & Faulty 22/Sep/2019 08:00 22/Sep/2019 18:00 Load can be managed on Dabhol-
string replacement Work Nagotnae CKT-I line
730 PLANNED OCC_522 PGCIL ODISHA 400kV GIS tie bay no. 431 of RAIGARH-3 & ROURKELA- AMP works 22/Sep/2019 9:00 22/Sep/2019 17:00
3 at Sundargarh
731 PLANNED OCC_522 MSETCL 400KV-BABLESHWAR-PADGHE-PG-2 Daily PID testing work 22/Sep/2019 08:00 30/Sep/2019 18:00 AR required in non auto
732 PLANNED OCC_522 POWERGRID_WR2 400KV-VADINAR-BACHAU-2 D For fixing Bird diverter, A/R OFF of ckt-1, dia to be kept 22/Sep/2019 8:00 30/Sep/2019 18:00 Outage
open.
733 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-DEHGAM-GANDHAR-1 AND DEHGAM C Retrofitting of Existing BHEL CB with New GE make CB. 22/Sep/2019 9:00 30/Sep/2019 18:00 Outage Bay
- 400KV B/R 1 at DEHGAM - 400KV
734 PLANNED OCC_522 GETCO 400 kV CHORANIA-VADAVI-1 Daily Bay Maintenance 23/Sep/2019 8:00 23/Sep/2019 18:00
735 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-AKOLA-AURANGABAD-2 AND D For AMP works. 23/Sep/2019 9:00 23/Sep/2019 18:00 Bay
FUTURE at AURANGABAD - 400KV
736 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-HALDARWA-2 D For Online PID work; Shutdown not required 23/Sep/2019 9:00 24/Sep/2019 18:00 AC TRANSMISSION To be clubed wit Kawas -
LINE CIRCUIT haldarva D/C outage
737 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-VARSANA-1 D RTV Coating work on bay equipment at Varsana end, 23/Sep/2019 8:00 24/Sep/2019 18:00 Outage AC TRANSMISSION
A/R OFF of ckt-2 and dia to be kept open at both ends LINE CIRCUIT
738 PLANNED OCC_522 NTPC 400KV-KORBA-NTPC-ESSAR MAHAN-1 D For Shunt reactor erection work, opportunity work 23/Sep/2019 8:00 25/Sep/2019 18:30 For Shunt reactor erection work, AC TRANSMISSION Consented. opportunity work
permit to be issued to POWERGRID & 400kV Korba- opportunity work permit to be issued to LINE CIRCUIT permit to be issued to
Vindhyachal-2 AR to be keep in non auto mode. POWERGRID & 400kV Korba- POWERGRID & 400kV Korba-
Vindhyachal-2 AR to be keep in non auto Vindhyachal-2 AR to be keep
mode. in non auto mode.

739 PLANNED OCC_522 GETCO 400KV-VADINAR-HADALA-1 Daily Feeder Bay Water Washing work 23/Sep/2019 8:00 23/Sep/2019 18:00
740 PLANNED OCC_522 GETCO 400KV VARSANA-CHARAKA LINE Daily For replacement of Fix contact Rod & L clamp of 89B 23/Sep/2019 8:00 23/Sep/2019 18:00 Outage to be taken with Main Bus-2
Isolator at Varsana end.
741 PLANNED OCC_522 GETCO VARSANA - 400KV - BUS 2 Daily For replacement of Fix contact Rod & L clamp of 89B 23/Sep/2019 8:00 23/Sep/2019 18:00
Isolator at Varsana end.
742 PLANNED OCC_522 MSETCL 400KV-RGPPL-NEW KOYNA-1 Daily Routine maint. Work & Faulty string replacement Work 23/Sep/2019 08:00 23/Sep/2019 18:00 Load can be managed on Dabhol-New
Koyna CKT-II line
743 PLANNED OCC_522 MSETCL 400KV-SSP-DHULE-MS-2 Daily Replacement of suspicious faulty strings if found in 23/Sep/2019 08:00 23/Sep/2019 18:00 Replacement of suspicious faulty strings
PID testing. if found in PID testing. AR out of Ckt 1
required
744 PLANNED OCC_522 POWERGRID_WR1 765KV BUS-2 SECTIONALYZER BAY-714 AT CHAMPA D FOR RTAMC/ NTAMC SIGNAL VALIDATION 23/Sep/2019 9:00 23/Sep/2019 13:00 714 Missed in Bay
PS data base
745 PLANNED OCC_522 POWERGRID_WR2 220KV-VAPI-MAGARWADA-1 D For AMP Works 23/Sep/2019 9:00 23/Sep/2019 17:00 Outage AC TRANSMISSION
LINE CIRCUIT
746 PLANNED OCC_522 POWERGRID_WR2 765KV-SASAN-VINDHYACHAL(PS)-1 D For Installation of Differential Relay at Vindhyachal, dia 23/Sep/2019 9:00 23/Sep/2019 17:30 Outage
to be kept open at both ends
747 PLANNED OCC_522 RRWTL Bay-711 Tie bay of Bilaspur Line-2 Daily Annual maintenance of bay equipments 23/Sep/2019 9:00 23/Sep/2019 18:00
748 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - AURANGABAD - 765KV B/R 1 AND D For AMP works. 23/Sep/2019 9:00 23/Sep/2019 18:00 Bay
765KV/400KV AURANGABAD-ICT-1 at AURANGABAD -
765KV
749 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-1 D FOR AMP WORKS. 23/Sep/2019 9:00 23/Sep/2019 18:00 Bay
AND RAIPUR-PS (DURG) - 765KV - BUS 1 at RAIPUR-PS
(DURG) - 765KV
750 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 765KV-Solapur-Raichur-1 AND Solapur - D To change Imax make Auxiliary and Limit switches in 23/Sep/2019 9:00 23/Sep/2019 18:00 Bay
765KV - Bus 1 at Solapur - 765KV SIEMENS make CB.
751 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-WARDHA-MOUDA-2 AND FUTURE at D For AMP work 23/Sep/2019 9:00 23/Sep/2019 18:00 Bay
Wardha - 400KV
752 PLANNED OCC_522 POWERGRID_WR1 765KV-DHARAMJAYGARH-JABALPUR-4 L/R@ D FOR AMP WORKS. 23/Sep/2019 9:00 23/Sep/2019 18:00 LINE REACTOR
DHARAMJAYGARH - 765KV
753 PLANNED OCC_522 POWERGRID_WR1 SEONI-PG - 400KV B/R 1 D For AMP works 23/Sep/2019 9:00 23/Sep/2019 18:00 BUS REACTOR
754 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-VINDHYACHAL-SATNA-1 AND D For installation of additional compressor 23/Sep/2019 9:00 23/Sep/2019 18:00 Outage Bay
SATNA - 400KV - BUS 2 at SATNA - 400KV
755 PLANNED OCC_522 POWERGRID_WR2 REWA - 400KV B/R 1 D For AMP & Conservator MOG Attending, dia to be kept 23/Sep/2019 9:00 23/Sep/2019 18:00 Outage BUS REACTOR
open
756 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-ITARSI-INDORE-MP-1 AND FUTURE D For Retrofitting of existing ABB make RAICA LBB relay 23/Sep/2019 9:00 23/Sep/2019 18:00 Outage
AT ITARSI with Alstom make P442 relay.
757 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV DAMOH-ICT-3 AND DAMOH D For AMP Works 23/Sep/2019 9:30 23/Sep/2019 18:00 Outage
- 220KV - BUS 1
758 PLANNED OCC_522 POWERGRID_WR2 400KV-RAJGARH-KASOR-1 D For AMP Works at Kasor 23/Sep/2019 10:00 23/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
759 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV VADODARA-ICT-1 D For CB AMP & Tertiary insulation, dia to be kept open 23/Sep/2019 10:00 23/Sep/2019 18:00 Outage TRANSFORMER

760 PLANNED OCC_522 MSETCL MAIN BAY - 400KV/11.5KV KORADI-II-ST-3 AND Daily PID test for Insulator string of 400KV Bay in 23/Sep/2019 13:00 23/Sep/2019 15:00 Work will be carried out Online by PID
KORADI-II - 400KV - BUS 1 at KORADI-II - 400KV Switchyard. Unit Nagpur.
761 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-KORADI-II-KORADI-III-2 AND Daily PID test for Insulator string of 400KV Bay in 23/Sep/2019 15:00 23/Sep/2019 17:00 Work will be carried out Online by PID
KORADI-II - 400KV - BUS 2 at KORADI-II - 400KV Switchyard. Unit Nagpur.
762 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-KHARGHAR-PUNE-PG-1 AND PUNE- D Replacement of Clamp & connectors 23/Sep/2019 9:00 23/Sep/2019 18:00 Bay
PG - 400KV - BUS 2 at PUNE-PG - 400KV
763 PLANNED OCC_522 KWPCL Main Bay - KWPCL - 400KV - Bus 1 AND 400KV/21KV Daily Bay : 401 Relay Testing & SCADA Re Configuration 23/Sep/2019 8:00 24/Sep/2019 18:00
KWPCL-GT-1
764 PLANNED OCC_522 NTPC ICT-2 Main bay-24 at NTPC Sipat For PM (ICT-2 Will remain charged through it's Tie Bay) 23/Sep/2019 8:00 24/Sep/2019 18:00

765 PLANNED OCC_522 CGPL 400KV-CGPL-BACHAU-4 L/R@ CGPL - 400KV D Breaker drive box painting 23/Sep/2019 8:00 24/Sep/2019 20:00 Voltage
Regulation
766 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-BILASPUR-SEONI-2 AND 765KV- C For AMP works. 23/Sep/2019 9:00 24/Sep/2019 18:00 708_Bay Bay
SIPAT-BILASPUR-1 at BILASPUR - 765KV
767 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-BINA-INDORE-1 AND INDORE - D For AMP Works 23/Sep/2019 9:00 24/Sep/2019 18:00 Outage Bay
765KV - BUS 1 at INDORE - 765KV
768 PLANNED OCC_522 NSPCL 400KV/220KV NSPCL-ICT-2 D Annual Maintennace 23/Sep/2019 9:00 25/Sep/2019 17:00 Annual Maintennace
769 PLANNED OCC_522 NSPCL Main Bay - 400KV/220KV NSPCL-ICT-2 AND NSPCL - D Annual Maintennace 23/Sep/2019 9:00 25/Sep/2019 17:00 Annual Maintennace
400KV - Bus 2
770 PLANNED OCC_522 NSPCL Tie Bay - 400KV/220KV NSPCL-ICT-1 AND D Annual Maintennace 23/Sep/2019 9:00 25/Sep/2019 17:00 Annual Maintennace
400KV/220KV NSPCL-ICT-2
771 PLANNED OCC_522 MP_SLDC 400KV/220KV INDORE-MP-ICT-2 C For replacement of 33 KV CTs , Transformer will be 23/Sep/2019 9:00 25/Sep/2019 18:00
kept OFF
772 PLANNED OCC_522 POWERGRID_WR2 GWALIOR - 765KV - BUS 1 D Replacement of suspension and tension string 23/Sep/2019 9:00 25/Sep/2019 18:00 Outage BUS
(Porcelain) with Polymer insulator (String) in main
and Tie bay along with associated Bus Gantry.

773 PLANNED OCC_522 MSETCL 400KV-DHULE-MS-BABLESHWAR-2 Daily on line PID testing 23/Sep/2019 08:00 27/Sep/2019 18:00 On line PID testing
774 PLANNED OCC_522 MSETCL 400KV-DHULE-MS-BABLESHWAR-1 Daily On PID testing 23/Sep/2019 08:00 27/Sep/2019 18:00 on line PID testing
775 NRPC AGRA-PG (765KV)-GWALIOR-WR (765KV)I DAILY Replacement of suspension and tension string 23/Sep/2019 06:00 23/Sep/2019 18:00
(porcelain) with polymer insulator (string) in main & Tie
bay along with associated bus gantry ( dia to be kept
open at both end).S/d requested by Wr-II

776 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-VAV-2 D For AMP Works 24/Sep/2019 9:00 24/Sep/2019 18:00 Outage AC TRANSMISSION May be availed in between
LINE CIRCUIT 16.09.19 to 21.09.19
777 PLANNED OCC_522 MSETCL AURANGABAD-M (WALUJ) - 400KV - BUS 2 Daily Routine Maintenance of 400KB Babhaleshwar bay @ 24/Sep/2019 09:00 24/Sep/2019 17:00 Routine Maintenance shall be facilitated subject to
Waluj end HVDC outage

778 PLANNED OCC_522 MSETCL CHANDRAPUR - PADGHA POLE 1 & 2 Contin Work of 2 nos of tower Erection(Loc. no. 285 & 286) 24/Sep/2019 06:00 30/Sep/2019 18:00 ORC work of Height raising at loc. no. Maharashtra TTC/ATC shall
uous and stringing of. 16 span of towers( Loc. no. 278-294) 285 & 286 of 500KV Chandrapur-Padghe be revised accordingly
for the Height raising at loc. no. 285 & 286 of 500KV HVDC Line due to construction of Kochi-
Chandrapur-Padghe HVDC Line due to construction of Amezary Dam.
Kochi-Ambezary Dam.

779 PLANNED OCC_522 POWERGRID_WR2 765KV-GWALIOR-AGRA-1 D Replacement of suspension and tension string 24/Sep/2019 9:00 24/Sep/2019 18:00 Outage AC TRANSMISSION
(Porcelain) with Polymer insulator (String) in main LINE CIRCUIT
and Tie bay along with associated Bus Gantry. Dia to be
kept open at both ends. Outage of 765kV Bus-1 is also
required.

780 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIPUR-PS (DURG)-CHAMPA-1 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 24/Sep/2019 14:00 24/Sep/2019 17:30 702 Bay
CHAMPA - 765KV B/R 1 at CHAMPA - 765KV
781 PLANNED OCC_522 GETCO 400 kV VADAVI-HALVAD-1 Daily Bay Maintenance 24/Sep/2019 8:00 24/Sep/2019 18:00
782 PLANNED OCC_522 APML MAIN BAY - 400KV/KV TIRODA-ST-3 AND TIRODA - Daily Testing & Maintenance of ICT & Its Relay 24/Sep/2019 08:00 24/Sep/2019 18:00 Testing & Maintenance of ICT & Its Relay
400KV - BUS 1 at TIRODA - 400KV

783 PLANNED OCC_522 MSETCL 400KV-SSP-DHULE-MS-2 Daily Replacement of PID suspicious string if found faulty in 24/Sep/2019 08:00 24/Sep/2019 18:00 Replacement of PID suspicious string if
PID testing found faulty in PID testing. AR out of Ckt
1 required
784 PLANNED OCC_522 MSETCL MAIN BAY - 400KV/11.5KV KORADI-II-ST-2 AND Daily PID test for Insulator string of 400KV Bay in 24/Sep/2019 09:00 24/Sep/2019 11:00 Work will be carried out Online by PID
KORADI-II - 400KV - BUS 1 at KORADI-II - 400KV Switchyard. Unit Nagpur.
785 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV VINDHYACHAL(PS)-ICT-1 D For change over of Bph unit with spare unit, dia to be 24/Sep/2019 9:00 24/Sep/2019 14:30 Outage
kept open on both sides, dia to be kept open.
786 PLANNED OCC_522 MP_SLDC 220KV Malanpur-Adani D For line maintenance work 24/Sep/2019 9:00 24/Sep/2019 17:00
787 PLANNED OCC_522 POWERGRID_WR2 220KV-VAPI-MAGARWADA-2 D For AMP Works 24/Sep/2019 9:00 24/Sep/2019 17:00 Outage AC TRANSMISSION
LINE CIRCUIT
788 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-4 AND D FOR AMP WORKS. 24/Sep/2019 9:00 24/Sep/2019 17:30 427 Bay
CHAMPA - 400KV - BUS 4 at CHAMPA - 400KV
789 PLANNED OCC_522 RRWTL Bay-712 Main Bay of Bilaspur Line-2 Daily Annual maintenance of bay equipments 24/Sep/2019 9:00 24/Sep/2019 18:00
790 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-WARDHA-AURANGABAD-1 AND D For AMP works. 24/Sep/2019 9:00 24/Sep/2019 18:00 Bay
AURANGABAD - 765KV - BUS 2 at AURANGABAD -
765KV
791 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV DHARAMJAYGARH-ICT-1 D FOR AMP WORKS. 24/Sep/2019 9:00 24/Sep/2019 18:00 Missed in Bay
AND DHARAMJAYGARH - 400KV - BUS 2 at data base
DHARAMJAYGARH - 765KV
792 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV SEONI-ICT-1 AND SEONI-PG D For AMP Works 24/Sep/2019 9:00 24/Sep/2019 18:00 Bay
- 400KV - BUS 1 at SEONI-PG - 400KV
793 PLANNED OCC_522 POWERGRID_WR1 Main Bay - Solapur - 765KV B/R 1 AND Solapur - D To change Imax make Auxiliary and Limit switches in 24/Sep/2019 9:00 24/Sep/2019 18:00 Bay
765KV - Bus 2 at Solapur - 765KV SIEMENS make CB.
794 PLANNED OCC_522 POWERGRID_WR2 400KV-SEONI-PG-KHANDWA-1 D Replacement of Auxilary relays of Seoni -1 LR Protection 24/Sep/2019 9:00 24/Sep/2019 18:00 Outage AC TRANSMISSION
Panel, A/R OFF of ckt-2 and dia to be kept open at both LINE CIRCUIT
ends.
795 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV/220KV ITARSI-ICT-1 AND ITARSI - D For Retrofitting of existing ABB make RAICA LBB relay 24/Sep/2019 9:00 24/Sep/2019 18:00 Outage
400KV - BUS 1 with Alstom make P442 relay.
796 PLANNED OCC_522 POWERGRID_WR2 DAMOH-220KV-TRANSFER BUS D For AMP Works 24/Sep/2019 9:30 24/Sep/2019 18:00 Outage
797 PLANNED OCC_522 POWERGRID_WR2 400KV-RAJGARH-KASOR-2 D For AMP Works at Kasor 24/Sep/2019 10:00 24/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
798 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV VADODARA-ICT-2 D For CB AMP & Tertiary insulation, dia to be kept open 24/Sep/2019 10:00 24/Sep/2019 18:00 Outage TRANSFORMER

799 PLANNED OCC_522 MSETCL TIE BAY - 400KV/11.5KV KORADI-II-ST-2 AND 400KV- Daily PID test for Insulator string of 400KV Bay in 24/Sep/2019 11:00 24/Sep/2019 13:00 Work will be carried out Online by PID
KORADI-II-KORADI-III-1 at KORADI-II - 400KV Switchyard. Unit Nagpur.

800 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-KORADI-II-KORADI-III-1 AND Daily PID test for Insulator string of 400KV Bay in 24/Sep/2019 13:00 24/Sep/2019 15:00 Work will be carried out Online by PID
KORADI-II - 400KV - BUS 2 at KORADI-II - 400KV Switchyard. Unit Nagpur.
801 PLANNED OCC_522 MSETCL TIE BAY - 400KV-WARDHA-KORADI-II-1 AND FUTURE Daily PID test for Insulator string of 400KV Bay in 24/Sep/2019 15:00 24/Sep/2019 17:00 Work will be carried out Online by PID
at KORADI-II - 400KV Switchyard. Unit Nagpur.
802 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-CHAKAN-PUNE-PG-1 AND 400KV- D For AMP Works 24/Sep/2019 9:00 24/Sep/2019 18:00 Bay
KHARGHAR-PUNE-PG-1 at PUNE-PG - 400KV
803 PLANNED OCC_522 NTPC 400KV-WARDHA-MOUDA-1 C Annual Maintenance: Annual testing-IR, CT testing, 24/Sep/2019 8:00 26/Sep/2019 18:00 Work permit to be issued to POWERGRID AC TRANSMISSION Outage may be
isolator testing, breaker testing, isolator alignment. and AR requiired in non Auto mode for LINE CIRCUIT provided.Work permit may
Ckt2 please be issued to
POWERGRID and AR
required in non Auto mode
for Ckt2

804 PLANNED OCC_522 NTPC VSTPS BUS REACTOR BAY (Stage-V/ Bay No. 428) Annual Bay & Reactor Maintenance 24/Sep/2019 8:00 26/Sep/2019 18:30
805 PLANNED OCC_522 NTPC VSTPS TIE BAY (Stage-V/ Bay No. 429) Annual Bay Maintenance 24/Sep/2019 8:00 26/Sep/2019 18:30
806 PLANNED OCC_522 MP_SLDC 400KV Sarni-Seoni Feeder with Transfer Bus C For Replacement of PG Isolator of Transfer Bus of Sarni- 24/Sep/2019 9:00 27/Sep/2019 18:00 After completion of work 400kv Sarni-
seoni Feeder Seoni feeder wiil be charged from Tie
Breaker
807 PLANNED OCC_522 MP_SLDC 80MVAR Reactor-I at 400KV S/s Bhopal C For attainding oil leackage form PRV and rewiring of 24/Sep/2019 8:00 28/Sep/2019 18:00
NIFPS and testing work.
808 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-WARDHA-AKOLA-2 AND WARDHA - D For AMP work 25/Sep/2019 9:00 25/Sep/2019 18:00 Bay
400KV - BUS 1 at Wardha - 400KV
809 PLANNED OCC_522 POWERGRID_WR2 220KV-KAWAS-HALDARWA-1 D For Online PID work; Shutdown not required 25/Sep/2019 9:00 26/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
810 PLANNED OCC_522 POWERGRID_WR1 PUNE-PG - 400KV - BUS 2 D Replacement of Clamp & connectors 25/Sep/2019 9:00 25/Sep/2019 18:00 BUS Please reschedule outage on
25.09.2019 / Shall be
facilitated subject to C-P
HVDC Outage

811 PLANNED OCC_522 MSETCL CHANDRAPU-II - 400KV - BUS 1 Daily for diagnostic testing and allied bay maintenance work 25/Sep/2019 09:00 25/Sep/2019 18:00 400KV BUS-1 CVT TAN DELTA & BAY shall be facilitated subject to
MAINTENANCE WORK HVDC outage
812 PLANNED OCC_522 POWERGRID_WR2 400KV-BACHAU-VARSANA-2 D RTV Coating work on bay equipment at Varsana end, 25/Sep/2019 8:00 26/Sep/2019 18:00 Outage
A/R OFF of ckt-1 and dia to be kept open at both ends
813 PLANNED OCC_522 MSETCL 765/400KV 500MVA SPARE ICT UNIT @ EKTUNI Daily For additional safety for working conditions, it is 25/Sep/2019 10:00 25/Sep/2019 18:00 Being Spare Unit, it is on NO LOAD
requested to approve shutdown on 765/400kV,
500MVA, Spare ICT Unit along with ICT-I .
814 PLANNED OCC_522 MSETCL 765KV/400KV EKTUNI-ICT-1 Daily High Insulation coating work on ICT Delta formation 25/Sep/2019 10:00 25/Sep/2019 18:00 765/400kV ICT-II will be in service.

815 PLANNED OCC_522 POWERGRID_WR2 765KV-GWALIOR-AGRA-2 D Replacement of suspension and tension string 25/Sep/2019 9:00 25/Sep/2019 18:00 Outage AC TRANSMISSION
(Porcelain) with Polymer insulator (String) in main LINE CIRCUIT
and Tie bay along with associated Bus Gantry. Dia to be
kept open at both ends. Outage of 765kV Bus-1 is also
required.

816 PLANNED OCC_522 POWERGRID_WR2 765KV-BHOPAL-BDTCL-JABALPUR-1 D AMP Terminal Equipment, dia to be kept open 25/Sep/2019 10:00 25/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
817 PLANNED OCC_522 ATIL 81 MVAR,400KV Bus reactor-1 , Phase -3 Daily 400KV Bus reactor No-1 with 4051 Main bay & 4050 25/Sep/2019 7:00 25/Sep/2019 20:00
switchyard,(4051 & 4050 bay) APMuL ,Mundra tie bay ,Annual routine maintenance work
818 PLANNED OCC_522 KWPCL Tie Bay - 400KV/11.5KV KWPCL-ST-1 AND 400KV- Daily 405 Bay Breaker & Isolator Maintenance 25/Sep/2019 8:00 25/Sep/2019 18:00
KWPCL-RAIGARH-PS-2
819 PLANNED OCC_522 GETCO 400KV-AMRELI-JETPUR-2 Daily Line maintanance work 25/Sep/2019 8:00 25/Sep/2019 16:00 Autoreclose out for 400kv Amreli-Hadala
line
820 PLANNED OCC_522 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily line maintenance 25/Sep/2019 08:00 25/Sep/2019 16:00 -
821 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-NARANPAR(OSTRO)-1 D For yearly AMP activities of all Bay Equipments and oil 25/Sep/2019 8:00 25/Sep/2019 19:00 Outage
AND BACHAU - 220KV - BUS 1 sampling of AIS CT's. Line outage is requuired

822 PLANNED OCC_522 POWERGRID_WR2 220KV-BACHAU-NARANPAR(OSTRO)-1 D For yearly AMP activities of all Bay Equipments and oil 25/Sep/2019 8:00 25/Sep/2019 19:00 Outage
sampling of AIS CT's, Outage of line is required.

823 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-CHAMPA-DHARAMJAYGARH-1 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 25/Sep/2019 9:00 25/Sep/2019 13:00 716 Bay
765KV/400KV CHAMPA-ICT-4 at CHAMPA - 765KV

824 PLANNED OCC_522 PGCIL ODISHA 765kV Sundargarh-Dharamjaygarh Ckt#3 at BPI erection works at T-point + TL Maintenace work 25/Sep/2019 9:00 25/Sep/2019 14:00
Sundargarh
825 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-WARDHA-WARORA-1 AND WARDHA Daily Routine Maintenance & Dignostic testing work Nut Bolt 25/Sep/2019 09:00 25/Sep/2019 17:00 Line will be charged through Tie CB 428.
- 400KV - BUS 2 at Wardha - 400KV Tightning work
826 PLANNED OCC_522 RRWTL 701LR, 765kV Warora Line Reactor-1 at Rajnandgaon Daily 4-5 times live switching operation required for 25/Sep/2019 9:00 25/Sep/2019 18:00
Switching Station commissioning of PWC600 Relay of 701 Warora Line-1
Reactor
827 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-WARDHA-RAIPUR-PS (DURG)-3 D FOR AMP WORKS. 25/Sep/2019 9:00 25/Sep/2019 18:00 Bay
AND RAIPUR-PS (DURG) - 765KV - BUS 2 at RAIPUR-PS
(DURG) - 765KV
828 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV SEONI-ICT-2 AND SEONI-PG D For AMP Works 25/Sep/2019 9:00 25/Sep/2019 18:00 Bay
- 400KV - BUS 1 at SEONI-PG - 400KV
829 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/440KV WARDHA-ICT-3 AND 400KV- D For AMP work 25/Sep/2019 9:00 25/Sep/2019 18:00 Bay
RAIPUR-WARDHA-2 at Wardha - 400KV
830 PLANNED OCC_522 POWERGRID_WR1 765KV-AURANGABAD-SOLAPUR-2 L/R@ D For AMP works. 25/Sep/2019 9:00 25/Sep/2019 18:00 Line remain in service LINE REACTOR
AURANGABAD - 765KV
831 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-VINDHYACHAL-SATNA-3 AND D For AMP Works 25/Sep/2019 9:00 25/Sep/2019 18:00 Outage Bay
SATNA - 400KV - BUS 2 at SATNA - 400KV
832 PLANNED OCC_522 TPL-DGEN 400KV/22KV DGEN-GT-1 D Energization of the Transformer during RSD for Station 25/Sep/2019 10:00 25/Sep/2019 17:00 DGEN Unit under RSD outage TRANSFORMER
Aux Power and Routine. Transformer will remain in
service.
833 PLANNED OCC_522 MP_SLDC 220KV Annupur-Kotmikala-I D For line maintenance work 25/Sep/2019 10:00 25/Sep/2019 17:00
834 PLANNED OCC_522 MP_SLDC 220KV Indore (PGCIL) -Jaitpura-I D For line maintenance work 25/Sep/2019 10:00 25/Sep/2019 17:00
835 PLANNED OCC_522 POWERGRID_WR2 VADODARA - 400KV B/R 1 D For CSD Commissionig, dia to be kept open. 25/Sep/2019 10:00 25/Sep/2019 18:00 Outage BUS REACTOR
836 PLANNED OCC_522 TPL-DGEN 400KV/22KV DGEN-GT-2 D De-energization of Transformer for Energy Conservation 25/Sep/2019 12:00 25/Sep/2019 17:00 DGEN Unit under RSD outage TRANSFORMER
during RSD. Transformer will remain de-energized and
available.
837 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-4 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 25/Sep/2019 14:00 25/Sep/2019 17:30 717 Bay
CHAMPA - 765KV - BUS 4 at CHAMPA - 765KV
838 PLANNED OCC_522 CGPL 400KV-CGPL-Jetpur-1 L/R@ CGPL - 400KV D Breaker drive box painting 25/Sep/2019 8:00 26/Sep/2019 20:00 Voltage
Regulation
839 PLANNED OCC_522 POWERGRID_WR2 BANASKANTHA - 400KV - BUS 2 D Extension bay construction work 25/Sep/2019 9:00 26/Sep/2019 16:00 Outage BUS
840 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV BHUJ-ICT-2 D CSD Commissionng at (Bay No. 420 & 421), dia to be 25/Sep/2019 9:00 26/Sep/2019 18:00 Outage TRANSFORMER
kept open on both sides
841 PLANNED OCC_522 POWERGRID_WR1 400KV-BHILAI-BHATAPARA-1 C Auto reclosure relay retrofitting work at Bhilai SS 25/Sep/2019 9:30 26/Sep/2019 17:30 Dia to be kept open also at Bhatapara AC TRANSMISSION
end for relay testing works. LINE CIRCUIT

842 PLANNED OCC_522 TPL-DGEN 400KV/220KV DGEN-ICT-3 C ICT 3 routine energisation testing during RSD and 25/Sep/2019 10:00 26/Sep/2019 17:00 ICT No load charging only, Not connected outage TRANSFORMER
shutdown for energy conservation after one day at 220 KV side.
energization
843 NRPC AGRA-PG (765KV)-GWALIOR-WR (765KV)II DAILY Replacement of suspension and tension string 25/Sep/2019 06:00 25/Sep/2019 18:00
(Porcelain) with Polymer insulator (string) in main & tie
bay along with associated Bus Gantry (dia to be kept
open at both end). S/d requested by Wr-II.

844 ERPC 765kV Sundargarh-Dharamjaygarh Ckt#3 at ODB BPI erection works at T-point + TL Maintenace work 25/Sep/2019 9:00 25/Sep/2019 14:00
Sundargarh
845 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-AKOLA-AURANGABAD-2 AND D For AMP works. 26/Sep/2019 9:00 26/Sep/2019 18:00 Bay
AURANGABAD - 400KV - BUS 1 at AURANGABAD -
400KV
846 PLANNED OCC_522 MSETCL AURANGABAD-M (WALUJ) - 400KV - BUS 2 Daily ROUTINE MAINTENANCE 26/Sep/2019 09:00 26/Sep/2019 17:00 ROUTINE MAINTENANCE shall be facilitated subject to
HVDC outage
847 PLANNED OCC_522 POWERGRID_WR2 220KV-KAKRAPAR 1&2-VAV-2 C For 04 No Isolators replacement, Bay AMP works at 26/Sep/2019 9:00 30/Sep/2019 18:00 Outage AC TRANSMISSION
GETCO Vav S/s LINE CIRCUIT
848 PLANNED OCC_522 POWERGRID_WR1 400KV-KORBA-NTPC-BHILAI-2 C Diversion work of line due to ash dyke of Maruti Clean 26/Sep/2019 8:00 30/Sep/2019 18:00 Working code may please be provided to AC TRANSMISSION
Project Power Limited(MCCPL).Erection work of two POWERGRID and AR in non Auto mode LINE CIRCUIT
nos.new towers,dismantling work of 02 nos. old required for Ckt-I.
towers,de-stringing & stringing works
849 PLANNED OCC_522 MEGPTCL MAIN BAY - 404 OF 765/400kV 1500MVA ICT @ AKOLA Daily Annual Maintenance of Bay Equipments 26/Sep/2019 09:00 26/Sep/2019 18:00 Annual Maintenance of Bay Equipments
2

850 PLANNED OCC_522 POWERGRID_WR1 765KV-AURANGABAD-Solapur-1 L/R@ Solapur - 765KV D Reactor AMP works. 26/Sep/2019 9:00 26/Sep/2019 18:00 LINE REACTOR

851 PLANNED OCC_522 POWERGRID_WR2 765KV-GWALIOR-JAIPUR-1 D Replacement of suspension and tension string 26/Sep/2019 9:00 26/Sep/2019 18:00 Outage AC TRANSMISSION
(Porcelain) with Polymer insulator (String) in main LINE CIRCUIT
and Tie bay along with associated Bus Gantry. Dia to be
kept open at both ends A/R OFF of ckt-2. Outage of
765kV Bus-1 is also required.

852 PLANNED OCC_522 MP_SLDC 220KV Indore (PGCIL) -Jaitpura-II D For line maintenance work 26/Sep/2019 10:00 26/Sep/2019 17:00
853 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-CHAKAN-PUNE-PG-1 AND PUNE-PG D For AMP Works 26/Sep/2019 9:00 26/Sep/2019 18:00 Bay
- 400KV - BUS 1 at PUNE-PG - 400KV
854 PLANNED OCC_522 GETCO 400KV-VADINAR-HADALA-2 Daily Feeder Bay Water Washing work 26/Sep/2019 8:00 26/Sep/2019 18:00
855 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 220KV-BACHAU-NARANPAR(OSTRO)-2 D For yearly AMP activities of all Bay Equipments and oil 26/Sep/2019 8:00 26/Sep/2019 19:00 Outage
AND BACHAU - 220KV - BUS 1 sampling of AIS CT's. Line outage is requuired

856 PLANNED OCC_522 POWERGRID_WR2 220KV-BACHAU-NARANPAR(OSTRO)-2 D For yearly AMP activities of all Bay Equipments and oil 26/Sep/2019 8:00 26/Sep/2019 19:00 Outage
sampling of AIS CT's, Outage of line is required.

857 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-RAIGARH-PS-CHAMPA-1 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 26/Sep/2019 9:00 26/Sep/2019 13:00 718 Bay
CHAMPA - 765KV - BUS 3 at CHAMPA - 765KV
858 PLANNED OCC_522 PGCIL ODISHA 765kV Sundargarh-Dharamjaygarh Ckt#4 at BPI erection works at T-point + TL Maintenace work 26/Sep/2019 9:00 26/Sep/2019 14:00
Sundargarh
859 PLANNED OCC_522 MSETCL MAIN BAY - 400KV-WARDHA-KORADI-II-1 AND Daily Routine Maintenance & Dignostic testing work Nut Bolt 26/Sep/2019 09:00 26/Sep/2019 17:00 400KV KORADI-WARDHA Line will be
WARDHA - 400KV - BUS 1 at Wardha - 400KV Tightning work charged through Tie CB 414.
860 PLANNED OCC_522 MSETCL 220KV-WARDHA-PUSAD-1 Daily For Routine Maintainance Work 26/Sep/2019 09:00 26/Sep/2019 17:00 nil

861 PLANNED OCC_522 MP_SLDC 220KV Mahgaon-Adani D For line maintenance work 26/Sep/2019 9:00 26/Sep/2019 17:00
862 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV/400KV VINDHYACHAL(PS)-ICT-3 D For AMP Works 26/Sep/2019 9:00 26/Sep/2019 17:30 Outage
AND VINDHYACHAL(PS) - 400KV - BUS 2
863 PLANNED OCC_522 RRWTL 704LR, 765kV Warora Line Reactor-2 at Rajnandgaon Daily 4-5 times live switching operation required for 26/Sep/2019 9:00 26/Sep/2019 18:00
Switching Station commissioning of PWC600 Relay of 704 Warora Line-2
Reactor
864 PLANNED OCC_522 MSETCL 400KV-KOLHAPUR-MS-ALKUD-1 Daily Quarterly. Maint. work 26/Sep/2019 09:00 26/Sep/2019 18:00 -

865 PLANNED OCC_522 POWERGRID_WR1 400KV AC - 466 BAY - POLE 2 - CONVERTER DIA MAIN D FOR AMP WORKS. 26/Sep/2019 9:00 26/Sep/2019 18:00 Missed in 400KV AC BAY
BAY - II data base
866 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV DHARAMJAYGARH-ICT-2 D FOR AMP WORKS. 26/Sep/2019 9:00 26/Sep/2019 18:00 Missed in Bay
AND DHARAMJAYGARH - 400KV - BUS 2 at data base
DHARAMJAYGARH - 765KV
867 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV SEONI-ICT-2 AND 400KV- D For AMP Works 26/Sep/2019 9:00 26/Sep/2019 18:00 Bay
SEONI-PG-KHANDWA-1 at SEONI-PG - 400KV
868 PLANNED OCC_522 POWERGRID_WR1 Tie Bay - Solapur - 400KV B/R 1 AND 400KV-Solapur- D Bay AMP works 26/Sep/2019 9:00 26/Sep/2019 18:00 Bay
FUTURE-1 at Solapur - 400KV
869 PLANNED OCC_522 POWERGRID_WR1 765KV-AURANGABAD-SOLAPUR-1 L/R@ D For AMP works. 26/Sep/2019 9:00 26/Sep/2019 18:00 Line remain in service LINE REACTOR
AURANGABAD - 765KV
870 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-SATPURA-ITARSI-1 AND ITARSI - D For Retrofitting of existing LBB relay with Alstom make 26/Sep/2019 9:00 26/Sep/2019 18:00 Outage
400KV - BUS 2 P442 relay.
871 PLANNED OCC_522 ATIL MAIN BAY (414) OF TIRODA CKT - 2 @ WARORA Daily Replacement of Breaker 26/Sep/2019 10:00 27/Sep/2019 18:00 Replacement of Breaker Outage required from
26.09.2019 @10;00 hrs to
27.09.2019 @ 18:00hrs on
continuous basis

872 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIGARH-PS-CHAMPA-1 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 26/Sep/2019 14:00 26/Sep/2019 17:30 719 Bay
765KV/400KV CHAMPA-ICT-5 at CHAMPA - 765KV
873 PLANNED OCC_522 DBPOWER DB POWER - 400KV - BUS 1 D For AMP works 26/Sep/2019 8:00 27/Sep/2019 18:00 Shutdown is Planned considering the DB Power shall not bid in PX
DBPL Unit#2 AOH in Sep-19 during sd perod
874 PLANNED OCC_522 KWPCL KWPCL - 400KV - BUS 2 Daily BUS 2 Relay Testing & SCADA Re Configuration , 26/Sep/2019 8:00 27/Sep/2019 18:00
Breaker & Isolator Maintenance.
875 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV/400KV BILASPUR-ICT-2 AND FUTURE C For AMP works. 26/Sep/2019 9:00 27/Sep/2019 18:00 720_Bay Bay
at BILASPUR - 765KV
876 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - INDORE - 765KV B/R 1 AND INDORE - D For AMP Works 26/Sep/2019 9:00 27/Sep/2019 18:00 Outage Bay
765KV - BUS 1 at INDORE - 765KV
877 PLANNED OCC_522 MSETCL NEW KOYNA - 400KV - BUS 1 Contin Cold washing, condutor replacement, Isolator 26/Sep/2019 08:00 28/Sep/2019 18:00 Main Bus-II will be in service
uous replacement & Routine maint. Work
878 PLANNED OCC_522 NTPC 765 KV Bus Reactor Main Bay-4 at NTPC Sipat For PM (765 KV Bus reactor will remain charged 26/Sep/2019 8:00 28/Sep/2019 18:00
through it's tie bay)
879 PLANNED OCC_522 INOX Bay No. 208 at Bhuj PS D RTV Coating of insulators 26/Sep/2019 8:00 30/Sep/2019 20:00
880 PLANNED OCC_522 KWPCL Main Bay - KWPCL - 400KV - Bus 1 AND 400KV/21KV Contin Bay 401 : 401 89 B Isolator Modification Work 26/Sep/2019 8:00 07/Oct/2019 18:00
KWPCL-GT-1 ous
881 NRPC PHAGI (765KV)-GWALIOR-WR (765KV)1 DAILY Replacement of suspension and tension string 26/Sep/2019 06:00 26/Sep/2019 18:30
(Porcelain) with Polymer insulator (String) in main
and Tie bay along with associated Bus Gantry.
Dia to be kept Open at both ends.S/D by WR-II

882 ERPC 765kV Sundargarh-Dharamjaygarh Ckt#4 at ODB BPI erection works at T-point + TL Maintenace work 26/Sep/2019 9:00 26/Sep/2019 14:00
Sundargarh
883 NHPTL 275 MVA, Sc testing D SC testing 26/Sep/2019 9:00 29/Sep/2019 16:00
884 PLANNED OCC_522 GETCO 220KV-KAWAS-ICHCHAPUR-2 Daily Bay Maintenance & condition monitoring work 27/Sep/2019 8:00 27/Sep/2019 18:00
885 PLANNED OCC_522 GETCO 400KV-MANSAR-BACHAU Daily 89-B & 89-L Line isolator Isolator mechanical & 27/Sep/2019 8:00 27/Sep/2019 18:00 Maint work
electrical setting work & Bay Maintenance work
886 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 765KV - BUS 2 D RTV Coating STAGE-4 27/Sep/2019 9:00 28/Sep/2019 18:00 Outage BUS
887 PLANNED OCC_522 POWERGRID_WR2 BINA - 765KV - BUS 1 D For replacement of 765 KV Main Bus-1 Pilot/strain long 27/Sep/2019 9:00 28/Sep/2019 18:00 Outage BUS shall be facilitated subject to
rod polymer insulator in place of porcelain insulator NHPTL testing

888 PLANNED OCC_522 MP_SLDC 220KV Indore (PGCIL) -Ujjain-II D For line maintenance work 27/Sep/2019 10:00 27/Sep/2019 17:00
889 PLANNED OCC_522 MSETCL 400KV-PARLI-M-LONIKHAND-II-2 Daily Half yearly maintenance and diagnostic testing work 27/Sep/2019 09:00 27/Sep/2019 18:00 -
890 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV GWALIOR-ICT-2 D Replacement of suspension and tension string 27/Sep/2019 9:00 27/Sep/2019 18:00 Outage TRANSFORMER
(Porcelain) with Polymer insulator (String) in main
and Tie bay along with associated Bus Gantry. Dia to be
kept open on both sides.

891 PLANNED OCC_522 GETCO 400KV- JETPUR-63 MVAR REACTOR CUM TBC BAY Daily Maintenance work 27/Sep/2019 8:00 27/Sep/2019 18:00
892 PLANNED OCC_522 APML Tie Bay- 417 of Station Transformer 3@ Tirora Daily - 27/Sep/2019 08:00 27/Sep/2019 18:00 Testing & Maintenance of Bay Breaker &
CT
893 PLANNED OCC_522 POWERGRID_WR2 400KV-CGPL-JETPUR-1 D For attending hotspot in Bus Isolator & line isolator and 27/Sep/2019 8:00 27/Sep/2019 18:00 Outage
replacement of fixed contact rods of PG Isolator. Open
Line spacer damper fixing. A/R OFF of ckt-2 and dia to
be kept open at both ends.

894 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-5 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 27/Sep/2019 9:00 27/Sep/2019 13:00 720 Bay
CHAMPA - 765KV - BUS 2 at CHAMPA - 765KV
895 PLANNED OCC_522 MSETCL TIE BAY - 400KV-WARDHA-WARORA-1 AND FUTURE at Daily Routine Maintenance & Dignostic testing work Nut Bolt 27/Sep/2019 09:00 27/Sep/2019 17:00 Line will be charged through mainCB
Wardha - 400K Tightning work 429.
896 PLANNED OCC_522 MSETCL 220KV-TARAPUR 1&2-BOISAR-M-1 Daily ERTH-WIRE REPLACEMENT & INSULATOR 27/Sep/2019 09:00 27/Sep/2019 17:00 -
REPLACEMENT
897 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-KALA-VAPI-1 AND VAPI - 400KV - D For AMP Works 27/Sep/2019 9:00 27/Sep/2019 17:00 Outage Bay
BUS 2 at VAPI - 400KV
898 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-VINDHYACHAL(PS)-SASAN-1 AND D For AMP Works 27/Sep/2019 9:00 27/Sep/2019 17:30 Outage
VINDHYACHAL(PS) - 400KV - BUS 1
899 PLANNED OCC_522 RRWTL 707Bus reactor at Rajnandgaon Switching Station Daily 4-5 times live switching operation required for 27/Sep/2019 9:00 27/Sep/2019 18:00
commissioning of PWC600 Relay of 707-Bus reactor

900 PLANNED OCC_522 MSETCL 400KV-KOLHAPUR-MS-SOLAPUR-2 Daily Quarterly. Maint. work 27/Sep/2019 09:00 27/Sep/2019 18:00 -

901 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-RAIGARH-PS-RAIPUR-PS (DURG)-2 D FOR AMP WORKS. 27/Sep/2019 9:00 27/Sep/2019 18:00 Bay
AND 765KV-WARDHA-RAIPUR-PS (DURG)-1 at RAIPUR-
PS (DURG) - 765KV
902 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-SEONI-PG-KHANDWA-1 AND SEONI- D For AMP Works 27/Sep/2019 9:00 27/Sep/2019 18:00 Bay
PG - 400KV - BUS 2 at SEONI-PG - 400KV
903 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 765KV-SEONI-WARDHA-1 AND FUTURE at D For AMP work 27/Sep/2019 9:00 27/Sep/2019 18:00 Bay
Wardha - 765KV
904 PLANNED OCC_522 POWERGRID_WR1 765KV-WARDHA-AURANGABAD-2 L/R@ AURANGABAD D For AMP works. 27/Sep/2019 9:00 27/Sep/2019 18:00 Line outage required for 30min to LINE REACTOR
- 765KV isolation of non switchable L/R at
Aurangabad end
905 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-SATNA-BINA-3 AND 400KV- D For AMP Works 27/Sep/2019 9:00 27/Sep/2019 18:00 Outage Bay
VINDHYACHAL-SATNA-3 at SATNA - 400KV
906 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV BOISAR-ICT-1 D For AMP Works, dia to be kept open on both sides 27/Sep/2019 9:00 27/Sep/2019 18:00 Outage TRANSFORMER
907 PLANNED OCC_522 POWERGRID_WR2 400KV-INDORE-MP-ASOJ-1 D For taking line reactor in service at Asoj after Dry out 27/Sep/2019 10:00 27/Sep/2019 12:00 Outage AC TRANSMISSION
of Reactor LINE CIRCUIT
908 PLANNED OCC_522 MP_SLDC 400KV Indore PGCIL (Hatuniya)-Pithampur-1 D For line maintenance work 27/Sep/2019 10:00 27/Sep/2019 17:00
909 PLANNED OCC_522 POWERGRID_WR1 TIE BAY - 400KV-PUNE-GIS-PUNE-PG-1 AND D For AMP Works 27/Sep/2019 9:00 27/Sep/2019 18:00 Bay
400KV/220KV PUNE-PG-ICT-1 at PUNE-PG - 400KV
910 PLANNED OCC_522 CGPL 400KV-CGPL-Jetpur-2 L/R@ CGPL - 400KV D Breaker drive box painting 27/Sep/2019 8:00 28/Sep/2019 20:00 Voltage
Regulation
911 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - BANASKANTHA - 400KV B/R 1 AND FUTURE D Extension bay construction work 27/Sep/2019 9:00 28/Sep/2019 16:00 Outage Bay
at Banaskantha - 400KV
912 PLANNED OCC_522 PGCIL ODISHA 765kV GIS BUS-I along with AIS section of Darmajaygar- for 765KV GIS and 765KV ICT-3&4 commissioning 27/Sep/2019 9:00 28/Sep/2019 17:00
I & II Main Bays work under construction head
913 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 400KV B/R 1 D CSD Commissionng at (Bay No.414 & 415), dia to be 27/Sep/2019 9:00 28/Sep/2019 18:00 Outage BUS REACTOR
kept open
914 PLANNED OCC_522 POWERGRID_WR2 BACHAU - 400KV - BUS 1 C For F/W upgradation of Bus-1 Bus Bar Bay units and 28/Sep/2019 8:00 28/Sep/2019 18:00 Outage
MCU and Busbar testing. During upgradation of MCU-
1, MCU-2 would remain in service (for Bus Bar
Protection) and vice-versa.

915 PLANNED OCC_522 POWERGRID_WR1 765KV-AURANGABAD-Solapur-2 L/R@ Solapur - 765KV D Reactor AMP works. 28/Sep/2019 9:00 28/Sep/2019 18:00 LINE REACTOR

916 PLANNED OCC_522 POWERGRID_WR2 765KV/400KV GWALIOR-ICT-1 D Replacement of suspension and tension string 28/Sep/2019 9:00 28/Sep/2019 18:00 Outage TRANSFORMER
(Porcelain) with Polymer insulator (String) in main
and Tie bay along with associated Bus Gantry. Dia to be
kept open on both sides.

917 PLANNED OCC_522 GETCO 400KV/220KV JETPUR-ICT-3 Daily Maintenance work 28/Sep/2019 8:00 28/Sep/2019 18:00
918 PLANNED OCC_522 POWERGRID_WR2 220KV-VAPI-KHARADPADA-DNH-1 D For AMP of line terminal equipments 28/Sep/2019 8:00 28/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
919 PLANNED OCC_522 POWERGRID_WR2 400KV-CGPL-JETPUR-2 D For attending hotspot in Bus Isolator & line isolator and 28/Sep/2019 8:00 28/Sep/2019 18:00 Outage
replacement of fixed contact rods of PG Isolator. Open
Line spacer damper fixing. A/R OFF of ckt-1 and dia to
be kept open at both ends.

920 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-VINDHYACHAL(PS)-SASAN-1 AND D For AMP Works 28/Sep/2019 9:00 28/Sep/2019 17:30 Outage
765KV/400KV VINDHYACHAL(PS)-ICT-1
921 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-KSK MAHANADI-CHAMPA-3 AND D FOR AMP WORKS. 28/Sep/2019 9:00 28/Sep/2019 17:30 444 Bay
CHAMPA - 400KV - BUS 3 at CHAMPA - 400KV
922 PLANNED OCC_522 MEGPTCL TIE BAY - 405 OF 765/400kV 1500MVA ICT & FUTURE Daily Annual Maintenance of Bay Equipments 28/Sep/2019 09:00 28/Sep/2019 18:00 Annual Maintenance of Bay Equipments
BAY @ AKOLA 2

923 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV SOLAPUR-ICT-3 AND D CB AMP works 28/Sep/2019 9:00 28/Sep/2019 18:00 Bay
SOLAPUR - 220KV - BUS 1 at Solapur - 220KV
924 PLANNED OCC_522 POWERGRID_WR1 765KV-CHAMPA-DHARAMJAYGARH-2 C AR Testing at Korba end 28/Sep/2019 9:00 28/Sep/2019 18:00 AC TRANSMISSION
LINE CIRCUIT
925 PLANNED OCC_522 POWERGRID_WR1 WARDHA - 765KV B/R 2 D For AMP work 28/Sep/2019 9:00 28/Sep/2019 18:00 BUS REACTOR
926 PLANNED OCC_522 POWERGRID_WR2 TIE BAY - 400KV-SATNA-BINA-4 AND 400KV- D For AMP Works 28/Sep/2019 9:00 28/Sep/2019 18:00 Outage Bay
VINDHYACHAL-SATNA-4 at SATNA - 400KV
927 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV INDORE-ICT-1 D For CSD Commissioning Works, dia to be kept open. 28/Sep/2019 9:00 28/Sep/2019 18:00 Outage TRANSFORMER

928 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 400KV-ITARSI-INDORE-MP-2 AND ITARSI - D For Retrofitting of existing LBB relay with Alstom make 28/Sep/2019 9:00 28/Sep/2019 18:00 Outage
400KV - BUS 1 P442 relay.
929 PLANNED OCC_522 MSETCL AKOLA - 400KV - BUS 2 Daily Routine maintenance & testing work 28/Sep/2019 10:00 28/Sep/2019 18:00 NA
930 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV-PUNE-GIS-PUNE-PG-1 AND PUNE- D For AMP Works 28/Sep/2019 9:00 28/Sep/2019 18:00 Bay
PG - 400KV - BUS 1 at PUNE-PG - 400KV
931 PLANNED OCC_522 DBPOWER DB POWER - 400KV - BUS 2 D For AMP works 28/Sep/2019 8:00 29/Sep/2019 18:00 Shutdown is Planned considering the DB Power shall not bid in PX
DBPL Unit#2 AOH in Sep-19 during sd perod
932 PLANNED OCC_522 KWPCL KWPCL - 400KV - BUS 1 Daily BUS 1 Relay Testing & SCADA Re Configuration , 28/Sep/2019 8:00 30/Sep/2019 18:00
Breaker & Isolator Maintenance.
933 PLANNED OCC_522 MP_SLDC 400KV Sarni-Seoni Bay with 400KV Main BUS I C For Replacement of PG Isolator of Main Bus-I of 400KV 28/Sep/2019 9:00 01/Oct/2019 18:00 400kv Sarni-Seoni feeder wiil be in
Sarni-seoni Bay service through Tie Breaker
934 PLANNED OCC_522 MSETCL 400KV-KHARGHAR-PUNE-PG-1 Daily R&M and Diagnostic testing work 28/Sep/2019 08:30 28/Sep/2019 18:00 -- Please reschedule outage on
28.09.2019
935 PLANNED OCC_522 MSETCL 220KV-BOISAR-BOISAR-M-2 Daily Line Isoaltor repairing work. 28/Sep/2019 09:00 28/Sep/2019 17:00 - Please reschedule outage on
28.09.2019
936 PLANNED OCC_522 POWERGRID_WR2 765KV-BANASKANTHA-CHITTORGARH-2 L/R@ D For taking spare unit into service 29/Sep/2019 9:00 29/Sep/2019 16:00 Outage BUS REACTOR
BANASKANTHA - 765KV
937 PLANNED OCC_522 POWERGRID_WR2 BOISAR - 220KV - BUS 2 D For AMP Works 29/Sep/2019 9:00 29/Sep/2019 18:00 Outage BUS Please reschedule outage on
29.09.2019
938 PLANNED OCC_522 MSETCL 220KV-TALEGAON-PUNE-PG-1 Daily Half yearly maintenence , Diagonastic Testing 29/Sep/2019 09:00 29/Sep/2019 17:00 -
939 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 400KV - BUS 2 D Jumper Connection under Extension of Bhuj S/s for 29/Sep/2019 10:00 29/Sep/2019 18:00 Outage BUS
new 400/220KV 500MVA ICT-3
940 PLANNED OCC_522 POWERGRID_WR2 BACHAU - 400KV - BUS 2 D For F/W upgradation of Bus-2 Bus Bar Bay units and 29/Sep/2019 8:00 29/Sep/2019 18:00 Outage
MCU and Busbar testing. During upgradation of MCU-
1, MCU-2 would remain in service (for Bus Bar
Protection) and vice-versa.

941 PLANNED OCC_522 POWERGRID_WR2 BINA - 765KV - BUS 2 D For replacement of 765 KV Main Bus-2 Pilot/strain long 29/Sep/2019 9:00 30/Sep/2019 18:00 Outage BUS shall be facilitated subject to
rod polymer insulator in place of porcelain insulator NHPTL testing

942 PLANNED OCC_522 MSETCL BUS COUPLER BAY - KHARGHAR - 400KV - BUS 1 AND Contin R&M and Diagnostic testing work 29/Sep/2019 08:30 30/Sep/2019 18:00 Outage required along with A Bus at
KHARGHAR - 400KV - BUS 2 at KHARGHAR - 400KV uous Kharghar

943 PLANNED OCC_522 MSETCL KHARGHAR - 400KV - BUS 1 Contin R&M and diagnostic testing work 29/Sep/2019 08:30 30/Sep/2019 18:00 OUTAGE REQUIRED ALONG WITH BUS Outage shall be facilitated
uous COUPLER @ KHARGHAR subject to C-P HVDC outage

944 PLANNED OCC_522 ATIL Sami - Mundra 400 KV Line 1 Daily SRI insulator replacement at different locations in line 29/Sep/2019 6:00 29/Sep/2019 18:00

945 PLANNED OCC_522 MSETCL 220KV-BOISAR-BOISAR-M-3 Daily Line Isoaltor repairing work. 29/Sep/2019 09:00 29/Sep/2019 17:00 -
946 PLANNED OCC_522 ATIL Sami - Mundra 400 KV Line Reactor-1 at Sami (Non- Contin Oil Filtration of Line Reactor - 1 29/Sep/2019 6:00 30/Sep/2019 6:00
switcheble reactor) ue
947 PLANNED OCC_522 MSETCL NEW KOYNA - 400KV - BUS 2 Contin Cold washing, condutor replacement, Isolator 29/Sep/2019 08:00 30/Sep/2019 18:00 Main Bus-I will be in service
uous replacement & Routine maint. Work
948 PLANNED OCC_522 POWERGRID_WR2 220KV-BHUJ-VADVA-1 D Jumper Connection under Extension of Bhuj S/s for 30/Sep/2019 10:00 30/Sep/2019 18:00 Outage AC TRANSMISSION
new 400/220KV 500MVA ICT-3 , Ouatge of 220kV Bus- LINE CIRCUIT
1 is also required.
949 PLANNED OCC_522 POWERGRID_WR2 BHUJ - 220KV - BUS 1 D Jumper Connection under Extension of Bhuj S/s for 30/Sep/2019 10:00 30/Sep/2019 18:00 Outage BUS
new 400/220KV 500MVA ICT-3, Ouatge of 220kV
Desalpar line is also required.
950 PLANNED OCC_522 DBPOWER 400KV-DB POWER-RAIGARH-PS-1 D For AMP works 30/Sep/2019 8:00 30/Sep/2019 18:00 It was already approved in OCC-520 but DB Power shall not bid in PX
deffered due to real time data during sd perod
communication issue. Now again
Shutdown is Planned considering the
DBPL Unit#2 AOH in Sep-19

951 PLANNED OCC_522 GETCO 400KV/220KV JETPUR-ICT-4 Daily Maintenance work 30/Sep/2019 8:00 30/Sep/2019 18:00
952 PLANNED OCC_522 MP_SLDC 220KV Bhanpura-Ranpur (Kota) D For line maintenance work 30/Sep/2019 8:00 30/Sep/2019 18:00
953 PLANNED OCC_522 POWERGRID_WR2 220KV-VAPI-BHILOSA-DNH-1 D For AMP Works 30/Sep/2019 8:00 30/Sep/2019 18:00 Outage AC TRANSMISSION
LINE CIRCUIT
954 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV BACHAU-ICT-2 D Insulation coating work on tertiary equipment. Dia to be 30/Sep/2019 8:00 30/Sep/2019 18:00 Outage
kept open on both sides.
955 PLANNED OCC_522 CGPL CGPL Mundra 400kV Bachau-3 line and Bachau-4 line D For rectfication of high mast wire rope defect. 30/Sep/2019 8:00 30/Sep/2019 20:00 Voltage
at the same time at CGPL end Regulation
956 PLANNED OCC_522 CGPL MAIN BAY - 400KV-CGPL-BACHAU-4 AND CGPL - D For rectfication of high mast wire rope defect. 30/Sep/2019 8:00 30/Sep/2019 20:00 Voltage
400KV - BUS 2/ MAIN BAY - 400KV-CGPL-BACHAU-3 Regulation
AND CGPL - 400KV - BUS 2
957 PLANNED OCC_522 PGCIL 220 KV Urla-Raipur (PGCIL) Line at 400 KV S/s Raipur Daily For retrofitting of Auto reclose relay at Raipur(PGCIL) 30/Sep/2019 9:00 30/Sep/2019 16:00
(PGCIL) . end.
958 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV BILASPUR-ICT-1 AND D For AMP works. 30/Sep/2019 9:00 30/Sep/2019 18:00 724_Bay Bay
BILASPUR - 765KV - BUS 2 at BILASPUR - 765KV
959 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV-WARDHA-RAIPUR-PS (DURG)-1 D FOR AMP WORKS. 30/Sep/2019 9:00 30/Sep/2019 18:00 Bay
AND RAIPUR-PS (DURG) - 765KV - BUS 2 at RAIPUR-PS
(DURG) - 765KV
960 PLANNED OCC_522 POWERGRID_WR1 Main Bay - 765KV/400KV Solapur-ICT-2 AND Solapur - D To change Imax make Auxiliary and Limit switches in 30/Sep/2019 9:00 30/Sep/2019 18:00 Bay
765KV - Bus 2 at Solapur - 765KV SIEMENS make CB.
961 PLANNED OCC_522 POWERGRID_WR1 400KV/220KV WARDHA-ICT-1 D For AMP work 30/Sep/2019 9:00 30/Sep/2019 18:00 TRANSFORMER
962 PLANNED OCC_522 POWERGRID_WR2 MAIN BAY - 765KV-BINA-JABALPUR-1 AND BINA - D For AMP Works 30/Sep/2019 9:00 30/Sep/2019 18:00 Outage Bay
765KV - BUS 1 at BINA - 765KV
963 PLANNED OCC_522 POWERGRID_WR2 400KV/220KV INDORE-ICT-2 D For CSD Commissioning Works, dia to be kept open. 30/Sep/2019 9:00 30/Sep/2019 18:00 Outage TRANSFORMER

964 PLANNED OCC_522 POWERGRID_WR1 220KV-RAIPUR-URLA-CHHATTISGARH-1 D Auto reclosure relay retrofitting work of bay at Raipur 30/Sep/2019 9:30 30/Sep/2019 17:30 AC TRANSMISSION
SS LINE CIRCUIT
965 PLANNED OCC_522 MP_SLDC 220KV Annupur-Kotmikala-II D For line maintenance work 30/Sep/2019 10:00 30/Sep/2019 17:00
966 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 765KV/400KV CHAMPA-ICT-6 AND D FOR RTAMC/ NTAMC SIGNAL VALIDATION 30/Sep/2019 14:00 30/Sep/2019 17:30 723 Bay
CHAMPA - 765KV - BUS 4 at CHAMPA - 765KV
967 PLANNED OCC_522 POWERGRID_WR1 MAIN BAY - 400KV/220KV PUNE-PG-ICT-1 AND PUNE- D Replacement of Clamp & connectors 30/Sep/2019 9:00 30/Sep/2019 18:00 Bay
PG - 400KV - BUS 2 at PUNE-PG - 400KV
Anaulagnak 3.3

Aagast 2019 AaOr isatMbar 2019 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta

Anticipated demand and energy for the month of August 2019 AND September 2019

maaMga }jaa- kI AavaSyakta


rajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa
Aagast 2019 isatMbar 2019 Aagast 2019 isatMbar 2019
August 2019 September 2019 August 2019 September 2019

1 gaujarat GUJARAT

saIimat RESTRICTED 15800 18750 9940 11040


AsaIimat UNRESTRICTED 15810 18775 9950 11050

2 maQya p`doSa MADHYA PRADESH

saIimat RESTRICTED 8800 9570 5900 5800


AsaIimat UNRESTRICTED 8800 9570 5900 5800

3 C<aIsagaZ, CHHATISGARH

saIimat RESTRICTED 4610 4880 2642 2750


AsaIimat UNRESTRICTED 4610 4880 2642 2750

4 maharaYT/ MAHARASHTRA

saIimat RESTRICTED 20093 22596 12800 13750


AsaIimat UNRESTRICTED 20243 22646 12850 13800

5 gaaovaa GOA

saIimat RESTRICTED 550 571 328 344


AsaIimat UNRESTRICTED 610 627 377 393

6 dmana dIva DD

saIimat RESTRICTED 354 360 219 222


AsaIimat UNRESTRICTED 383 378 245 241

7 DI ena eca DNH

saIimat RESTRICTED 853 853 492 493


AsaIimat UNRESTRICTED 891 930 664 644

8 piScama xao~ WESTERN REGION

saIimat RESTRICTED 49767 55276 32901 35239


AsaIimat UNRESTRICTED 55860 61285 39309 39986
Anaulagnak 4.1
Unit -wise Actual generation for the month of July 2019 jaUlaa[- 2019
Actual vaastivak
k`maaMk sToSana ka naama }jaa- carma Auxillary
Sr. Station Name Energy Peak Consumption
No. (MUs) (Mw) (MUs)
UKAI(H) -1 0.00 0
UKAI(H) -2 0.00 0
UKAI(H) -3 0.00 0
UKAI(H) -4 0.00 0 0.00
UKAI(TOTAL) 0.00 0 0.3140
UKAI LBCH - 1 0.00 0
UKAI LBCH - 2 0.00 0 0.00
UKAI LBCH (TOTAL) 0.00 0 0.01
KADANA - 1 0.00 0
KADANA - 2 11.49 49
KADANA - 3 8.77 46
KADANA - 4 0.67 48 0.00
KADANA (TOTAL) 20.93 143 0.05
PANAM 0.03 1 0.00
Madhuban Dam (Hy.)-1 0.91 2
Madhuban Dam (Hy.)-2 0.89 2
Madhuban Dam (Hy.)-3 1.15 2 0.01
AREVA HY(KARJAN) 0.00 2 0.00
Ajanta hy (DOLATPURA)-1 1.07 0
Ajanta hy (DOLATPURA)-2 1.22 4
Ajanta hy (DOLATPURA)-3 1.49 4 0.02
SMALL HYDRO 6.75 16 0.03
SSP RBPH-1 0.00 0 0.00
SSP RBPH-2 0.00 0 0.00
SSP RBPH-3 0.00 0 0.00
SSP RBPH-4 0.00 0 0.00
SSP RBPH-5 0.00 0 0.00
SSP RBPH-6 0.00 0 0.00
SSP-CHPH-1 5.01 35 0.08
SSP-CHPH-2 2.45 34 0.04
SSP-CHPH-3 4.08 37 0.06
SSP-CHPH-4 6.57 36 0.10
SSP-CHPH-5 6.33 35 0.09
SSP (TOTAL) * 24.43 177 0.37
SSP GUVNL Share 3.91 28 0.06
GUJARAT TOTAL ( HYDRO ) 27.68 188 407.23
THERMAL(GUJARAT)
Torrent Power Ltd.- D 74.20 124 6.65
Torrent Power Ltd.- E 81.73 123 6.75
Torrent Power Ltd.- F 86.10 124 7.42
TOTAL TP AHMEDABAD 242.03 370 20.81
DGB - GT1 0.00 0
DGB - STG1 0.00 0 0.25
DGB - GT2 0.00 0
DGB - STG2 0.00 0 0.26
DGB - GT3 11.32 0
DGB - STG3 5.86 0 1.73
TOTAL DHUVARAN 17.18 0 2.24
UKAI-3 102.93 203 10.54
UKAI-4 127.44 204 11.92
UKAI-5 101.84 210 10.19
UKAI-6 49.10 505 4.71
TOTAL UKAI 381.31 1122 37.36
GANDHINAGAR -3 38.90 213 4.66
GANDHINAGAR -4 35.38 212 4.57
GANDHINAGAR -5 135.16 216 13.34
TOTAL GANDHINAGAR 209.44 641 22.56
WANAKBORI -1 42.66 216
WANAKBORI -2 49.49 214
WANAKBORI -3 80.40 213
WANAKBORI -4 73.89 211
WANAKBORI -5 81.23 214
WANAKBORI -6 77.23 213
WANAKBORI -7 132.14 215
TOTAL WANAKBORI 537.04 1496 52.09
UGPP GT-4 29.86 235
UGPP STG-2 19.69 144 2.07
TOTAL UTRAN 49.54 379 2.07
SIKKA - 3 131.98 255 12.46
SIKKA - 4 152.85 255 14.01
TOTAL SIKKA 284.83 510 26.47
Akrimota Linite-1 49.47 97 10.06
Akrimota Linite-2 38.81 79 8.09
TOTAL Akrimota Lignite 88.28 176 18.15
Kutch Lig.-1 17.09 68 3.00
Kutch Lig.-2 0.00 0 0.34
Kutch Lig.-3 30.57 69 4.32
Kutch Lig.-4 28.49 72 6.27
TOTAL Kutch Lig 76.14 209 13.92
GIPCL - GT 1 16.08 30
GIPCL - GT 2 4.52 30
GIPCL - GT 3 11.63 31
GIPCL - ST 1 19.94 33
GIPCL - GT 4 0.00 0
GIPCL - ST 2 0.00 0
TOTAL GIPCL 52.17 124 1.57
SURAT - LIG1 59.20 120 6.48
SURAT - LIG 2 69.66 118 7.61
SURAT - LIG 3 66.11 119 7.58
SURAT - LIG 4 62.10 128 7.06
Total SURAT -LIG 257.07 485 28.73
EPGL1 166.74 458 13.02
EPGL 2 0.00 0 0.14
TOTAL ESSAR 166.74 458 13.16
CLPIPL GT1 0.00 0 0.00
CLPIPL GT2 0.00 0 0.00
CLPIPL GT3 0.00 0 0.00
CLPIPL STG 0.00 0 0.00
TOTAL CLPIPL 0.00 0 0.00
GSEG 1 1.60 46
GSEG 2 1.06 49
GSEG STG 0.16 22 0.58
GSEG -II GT 1 15.44 225 0.00
GSEG -II STG 8.75 123 0.95
TOTAL GSEG 27.01 466 1.54
Sugen (GT 1) 198.70 376
Sugen (GT 2) 212.77 386
Sugen ( GT 3) 210.88 381 13.22
Uno Sugen 213.56 386 4.48
TOTAL SUGEN 835.91 1528 17.69
APL 1 220.44 337 0.00
APL 2 221.91 340 0.00
APL 3 198.99 344 0.00
APL 4 210.15 340 0.00
APL 5 325.91 661 0.00
APL 6 170.73 639 0.00
APL 7 400.27 674 0.00
APL 8 399.07 675 0.00
APL 9 397.16 671 0.00
TOTAL APMuL 2544.62 4680 195.98
OPGS GT1 75.17 151 6.90
OPGS GT2 0.00 0 0.00
TOTAL OPGS 75.17 151 6.90
BECL 1 0.00 0 3.41
BECL 2 25.56 0 5.82
TOTAL BECL 25.56 0 9.23
GPPC GT1 22.06 226
GPPC STG1 13.59 124 3.10
GPPC GT2 0.00 0
GPPC STG2 0.00 0 0.41
TOTAL GPPC 35.65 0 3.51
OTHER CPP 9.44 13 0.00
TOTAL CPP 9.44 13 0.00
GUJARAT TOTAL (Th.) 5915.13 12807 473.98
0.00
GUVNL TOTAL (H+T ) 5942.81 12995 474.39
WIND ENERGY 2002.11 2781 40.04
SOLAR ENERGY 237.15 329 4.74
BIO -MASS ENERGY 8.19 11 0.16
GUJARAT TOTAL RES 2247.45 3121 44.95
GUVNL TOTAL (H+T+RES ) 8190.26 16116 474.43

MADHYA PRADESH
HYDRO

G.' SAGAR 0.00 0 0.09


R.P.SAGAR 0.01 0 0.02
J.' SAGAR 6.35 66 0.02
TOTAL CHAMBAL(100%) 6.36 66 0.13
MP CHAMBAL SHARE (50%) 3.18 33 0.07
PENCH 0.00 157 0.06
MP PENCH SHARE(2/3) 0.00 105 0.04
BARGI 15.78 92 0.06
BARGI (LEFT BANK (NVDA) 0.00 0 0.00
Bansagar TONS 14.79 315 0.25
Bansagar Devlondh 30.25 63 0.02
Bansagar Silpara 0.00 20 0.02
Bansagar Jinaha 0.00 22 0.01
Madikheda 0.00 69 0.08
BIR'PUR 5.15 21 0.02
TAWA 0.00 0 0.00
TOTAL 65.97 602 0.46
RAJGHAT 0.00 42 0.03
MP SHARE RAJGHAT(50%) 0.00 21 0.01
Omkareshwar
Unit-1 6.29 65
Unit-2 18.11 65
Unit-3 17.42 65
Unit-4 13.89 65
Unit-5 8.37 65
Unit-6 2.20 65
Unit-7 4.07 65
Unit-8 1.19 64
TOTAL Omkareshwar 17.73 460 0.39
Indira Sagar - 1 10.14 134
Indira Sagar - 2 6.73 134
Indira Sagar - 3 7.40 135
Indira Sagar - 4 11.72 135
Indira Sagar - 5 13.95 134
Indira Sagar - 6 8.71 132
Indira Sagar - 7 10.52 133
Indira Sagar - 8 11.44 129
TOTAL INDIRA SAGAR (100%) 80.62 555 0.56
MP SSP SHARE 13.93 101 0.21
MP TOTAL (H) 167.50 1776 1.53

MADHYA PRADESH (THERMAL)

AMARKANTAK (III UNIT-5) 95.30 220 0.00


TOTAL AMARKANKTAK-II 95.30 220 10.22
SATPURA-II UNIT - 6 89.39 0
SATPURA-II UNIT - 7 56.12 175
SATPURA-II (UNITS 6 - 7) 145.51 175 15.22
SATPURA-III UNIT - 8 96.28 188
SATPURA-III UNIT - 9 99.93 195
SATPURA-III (UNITS 8-9) 196.21 383 20.14
SATPURA-IVUNIT - 10 135.97 265
SATPURA-IV UNIT - 11 23.49 259
SATPURA-III (UNITS 10-11) 159.46 524 15.73
TOTAL SATPURA 501.17 1082 51.08
S.GANDHI TPS-1 62.24 204
S.GANDHI TPS-2 51.70 202
SGTPS PHASE-I 113.94 406 13.57
S.GANDHI TPS-3 100.14 209
S.GANDHI TPS-4 93.07 213
SGTPS PHASE-II 193.21 422 21.15
S.GANDHI TPS-5 297.03 509
SGTPS PHASE-III 297.03 509 21.66
TOTAL S.GANDHI TPS 604.18 1337 56.38
SRI SINGHAJI(SSTPS)-I 29.19 605
SRI SINGHAJI(SSTPS)-II 258.18 599
SSTPS PHASE-I 287.37 1204 18.78
SRI SINGHAJI(SSTPS)-III 282.04 527
SRI SINGHAJI(SSTPS)-IV 291.27 0
SSTPS PHASE-II 573.32 527
TOTAL SSTPS 860.69 1731 52.87
BLA POWER 25.94 36 1.47
JP BINA+CPP 127.09 177 7.19
MP IPP INJECTION 153.03 213 8.66
MP TOTAL (Th.) 2214.37 4583 179.22

MP TOTAL (H+T ) 2381.86 6358 180.74


WIND ENERGY 594.96 826 29.75
SOLAR ENERGY 201.29 280 10.06
BIO -MASS ENERGY 3.22 4 0.16
TOTAL MP RES 799.47 1110 39.97
MP TOTAL (H+T+RES ) 3181.34 7469 220.72

CHHATTISGARH

HYDRO
H. BANGO 27.90 120 0.06
Gangrel 0.10 10 0.01
Mini Micro KWB 0.00 7 0.00
CHHATTISHGARH TOTAL (H) 28.00 137 0.07
CHHATTISHGARH (THERMAL)
KORBA (E-II) -1 0.00 0
KORBA (E-II) -2 0.00 0
KORBA (E-II) -3 0.00 0
KORBA (E-II) -4 0.00 0
TOTAL KORBA (E) 1-4 0.00 0 0.00
KORBA (E) -5 56.88 97
KORBA (E) -6 57.19 78
TOTAL KORBA (E) 5-6 114.07 182 13.27
TOTAL KORBA (E) 114.07 182 13.27
KORBA(W) - 1 123.87 176
KORBA(W) - 2 114.07 201
TOTAL KORBA (W) 1-2 237.94 377 22.49
KORBA(W) - 3 91.85 190
KORBA(W) - 4 124.32 193
TOTAL KORBA (W) 3-4 216.16 383 20.63
KWB EXTN -5 336.31 491 18.13
TOTAL KORBA (W) 790.41 2011 61.25
KORBA(EB) Extn - 1 (DSPM 1) 176.40 255
KORBA(EB) Extn - 2 (DSPM 2 175.37 255
TOTAL KORBA (E) DSPM 351.77 510 27.66
MARWA-1 273.41 0
MARWA-2 260.88 454
TOTAL MARWA 534.29 454 30.59
TOTAL CHHATTISHGARH (THERMAL) 1790.54 3157 132.76
CHHATTISGARH (TH+HY) 1818.54 3294 132.84

MAHARASHTRA
HYDRO
Koyana I & II 64.14 0 1.04
Koyana IV 47.19 0 0.74
Koyana III 17.65 0 0.22
K.D.P.H. 0.00 0 0.02
Total KGSC 128.98 0 2.02
Panshet 4.21 0 0.01
V'sgaon 1.26 0 0.00
Pawna 2.22 0 0.01
M'kdoh 0.04 0 0.01
Dimbhe 1.15 0 0.00
Bhatghar 2.71 0 0.01
Kanher 0.92 0 0.01
Dhom 0.83 0 0.00
Ujjani 0.93 0 0.01
Warna 2.69 0 0.01
Tillari 5.98 0 0.03
D'ganga 0.00 0 0.02
T'medhe 0.05 0 0.00
R'nagari 0.00 0 0.00
Bhira 9.28 0 0.01
Total HPC Pune 32.27 0 0.14
Vaitarna 5.30 0 0.07
Vaitarna D.T. 0.36 0 0.00
Bhatsa 8.61 0 0.02
Surya 0.00 0 0.01
Yeldari 0.00 0 0.01
Paithan 2.39 0 0.02
Ghatghar U-I 4.15 0 0.14
Ghatghar U-II 0.00 0 0.00
Total HPC Nasik 20.81 0 0.27
TATA HYDRO
KHOPOLI 28.22 75
BHIVPURI 13.73 72
BHIRA 35.11 150
BHIRA PS 51.16 165
TOTAL TATA HYDRO 128.21 0 4.48
TOTAL MAHARASHTRA (Hydro) 324.69 0 5.85

THERMAL
NASIK - 3 105.09 198
NASIK - 4 115.85 208
NASIK - 5 90.59 203
TOTAL NASIK 311.53 609
TROMBAY - 5 254.55 485
TROMBAY - 6 0.00 0
TROMBAY -8 150.86 233
TROMBAY - 7 A 74.26 117
TROMBAY - 7 B 45.44 67
TOTAL TROMBAY 525.11 902
KORADI - 6 59.84 170
KORADI - 7 42.59 160
KORADI - 8 190.87 500
KORADI - 9 154.80 500
KORADI - 10 180.33 470
TOTAL KORADI 628.43 1800
BHUSAWAL - 3 0.00 0
BHUSAWAL - 4 299.50 505
BHUSAWAL - 5 283.80 500
TOTAL BHUSAWAL 583.30 1005
PARLI - 4 0.00 0
PARLI - 5 0.00 0
PARLI - 6 0.00 0
PARLI - 7 0.00 0
PARLI - 8 0.00 0
TOTAL PARLI 0.00 0
K'KHEDA - II - 1 100.32 185
K'KHEDA - II - 2 85.10 170
K'KHEDA - II - 3 105.25 200
K'KHEDA - II - 4 60.36 185
K'KHEDA - II - 5 171.42 500
TOTAL K'KHEDA 522.45 1240
PGPL-1 0.00 0
PGPL-2 0.00 0
TOTAL PGPL 0.00 0
URAN (G) - 5 0.00 0
URAN (G) - 6 0.00 0
URAN (G) - 7 0.00 0
URAN (G) - 8 178.80 424
ALL URAN (G) 260.02 424
URAN - WHR -I 0.00 0
URAN - WHR -II 0.00 0
TOTAL URAN - WHR 0.00 0
CHANDRAPUR -3 74.15 185
CHANDRAPUR -4 92.82 170
CHANDRAPUR -5 221.21 414
CHANDRAPUR -6 233.99 460
CHANDRAPUR -7 200.26 429
CHANDRAPUR -8 253.46 495
CHANDRAPUR -9 189.74 495
TOTAL CHANDRAPUR 1265.63 2648
PARAS -3 142.36 259
PARAS - 4 130.87 255
TOTAL PARAS 273.23 514
REL DAHANU - I 144.76 250
REL DAHANU - I I 144.76 250
TOTAL DAHANU 298.73 500
APML(All Units) 1903.74 0
JSWEL(All Units) 681.48 0
VIPL(All Units) 0.00 0
RPL AMT(All Units) 137.38 0
WPCL(All Units) 0.00 0
Other CPPS/IPPS 74.82 0
TOTAL MAHARASHTRA CPPS/IPPS 2797.42 3885
MAHARASHTRA TOTAL (Th.)(INCL TATA,ADANI) 7465.85 13527 413.05
MAHARASHTRA TOTAL (H+T ) 7790.54 13527 418.90
Wind injection (W) 1436.63 1995 28.73
Solar injection (S) 137.49 191 2.75
TOTAL MAHARASHTRA RES 1574.12 2186 31.48
TOTAL MAHARASHTRA (TH+H+RES) 9364.66 15714 450.38

GOA
IPP GOA 14.40 20 0.28

CENTRAL SECTOR
NPCIL
TAPS - I 118.97 160 0.00
TAPS - II 83.55 160 0.00
TOTAL TAPS 1-2 202.52 320 14.80
TAPS - III 405.59 549 0.00
TAPS - IV 404.92 546 0.00
TOTAL TAPS 3-4 810.50 1095 72.35
KAKRAPAR - I 157.58 0 0.00
KAKARAPAR - II 165.27 222 0.00
TOTAL KAPS 1-2 322.85 222 32.00
TOTAL NPCIL GENERATION 1013.03 1415 119.14

NTPC
KSTPS-1 149.82 215 0.00
KSTPS-2 137.44 214 0.00
KSTPS-3 140.83 213 0.00
KSTPS-4 343.12 513 0.00
KSTPS-5 359.29 514 0.00
KSTPS-6 356.27 515 0.00
KSTPS-7 198.64 513 0.00
TOTAL K S T P S 1685.41 2697 107.67
VSTPS-1 137.62 215 0.00
VSTPS-2 135.50 212 0.00
VSTPS-3 137.20 211 0.00
VSTPS-4 135.23 213 0.00
VSTPS-5 139.27 214 0.00
VSTPS-6 139.55 215 0.00
V S T P S -7 0.00 513 0.00
V S T P S -8 342.31 515 0.00
V S T P S -9 344.08 514 0.00
V S T P S -10 348.64 513 0.00
V S T P S -11 352.24 513 0.00
V S T P S -12 355.53 514 0.00
V S T P S -13 346.82 515 0.00
TOTAL V S T P S 2913.99 4877 197.07
SIPAT STPS-1 480.26 660 0.00
SIPAT STPS-2 406.15 660 0.00
SIPAT STPS-3 474.44 670 0.00
SIPAT STPS-4 364.68 520 0.00
SIPAT STPS-5 365.44 520 0.00
TOTAL SIPAT 2090.97 3030 122.46
KAWAS-GT-1A 8.97 105 0.00
KAWAS-GT-1B 42.08 106 0.00
KAWAS- ST-1 25.21 116 0.00
KAWAS-GT-2A 4.55 106 0.00
KAWAS-GT- 2 B 4.16 106 0.00
KAWAS-ST-2 3.76 116 0.00
TOTAL KAWAS 88.73 655 3.66
GANDHAR - GT1 21.40 144 0.00
GANDHAR - GT2 34.24 144 0.00
GANDHAR - GT3 6.14 144 0.00
GANDHAR - ST3 30.39 0 0.00
TOTAL GANDHAR 92.17 432 3.33
MAUDA-1 275.54 510 0.00
MAUDA-2 275.00 510 0.00
MAUDA-3 312.52 660 0.00
MAUDA-4 60.56 500 0.00
TOTAL MAUDA 923.61 2180 57.22
SOLAPUR-1 0.00 680 0.00
SOLAPUR-2 0.00 0 0.00
TOTAL SOLAPUR 0.00 660 3.97
LARA-1 0.00 0 0.00
LARA-2 0.00 0 0.00
TOTAL LARA 0.00 660 0.00
GADARWADA-1 126.15 800 0.00
GADARWADA-2 0.00 0 0.00
TOTAL GADARWADA 126.15 800 20.92
KHARGAONE-1 0.00 0 0.00
KHARGAONE-2 0.00 0 0.00
TOTAL KHARGAONE 0.00 660 0.00
TOTAL NTPC GENERATION 7921.03 16651 516.30

RGPPL
RGPPL (Dabhol) Phase I 0.00 0 0.00
RGPPL (Dabhol) Phase II 1.34 560 0.00
RGPPL (Dabhol) Phase III 373.23 265 0.00
RGPPL TOTAL 374.57 560 9.36
OTHER REGIONAL IPPS
SASAN TOTAL 2644.77 0 132.24
CGPL TOTAL 1802.55 0 90.13
JPL TOTAL 178.25 0 8.91
JPL EXT TOTAL 758.30 0 37.91
BALCO -1 0.00 0 0.00
BALCO -2 0.00 0 0.00
BALCO -3 0.00 0 0.00
BALCO -4 0.00 0 0.00
BALCO TOTAL 274.45 0 13.72
ACBIL -1 0.00 0 0.00
ACBIL -2 0.00 0 0.00
ACBIL TOTAL 442.20 0 22.11
TRN -1 0.00 0 0.00
TRN-2 0.00 0 0.00
TRN TOTAL 216.36 0 10.82
NSPCL -1 0.00 0 0.00
NSPCL-2 0.00 0 0.00
NSPCL TOTAL 250.28 0 12.51
JAYPEE NIGRIE -1 0.00 0 0.00
JAYPEE NIGRIE-2 0.00 0 0.00
JAYPEE NIGRIE TOTAL 619.64 0 30.98
KSK MAHANADI -1 0.00 0 0.00
KSK MAHANADI -2 0.00 0 0.00
KSK MAHANADI -3 0.00 0 0.00
KSK MAHANADI TOTAL 790.75 0 39.54
MB POWER -1 0.00 0 0.00
MB POWER-2 0.00 0 0.00
MB POWER TOTAL 626.36 0 31.32
DB POWER -1 0.00 0 0.00
DB POWER-2 0.00 0 0.00
DB POWER TOTAL 646.88 0 32.34
RKM POWER GENERATION -1 0.00 0 0.00
RKM POWER GENERATION -2 0.00 0 0.00
RKM POWER GENERATION -3 0.00 0 0.00
RKM POWER GENERATION TOTAL 220.75 0 11.04
KWPCL -1 0.00 0 0.00
KWPCL-2 0.00 0 0.00
KWPCL TOTAL -0.46 0 -0.02
JHABUA POWER-1 0.00 0 0.00
JHABUA POWER-2 0.00 0 0.00
JHABUA POWER TOTAL 261.48 0 13.07
LANCO(AMERKANTAK PATHADI)-1 0.00 0 0.00
LANCO(AMERKANTAK PATHADI)-2 0.00 0 0.00
LANCO(AMERKANTAK ) TOTAL 313.87 0 15.69
SKS-1 0.00 0 0.00
SKS-2 0.00 0 0.00
SKS POWER GEN TOTAL 285.23 0 13.47

GMR RAIPUR -1 0.00 0 0.00


GMR RAIPUR-2 0.00 0 0.00
GMR RAIPUR GEN TOTAL 376.75 0 18.84

DHARIWAL-1 0.00 0 0.00


DHARIWAL-2 0.00 0 0.00
DHARIWAL GEN TOTAL 185.76 0 9.29

EPML-1 0.00 0 0.00


EPML-2 0.00 0 0.00
EMPL GEN TOTAL 282.86 0 14.14
TOTAL WR IPP 11177.05 0 529.94

(I) piScamaI xao~ WESTERN REGION


ga`aosa ]%padna Gross generation 43054.87
(J) ]plabQata Availability 40601.48
naoT ivainamaya Net Exchanges -7870.55
]plabQa }jaa- Energy Availability 32730.93
Anaulagnak 4.2
ANNEX-4.2
Restricted and Unrestricted demand for the month of July 2019
rajya State vaastivak Actual (MW) idnaaMk samaya AavaRi<a
AapUit- Date Time Frequency
Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 17577 - - - 17577 20.07.2019 15:00 50.04
saIimat Restricted
AsaIimat Unrestricted 17577 0 0 0 17577 20.07.2019 15:00 50.04
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 10316 10316 31.07.2019 0:00 50.02
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 10097 - - 0 10097 19.07.2019 7:00 50.00
saIimat Restricted
AsaIimat Unrestricted 10097 0 0 0 10097 19.7.2019 7:00 50.00
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 5836 5836 06.07.2019 14:00
C<aIsagaZ, CHHATTISGARH
pMjaIkRt Registered 4736 - - - 4736 21.07.2019 23:00 49.94
saIimat Restricted
AsaIimat Unrestricted 4736 0 10 0 4746 21.07.2019 23:00 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 2661 2661 02.07.2019 13:45
maharaYT/ MAHARASHTRA
pMjaIkRt Registered 20583 - - - 20583 18.07.2019 12:00 49.99
saIimat Restricted
AsaIimat Unrestricted 20561 0 7 0 20604 18.07.2019 16:00 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 12867 12867 31-Jul-19 4:00 50.00
gaaovaa *GOA
pMjaIkRt Registered 566 - - - 566 13.07.2019 21:00 50.01
AsaIimat Unrestricted 566 0 0.00 0 566 13.07.2019 21:00 50.01
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 868 - - - 868 30.07.2019 1:00 50.01
AsaIimat Unrestricted 868 0 0 0 868 30.07.2019 1:00 50.01
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 350 - - - 350 19.07.2019 15:00 50.00
AsaIimat Unrestricted 350 0 0 0 350 19.07.2019 15:00 50.00
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 826 - - - 826 24.07.2019 18:00 50.06
AsaIimat Unrestricted 826 0 0 0 826 24.07.2019 18:00 50.06
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 52509 - - - 52509 18.07.2019 15:00 49.94
saIimat Restricted
AsaIimat Unrestricted 52509 0 110 0 52619 18.07.2019 15:00 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 36081 36081 31.07.2019 4:00
माह जुलाई 2019 July 2019 Annexure 4.3
List of Inter-state/Inter-Regional Lines- Parallel/ Radial Operation
अनु. . समांतर/वत
ृ ीय चालन PARALLEL / RADIAL OPERATION Total Operating Hours(HH:MM:SS)

एचवीडीसी लाइन HVDC Lines


1 एचवीडीसी बॅक टु बॅक लंक वं याचल पोल 1 HVDC back-to back link Vindhyachal-Pole 1 742:20:00

2 एचवीडीसी बॅक टु बॅक लंक वं याचल पोल 2 HVDC back-to back link Vindhyachal-Pole 2 742:38:00

3 एचवीडीसी मँद
ु रा टु महे नदरगढ़ पोले 1 HVDC Mundra-Mahendergarh Pole 1 744:00:00

4 एचवीडीसी मँद
ु रा टु महे नदरगढ़ पोले 2 HVDC Mundra-Mahendergarh Pole 2 738:59:00

5 एचवीडीसी चांपा टु कु े पोल 1 HVDC Champa-Kurukshetra Pole-1 741:52:00

6 एचवीडीसी चांपा टु कु े पोल 2 HVDC Champa-Kurukshetra Pole-2 744:00:00

7 एचवीडीसी चांपा टु कु े पोल 3 HVDC Champa-Kurukshetra Pole-3 744:00:00

8 एचवीडीसी बॅक टु बॅक लंक भ ावती पोल 1 HVDC back-to back link Bhadrawti Pole-1 723:15:00

9 एचवीडीसी बॅक टु बॅक लंक भ ावती पोल 2 HVDC back-to back link Bhadrawti Pole-2 738:56:00

अंतर- े ीय लाइन Inter-Regional Lines


1 765 केवी सोलापुर से रायचूर -I 765kV solapur to Raichur I 744:00:00

2 765 केवी सोलापुर से रायचूर -II 765kV solapur to Raichur II 744:00:00

3 765 केवी वधा से नजामाबाद-I 765kV Wardha to Nizamabad I 744:00:00

4 765 केवी वधा से नजामाबाद-II 765kV Wardha to Nizamabad II 744:00:00

5 765 केवी वा लयर से फागी-I 765kV Gwalior to Phagi I 744:00:00

6 765 केवी वा लयर से फागी-II 765kV Gwalior to Phagi II 744:00:00

7 765 केवी वा लयर से आगरा-I 765kV Gwalior to Agra I 744:00:00

8 765 केवी वा लयर से आगरा-II 765kV Gwalior to Agra II 744:00:00

9 765 केवी धरमजयगड से यू रांची-I 765kV D'garh to New Ranchi I 744:00:00

10 765 केवी धरमजयगड से यू रांची-II 765kV D'garh to New Ranchi II 743:32:00

11 765 केवी धरमजयगड से झारसग


ु ुड़ा-I 765kV D'garh to Jharsuguda I 744:00:00

12 765 केवी धरमजयगड से झारसग


ु ुड़ा-II 765kV D'garh to Jharsuguda II 744:00:00

13 766 केवी धरमजयगड से झारसग


ु ुड़ा-III 765kV D'garh to Jharsuguda III 744:00:00

14 767 केवी धरमजयगड से झारसग


ु ुड़ा-IV 765kV D'garh to Jharsuguda IV 744:00:00

15 400 केवी को हापुर से नर I 400kV Kolhapur-Narendra I 744:00:00

16 400 केवी को हापुर से नर II 400kV Kolhapur-Narendra II 744:00:00

17 400 केवी कंसार से भनमल 400kV Kansari- Bhinmal 740:47:00

18 400 केवी कंसार से कं ोल 400kV Kansari- Kankroli 744:00:00

19 400 केवी रै प से सज
ू लपरु -I 400 kV RAPP-Sujalur I 744:00:00

20 400 केवी रै प से सज
ू लपरु -II 400kV RAPP-Sujalur II 744:00:00

21 400 केवी सपत से रांची I 400kV Sipat-Ranchi I 744:00:00

22 400 केवी सपत से रांची II 400kV Sipat-Ranchi II 744:00:00

23 400 केवी रायगढ़ से झरसग


ु ुड़ा I 400kV Raigarh to Jharsuguda I 744:00:00

24 400 केवी रायगढ़ से झरसग


ु ुड़ा II 400kV Raigarh to Jharsuguda II 744:00:00

25 400 केवी रायगढ़ से झरसग


ु ुड़ा III 400kV Raigarh to Jharsuguda III 744:00:00

26 400 केवी रायगढ़ से झरसग


ु ुड़ा IV 400kV Raigarh to Jharsuguda IV 744:00:00

27 400 केवी रायगढ़ से बु धपदर 220kV Raigarh-Budhipadar 633:34:00

28 220 केवी कोरबा पूव से बु धपादर-II 220kV K(E) to Budhipadar-II 636:44:00

29 220 केवी कोरबा पूव से बु धपादर-III 220kV K(E) to Budhipadar-III 744:00:00

30 220 केवी बदोड़ से साकतपुर 220kV Badod to Sakatpur 744:00:00

31 220 केवी भनपुर से मोडक 220kV Bhanpur to Modak 743:25:00

32 220 केवी महगाओं से औरै या 220kV Mehgaon to Auraiya 744:00:00

220 केवी मालनपुर से औरै या पि चम े य भार ेषण क , मु बई WRLDC, Mumbai


33 220kV Malanpur to Auraiya 742:13:00
अंतर-रा यीय लाइन Inter-State Lines
1 765 केवी सवनी से वधा-I 765kV Seoni to Wardha-I 744:00:00

2 765 केवी सवनी से वधा-II 765kV Seoni to Wardha-II 740:11:00

3 765 केवी दग
ु से वधा -I 765kV Durg to Wardha I 409:17:00

4 765 केवी दग
ु से वधा -II 765kV Durg to Wardha II 570:24:00

5 765 केवी दग
ु से वधा -III 765kV Durg to Wardha III 451:17:00

6 765 केवी दग
ु से वधा -IV 765kV Durg to Wardha IV 518:02:00

7 765 केवी धुले से वडोदरा-I 765kV Dhule to Vadodara I 744:00:00

8 765 केवी इंदौर से वडोदरा-I 765kV Indore(PG) to Vadodara I 737:32:00

9 765 केवी धरमजयगड से जबलपुर-I 765kV D'garh to Jabalpur I 571:58:00

10 765 केवी धरमजयगड से जबलपरु -II 765kV D'garh to Jabalpur II 744:00:00

11 765 केवी धरमजयगड से जबलपुर-III 765kV D'garh to Jabalpur III 163:47:00

12 765 केवी धरमजयगड से जबलपुर-IV 765kV D'garh to Jabalpur IV 744:00:00

13 765 केवी सवनी से बलासपरु -I 765kV Seoni to Bilaspur-I 744:00:00

14 765 केवी सवनी से बलासपुर-II 765kV Seoni to Bilaspur-II 744:00:00

15 400 केवी भलाई से कोराडी 400kV Bhilai to Koradi 744:00:00

16 400 केवी भलाई से भ ावती 400kV Bhilai to Bhadravati 744:00:00

17 400 केवी भलाई से सयो न 400kV Bhilai to Seoni 744:00:00

18 400 केवी रायपुर से भ ावती -I 400kV Raipur to Bhadravati-I 717:03:00

19 400 केवी रायपुर से भ ावती –II 400kV Raipur to Bhadravati-II 744:00:00

20 400 केवी रायपरु से भ ावती –III 400kV Raipur to Bhadravati-III 738:06:00

21 400 केवी रायपुर से वधा–I 400kV Raipur to Wardha-I 744:00:00

22 400 केवी रायपुर से वधा–II 400kV Raipur to Wardha-II 744:00:00

23 400 केवी सातपुरा से कोराडी 400kV Satpura to Koradi 744:00:00

24 400 केवी को हापरु (GIS) से मापुसा-I 400kV Kolhapur(GIS)-Mapusa-I 744:00:00

25 400 केवी को हापरु (GIS) से मापुसा-II 400kV Kolhapur(GIS)-Mapusa-II 744:00:00

26 400 केवी खंडवा से धुले-I 400kV Khandwa-Dhule-I 744:00:00

27 400 केवी खंडवा से धल


ु े-II 400kV Khandwa-Dhule-II 744:00:00

28 400 केवी एसएसपी से धुले-I 400kV SSP-Dhule-I 621:35:00

29 400 केवी एसएसपी से धुले-II 400kV SSP-Dhule-II 619:03:00

30 400 केवी वापी से बोईसर 400kV Vapi-Boisar 744:00:00

31 400 केवी एसएसपी से राजगढ़-I 400kV SSP- Rajgarh -I 744:00:00

32 400 केवी एसएसपी से राजगढ़-II 400kV SSP- Rajgarh -II 744:00:00

33 400 केवी कासोर से राजगढ़-I 400kV Kasor- Rajgarh -I 744:00:00

34 400 केवी कासोर से राजगढ़-II 400kV Kasore- Rajgarh -II 744:00:00

35 400 केवी इंदौर से असोज-I 400kV Indore to Asoj-I 740:30:00

36 400 केवी इंदौर से असोज-II 400kV Indore to Asoj-II 744:00:00

37 400 केवी कोरबा से बीर संगपरु I 400kV Korba-Birsigpur I 744:00:00

38 400 केवी कोरबा से बीर संगपुर II 400kV Korba-Birsigpur II 744:00:00

39 400 केवी कोरबा से ए सार महान 400kV Korba-Essar Mahan 744:00:00

40 400 केवी कोरबा से वं याचल 400kV Korba-Vindhyachal 744:00:00

41 400 केवी नागदा से दे हगाम-I 400kV Nagda to Dehgam I 716:57:00

42 400 केवी नागदा से दे हगाम-II 400kV Nagda to Dehgam II 708:59:00

पि चम े य भार ेषण क , मु बई WRLDC, Mumbai


Anaulagnak 4.4
Annex-4.4
jaUlaa[- 2019 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF July 2019

ivavarNa Particulars
gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL ena eca DI saI NHDC maraiva]kM ila MSEGCL

]ka[- Ukai gaaMQaIsaagar Gandhisagar [Midra saagar Indira Sagar kaoyanaa Koyna

Levels in Mtrs. str maITr maoM

maah ko AMt maoM 90.62 386.15 254.17 651.88


At the end of the month

ipClao vaYa- [sa maah ko Anau$p AaMkD,oM


91.49 388.43 252.67 654.71
Corresponding Figure of the
month Last Year
Western Region-Event Report for July 2019 Annexure 5
Outage Revival Outage Duration
Category as per CEA Energy Unserved
S.No Region Name of Elements Owner/Agency Event Generation Loss (MW) Load Loss (MW)
standards (MU)
Date Time Date Time Time

Tripping of
800 kV HVDC Champa-Kurukshetra Pole 1&2 tripped on Metallic Return Line Differential(MRLD) protection
1 WR 1.800 kV HVDC Champa-Kurukshetra Pole 1 PGCIL 05/07/2019 17:20 05/07/2019 17:49 0:29 Nil Nil GI-2 Nil
and Earth overcurrent protection respectively due to Direct Metallic Return(DMR) line 1 shortcircuit fault
2.800 kV HVDC Champa-Kurukshetra Pole 2

Tripping of
220 kV Padghe Bus 2 and 220 kV Padghe-Temghar 1&2 were under outage prior to the event. 220 kV Kalwa-
1.220 kV Kalwa-Apta
Kalwa interconnecter 1&2 were in open condition to reduce the fault level. 220 kV Apta-Taloja and 220 kV
2.220 kV Kalwa-AKP
2 WR MSETCL 10/07/2019 9:04 10/07/2019 9:20 0:16 Kalwa-Apta tripped due to conductor snapping and resulted in overloading and tripping of 220 kV Kalwa- Nil 610 GD-1 0.162666667
3.220 kV Klawa-Colorchem
Colorchem and 220 kV Kalwa-AKP. 220 kV Kalwa 1, colorchem,Themghar and Taloja got blackout due to the
4.220 kV Apta-Taloja
event.

Tripping of
1.400/21.75 kV 600 MVA Deepnagar GT-5
2.400/21.75 kV 600 MVA Deepnagar GT-4 At 400/220 kV Deepnagar station, LBB of ST 4 & GT 5 operated which resulted in tripping of 400 kV
3 WR MSEGCL 12/07/2019 10:19 12/07/2019 12:04 1:45 350 Nil GI-2 Nil
3.400/11/6.6 kV Deepnagar ST 4 Deepnagar Bus 1
4.500MW Deepnagar Unit 4&5
5.400 kV Deepnagar Bus1

Tripping of
1.220/132 kV 160 MVA Bemetara ICT 1 220/132 kV 160 MVA Bemetara ICTs 1&2 and 220/132 kV 160 MVA Gendpur ICT 2 tripped on overload and
4 WR CSPTCL 13/07/2019 22:20 13/07/2019 22:34 0:14 Nil 346 GD-1 0.080733333
2.220/132 kV 160 MVA Bemetara ICT 2 led ton the blackout of 220 kV Gendpur s/s and 132 kV Kawardha,Pandariya and Saja s/s
3.220/132 kV 160 MVA Gendpur ICT 2

Tripping of
1.400 kV Amreli-Hadala
2.400 kV Amreli-Chorania
R-B phase fault occurred on 400 kV Amreli-Hadala line and the fault was not cleared by Amreli end CB
5 WR 3.400 kV Amreli-Jetpur 2 GETCO 16/07/2019 11:14 16/07/2019 11:46 0:32 Nil Nil GI-2 Nil
which led to LBB protection operation and tripping of all the elements connected to 400 kV Amreli Bus 2
4.400/220 kV 315 MVA Amreli ICTs 1&4
5. 400 kV Kasor 1 LR charged as BR at Amreli
6.400 kV 50 MVAR Amreli Bus reactor

220 kV Taloja-Apta and 220 kV Jambhul-Anandnagar were under outage prior to the event. 220 kV ICTs at
Pal s/s were handtripped from 100 kV side to shift the load of 100 kV Dombivalli s/s to 100 kV Pal-Mumbra
Tripping of
and 100 kV Pal-Taloja .
6 WR 1.220 kV Kalwa-Taloja MSETCL 19/07/2019 19:28 19/07/2019 19:37 0:09 Nil 144 GD-1 #VALUE!
At 19:28 Hrs, 220 kV Kalwa-Taloja tripped due to the snapping of B phase conductor and no source was
2.100 kV Pal-Mumbra
available at Taloja s/s.100 kV Pal-Mumbra tripped on overload and led to the total failure of supply at
220kV Taloja, 100 kV Dombivalli, Taloja, DFPCL, FGIL, BOC, Hindalco and Mumbra s/s.
Tripping of
1.220 kV Kukma-Panandhro 1 At 220kV Akrimota, Bus 2 and Akrimota-Nakhtrana 2 were under shutdown. 220kV Bus 1 and Akrimota -
2.220 kV Kukma-Panandhro 2 Nakhtrana ckt 1 tripped due to heavy chattering in PI of Bus. Since, both the buses tripped, ALTPS units 1 &
7 WR 3.220 kV Akrimota bus 1 GSECL 21/07/2019 15:50 21/07/2019 18:45 2:55 2 and 220kV ALTPS-KLTPS ckt 1&2 tripped and ALTPS station became dead. At the same time 220kV 217 Nil GD-1 Nil
4.220 kV Akrimota-Nakharatna 1 KLTPS - Kukma ckt 1&2 tripped on reflection fault. As 220kV KLTPS-Nakhtrana ckt 1&2 were under outage
5.KLTPS Unit 1&4 due to tower collapse, units 1&4 at KLTPS tripped on loss of evacuation.

Tripping of
1.220 kV Khargar Bus 1
2.400/220 kV Khargar ICTs 1&3
3.220 kV Khargar-Nerul At 400/220 kV Khargar s/s, 220 kV Bus 1 and all connected elements tripped due to the B phase bus CVT
8 WR MSETCL 25/07/2019 3:48 25/07/2019 4:45 0:57 Nil 33 GI-1 0.03135
4.220 kV Khargar-Uran 1 blast on Bus bar protection operation.
5.220 kV Khargar-Panvel
6.220 kV Khargar-Borivalli
7.220/33 kV Khargar ICTs 1&3

Tripping of
1.220 kV Ponda Bus 2
At 220kV Ponda, Bus 2 bus fault occured due to the decapping of bus insulator and resulted in tripping of
2.220 kV Ponda-Xeldem 1&2
9 WR Goa 29/07/2019 17:38 29/07/2019 18:05 0:27 all the elements connected to it.220 kV Mahalashmi-Amona also tripped during the event.Tripping of 220 Nil 200 GD-1 0.1
3.220 kV Mahalakshmi-Amona
kV Ponda-Xeldem 1&2, led to black out at 220kV Xeldem S/S.
4.220/110 kV Ponda ICTs 2&3
5.220 kV Amona-Ponda 1&2

Tripping of
1.220 kV Boisar-Boisar(PG) 1,2&3
Due to the snapping of earthwire of multicircuit tower, 220 kV Boisar-Boisar(PG) T/C and 220 kV Boisar-
2.220 kV Boisar-Nallasopara
10 WR MSETCL 29/07/2019 17:48 29/07/2019 18:45 0:57 Nallasopara tripped. 220 kV Boisar-TAPS also tripped at the same time on Directional earth fault and 220 Nil Nil GI-1 Nil
3.220 kV Boisar-TAPS
kV TAPS-Borivalli tripped later on overcurrent protection operation.
4.220 kV TAPS-Borivalli
Tripping of
1.400 kV Boisar-Padghe 1
2.400 kV Tarapur-Padghe 2
3.400 kV Nagothane-Padghe 1 At 400/220 kV Padghe s/s, R phase CVT of 400 kV Bus 1 blasted and resulted in tripping of all the elements
11 WR MSETCL 31/07/2019 12:54 31/07/2019 14:59 2:05 Nil Nil GI-2 Nil
4. ±500 kV HVDC Chandrapur-Padghe Pole 2 connected to 400 kV Bus 1.
5.400/220 kV 315 MVA ICT2
6.400/220 kV 500 MVA ICT 3
7.400 kV Bableshwar-Padghe 1

Disclaimer : The Above details are based on the preliminary/flash report of the event and may change after finalisation of the detailed report.The qunatum of load/generation loss is based on details given by SLDC and utility and may vary later with updated details.
Annexure-6
Status of healthiness of SERs/DRs
S.l. Name of Constituent Date of
No. Receipt
1 PGCIL,WRTS-I 05.04.2019
2 PGCIL,WRTS-II 05.08.2019
3 MPPTCL 15.05.2019
4 NTPC 02.10.2018
5 CSPTCL 06.08.2019
6 GETCO 05.10.2018
7 MSETCL 16.08.2019
8 DD/DNH 17.08.2018
9 GOA 02.10.2018
10 NPCIL 01.03.2019
11 NCA/SSP 04.06.2019
12 NHDC 04.10.2018
13 Jindal PL 17.08.2018
14 CGPL 05.10.2018
15 DB POWER 03.04.2019
16 KWPCL 01.03.2019
17 ACBIL/TRN ENERGY 04.10.2018
18 KSK 02.01.2019
19 GMR CHHATTISHGARH 21.08.2018
20 JNSTPS 05.10.2018
21 MB POWER 09.08.2018
22 SASAN UMPP 21.08.2018
23 NSPCL 21.08.2018
24 RGPPL 06.10.2018
25 SUGEN/DGEN 06.08.2019
26 RKM POWER 05.10.2018
27 ESSAR POWER 09.08.2018
28 BDTCL/JTCL/RTCL 08.10.2018
29 RELIANCE TRANSMISSION 04.04.2018
30 ADANI POWER 04.04.2019
31 JHABUA POWER 04.10.2018
32 EPTCL 05.10.2018
33 TPGL 01.03.2019

*****
Annexure-7.1
Status of Reactors
Sl. 400 kV Size Implementing Expected date of
No. Sub/Stn. (MVAr agency commissioning
)
1 Nanded 125 MSETCL Commissioned on 02/2018
2 Kolhapur 125 MSETCL Commissioned on 02/2018
3 Akola 125 MSETCL Commissioned on 02/2018
4 ISP 125 NHDC December – 2019 expected

5 Satpura-ISP 50 MPPGCL Sep 2019


Line Rx(at
Satpura end)
6 Bus Reactor at 330 PGCIL Commissioned on 24.04.2018
New Parli(PG)

7 Bus Reactor at 80 DIL Commissioned on 23.05.2018


Dhariwal

8
Warora(PS) 80 PWTL/Maharashtra Commissioned on 09-05-2018

9
Warora(PS) 80 PWTL/Maharashtra Commissioned on 09-05-2018

10
Warora(PS) 330 PWTL/Maharashtra Commissioned on 18-05-2018

11
Warora(PS) 330 PWTL/Maharashtra Commissioned on 18-05-2018

12
New Parli 330 PPTL/Maharashtra Commissioned on 21-05-2018

13
New Parli 330 PPTL/Maharashtra Commissioned on 21-05-2018

14
Warora(PS) 330 PWTL/Maharashtra Commissioned on 10-05-2018

15
KAPS 3&4 125 NPCIL/Gujarat Commissioned on 14-05-2018

16 EPTCL/ Commissioned on 21.07.2018


50 EPTCL
Chhattisgarh
17 EPTCL / Commissioned on 27.07.2018
50 EPTCL
Chhattisgarh

**************
Annexure 7.2
Status of Transmission schemes: 765/400 kV and above
The updated status on various ongoing transmission schemes for the year
2018-19 as per the current information available is as follows: -
Sl. Name of the Line Ckt Target Revised Remarks
No. km Completi estimated
on target
date
Date as
per TRM
on 07.05
Powergrid
1 LILO of Lonikhand-Kalwa at 16 Mar 19
Navi Mumbai GIS-JSL/LS
Cable
2 Parli(PG)-New Parli(PG) ckt I 18 Commissioned on
& II 21.04.2018

3 765kV Vindhyachal - 749 Charged on 29.12.2018


Jabalpur D/C

4 765kV D/C Gadarwara 453.6 Commissioned in Oct 18


STPP - Warora
5 800 kV Raigarh-Pugalur 3676 March-19 Work under progress
HVDC Bipole

6 765kV D/C Banaskantha - 293.3 March


Chittorgarh 2018
7 400kV D/C Banaskantha 132 June
(Radhanesda) - 2019
Banaskantha (PG)
8 765kV Bhuj-Banaskamta 583 Mar 19
DC
9 400 kV Mundra UMPP – 190 Mar 19
Bhuj DC

10 400 kV D/c Wardha- 347 February Work is in progress


Aurangabad(Upgradable to 19
1200 kV)
11 765 kV D/C Jharsuguda- 149 Charged on 01.11.18
Dharamjaigarh line 2
12 400kV D/C Banaskantha 132 Sep 19 WIP
(Radhanesda) -
Banaskantha (PG) T/L.

14 765kV D/C Vindhyachal - 183.5 Aug 20 WIP


Varanasi T/L.
(WR-II Portion Only)

Chhattishgarh
1 LILO of 400kV Raita- 2 Aug 19 Oct 19 Work under Progress
Jagdalpur at Dhamtari
2 220 kV Barsoor-Jagdalpur 175 Mar 19 Jun 19
3 220kV Gurur-Kurud 73.6 Aug 19 Oct 19
(Bangoli)

4 LILO of 220kV Korba(E)- 3 Line work in progress and


Siltara at DSPM for feeder bay works tender
to be issued shortly

5 LILO of 220 KV Mopka- 128 July 18 Jun 19 WIP


Bhatapara Circuit & 220 KV
Mopka-Siltara Circuit on
multicircuit tower at
proposed 220/132 KV S/s
at Dherdehi (Bilaspur)

6 Second circuit of 220kv 39.58 Jul 19 WIP


Bemetara-Mungeli

Gujarat
1 400 kV D/C Vadinar-Amreli 116.85 Aug 19 400kV Hadala-Jetpur
line made LILO at Amreli
through Vadinar-Amreli
line (Pkg-1) at Amreli S/s
on 22.11.13 (Stop Gap).
2 400kV APL-Hadala LILO to 89.40 June 19 Dec 19 Work in Progress
Halvad
3 400 kV D/C Amreli-Kasor 164.30 June 19 Mar 20 WIP(Severe RoW
line Problem)
4 400kV D/C Vadavi - Halvad 146.4 March 19 Mar 20 WIP
Line
5 400 kV Varsana-Halvad 143.38 June 19
6 400 kV Wanakbori-Soja DC 121.75 Jun 19 Jun 19 WIP(package-I charged
8 on 30.03.2019)
7 400 kV Soja-Zerda DC 268.92 Jun 19 Jun 19 WIP(RoW Problem)
8 400 kV Hadala-Shapar D/c 124.34 Mar 19 Mar 20 WIP
9 400 kV Bhogat- Kalawad 260.57 Mar 20 Mar 20
D/C
10 400 kV Bhachuunda- 276.16 June 20 June 20
Varsana D/c
11 LILO of both ckt. of 400kV 25.76 Mar 19 WIP
D/C Mundra - Zerda line
at 400kV Charanka S/s

12 664 MAR Mar 20 WIP(Severe RoW


400KV mundra-zerda
20(Packa Problem)
line-I
ge-3)

13 400KV LILO wanakbori- 12.9 Jul 19 WIP


soja line 2 at Dehgam

14 400KV D/C shapar- 346 Jun 21 WIP


Fedra(pachchham) Line

Madhya Pradesh

1 400KV DCDS Line for LILO WIP


of one circuit of Satna
49.90 Sept.'19
(PGCIL)-Bina(PGCIL) 400kV
line at Sagar 400kV S/s

2 400kV DCDS line from WIP


Nagda 400kV S/s to 137.3 June'20
Mandsaur 400kV S/s 2

3 400kV DCDS line from 179.4 Apr'20 WIP


Ashta 400kV S/s to Ujjain 7
400kV S/s

4 400kV DCDS line from WIP


Indore (PGCIL) 765kV S/s to 90.46 Apr'20
Ujjain 400kV S/s

5 400kV DCDS line from WIP


Nagda 400kV S/s to Ujjain 106.8 Apr'20
400kV S/s 6

Maharashtra (STU)
1 400 kV Bableshwar-Kudus 150 March 19 Mar 20 Forest clearance awaited,
D/C (Quad) severe ROW problem
2 New Parli(PG)-Solapur ckt-I & 118 Commissioned on
II 24.04.2018

3 400 KV D/C Jejuri-Hinjewadi March 19 March 20 WIP


Line(Jejuri-Wainjhar) 101
Package-I.

4 400 KV D/C Jejuri-Hinjewadi Mar 19 March 20 WIP


Line
92.67
(Wainjhar- Hinjewadi)
Package-II.

5 LILO on another Ckt of Dec 19 Dec 19 WIP


400KV Bhusawal II -
Aurangabad-I for 177.37
Thaptitanda

6 220 kV M/C line, LILO on Jun 19 Jun 19 WIP


220 kV Boisar (M) - Borivali
express feed-II at Boisar (PG)
s/s

Other ISTS lines


1 LILO of one ckt of Severe RoW problem
May
Aurangabad - Padghe 765 KV 130
2019
D/C line at Pune
2 Jharsuguda – Raipur 765 kV March 19 Ready to charge
610
D/C (hexa) line (Sterlite)

3 765KV D/C Khandwa Pool July 19


(KTL)-Indore (PGCIL) 180 July 19
Line(Sterlite)
4 765KV D/C Khandwa Pool July 19
(KTL)-Dhule (BDTCL) 379 July 19
Line(Sterlite)
5 400KV D/C Khargone TPP
July
Switchyard (NTPC)-Khandwa 49 July 2019
2019
Pool (KTL) Line(Sterlite)
6 Inter- connection with Actual COD : May -21
Xeldem (existing) substation
through 220kV D/c line with
29.17 Jun-20 Jun-20
HTLS conductor (ampacity
equivalent to twin moose
conductor)

7 LILO of one ckt. of Narendra WIP


(existing) – Narendra (New)
93.67 Apr-21 Apr-21
400kV D/c quad line at
Xeldem

8 Dharamjaygarh Pool Section Actual COD : July -21


B – Raigarh (Tamnar) Pool 70 Jun-20 Jun-20
765 kV D/c line

The WR utilities may intimate the current status on above.

******************
Annexure 7.3
Status of Generating Units in WR
The status regarding Generating units, commissioned /expected to be
commissioned during the current year 2018-19 is as below:
Name of the Power Projects Unit Capacity Date of Commissioning
No. (MW) /Schedule Date
Gujarat

Chhattisgarh
NIL
Maharashtra
NIL

Madhya Pradesh

NIL
Central sector/IPP

NTPC LARA UNIT 2 800

NTPC GADARWADA UNIT 2 800

********
ANNEXURE-8.1
REPORT ON MOCK DRILL FOR CRISIS
MANAGEMENT PLAN IN POWER SECTOR
for the quarter ending ……………….

1. Name of Power Utility / Generating Station :

2. Date / Time of Mock-drill :

3. Location site of Mock-drill :

4. Observers :
(Indicate names of Team designated
Leader / Members to handle crisis
situation)

5. Scenario of mock emergent situation :

6. Objective :

7. Chronological order of events logged :

Time Events Response Time

8. Observations on effectiveness of Mock Drill :

9. Recommendations / Suggestions on the observations (S. No. 8) :

Signature of Designated Signature of


(Safety / Security Officer) (Head O & M of Plant)

Dated…………………… Dated……………………
Annexure -8.2 B

Reporting Format to the PSDF Project Monitoring Group


1. Name of the Scheme
1.1 Name of the substation and its Location
1.2 Executing Agency
1.3 State/Region

2. Date of Sanction order


2.1 Date of Agreement of Entity with State Govt./NLDC
2.2 Total Approved Cost of the Scheme

2.3 Approved Grant by Monitoring Committee ( Rs. In Lakhs)


2.4 Date of Requisition by the Entity
2.4.a) date and Reference of LOA
2.4.b) Amount of LOA
2.5 Date of Disbursement and amount
2.5.1 : Ist Installment
2.5.2: IInd installment
2.5.3: IIIrd installment
2.6 Date of Scheduled completion of Work
2.7 Date of handing over of Site to entity (in case of turnkey projects)

Report for the Month of ____MM / YY________


Quantity
Qty. AS CUMMULATIVE
No. Supply Description Received
PER LOA PROGRESS Till date BALANCE Remarks
during Month
Sch. Act.
1 item Details
1.1
1.2
….

works as per Progress CUMMULATIVE


Erection Description Balance
LOA During Month PROGRESS Till date

2 work details
2.1
2.2
….

3 Others

Signature with seal of the Nodal Officer


ANNEXURE 8.3
Annexure 8.4

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2019 - Dec 2019)

1 2 3 4

2016-17 2017-18 2018-19


Projected Demand Data given
Comments
2015-16 2016- 2017-18 for (Oct 2019 - by DICs
Oct-16 Nov -16 Dec-16 Oct-17 Nov -17 Dec-17 Oct-18 Nov -18 Dec-18
Av erage 17Av erage Av erage Dec 2019) before
normalization

Chattisgarh 3,242 3,058 3,500 3,635 3,231 3,202 4,270 3,774 3,401 3,267 3,356 3,815 4,028

Gujarat 14,134 12,911 12,883 16,590 14,735 14,664 16,606 14,610 14,272 13,309 15,330 15,163 16,454 16,100 As per data given by Gujarat

Madhya Pradesh 8,832 10,867 11,501 10,453 11,797 12,301 11,496 10,007 13,215 10,400 11,517 11,573 12,336 15,570 As per data given by MP

Maharashtra 20,462 20,298 19,835 18,248 21,012 19,956 23,159 22,378 21,089 20,198 19,739 22,209 22,726

Daman & Diu 327 314 296 349 336 362 341 329 328 312 349 333 352

Dadra Nagar Haveli 784 761 721 790 781 766 780 704 803 755 779 762 773

Goa 487 531 411 517 494 490 536 513 512 476 500 520 543

ESIL 732 622 656 619 641 691 641 704 708 668 650 684 684 700 As per data given by ESIL

Notes
1. Projections are based on the past 3 years' monthly Peak Demand Met data available on the website of CEA
2. The above projections are being done for financial year 2019-2020 (Q3) i.e October 2019-December 2019
3. Projections are being done based on the forecast function available in MS Office Excel
4. CEA Reports can be accessed from the following links:
http://www.cea.nic.in/reports/monthly/powersupply/2018/psp_peak-10.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2018/psp_peak-11.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2018/psp_peak-12.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2017/psp_peak-10.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2017/psp_peak-11.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2017/psp_peak-12.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2016/psp_peak-10.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2016/psp_peak-11.pdf
http://www.cea.nic.in/reports/monthly/powersupply/2016/psp_peak-12.pdf
Generation Projection (Oct 2019 - Dec 2019)
Generation declared Commercial from Generation declared/expected to be declared Commercial from
1st Jan'19 to 30th June'19 1st July'19 to 30th Sep'19

Projection Figure as Projected Generation


Gen.
Sl. Regio s based on Unit Installed Gen. Installed Comments From DICs /Others per before normalization
Entities Bus Name Sub Total Bus Name Unit No. consider Sub Total TOTAL
No. n 3 Years No. Capacity considered Capacity (if any) Comments/ w.r.t projected All India
ed
Data PoC Data Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Shree Singaji
1 MP WR 5153 4 660 432 432 5585 As per data given by M.P. 8530 8530
TPP, Stage –II
2 Maharashtra WR 14488 14488 14488

3 Chattisgarh WR 2589 2589 2589

4 Gujarat WR 9965 9965 As per data given by Gujarat 12651 12651

5 Goa WR 0 0 0

6 D&D WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4640 4640 As per data given by NTPC 4415 4415

9 Ratnagiri Dabhol WR 631 631 631

10 TAPS (1,2,3,4) WR 884 884 884

11 Jindal WR 506 506 As per data given by JPL 635 635

12 LANCO WR 576 576 576

13 NSPCL Bhilai WR 451 451 451

14 Korba WR 2442 2442 2421 2421


As per data given by NTPC
15 SIPAT WR 2846 2846 2794 2794

16 CGPL WR 3583 3583 3583

17 Mauda WR 1785 1785 2050 2050

18 Gandhar WR 517 517 As per data given by NTPC 350 350

19 Kawas WR 596 596 250 250

20 SSP WR 360 360 360

21 KAPS WR 0 0 0

22 Essar Mahan WR 962 962 As per data given by Essar Mahan 1123 1123

23 BALCO WR 482 482 As per data given by Balco 400 400

24 KSK Mahanadi WR 881 881 881

25 Sasan UMPP WR 3857 3857 As per data given by Sasan UMPP 3813 3813

26 JPL Stg-2 WR 1190 1190 As per data given by JPL 1140 1140
Generation Projection (Oct 2019 - Dec 2019)
Generation declared Commercial from Generation declared/expected to be declared Commercial from
1st Jan'19 to 30th June'19 1st July'19 to 30th Sep'19

Projection Figure as Projected Generation


Gen.
Sl. Regio s based on Unit Installed Gen. Installed Comments From DICs /Others per before normalization
Entities Bus Name Sub Total Bus Name Unit No. consider Sub Total TOTAL
No. n 3 Years No. Capacity considered Capacity (if any) Comments/ w.r.t projected All India
ed
Data PoC Data Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

27 DGEN WR 0 0 0

28 DB Power Ltd. WR 1036 1036 0

29 Korba West WR 0 0 0

30 Dhariwal WR 284 284 As per data given by Dhariwal 273 273

31 GMR Chhattisgarh WR 419 419 419

32 JP Nigrie WR 1205 1205 As per data given by JP Nigrie 1241 1241

33 GMR Warora WR 546 546 546

ACBIL+Spectrum+
34 WR 649 649 As per data given by ACBIL 681 681
MCCPL
35 MB Power (Anuppur) WR 1093 1093 As per data given by MB Power 900 900

36 RKM Power WR 284 RKM Power 2 360 232 232 516 516

37 Jhabua Power WR 461 461 461

38 TRN Energy WR 565 565 As per data given by TRN Energy 540 540

39 Sholapur STPP WR 428 Sholapur STPP 2 660 432 432 860 As per data given by NTPC 970 970

40 Lara STPP WR Lara STPP 1 800 528 528 528 As per data given by NTPC 560 560

WR SKS Power 1 300 198


41 SKS Power 396 396 396
SKS Power 2 300 198

42 Gadarwada WR Gadarwada 1 800 528 528 528 As per data given by NTPC 560 560

43 Ostro WR 100 100

44 Rewa WR 165 165

TOTAL 66352 1492 1056 68900 73342

Note:
1. Projections are based on monthly maximum injection in the last 3 years from actual metered data.
2. Generation forecast has been done based on the following criteria
(i) If there is an increasing trend then last year average generation has been considered
(ii) Otherwise average of past three year average generation has been considered
3. In case of new generators where past data was not available following has been assumed
(i) 1.0 plf for hydro generators
(ii) 0.7 plf for thermal generators.
(iii) 0.3 plf for gas stations
Annexure 9.5A

Western Region-Event Report for July 2019


Outage Category as per CEA Energy Unserved
S.No Region Name of Elements Owner/Agency Event Generation Loss (MW) Load Loss (MW) DR submitted Report submitted
standards (MU)
Date Time
Tripping of 800 kV HVDC Champa-Kurukshetra Pole 1&2 tripped on Metallic Return Line Differential(MRLD)
Preliminary
1 WR 1.800 kV HVDC Champa-Kurukshetra Pole 1 PGCIL 05-07-2019 17:20 protection and Earth overcurrent protection respectively due to Direct Metallic Return(DMR) line 1 Nil Nil GI-2 Nil Yes
submitted
2.800 kV HVDC Champa-Kurukshetra Pole 2 shortcircuit fault
Kalwa end DR of
Tripping of
220 kV Padghe Bus 2 and 220 kV Padghe-Temghar 1&2 were under outage prior to the event. 220 kV Apta,AKP and
1.220 kV Kalwa-Apta
Kalwa-Kalwa interconnecter 1&2 were in open condition to reduce the fault level. 220 kV Apta-Taloja colorchem
2.220 kV Kalwa-AKP
2 WR MSETCL 10-07-2019 09:04 and 220 kV Kalwa-Apta tripped due to conductor snapping and resulted in overloading and tripping of Nil 610 GD-1 0.162666667 submitted.Remote Yes
3.220 kV Klawa-Colorchem
220 kV Kalwa-Colorchem and 220 kV Kalwa-AKP. 220 kV Kalwa 1, colorchem,Themghar and Taloja got end DR alongwith
4.220 kV Apta-Taloja
blackout due to the event. Apta Taloja DR not
submitted
Tripping of
1.400/21.75 kV 600 MVA Deepnagar GT-5
2.400/21.75 kV 600 MVA Deepnagar GT-4 At 400/220 kV Deepnagar station, LBB of ST 4 & GT 5 operated which resulted in tripping of 400 kV
3 WR MSEGCL 12-07-2019 10:19 350 Nil GI-2 Nil Yes Yes
3.400/11/6.6 kV Deepnagar ST 4 Deepnagar Bus 1
4.500MW Deepnagar Unit 4&5
5.400 kV Deepnagar Bus1
Tripping of
1.220/132 kV 160 MVA Bemetara ICT 1 220/132 kV 160 MVA Bemetara ICTs 1&2 and 220/132 kV 160 MVA Gendpur ICT 2 tripped on overload Bemetara ICT 1 DR
4 WR CSPTCL 13-07-2019 22:20 Nil 346 GD-1 0.080733333 Yes
2.220/132 kV 160 MVA Bemetara ICT 2 and led ton the blackout of 220 kV Gendpur s/s and 132 kV Kawardha,Pandariya and Saja s/s only submitted
3.220/132 kV 160 MVA Gendpur ICT 2
Tripping of
1.400 kV Amreli-Hadala
2.400 kV Amreli-Chorania R-B phase fault occurred on 400 kV Amreli-Hadala line and the fault was not cleared by Amreli end CB
5 WR 3.400 kV Amreli-Jetpur 2 GETCO 16-07-2019 11:14 which led to LBB protection operation and tripping of all the elements connected to 400 kV Amreli Bus Nil Nil GI-2 Nil Yes Yes
4.400/220 kV 315 MVA Amreli ICTs 1&4 2
5. 400 kV Kasor 1 LR charged as BR at Amreli
6.400 kV 50 MVAR Amreli Bus reactor
220 kV Taloja-Apta and 220 kV Jambhul-Anandnagar were under outage prior to the event. 220 kV ICTs
at Pal s/s were handtripped from 100 kV side to shift the load of 100 kV Dombivalli s/s to 100 kV Pal-
Tripping of
Mumbra and 100 kV Pal-Taloja .
6 WR 1.220 kV Kalwa-Taloja MSETCL 19-07-2019 19:28 Nil 144 GD-1 0.0216 Yes Yes
At 19:28 Hrs, 220 kV Kalwa-Taloja tripped due to the snapping of B phase conductor and no source was
2.100 kV Pal-Mumbra
available at Taloja s/s.100 kV Pal-Mumbra tripped on overload and led to the total failure of supply at
220kV Taloja, 100 kV Dombivalli, Taloja, DFPCL, FGIL, BOC, Hindalco and Mumbra s/s.
Tripping of
1.220 kV Kukma-Panandhro 1 At 220kV Akrimota, Bus 2 and Akrimota-Nakhtrana 2 were under shutdown. 220kV Bus 1 and Akrimota -
2.220 kV Kukma-Panandhro 2 Nakhtrana ckt 1 tripped due to heavy chattering in PI of Bus. Since, both the buses tripped, ALTPS units
Akrimota Bus 1 DR
7 WR 3.220 kV Akrimota bus 1 GSECL 21-07-2019 15:50 1 & 2 and 220kV ALTPS-KLTPS ckt 1&2 tripped and ALTPS station became dead. At the same time 217 Nil GD-1 Nil Yes
not submitted
4.220 kV Akrimota-Nakharatna 1 220kV KLTPS - Kukma ckt 1&2 tripped on reflection fault. As 220kV KLTPS-Nakhtrana ckt 1&2 were
5.KLTPS Unit 1&4 under outage due to tower collapse, units 1&4 at KLTPS tripped on loss of evacuation.

Tripping of
1.220 kV Khargar Bus 1
2.400/220 kV Khargar ICTs 1&3 Bus bar DR only
3.220 kV Khargar-Nerul At 400/220 kV Khargar s/s, 220 kV Bus 1 and all connected elements tripped due to the B phase bus submitted.Remote
8 WR MSETCL 25-07-2019 03:48 Nil 33 GI-1 0.03135 Yes
4.220 kV Khargar-Uran 1 CVT blast on Bus bar protection operation. end DR not
5.220 kV Khargar-Panvel submitted
6.220 kV Khargar-Borivalli
7.220/33 kV Khargar ICTs 1&3
Tripping of
1.220 kV Ponda Bus 2
At 220kV Ponda, Bus 2 bus fault occured due to the decapping of bus insulator and resulted in
2.220 kV Ponda-Xeldem 1&2
9 WR Goa 29-07-2019 17:38 tripping of all the elements connected to it.220 kV Mahalashmi-Amona also tripped during the Nil 200 GD-1 0.1 No No
3.220 kV Mahalakshmi-Amona
event.Tripping of 220 kV Ponda-Xeldem 1&2, led to black out at 220kV Xeldem S/S.
4.220/110 kV Ponda ICTs 2&3
5.220 kV Amona-Ponda 1&2
Tripping of
DR of Boisar (M)
1.220 kV Boisar-Boisar(PG) 1,2&3
Due to the snapping of earthwire of multicircuit tower, 220 kV Boisar-Boisar(PG) T/C and 220 kV Boisar- end for 220 kV
2.220 kV Boisar-Nallasopara
10 WR MSETCL 29-07-2019 17:48 Nallasopara tripped. 220 kV Boisar-TAPS also tripped at the same time on Directional earth fault and Nil Nil GI-1 Nil Boisar(M)- Yes
3.220 kV Boisar-TAPS
220 kV TAPS-Borivalli tripped later on overcurrent protection operation. Boisar(PG) 2&3 are
4.220 kV TAPS-Borivalli
only submitted
Tripping of
1.400 kV Boisar-Padghe 1
2.400 kV Tarapur-Padghe 2
3.400 kV Nagothane-Padghe 1 At 400/220 kV Padghe s/s, R phase CVT of 400 kV Bus 1 blasted and resulted in tripping of all the
11 WR MSETCL 31-07-2019 12:52 Nil Nil GI-2 Nil Yes Yes
4. 400 kV HVDC feeder 2 elements connected to 400 kV Bus 1.
5.400/220 kV 315 MVA ICT2
6.400/220 kV 500 MVA ICT 3
7.400 kV Bableshwar-Padghe 1
At 220/132 kV Raigarh s/s, R phase fault occurred at ideally charged 132 kV Salasar feeder and the
Tripping of
breaker failed to open due to mechanical problem and resulted in tripping of 132 kV Bus at Raigarh ICTs DR not
12 WR 1.220/132 kV 160 MVA RaigarhICTs1,2&3 CSPTCL 24-07-2019 18:11 Nil 125 GD-1 0.08125 Yes
s/s. 132 kV Raigarh,132KV Kodatarai, 132KV Dabhra and 132KV S/S Baramkela supply got interrupted submitted
2.132 kV Raigarh-Salasar
due to the event.