Project Management Summary Initiavative 3 Lakhs Plan Phase-1
Project Management Summary Initiavative 3 Lakhs Plan Phase-1
Project Management Summary Initiavative 3 Lakhs Plan Phase-1
Sheet no:-
Unit No. :-
Calculation Number :-
INITIAVATIVE
> As per the feasibility of project it has been checked to protect the panel from rain water
> As per the viability of the project the total cost of the structure is 3 LAKHS
PLAN
PHASE-1
> Fix the layout of structure
> Fix the material for roofing
> Find the loads tranfer from the roofing sheet to purlin
> Design the purlin member
> Calculate the load tranfer from purlin to main beam and secondary beam
> design the member of Beams
> Find the wind load tranfer from roofing sheet to Girts
> Design the member of Girts
> Calculate the load tranfer from Girts to column
> Calculate the earthquake load and apply on Column
> Calculate the load tranfer from Beams to relative Column
> Design the member of Column
> Design the base plate
Design the welded and bolted connection
Fix the meeting with Internal Customer and take the comments
PHASE-2
Prepare the Drawing
Again fix the meeting with Internal Customer then correct it if required otherwise release the
approved drawing to the site execution department
EXECUTION
Follows the Plan and execute it.
CLOSE
LL (Learn the Lesson)
DON't UNDER ESTIMATE MINUTE THINGS, BEACAUSE CAUSE DROPS MAKE AN OCEAN
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
GIVEN DATA
Location JAMNAGAR
By:-
-
800
S1 S4 Table for Assumed Member
MB5 Member
Main Beam
1000 MB3
Secondary Beam
SB1
3025 MB1 P1 P2 MB2 Purlin
Struts
SB2
1000
MB4
S3
S2
660 660
2650
or Assumed Member
Abbreviation Length (mm.)
MB1 3025
MB2 3065
MB3 2575
MB4 2500
SB1 2650
SB2 2650
P1 4005
P2 4005
S1 3300
S2 3300
S3 3000
S4 2980
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
Roofing Sheet
DL LL
Self weight of GI Sheet = 100 + 0 N/M2
100 + 0 N/M2
= 11.5 × 3.025 KG / M
= 34.79 KG
= 11.5 × 3.065 KG / M
= 35.25 KG
= 11.5 × 2.575 KG / M
= 29.61 KG
= 28.75 KG
:-
By:-
-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 11.5 × 2.65 KG / M
= 30.48 KG
= 11.5 × 2.65 KG / M
= 30.48 KG
= 6.8 × 4.005 KG / M
= 27.23 KG
= 6.8 × 4.005 KG / M
= 27.23 KG
:-
By:-
-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 14.9 × 3.3 KG / M
= 49.17 KG
= 14.9 × 3.3 KG / M
= 49.17 KG
= 14.9 × 3 KG / M
= 44.70 KG
= 14.9 × 2.98 KG / M
= 44.40 KG
:-
By:-
-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
K1 = 1.08
Category = 1
Class = A
And K2 = 1.05
Now Vz = Vb × K1 × K2 ×
= 50 × 1.08 1.05
= 56.7
= 1928.93 N/M2
= 1.93 KN/M2
:-
By:-
K3
1
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
DESIGN OF PURLIN
H = 35.1276 N/M
P = 196.6 N/M
= 2565.5 N/M
= 2762.1 N/M
Muu = Pl/10
= 2762.1 × 1.005 × 1.005
10
= 278.9766 N.M
= 278976.6 N.MM
:-
By:-
-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
Mvv = Hl/10
= 3.547976 N.M
= 3547.976 N.MM
Assume Zuu/Zvv = 7
Increase the stresses by 33 1/3 % to account for wind
= 9011.95 MM3
= 60.11
< 1.33 * бbc = 219.45
Which is Safe
By:-
-
VADINAR
Sheet no:-
Unit No. :-
Calculation Number :-
UNIT KN / M KN / M KN / M
UDL 2.8 2.8 2.8
P1 & P2
1 1 1
M M M
Unit No. :-
Calculation Number :-
UNIT KN KN
PL 1.1 1.1
MB4
S2 S3
1.1 1.1
KN KN
2.5
= 643500
165
= 3900 N/mm2
The required Section Modulus is refered from IS Handbook No.1
D = 100 mm 0.1 M
T = 7.2 mm 0.0072 M
t = 4 mm 0.004 M
Ixx = 258 cm4 3E+06 mm4
Zxx = 52 cm4 520000 mm4
Iyy = 41 cm4 410000 mm4
Zyy = 10.9 cm3 10900 mm3
rxx = 4.2 cm 42 mm
ryy = 1.7 cm 17 mm
Weight = 11.5 Kg/M 112.815 N/M
Area = 14.6 cm2 14.6 mm2
y:-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 1.1
14.6
= 0.0753424658 KN/mm2
= 75.342465753 N/mm2
Which is Safe
δallowable = Length
325
= 2500
325
= 7.69 mm
δcal =
= 0.90 mm
Which is safe
бp = reaction
(b+2h2 3 )t
= 1100
607.84
hecked By:-
ate. :-
S No. :-
nit No. :-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
UNIT KN KN
PL 1.1 1.1
MB3
S2 S3 MB2
KN KN KN
2.575
1.775 0.8
Beam MB3
Hear the Max. shear force and bending moment and deflection is very low as compare with MB4
so does not required any futher calculation for the MB3
Unit No. :-
Calculation Number :-
UNIT KN KN
PL 1.1 1.1
MB4
MB1 MB2
1.1 1.1
KN KN
2.65
= 726000
165
= 4400 N/mm2
The required Section Modulus is refered from IS Handbook No.1
D = 100 mm 0.1 M
T = 7.2 mm 0.0072 M
t = 4 mm 0.004 M
Ixx = 258 cm4 3E+06 mm4
Zxx = 52 cm4 520000 mm4
Iyy = 41 cm4 410000 mm4
Zyy = 10.9 cm3 10900 mm3
rxx = 4.2 cm 42 mm
ryy = 1.7 cm 17 mm
Weight = 11.5 Kg/M 112.815 N/M
Area = 14.6 cm2 14.6 mm2
y:-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 1.1
14.6
= 0.0753424658 KN/mm2
= 75.34 N/mm2
Which is Safe
δallowable = Length
325
= 2650
325
= 8.15 mm
δcal =
= 1.00 mm
Which is safe
бp = reaction
(b+2h2 3 )t
= 1100
607.84
hecked By:-
ate. :-
S No. :-
nit No. :-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
UNIT KN KN
PL 1.1 1.1
MB2
S3 MB5
1.1 1.1
KN KN
3.065
Beam MB2
= 1E+06
165
= 6666.67 N/mm2
The required Section Modulus is refered from IS Handbook No.1
D = 100 mm 0.1 M
T = 7.2 mm 0.0072 M
t = 4 mm 0.004 M
Ixx = 258 cm4 3E+06 mm4
Zxx = 52 cm4 520000 mm4
Iyy = 41 cm4 410000 mm4
Zyy = 10.9 cm3 10900 mm3
rxx = 4.2 cm 42 mm
ryy = 1.7 cm 17 mm
Weight = 11.5 Kg/M 112.815 N/M
Area = 14.6 cm2 14.6 mm2
y:-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 1.1
14.6
= 0.0753424658 KN/mm2
= 75.342465753 N/mm2
Which is Safe
δallowable = Length
325
= 3065
325
= 9.43 mm
δcal =
= 2.15 mm
Which is safe
бp = reaction
(b+2h2 3 )t
= 1100
607.84
hecked By:-
ate. :-
S No. :-
nit No. :-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
UNIT KN KN
PL 1.1 1.1
MB1
S2 S1
1.1 1.1
KN KN
3.025
Beam MB1
= 1E+06
165
= 6666.67 N/mm2
The required Section Modulus is refered from IS Handbook No.1
D = 100 mm 0.1 M
T = 7.2 mm 0.0072 M
t = 4 mm 0.004 M
Ixx = 258 cm4 3E+06 mm4
Zxx = 52 cm4 520000 mm4
Iyy = 41 cm4 410000 mm4
Zyy = 10.9 cm3 10900 mm3
rxx = 4.2 cm 42 mm
ryy = 1.7 cm 17 mm
Weight = 11.5 Kg/M 112.815 N/M
Area = 14.6 cm2 14.6 mm2
y:-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 1.1
14.6
= 0.075 KN/mm2
= 75.342465753 N/mm2
Which is Safe
δallowable = Length
325
= 3025
325
= 9.31 mm
δcal =
= 2.08 mm
Which is safe
бp = reaction
(b+2h2 3 )t
= 1100
607.84
hecked By:-
ate. :-
S No. :-
nit No. :-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
UNIT KN
PL 1.1
MB5
S3
0.0
KN
0.725
Beam MB5
= 797500
165
= 4833.33 N/mm2
D = 100 mm 0.1 M
T = 7.2 mm 0.0072 M
t = 4 mm 0.004 M
Ixx = 258 cm4 3E+06 mm4
Zxx = 52 cm4 52000 mm3
Iyy = 41 cm4 410000 mm4
Zyy = 10.9 cm3 10900 mm3
rxx = 4.2 cm 42 mm
ryy = 1.7 cm 17 mm
Weight = 11.5 Kg/M 112.815 N/M
Area = 14.6 cm2 14.6 mm2
y:-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
= 1.1
14.6
= 0.0753424658 KN/mm2
= 75.342465753 N/mm2
Which is Safe
δallowable = Length
325
= 725
325
= 2.23 mm
δcal =
= 0.90 mm
Which is safe
бp = reaction
(b+2h2 3 )t
= 1100
607.84
hecked By:-
ate. :-
S No. :-
nit No. :-
Prepared By:- HMR
Calculation Number :-
DL LL DL LL DL
1 C1,C15,C7,C21 121.8438 + 46.875 288.7063 + 118.125 47.55
2 C2 To C6 243.6875 + 93.75 554.4875 + 236.25 33.6
3 C16 To C20 243.6875 + 93.75 554.49 + 236.25 33.6
4 C8,C14 227.3125 + 93.75 577.4125 + 236.25 39.2
5 C9 To C13 454.625 + 187.5 1109.0 + 472.5 39.2
Sheet no:-
Checked By:-
Date. :-
PS No. :-
Unit No. :-
BEAM
TL
Collumn Self Wt. KN Total KN
KN
LL DL LL
+ 0 458.1 + 165 623.1
+ 0 831.775 + 330 1161.775
+ 0 831.7775 + 330 1161.778
+ 0 843.925 + 330 1173.925
+ 0 1602.8 + 660 2262.8
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
Then F = Cf × Ae × Pd
= 0.9 × 3 × 1856.15
= 5011.61 N/M
= 5.01 KN/M
By:-
-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
1.8 1.8 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6
3.7 3.7 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.2
Checked By:-
Date. :-
PS No. :-
Unit No. :-
1.6
4.0 4.0
10.1 4.0
4.0
3.3 1.7
3.3 1.7
4.0 4.0
3.3 2
1.66 0.83
3.2
8.1 8.1
20.2 8.1
8.1
6.6 3.3
6.6 3.3
8.1 8.1
6.6 2
3.32 1.66
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
Sa = 2.5
g
( T = 0.075 × h ^ 0.75
= 0.23
Ah = Z × I × Sa
2 R g
= 0.24 × 1 × 2.5
2 3
= 0.1
VB = Ah × W
= 0.1 × W
:-
By:-
-
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
For
External Frame (C1, C2, C3, C4, C5, C6, C7 )
W = 894.30 KN
VB = 0.1 × W
= 89.43 KN
For
Internal Frame (C8, C9, C10, C11, C12, C13, C14, C15 )
W = 1458.23 KN
VB = 0.1 × W
= 145.82 KN
Wi hi Qi = VB
LEVEL KN m Wi × hi^2 KN
Wi hi Qi = VB
LEVEL KN m Wi × hi^2 KN
By:-
Vi
KN
17.314
Vi
KN
28.231
VADINAR CALCULATION SHEET
Sheet no:-
Unit No. :-
Calculation Number :-
1.4 1.4 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6
0.0
2.4 2.4 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9
Checked By:-
Date. :-
PS No. :-
Unit No. :-
BY PORTAL METHOD
1.3
3.2 3.2
7.9 3.2
3.2
7.9 3.2
BY PORTAL METHOD
2.1
5.2 5.2
12.9 5.2
5.2
12.9 5.2