1. METEC Design and Construction Engineers India Private Limited has prepared an internal fabrication schedule for M/s Aarush Logistics project as of September 23, 2019. 2. The schedule provides details of pipe types, references, lengths, quantities, number of racks, total quantities, and duration for various zones including Zones 15, 17, 14, 11, and 13. 3. Most zones have 0 meters of vertical and horizontal piping planned, though Zones 15G31PR1-3 have detailed plans ranging from 1-10 meters of piping across 1-9 racks.

Uploaded by

Dass Dass
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
114 views12 pages

Structural Fabrication Schedule

1. METEC Design and Construction Engineers India Private Limited has prepared an internal fabrication schedule for M/s Aarush Logistics project as of September 23, 2019. 2. The schedule provides details of pipe types, references, lengths, quantities, number of racks, total quantities, and duration for various zones including Zones 15, 17, 14, 11, and 13. 3. Most zones have 0 meters of vertical and horizontal piping planned, though Zones 15G31PR1-3 have detailed plans ranging from 1-10 meters of piping across 1-9 racks.

Uploaded by

Dass Dass
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

METEC DESIGN AND CONSTRUCTION ENGINEERS INDIA PRIVATE LIMITED

INTERNAL FABRICATION SCHEDULE FOR M/s AARUSH LOGISTICS PROJECT ( Status as on 23-09-2019)
Single rack qty
Si.No Zone Ref Pipe Type Pipe Ref No. of rack Total Qty Duration
Length Qty Total Qty Unit
1 Vertical 1.193 1 1.193 Mtrs 1 1.193
2 Horizontal 1.276 5 6.38 Mtrs 1 6.38
Z15G31PR1
3 Connector 1 5 5 Mtrs 1 5
4 Plate 1 0
5 Vertical 1.193 1 1.193 Mtrs 9 10.737
6 Horizontal 1.276 5 6.38 Mtrs 9 57.42
Z15G31PR2
7 Connector 1 5 5 Mtrs 9 45
8 Plate 9 0
9 Vertical 1.193 1 1.193 Mtrs 9 10.737
10 Horizontal 1.276 5 6.38 Mtrs 9 57.42
Z15G31PR3
11 Connector 1 5 5 Mtrs 9 45
12 Plate 9 0
13 Vertical 0 Mtrs 0
14 Horizontal 0 Mtrs 0
Z15G27PR1
15 Connector 0 Mtrs 0
16 Plate 0
17 Vertical 0 Mtrs 0
18 Horizontal 0 Mtrs 0
Z15G27PR2
19 Connector 0 Mtrs 0
20 Plate 0
21 Vertical 0 Mtrs 0
22 Horizontal 0 Mtrs 0
Z15G27PR3
23 Connector 0 Mtrs 0
24 Plate 0
Zone 15
25 Vertical 0 Mtrs 0
26 Horizontal 0 Mtrs 0
Z15GBPR1
27 Connector 0 Mtrs 0
28 Plate 0
29 Vertical 0 Mtrs 0
30 Horizontal 0 Mtrs 0
Z15GBPR2
31 Connector 0 Mtrs 0
32 Plate 0
33 Vertical 0 Mtrs 0
34 Horizontal 0 Mtrs 0
Z15GBPR3
Single rack qty
Si.No Zone Ref Pipe Type Pipe Ref No. of rack Total Qty Duration
Length Qty Total Qty Unit
Z15GBPR3
35 Connector 0 Mtrs 0
36 Plate 0
37 Vertical 0 Mtrs 0
38 Horizontal 0 Mtrs 0
Z15GGPR1
39 Connector 0 Mtrs 0
40 Plate 0
41 Vertical 0 Mtrs 0
42 Horizontal 0 Mtrs 0
Z15GGPR2
43 Connector 0 Mtrs 0
44 Plate 0
45 Vertical 0 Mtrs 0
46 Horizontal 0 Mtrs 0
Z15GGPR3
47 Connector 0 Mtrs 0
48 Plate 0
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
Single rack qty
Si.No Zone Ref Pipe Type Pipe Ref No. of rack Total Qty Duration
Length Qty Total Qty Unit
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97 Zone - 17
98
99
100
101
102
103
104
105
106
107
108
Single rack qty
Si.No Zone Ref Pipe Type Pipe Ref No. of rack Total Qty Duration
Length Qty Total Qty Unit
109
110
111
112
113
114
115
116
117
118
119
120
121
Zone - 14
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
Zone - 11
143
144
145
Zone - 11
Single rack qty
Si.No Zone Ref Pipe Type Pipe Ref No. of rack Total Qty Duration
Length Qty Total Qty Unit
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
Zone -13
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
Single rack qty
Si.No Zone Ref Pipe Type Pipe Ref No. of rack Total Qty Duration
Length Qty Total Qty Unit
183
184
185 Zone - 12
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
E LIMITED
tatus as on 23-09-2019)
Fabriction work Remarks
Fabriction work Remarks
Fabriction work Remarks
Fabriction work Remarks
Fabriction work Remarks
Fabriction work Remarks