Pre-Design Phase / Feasibility Study: The Architect'S Phases of Design
Pre-Design Phase / Feasibility Study: The Architect'S Phases of Design
Site Analysis
o Survey, Geo technical, financial, etc…
o If we are dealing with an existing building: asbestos
testing, lead testing, or other hazardous materials investigation.
Zoning Analysis / Code analysis
o Establish what you can build, as for use and size.
o Specific Code Issues that may affect the project.
Project Scope
o Client must identify to the best of their ability the
project scope of work.
Project Goals
Building Program
o A Building Program is a list of the proposed uses.
Project Budgeting
Project Schedule
o Sometimes this may be too preliminary to establish.
Selection Of Project team
The architect stays on the project until the the building is finished.
Final inspections are all completed, and the owner obtains a
Certificate of Occupancy.
REFERENCE:
https://jorgefontan.com/architectural-design-phases/