Introduction to
Lean Six Sigma
Table of Contents
Lean Overview
Six Sigma Overview
Lean Six Sigma Integration
Lean Six Sigma Deployment
Planning
Wrap-Up
“A bad system will defeat a good person every time.” – Deming
International Standards for Lean Six Sigma 2
Learning Objectives
By the end of this course, you will:
Know the origin and aims of Lean, Six
Sigma, and Lean Six Sigma
Understand the roles and responsibilities
within a Lean Six Sigma Team
Understand the project identification,
selection, and prioritization process
Understand how Lean and Six Sigma synergistically come together,
building a transformation methodology more powerful than the sum of
the parts
Understand the value proposition of Lean Six Sigma
Learn the Lean Six Sigma terms, tools, and DMAIC methods/definitions
Tell me & I will forget, show me & I may remember, involve me & I’ll understand
International Standards for Lean Six Sigma 3
Lean
Origins of Lean
Lean has been around a long time:
Pioneered by Ford in the early 1900’s (33 hrs from iron ore to finished
Model T, almost zero inventory but also zero flexibility!)
Perfected by Toyota post WWII (multiple models/colors/options, rapid
setups, Kanban, mistake-proofing, almost zero inventory with maximum
flexibility!)
Known by many names:
Toyota Production System
Just-In-Time (JIT)
Continuous Flow
While Lean was born in Manufacturing, It later matured into Transactions & Services
International Standards for Lean Six Sigma 5
Management, Core & Support
Processes Defined
Management Processes: the activities
associated with governing the organization.
Examples: strategic planning; corporate
governance, budgeting
Core Processes: the activities that create the
primary value stream (important to the customer)
in an organization.
Examples: contract negotiation, customer 5s can be applied on all
processes.
acquisition, assembly, testing
Sort, Straighten, Sweep,
Support Processes: these activities Schedule, Sustain
enable the core processes
Organize what is needed,
Examples: recruiting, production control, where it is needed, in the
accounts receivable needed quantities.
Lean Six Sigma can be applied to any Process
International Standards for Lean Six Sigma 6
Lean Basics
The Basics
What is Lean?
Value Analysis
Little’s Law: Lead Time (Calculation)
Process Cycle Efficiency (Calculation)
Takt Time (Calculation)
Outwardly focused on being flexible to meet customer demand,
inwardly focused on reducing/eliminating the waste and cost in all
processes
Highly applicable to transactional businesses!
Whenever flexibility and speed are key: banks, technology firms and
customer service organizations the most recent to adopt Lean practices
Lean Flows Value from Customer Demand
International Standards for Lean Six Sigma 7
Lean - What is Lean?
Lean is a methodology for increasing process speed (reduced cycle time),
improving efficiency (minimize time, capital invested, and cost) in any
process, and increased agility and process flow.
Lean is a methodology
for increasing process
speed and improving
efficiency through waste
reduction.
What Lean Is Not:
A business strategy
Only for manufacturing
companies
About headcount reductions
Only about the tools
Products and Services are Process Pulled vs. Pushed
International Standards for Lean Six Sigma 8
The Path to Lean
Define Value Maximize Continuously
Define Value Create Pull
Stream Flow Improve
Define CVA Value Stream Constraint Work Control Standardized
Maps Analysis Systems Work
A3 Report Spaghetti Process Stocking Visual Controls
Maps Balancing Strategy
Quick Wins Work Cell ABC 5s+1
NVA Analysis Stratification
Layout
Poke Yoke Replenishment Batch Size TPM
Little’s Law Optimization
Pull
Metrics Process Value Setup Kanban Kaizen
Efficiency Reduction
Lean (Speed) + Six Sigma (Quality) = ROI (Lower Costs)
International Standards for Lean Six Sigma 9
Value Analysis
With regard to Value Analysis there are three things to look for in
every process:
Value-Add (VA) or Customer Value-Add (CVA)
This is the activity or process steps that are essential to
delivering a product or service to a customer. These are the
activities the customers are willing to pay .
Business Non-Value Add (BNVA) or Required Waste (RW)
These are the process steps and activities that the company
needs to execute the value-added work; the customer may not
see a direct correlation to the delivery of the product or
service. These also include regulatory requirements.
Non-Value Add (NVA)
These are the activities that add no value and are not required
for financial, legal or other business reasons.
Value Analysis is thru the Customer’s Perspective
International Standards for Lean Six Sigma 10
The Seven (7) Wastes of Lean
1. Transport – movement of parts and/or documentation further than
necessary.
2. Inventory – stock of virtually anything is waste.
3. Motion – non-value added movement of people, or machinery.
4. Waiting – wait time is idle time; waiting for people, machines,
information or material.
5. Overproduction – producing more than customers demand or
producing at a faster pace than is needed.
6. Overprocessing – putting in more work than is necessary to meet the
customer’s requirements.
7. Defects – rework and defects which take time, materials, energy,
capacity and labor.
* Another waste is: People (untapped and/or misused resources)
TIMWOOD = Process Waste to Target & Eliminate
International Standards for Lean Six Sigma 11
The Lessons of Lean
“Un-lean” processes
Most processes are not lean
In most service process 90% or more of the
work is non-value add or Business non-value
add, while world class service processes still
contain 50% waste.
Work done to correct mistakes, correct
earlier delays, contact someone when pre-
negotiation could have been done, etc.
contributes to non-value added work.
Lean is about increasing process speed,
flow, and agility where produces and services
are pulled thru the process by customer
demand.
Lean is a Bottoms-Up Management Approach
International Standards for Lean Six Sigma 12
Little’s Law
To reduce Lead time, you have 2 choices:
Invest dollars of capital in people and equipment to increase Avg.
Completion Rate
Invest Intellectual capital to reduce number of “Things In Process” using
Lean Tools (Pull Systems, Setup Reduction, etc) and Six Sigma tools
(Variation Reduction)
Little’s Law: Mathematics of Theory of Constraints (TOC) and Toyota
Production System (TPS)
Pull rather than Push work into a process which may already be
overloaded. Why is it called Pull? Because the WIP is not increased until
it has been reduced by a shipment or a service completion.
This requires an input queue prior to WIP, and a ranking system for
release of work into WIP.
Lead Time (process) starts when an item is released into WIP.
WIP = Work In Process; TIP = Things In Process
International Standards for Lean Six Sigma 13
Process Cycle Efficiency
Process Cycle Efficiency helps quantify opportunity
Value-Added Time (VA)
PCE% = x 100%
Process Lead Time (PLT)
Amount of WIP
PLT = = Little’s Law
Avg. completion rate * Chart from Lean Six Sigma for Service, Michael L.
George, copyright 2003, The McGraw Hill Companies
PCE% is a universal process metric
Typical World-Class
that can be used to compare different Application
PCE PCE
processes.
It estimates how efficient a process is Manufacturing 5% 30%
from the customers perspective.
The higher the PCE%, the faster the Services 10% 50%
customer value is delivered.
How Much Value Add Does Your Processes Generate?
International Standards for Lean Six Sigma 14
Analysis Tool:
“Value-Add” Assessment
Assessing Types of Tasks
Value Adding (VA): Steps essential to deliver
product or service according to customer
requirements. Three criteria:
1. Transforms the product or service toward
completion
2. Customer cares (would be willing to pay for it)
3. Done right the first time
Required Waste (RW): Steps that are not essential
to the customer but the business has to perform
Non-Value Adding (NVA): Steps that do not qualify
as Value Add or Business Non-Value Adding
Each Process Step Can Have Varying % of VA, RW, NVA
International Standards for Lean Six Sigma 15
Takt Rate Analysis
Time Trap Identification: the process (or process step) that injects the most
amount of delay into the process is the time trap.
Takt Rate Analysis compares the task time of each process or step to:
Each other to determine the time trap
Customer demand to determine if the time trap is the constraint
Number of Units to Process
Takt Rate = Customer Demand Rate =
Net Process Time Available
Net Process Time Available
Takt Time =
Number of Units to Process
How Do We Find the Time Traps (Wasted Time)?
Map the process; known as a value stream map
Time each activity (if timing is not available)
Time the wait states (waiting on material, other people, rework, overloaded WIP)
Takt = German Word for Rhythm, The Beat of a Drum
International Standards for Lean Six Sigma 16
Visible Workplace
Work that is not seen (invisible) cannot be improved
In manufacturing you can see large parts of the work flow; in service work
you cannot. Perhaps that’s why lean started in manufacturing.
WIP (TIP =Things In Process) is difficult to see in services
How Do We Make Work Visible?
• Establish and display WIP = Work in Process (TIP)
• Establish and display metrics for the process (the dashboard for the
hour, day, week, month)
• Display a list of proposed Quality, Speed, and Financial metrics.
• i.e. Quality = Defect Rate, Rolled Throughput Yield
• i.e. Speed = Process Lead Time (PLT), PCE%
• i.e. Financial = Per Unit Cost, Scrap Rate
How Visible are your Business Processes?
International Standards for Lean Six Sigma 17
Toyota Production System
Waste Elimination (Applies to Every Process)
“The ability to eliminate waste is developed by giving
up the belief that there is ‘no other way’ to perform
a given task. It is useless to say, ‘It has to be done
that way,’ or ‘This can’t be helped!’
At Toyota, we have found that
there is always another way.”
– Study of the Toyota Production System
“Quick and Crude is better than Slow and Elegant” – John R. Black
International Standards for Lean Six Sigma 18
But Lean Alone Has Holes
Lacks defined cultural infrastructure
Top leadership engagement
Deployment organization (Champions, Black Belts, etc.)
Sometimes lacks focus on customer
Lacks a consistent methodology
Most lean efforts lack focus on variation elimination and simply
“account for” the variability by carrying excess inventory and
resources
Lean tools do not intrinsically focus on bringing a process under
statistical control and maintaining that control allowing for unpleasant
surprises
When using Lean alone, you risk delivering the wrong things, faster!
International Standards for Lean Six Sigma 19
Six Sigma
Six Sigma History
Motorola was the first advocate in the 80’s
Six Sigma Black Belt methodology began in late 80’s/early 90’s
More recently, other companies have embraced Six Sigma:
GE Bombardier US NAVY Eli Lilly Best Buy
Allied Signal Sony US ARMY Xerox Caterpillar
Project implementers names includes “Black Belts”, “Top Guns”, “Change
Agents”, “Trailblazers”, etc.
Implementers are expected to deliver annual benefits between $500,000
and $1,000,000 through 3-5 projects per year
Top-down program with Executive and Champion support
Outwardly focused on Voice of the Customer, inwardly focused on using
statistical tools on projects that yield high return on investment
Six Sigma Improves Quality by Reducing Defects & Variation
International Standards for Lean Six Sigma 21
What is Six Sigma?
Six Sigma is a quality improvement
methodology designed to reduce product
or service failure rates to near perfection.
Incorporated into the methodology is the
use of a data-driven approach to work
toward the elimination of defects in every
process area of a business, emphasizing
the production of products and services
better, faster and at a lower cost than the
competition.
Simply: Six Sigma is a methodology for
determining and reducing/eliminating
variation in a process, thereby improving
quality.
Six Sigma is a Data & Customer Driven Approach
International Standards for Lean Six Sigma 22
Six Sigma Defined
What Six Sigma Is:
An enabler to business strategy
Places customers at the center of performance improvements
Fact-based approach for improving business processes & solving problems
A proven methodology and toolset supported by deep training and mentoring
Focused on reducing variability of processes
A way to develop highly skilled business leaders
A means for creating capacity in organizations
What Six Sigma Is Not:
A business strategy
A way to develop statisticians and engineers
Only for manufacturing companies
Only about “cost reductions”
A “flavor of the month” approach
An approach that slows decision making and business outcomes
Six Sigma Practitioners Believe Quality is Everyone’s Responsibility
International Standards for Lean Six Sigma 23
What is a Process?
Process: Any activity that takes inputs, adds value and provides an output(s).
Process Approach: The identification, interaction, application and management
of systematic activities in an organization.
Y = f(X)
Input Process Output
x x x
x x Y
x
Each Process Step is and Opportunity for Value Creation or Defects and Waste
International Standards for Lean Six Sigma 24
What Do Our Clients Want?
Lean (Speed); Six Sigma (Quality); Both (Cost)
International Standards for Lean Six Sigma 25
Six Sigma Tools
Quality Functional Deployment C & E Matrix
SIPOC Failure Modes and Effects Analysis
CCR or CTQ Tree Cause and Effect Diagrams
Process Map Mood’s Median
Voice of the Customer Analysis ANOVA
Quality Function Deployment Components of Variation Analysis
Kano Analysis Simple and Multiple Regression
Data Collection Plan Chi-Square Analysis
Statistical Sampling Logistical Regression
Measurement System Analysis Benchmarking
Statistical Process Control Pugh Selection Matrix
Financial Analysis Design of Experiments
Pareto Analysis Piloting
Brainstorming Gage R&R or AR&R
Frequency Plots & Histograms Cost/Benefit Analysis
Control Charts Standard Operational Procedures
Process Capability Analysis Control Response Plans
Control Charting
Kaizen Events Targeted in Measure to Accelerate Results
International Standards for Lean Six Sigma 26
How Capable Are Your Products &
Services? (% Shippable without Rework)
The amount of
process
variation and
defects
increase as the
# of SKU’s or
Process Steps
increase, while
the yield
decreases
Cp = Capability of your Process
International Standards for Lean Six Sigma 27
Six Sigma DPMO
Defects Per Million Opportunities
Six Sigma is a Quality Measure and a Goal
International Standards for Lean Six Sigma 28
Six (6) Causes of Variation?
A Fishbone Diagram is also
called the Ishikawa Diagram
or Cause and Effect Diagram.
It gets its name from the fact
that the shape looks a bit like
a fish skeleton.
The 5 Why’s technique help
us drill down to the root cause
A fish bone diagram is a common tool used
for a cause and effect analysis, where you
try to identify possible causes for a certain
problem or event.
What are the causes of variation in your processes?
International Standards for Lean Six Sigma 29
But Six Sigma Alone Has Holes
Six Sigma lacks many concepts and tools lean is strong in
Set-up reduction
Waste elimination
Mistake Proofing (Error Proofing or Poke Yoke)
Cycle-time improvement
Process simplification
Work in process control and reduction
Six Sigma has long time-lines for projects (4-18 months) compared to Lean
(1-4 months) or even less with Kaizen
Six Sigma specialists (Black Belts) are often less productive than Lean
specialists (Lean Sensei)
Six Sigma Black Belts do 3-5 projects a year
Dedicated Lean project leaders do 10-20 projects a year
Six Sigma is often seen as being “too slow”
When using Six Sigma alone, you risk delivering the right things, slower!
International Standards for Lean Six Sigma 30
Lean Six Sigma Integration
What is Lean Six Sigma?
Lean Six Sigma is a methodology for achieving
the goals of the enterprise; lean six sigma is
utilized to improve Customer Satisfaction and
gain greater Return on Investment.
Simply Stated: Lean Six Sigma is the combined
methodology of lean and six sigma utilized to
increase process velocity, improve efficiency,
and reduce or eliminate process variation.
Six Sigma is the “Unifying Framework” Lean provides additional tools
Six Sigma provides the improvement and approaches to “turbo-
infrastructure charge” improvement efforts
» CEO Engagement
Tools: Set-up reduction, 5S,
» Deployment Champions
» Green Belts, Black Belts, Master Black Belts Kanban, Waste Reduction, Value
Stream Map
Over-riding methodology: DMAIC, DFSS
Approaches: Kaizen, Poke-Yoke
Lean & Six Sigma can co-exist independently, but the benefits of integration are huge
International Standards for Lean Six Sigma 32
Why Combine Lean & Six Sigma?
Lean and Six Sigma are often viewed as competing practices
which misses the central issues:
You can’t reliably maximize velocity (through waste reduction) without
improving quality (through elimination of process variation)
You can’t maximize quality without improving process velocity
(take out non-value add)
You can’t maximize ROI unless you do both.
…while the pitfalls of not integrating them are formidable
Divided focus of the organization
Separate and unequal messages for improvement
Destructive competition for resources and projects
Lean (Speed) + Six Sigma (Quality) = ROI (Lower Costs)
International Standards for Lean Six Sigma 33
The Evolution of Lean Six Sigma
Continuous Improvement can be traced to
Taylor’s time studies
Toyota created Lean to achieve Henry Ford’s
low cost GM’s variety of product
Motorola initiated “Six Sigma” to meet the
challenge of Japanese chip quality and cost
Deming, Baldridge, and Shingo Prize’s are
Descriptive of success
GE Prescribed the Six Sigma infrastructure of
success connected to business strategy
Lean Six Sigma integrates Lean lead time and
cost reduction with Six Sigma quality and
sustaining infrastructure of success
We are moving into Lean Six Sigma Industry Integration
International Standards for Lean Six Sigma 34
The DMAIC Methodology
Used by improvement teams to
improve the current capabilities of
an existing process.
Used to:
Define a problem,
gather data and Measure the
problem,
Analyze the captured data for
root causes,
Improve the process by
developing and implementing
solutions, and
Control (standardize the solution)
the process.
DMAIC is used to Improve Existing Processes
International Standards for Lean Six Sigma 35
Funnel-Down Many Variables
to the Critical Few!
Define
Measure
Analyze
Improve
Control
"It is not necessary to change ! Survival is not mandatory."... Demming
International Standards for Lean Six Sigma 36
High Level DMAIC Approach
We Learn as we Move Through the DMAIC Phases
International Standards for Lean Six Sigma
Deployment Planning
Lean Six Sigma DMAIC Roadmap
Define Measure Analyze Improve Control
Kaizen Events Targeted in Measure to Accelerate Results
International Standards for Lean Six Sigma 39
Deployment Infrastructure
Typical Roles for Lean Six Sigma Deployment
*These roles should • Owns vision, direction, integration, & results
receive coaching when Organization • Leads change, provide strategic direction
they first begin their practice Leadership • Executive Training
Master
Deployment
Black Belts*
• Trains Black Belts/Green Belts Champions*
• Coaches Black Belts/Green Belts • Leads efforts within
•
•
Leads Lean Six Sigma projects
Full-time position All Employees
All Employees department
• Prioritizes projects
• MBB Training after BB • Understand vision
experience • Manages Project Portfolio
• Apply concepts to their job • Executive Training &
Black Belts* and work area Sponsor Training
• Leads Lean Six Sigma projects • White Belt/Awareness Project
• Trains and coaches Project training Sponsors
Teams
• Full-time position • Project owner
• Black Belt Training • Implements solutions
Green Belts* • Owns financial results
Process Manager • Part time as part of job
• Sponsor Training
• Lead projects – usually Project Team
Kaizens
• Part time Members • Provide project-specific support
• Green Belt Training • Often called Yellow Belts
Often serve in role for 18 - 36 • First-line supervision in business
months and then Re-Integrate • Provide project-specific support process
• Often called Yellow Belts
back to the organization to • Part time on projects • Yellow Belt Training
organically grow culture • Yellow Belt Training
40
Green Belt Candidates
Factors for Project Success
Drive Communication
Willing to APPLY what was covered in High team involvement, collaborative
class Able to communicate progress
Drive the solution frequently
Candidate able to stay schedule focused Able to lead a group effort (flip charts &
and keep project on time post-its)
Candidate resolves barriers or gets help Mentoring time taken seriously
resolving barriers quickly
Does not let ‘artificial’ organizational
Readiness
Open to constructive criticism
boundaries get in the way
Able to ask the fundamental or tough
Mindset questions
Open and flexible mindset Candidate prepared for class and
For both class and project work want to completes tools per schedule
stay focused on the process and not on Basic MS Office Computer Skills
blaming people! Basic statistics knowledge
“Blame the process not the people”
Leadership and Team Facilitation Skills are Critical
International Standards for Lean Six Sigma 41
Belt Expectations and Involvement
Role Commitment Objectives/Activities
• Full-time • Learn how to build and lead cross-functional teams
• 5-week training • Learn/Apply the DMAIC problem solving - solve high priority opportunities
• Lead multiple projects • Learn and practice using Lean Six Sigma toolset to deliver 6 to 8 projects
Black over 18-24 months
• 18-24 months until
Belt redeployed • Re-deploy into the business with an enhanced set of leadership and
technical skills
• Part-time • Learn how to build and lead cross-functional teams
Green • 2-week training • Learn the DMAIC problem solving and process improvement approach
Belt • Lead smaller projects • Learn how to utilize core tools in the Lean Six Sigma toolset
• On-going
• Part-time • Learn how to utilize the most basic Lean Six Sigma tools
Yellow • 1-week training • “Power team member” on small/large projects
Belt • On-going
• Part-time • Engage the organization
White • 1-8 hr training • Develop basic awareness of DMAIC methodology and Lean Six Sigma tools
Belt • On-going and rationale
Leadership and Team Facilitation Skills are Critical
International Standards for Lean Six Sigma 42
The “Burning Platform” Is Essential to
Create the Compelling Need for Change
Persuading people to pay the price of commitment requires a compelling need that
drives towards a new vision of the future. When this message is owned and driven by
an organization’s leadership, the likelihood of success is increased exponentially.
...lighting a “burning platform” at both the
organizational and personal level
Compelling Need
Business Human and financial resources
opportunities to our organization Other opportunities
Business threats
Personal energy and time
Personal opportunity To me through my Loss of control
Personal threat frame of reference
Personal risk
Benefits of change is greater than cost & risk of change
International Standards for Lean Six Sigma 43
Change Management Tools
Project Charter
Stakeholder Analysis
Influence Strategy Plan
Risk Analysis
Communication Plan
Issue Logs
Effective Meeting Skills
RACI Chart
Conflict Management Skills
Toll Gate Reviews (DMAIC)
Project Status Reports
Financial Progress Reports
A3 Report
Storyboards
Data & Metrics
Black Belts Selection from Future Leadership Pool
International Standards for Lean Six Sigma 44
Successful Project Factors
Project selected is clearly aligned with strategic company objectives
Problem, Goal and Metrics are well defined and agreed upon
Management and/or Champion involvement
Project is one you need to work anyway
Scope is well defined and reasonable
Data is available
Management resource commitment
Defects and Waste issues; tools are applicable
FREQUENT Communication about the project – candidate to team and
management
Ability to implement potential solutions, not just to come up with
recommendations
Projects Scoped Small for Faster Execution of Results
International Standards for Lean Six Sigma 45
Identifying The Opportunities
Core Processes: Exist to create enterprise value to customers
Support Processes: Exist to Help Core Processes Create Value
Everything is vague to a degree you do not realize until you have tried to make it precise
International Standards for Lean Six Sigma 46
Lean Six Sigma
Project Identification
Reduce cycle time of
incoming quality
inspections
Improve efficiency of
shipping and receiving
Financial Value
Drivers Green energy efficiency
Reduce Inventory & optimizations
costs 20% to
achieve industry Packaging
benchmark levels rationalizations
Reduction of slow
inventory turn items
Process Analysis
Strategy & Goals Assess Levers Opportunity Areas
International Standards for Lean Six Sigma 47
Lean Six Sigma Project Selection
Black Black Kaizen Green Kaizen Green
Belt Belt Charter Belt Charter Belt
Charter Charter #2 Charter #1 Charter
#1 #2 #1 #2
Act as though it were impossible to fail - Winston Churchill
International Standards for Lean Six Sigma 48
Projects in Process (PIP)
Traditional Approach: Work Control Approach:
Start all projects at once. Have each Minimize those same projects in
of 4 resources resource split their process: this time use the 4 resources
time evenly between 2 projects of 30 by teaming 2 people on the two highest
man- days of work each: priority projects until they are complete:
Resources Spread: Resources Focused:
Results Accrue at the End Results Accrue As Projects Complete
8 8
P P 7
7
r r
6 o 6
o
j 5 $$$ j 5
e 4 Returned e 4 $$$
c c
t
3
t
3 Returned
s 2 s 2
1 1
0 20 40 60 80 0 20 40 60 80
The real bang here is the cycles of learning, realized by completing projects sooner
International Standards for Lean Six Sigma 49
Measure Program Success
FACTOR POOR BELOW AVERAGE ABOVE AVERAGE EXCELLENT
Average Level of Unknown or less than May be known and 30% Known and 40 % to Known and greater than
Improvement per 30% to 40% 60% 60%
Project
Set Stretch Goals Average Financial Generally not Not well defined and Defined, tracked and Defined, Tracked and
and Metrics to Results per Project quantifiable less than an average of average around $100K average greater than
Focus Effort on $40K per project per project $150K per project
Six Sigma Quality Average Quantity of 1 to 2 2 to 3 3 to 4 4 or more
Projects per Black
Variation in Deployment Results Belt/Year
Organizational Little or no impact on More frequent use of Trend or movement Six Sigma becomes the
Approach/Culture the behavior of the data, but in isolated towards the use of "Way we think and
Change ogranization cases analytical methods and work"
Below Above data oriented decisions
TOTAL QUANTITY OF
IMPLEMENTATIONS
Average Average
FACTOR POOR BELOW AVERAGE ABOVE AVERAGE
Management
Figure 7.3.3-2 Quantitative
Heard of Six Sigma
Program Success Metrics EXCELLENT
Know of Six Sigma, do Know of Six Sigma and Know the system
Understanding not understand tools or some of the tools aspect of Six Sigma and
system aspects can relate to the usage
of the tools
Inferior Excellent Management none, purely a "Grass Some Support but weak Good support but Involved and reviewing
Commitment Roots" Intiative and variable variable results periodically
Up Front Planning Quality Manager selects Middle to upper One to two year plan, Two to three year plan
a couple of Quality Management pilot a deployment is given developed considering
Engineers for training small launch to see if it
good consideration, best roll out sequence,
works planning has some financials, goals,
holes which creat employee awareness
frustration points
Black Belt Task force level, time Part time only, less than Suppose to be full time Full time, greater than
RESULTS FROM SIX SIGMA Participation unknown 50% but management pulls 90%
them off projects, less
IMPLEMENTATIONS than 75%
Inrastructure None Generally None Most support functions Fully intergrated and
Development have been alerted of documented Six Sigma
Figure 7.3.3-1 VariationofinQuantitative
A combination Deployment
& support requirements System operating
with some guidelines
Results documentation
Qualitative program metrics trigger Project Selection Done by the Black Belt, Done by the Black Belt, Black Belts usually
no management
ownership
low level management
concurrence
finds projects and
Champion agrees
Champions and Black
Belts work together to
find best projects
early identification of issues for Project Tracking None Manual or poorly defined System in place but not
very disciplined usage
System and placed and
used to manage the Six
Sigma effort
proactive resolution to ensure Green Belts and
Yellow Belts
May only be Green or
Yellow Belts or just a
few Black Belts
Sprinkling of Green
Belts, but training is
only for awareness, no
Strategy in place,
difficult time getting
projects assigned to
Strategy in place, Green
Belts play a key role in
overall effort, Yellow
deployment results are maximized strategy Green Belts, Yellow Belt Belts perform process
training is to low a level management functions
Improvement Level Unknown or less than May be known and 30% Known and 40 % to Known and greater than
30% to 40%
Figure 7.3.3-2 Qualitative Program60% Success Metrics 60%
Financial Results Generally not Not well defined and Defined, tracked and Defined, Tracked and
quantifiable less than an average of average around $100K average greater than
Weekly Status Reporting of all Projects in Process $40K per project per project $150K per project
International Standards for Lean Six Sigma 50
Benefits and Culture
Financial:
Companies embracing Lean Six Sigma report payback (inclusive of all
costs) within 12 months
Ultimate ROI in range of 25-50x over 2-4 years
Cultural:
Deliberate and proven-approach to work
Returns dependent on:
Selecting and engaging the right
people
Executing the right projects
Fully engaging company leadership
Lean Six Sigma Cultural Change on Average is 3 Years
International Standards for Lean Six Sigma 51
Rigorous Benefits Measurement
Why rigorously classify
benefits?
Understand financial impact
External communications
Build momentum
Validate investment
Benefit Categorization
Type I: Direct benefits
Type II: Redeployments and
cost avoidance
Type III: Direct savings, but
lack of certainty as to cause
Type IV: Other benefits
Linking Strategy Results to Business Process Execution
International Standards for Lean Six Sigma 52
Lean Six Sigma Deployment
Key Success Factors
Executive support and engagement
Rigorous and appropriate project selection
Selecting projects that support the
business strategy
Metrics that focus on results, not the
number of people trained!
Active project sponsorship at the project
level
Selection of high-talent Black Belts and Champions
Full-time, dedicated resources in key roles
Mentoring by guides that understand Lean Six Sigma and understand
your business
Black Belt at 0.5 – 1% DNA; Green Belts at 2-6% DNA
International Standards for Lean Six Sigma 53
Wrap Up
Takeaways
Now you should be able to
Know the origin and aims of Lean, Six Sigma, and Lean Six Sigma
Understand the roles and responsibilities within a Lean Six Sigma
Team
Understand the project identification, selection, and prioritization
process
Understand how Lean and Six Sigma synergistically come together,
building a transformation methodology more powerful than the sum of
the parts
Understand the value proposition of Lean Six Sigma
Understand the Lean Six Sigma terms, tools, and DMAIC methods
and definitions
Thank You for Sharing Your Experiences
55
International Standards for Lean Six Sigma
Questions or Feedback?
?
?
?
?
? ?
? ? ?
? ?
We Hope You Enjoy The Lean Six Sigma Overview Training
International Standards for Lean Six Sigma 56
Backup
How will Lean Six Sigma Help Me?
It is a problem solving methodology to put recurring problems to bed!
It will facilitates communication between people with different backgrounds and
from different functions
Can be applied in all areas of your life and career
Helps drive focus and prevents gaps in logic
It is visible to higher levels of the company
Uses data for sound conclusions
Allows you to leverage and build on what you already know!
Requires team involvement and emphasizes sound communication
Minimizes emotion and conflict and moves to data-driven process-based solutions
Focuses on fundamentally solving a problem NOT on adding band-aids and
additional complexity
Built on standard tools & standard methodology, helps simplify your discussions!
It has been proven successful across many industries, solved countless problems
and saved billions of dollars
Focus on creating opportunities vs. resource constraints
International Standards for Lean Six Sigma 58
How does Lean Six Sigma
Differ from other ‘Initiatives’?
Builds on what you already know!!
Puts the customer and their requirements first
Fact-based, data-driven, scientific approach
Combines proven tools into an integrated
approach
Project selection based on top and bottom-line
impact
Focus on eliminating defects and reducing
variation
Cross-functional, process-driven
Exponential improvement targets
Builds upon past improvement techniques
Lean Six Sigma identifies and eliminates the root causes of waste and variation
International Standards for Lean Six Sigma 59
Leading Lean Six Sigma
Companies
52 publicly traded organizations
Company-wide, highly active deployments
Lean Six Sigma Company Stock Performance Research
International Standards for Lean Six Sigma 60
Lean Six Sigma Stock Price
Increase
*January, 1998 – January, 2008
International Standards for Lean Six Sigma 61
10 Year Stock Price Increase*
Lean Six Sigma Companies
*January, 1998 – January, 2008
International Standards for Lean Six Sigma 62
Six Sigma in 1980’s
Motorola has documented +$16B in savings as a result of Six Sigma efforts
International Standards for Lean Six Sigma 63
Six Sigma in 1990’s
General Electric added the Support and Sustain Infrastructure,Tollgates & Define Phase
International Standards for Lean Six Sigma 64
Six Sigma in 1990’s Advances
Development of Sponsor Role Executive Commitment
The project charter author Top executives trained and active
The individual responsible for sustaining the Mandated participation
gains
The Process Owner
Implementation of a Formal
Part of existing role Project Selection Process
Ensures strategic and financial linkage
Creation of a Financial
Ensures properly scoped projects
Representative Role
Ensures alignment between projects
Independent of the project Implementation of Formal Phase
Validates the project savings
Gate Review Process
Creation of Champion Role Ensures Stakeholders, Together, Regularly
Facilitates project selection process Review Project Progress and Gain
Aligns resources with projects alignment around future direction
Audits project progress Each review ends with formal Go/No-Go
Full-Time role if >15 Black Belts decision
1% Black Belt; 2-6% Green Belt DNA
International Standards for Lean Six Sigma 65
Lean Six Sigma in 2000’s
Toyota has continued to evolve its Toyota Production System (TPS) since the 1950s, but
the integration with Six Sigma has just recently occurred
International Standards for Lean Six Sigma 66
References
Pyzdek, Thomas, The Six Sigma Handbook, McGraw-Hill, 2003
Hildebrand, David H. & Ott, R. Lyman, Statistical Thinking for Managers,
Duxbury Press, Pacific Grove, CA, 1998
Kiemele, Mark J. & Schmidt, Stephen R. & Berdine, Ronald J., Basic
Statistics Tools for Continuous Improvement, Air Academy Press,
Colorado Springs, CO, 2000
Schmidt, Stephen R. & Launsby, Robert G., Understanding Industrial
Designed Experiments, Air Academy Press, Colorado Springs, CO, 2000
Minitab, Inc. 3081 Enterprise Dr., State College, PA 16801,
800-448-3555
I've learned that mistakes can often be as good a teacher as success - Jack Welch
International Standards for Lean Six Sigma 67
Intellectual Property Disclosure
This Training Manual and all materials, procedures and systems herein contained
or depicted (the "Manual"), are the sole and exclusive property of The International
Standard For Lean Six Sigma (ISLSS)
The contents hereof contain proprietary trade secrets that are the private and
confidential property of ISLSS Unauthorized use, disclosure, or reproduction of any
kind of any material contained in this Manual is expressly prohibited. The contents
hereof are to be returned immediately upon termination of any relationship or
agreement giving user authorization to possess or use such information or
materials.
Any unauthorized or illegal use shall subject the user to all remedies, both legal and
equitable, available to ISLSS This Manual may be altered, amended or
supplemented by ISLSS from time to time. In the event of any inconsistency or
conflict between a provision in this Manual and any federal, provincial, state or local
statute, regulation, order or other law, such law will supersede the conflicting or
inconsistent provisions of this Manual in all properties subject to that law.
Contact Steven Bonacorsi at
[email protected] International Standards for Lean Six Sigma 68