SAP Training Manual
SAP Training Manual
1
Contents
Introduction ………………………………………………………………………3
SAP Logon …………………………………………………………………………4
SAP Modules ………………………………………………..……………………5
SAP Transaction Access …………………………………….………………. 6
Favorites List ……………………………………………………….…………… 7
SAP Main Menus ………………………………………………….…….………8
System Function Bar ………………………………………….………..…….. 9
NDC Definitions ………………………………………….……………………..10
Function Location Structure ……………………………………………… 11
Rig User Transactions ………………………………….………………….. 12
Display Equipment List ….…………………………………….…………… 13
Multiple Selections ………………………………………………………….. 15
Layout ……………………………………………………………………………. 17
Measuring Point & Documents ………………………………………….. 19
Work Orders ……………………………………………………………………. 22
Notifications ……………………………………………………………………. 24
Notifications List ………………………………………………………………. 28
Change and Confirm Work Orders List ……………………………….. 29
Transaction Menus ………………………………………………………… . 33
Attachments ……………………………………………………………….……. 34
Variants ………..…………………………………………………………….…… 35
Material Search ……………………………………………………………….… 36
MD Chart …………………………………………………………………………. 39
PMS Scheduling and Execution ……………………………………….… 40
PMS Process ..……………………………………………………..…………. 41
Monthly Reports ………………………………..…….……………………… 42
2
Introduction
SAP is defined in literal terms from a German translation of
3
SAP Logging on
1 & 2 selections will use windows user name to logon (incase of windows user has SAP access)
3 & 4 selections require to enter SAP user name and password
4
Modules
Systems, Applications and Products (SAP R/3)
The SAP R/3 modules used to manage the maintenance of drilling equipment are:
Plant Maintenance
Financial Accounting and Controlling
Materials Management
Human Resources
Project System
The SAP Plant Maintenance Module is the primary tool used to manage NDC’s
equipment maintenance activities and resources. SAP is used by NDC to plan, record
and execute the rig maintenance system.
5
SAP Transaction Access
6
Favorites List
Creating Favorites
1- Inserting an Item from SAP Standard Menu or from User Menu
Right Click on an executable item from user/SAP menu Add to Favorites
The new item appears at the end of your list.
3- Inserting a Transaction
Right click on Favorites folder Insert transaction.
Dialog box appears. Enter the transaction code and choose Continue.
The new item appears at the end of your list, and is automatically labeled with the transaction name.
7
SAP Main Menus
LP01 : for SAP default which will allow you to view material details
Local : to select the windows default printer
8
The System Function Bar
Icon Quick info text Accelerator Key Function
Enter Enter Confirms the data you have selected or entered on the
screen. Does not save your work.
Save CTRL+S Saves your work. Same function as Save in the Edit
menu.
Exit SHIFT+F3 Exits the current function without saving. Returns you
to the initial screen or main menu screen.
Cancel F12 Exits the current task without saving. Same function as
Cancel in the Edit menu.
Find next CTRL+G Performs an extended search for data required in the
current screen.
Function Location
A functional location represents the place at which a maintenance task is performed.
Example : 1-OPR-B-ND01-01 HOISTING & ROTATING SYSTEM in ND01
Location
A location within the plant
Example : Genset 1
Cost Center
Represents a defined location of cost incurrence (started with 2 for offshore rigs and 3 for onshore rigs).
Examples : 301 ND01 cost center
203 Al Ittihad cost center
Work Center
A particular place or person who performs his duties within the corporate work system
Examples : RIGELEC, RIGMECH, DRILLER, BARGCAP & RIGMNGR
10
Function Location Structure (IH06)
1-OPR-B-ND66-01-01
Hoisting Sys
NDC
Operation
Hoisting &
Rotating Sys
Onshore
Rig
NO
11
Rig User Transactions
The below list of transactions are being used frequently by rig maintenance staff.
Go to Favorites to create your favorites list (Favorites \Insert Transaction)
12
Display Equipment List (IH08)
To display list of equipment, use transaction IH08 to search by one of the below criteria's
Search by Equipment Description
Enter part of equipment description in the below field(enter within two star signs **)
Maintenance Plant
Select or enter the rig number to view the related equipment list and press Execute(F8)
Double click on equipment number or select the line and press Display to view equipment details
13
Equipment Search
Search by Equipment Description
Example : *engine*
14
Multiple Selection Guide
For any range selection, you can enter single value, “from : to" range or press Multiple selection
If you have the list in spread sheet or copied in clipboard, press Upload
Or click on Multiple selection to select ND01, ND02 & ND03
Note : Multiple selection icon may lead to another transaction to select your range
You can apply the same method for any range selection
16
Change Layout of a List
You can change the layout of any list and save your changes as default setting.
To change your layout, click on Change Layout icon at the top of the list
Displayed column will be shown on the left side and hidden column on the left side
Double click on the column name to move from left to right or vise versa.
Go to Sort tab to sort out your displayed columns. (same function by sort icons )
After making the required adjustments, click on Save to save the changes
Click on Continue
If the layout code is already exists, change the code or overwrite the existing code.
If you enter the same transaction in new session, the new layout will be viewed.
You can also filter the list by selecting the required column and click on filter icon 17
Example of Change Layout
Using transaction IW49, display the PMSW orders RIGMECH operation list in ND01 dated 01.01.2013 to 01.01.2014 .
Display Order, Equipment, Description, System status & Work center columns only.
Sort the list by Order then by Equipment in Ascending orders.
Filter the displayed list to display the released orders only (REL).
Procedure :
Enter transaction code IW49 in command window
Select the Earliest start date period from 01.01.2013 to 01.01.2014 and Execute (F8)
Press the current layout icon to display, hide and sort the columns.
Press Transfer
To view measuring document list, select the measuring points list and click on MeasDocuments
Or use transaction IK17 and enter/select equipment or measuring point number
19
Create Measuring Document (Reading)
To enter a Measurement reading/counter reading for the measuring point, search for
measuring point number and use transaction IK11
To enter all Measurement reading for equipment, search for the equipment number and use
transaction IK22 . Select the equipment number and press ENTER key.
To enter counter value (Ex . Running Hour), press Object Counter button
To enter all related measuring reading , press All Measuring Points on Object button
For engine and compressor running hours, entry list is prepared to enter the counter reading easily in daily
basis. Use transaction IK34 and select your entry list number and press ENTER key
Enter all reading in the first page and press Next Page button to check for more counters
20
Example of Running Hours Entry
Record the engines & Compressors running hours of ND52
Procedure:
Enter transaction IK34 in command field on the top left corner of main SAP screen
Enter the running hours for all counters in the first page
If counter reading is the same as previous reading, press ENTER key to accept the warning message.
21
Work Orders
SAP is generating PMSW orders automatically in monthly basis as per the preventive maintenance system.
For unplanned repair/maintenance, the maintenance crew have to create RIGW order.
Select Order Type (RIGW), Priority & Equipment or Func Loc. and press ENTER key
Start date
Finish date
PMActType
Press Notifictn pin to add the notification feedback and breakdown data (Details in Notification part).
Select Component tab to insert the required spars in the work order screen
Order Description
Linked Notification
Activity Type
Breakdown Indicator
Shutdown Hours
23
Notifications
SAP notification are used to request for external service (M1), request for oil sample analysis (OL) or record
additional PMS activities (M3). M2 notification is created automatically along with RIGW order.
Type the failure history and scope of work in the long text
Incase of shutdown, go to Breakdown tab , select the Breakdown indicator and enter Downtime
The same should be done in M2 notification which is created automatically from RIGW orders. 24
Notification Feedback/Failure History
Notification Description
Failure Effect
Failure
Failure Text
Cause of Failure
Cause of Failure text
Action Taken
25
Oil Sampling
Oil sampling is a very important PM task. Whenever you have an operation in PMSW order for oil sample
submission, collect the oil sample using the standard bottle, fill in the label date and create OL notification.
Creating OL notification
You can create OL notification using IW21 however it is recommended to link the notification to the PMSW
order by following the below Procedure :
From the PMSW order Header Data, click on Create Notifictn icon
Fill in the sample data in the long text (Grade, RHS on oil ..etc.)
Click on Back icon to go to work order screen and Save to save the notification
If you have more than one sample, go to transaction IW21 to create separate notification (same Procedure).
If the sample submitted and reached the laboratory, the notification status will be changed from Z to Y.
After receiving the testing report, the result will be recorded in the notification status and feedback text. The
testing report will be attached to the equipment.
26
Create Oil Sample Notification from PMSW order
Enter transaction IW28 in the command field and press ENTER key
Also, you can view the completed notification by clicking on Completed check box
Double click on notification number or select the line and press Details to change the notification.
28
Change Orders
Use transaction IW32 to change single work order if you know the order number.
To view & change work order list, follow the below Procedure
1
Enter transaction IW38 in the command field and press ENTER key
Select the order type (RIGW or PMSW)
Select your rig number (Maintenance Plant)
4 Press Execute(F8) to view all open order list
29
Change Orders List (IW38)
Release Order
After creating an order, the system status will be CRTD. To release the order for execution,
Click on User Status icon , select Work and press ENTER key
Incase of work permit required, a warning message will be generated. Press ENTER key and Save
PMSW orders are generated by user status “WORK”, so you need only to press Release flag to release.
After releasing the order, the system status will be changed from CRTD to REL.
30
Order Confirmation
After executing the order tasks, go to transaction “IW41” and enter the order number to confirm.
Press Save
31
Example of Release and Confirm PMSW Order List
Release the list of PMSW orders in ND56 dated 12.12.2013 and confirm rig mechanic tasks
Procedure :
Enter transaction IW38 in command field and press Enter key
Click on Execute icon (or F8) to view all ND56 open PMSW orders list.
Click on Basic Start Date column and press Sort icon to sort the list by start date.
Click on Release flag and ENTER key to accept the permit warning message
The order status will be changed to REL. Select the REL list and click on Operation icon
Click on Work Center column and then click on Sort icon to sort by work center.
Note: In the same screen, you can enter your feedback in Confirmation Text field,
Example
Using IH08 to display equipment list. In this list, you can do the following:
press and hold CTRL key and click on the required equipment rows.
Press CTRL + Y and select the cells, then press CTRL + C to copy and cell information
Create Attachment
View Attachment
To view the attachment, Click on service for object icon and select Attachment List
34
Variants
If you often run a transaction with the same set of selections , you can save the values in a selection set called
a variant. You can create any number of variants for any transaction in which selection screens are defined.
Variants are assigned exclusively to the transaction for which they were created.
Creating Variants
1- Go to transaction screen which you need to create and save variant for your selection (Ex IH08)
2- Make all required selection and inputs then press Save as variant
Selecting a Variant
1- Whenever you run a transaction with saved variant, press Get Variant icon
2- Find Variant window will be shown, press Execute to view all variants or search for variant.
3- All saved variant on the transaction will be shown, double click or select the variant and press
All saved selections and data related to this variant will be recalled
35
Search Materials by Mnfr Part Number
Enter transaction MM03 in the command field and press ENTER key
Enter a material number or click on selection ball to search for the material
Click on the right top corner to search by part number
Enter the manufacturer part number
or material description or both.
Click on Start Search
Select the required material from the viewed list and press Copy
After selecting the material number, press ENTER key
Press Select All to view all material details and then press ENTER
Press to enter Plant 1000 and press Save to save as default setting.
Click on the below check box to view the material details directly.
In Basic data 1 tab , click on glass icon to view the material PDF file with detailed info.
If the PDF file is not viewed and this message is generated
Then you have to adjust your default printer to LP01
From the main menu bar, go to System/User Profile/Own Data select Default tab and set output
device to LP01
Note : The material codes started by 11 for stock or 22 for non stock, to copy the material number only,
Select the material, Press CTRL + Y then Press CTRL + C
To past, press CTRL + V
If Search by Class screen is shown after pressing the search ball, press back to view the selection screen
36
Search by Material Class
Enter transaction MM03 in the command field and press ENTER key
Click on selection ball to search for the material
Click on the right top corner to search by material class
Select Material for Classes tab
Note : To view the selection screen again, press back icon
Type *parts* as class and 001 as class type then press ENTER key.
37
Material Search (MM03)
Click here to search
Select
Select
38
Maintenance Division Organization Chart
Maintenance Manager
39
PMS Work Order Scheduling & Execution
PMS order delay should not be more than the following:
40
Preventive Maintenance Process
PMS order delay should not be more than the following: Are Yes Assign
Spares Required
Required? Spares
a. Weekly Jobs : max. allowable delay 1 day
b. Monthly & Quarterly jobs : max. allowable delay 1 week No
c. Semi annual jobs : max. allowable delay 2 weeks
d. Annual jobs : max. allowable delay 4 weeks. Execute Good
PM Task Issue &
Receipt
42
PMS Completion Report
Shows the percentage of completed PMS work orders to the total PMS orders
(Score = Completed/(Completed + Pending)*100 %).
The target completion percentage is 92%
Select the basic start date range from 01.01.2002 to current date(today)
The all viewed order list should be confirmed (CNF system status) to get 100% score
43
Hands On Maintenance Report
Shows the maintenance hours recorded in the confirmed PMSW, RIGW & MOCW orders during the month.
Enter transaction IW47 in the command field and press ENTER key
In Order Type field, click on multiple selection icon to select PMSW, RIGW & MOCW types
Type your rig number between two star signs in Function Location field
In finish execution field, select start and end date of the current month and remove any other dates
Click on Act Work column and press Sum to check the total hours
44
Display Confirmation List (IW47)
6
Click to Execute
1 2
Click on Click on multiple selection icon
order status
In process & Completed
4
Remove any other dates
5
Select start and end date
of the current month
Select order types
MOCW, PMSW & RIGW
3
45
Oil Sample Status Report
Shows the status of last oil sample for
critical equipment (IW28).
46
Measurement Reading Report
Shows the status of measurements
entry for critical equipment (IK17).