The document provides a schedule of loads for various circuits (CKT) in different areas of a building including the basement, ground floor, mezzanine, second floor, and third floor. For each circuit, it lists the load description, number of outlets, voltage, load in VA and amps, and size of wires and conduits required. The total connected load is calculated for each area and floor. The schedule provides specifications for over 50 circuits to help with electrical planning and installation in the building.
The document provides a schedule of loads for various circuits (CKT) in different areas of a building including the basement, ground floor, mezzanine, second floor, and third floor. For each circuit, it lists the load description, number of outlets, voltage, load in VA and amps, and size of wires and conduits required. The total connected load is calculated for each area and floor. The schedule provides specifications for over 50 circuits to help with electrical planning and installation in the building.
The document provides a schedule of loads for various circuits (CKT) in different areas of a building including the basement, ground floor, mezzanine, second floor, and third floor. For each circuit, it lists the load description, number of outlets, voltage, load in VA and amps, and size of wires and conduits required. The total connected load is calculated for each area and floor. The schedule provides specifications for over 50 circuits to help with electrical planning and installation in the building.
The document provides a schedule of loads for various circuits (CKT) in different areas of a building including the basement, ground floor, mezzanine, second floor, and third floor. For each circuit, it lists the load description, number of outlets, voltage, load in VA and amps, and size of wires and conduits required. The total connected load is calculated for each area and floor. The schedule provides specifications for over 50 circuits to help with electrical planning and installation in the building.