Nk N Lx Ly Thanh D t A Jx Wx
(T) (T) (cm) (cm) (mm) (mm) (cm )2
(cm ) 4
(cm3)
1 2 3 4 5 6 7 8 9 10
2.68 3.36 146 146 49 3 4.3 11.5 4.7
0.428 36 120 120 90 4 10.8 100.1 22.3
65 33.6 120 120 43 3.2 4.0 8.0 3.7
16.5 31.42 75 75 114 4.5 15.5 232.4 40.8
65 22.46 103 103 34 3 2.9 3.5 2.1
65 12.67 120 120 49 3 4.3 11.5 4.7
65 3.41 146 146 42 3 3.7 7.0 3.3
65 8.57 146 146 114 4 13.8 209.3 36.7
65 3.56 138 138 76 2.9 6.7 44.6 11.7

RHS

Nk N Lx Ly H B t A Jx Wx
(T) (T) (cm) (cm) (mm) (mm) (mm) (cm2) (cm4) (cm3)
1 2 3 4 5 6 7 8 9 10
2.68 3.36 146 146 200 100 3 17.6 947.2 94.72
2.68 3.36 146 146 30 30 1.5 1.7 2.3 1.55
P r lx ly lmax l0 jmin sneùn skeùo
(KG/m) (KG/cm2) (KG/cm2)
11 12 13 14 15 16 17 18 19
3.40 1.63 89.6 89.6 89.6 2.8 0.66 1,175 618
8.48 3.04 39.4 39.4 39.4 1.2 0.91 3,678 40
3.14 1.41 85.0 85.0 85.0 2.7 0.69 12,141 16,254
12.15 3.88 19.4 19.4 19.4 0.6 0.97 2,098 1,066
2.29 1.10 93.5 93.5 93.5 3.0 0.63 12,156 22,259
3.40 1.63 73.6 73.6 73.6 2.3 0.76 3,845 15,000
2.88 1.38 105.5 105.5 105.5 3.3 0.55 1,674 17,693
10.85 3.89 37.5 37.5 37.5 1.2 0.91 680 4,705
5.23 2.59 53.3 53.3 53.3 1.7 0.85 628 9,765

P r lx ly lmax l0 jmin sneùn skeùo


(KG/m) (KG/cm2) (KG/cm2)
11 12 13 14 15 16 17 18 19
13.85 7.33 19.9 19.9 19.9 0.6 0.97 197 152
1.34 1.17 125.3 125.3 125.3 4.0 0.44 4,465 1,567
5.37
Project CAN TEEN
Item: Roof structure
Date: May., 08, 2005

B= 6,857 L= 14,000

A. LOADING
1. DEAD LOAD (DL) 15 (KG/m2)
Roofing sheeting (KG/m2)
Insulation (KG/m2)
Purlin (KG/m2)
Service (KG/m2)

Join load G=g*B*Li=15*6857/1000*1.428= 146.88 (Kg)

2. LIVE LOAD (LL) 30 (KG/m2)

Join load P=p*B*Li=30*6857/1000*1.428= 293.75 (Kg)

B. FRAME OUTPUT

Frame Double angle h d A d g


2L (mm) (mm) (cm2) (mm) (KG/m)

1 80x8 24.6 6 19.3


2 80x7 21.6 6 16.96
3 40x4 63 6 6.16 6 4.84
4 40x4 63 6 6.16 6 4.84
5 63x6 63 6 14.56 6 11.44
6 63x6 63 6 14.56 6 11.44
7 63x6 63 6 14.56 6 11.44
8 63x6 63 6 14.56 6 11.44
9 63x6 63 6 14.56 6 11.44
10 50x5 50 5 9.6 6 7.54
11 50x5 50 5 9.6 6 7.54
12 50x5 50 5 9.6 6 7.54
13 50x5 50 5 9.6 6 7.54
14 50x5 50 5 9.6 6 7.54
15 50x5 50 5 9.6 6 7.54
16 50x5 50 5 9.6 6 7.54
17 50x5 50 5 9.6 6 7.54
18 50x5 50 5 9.6 6 7.54
19 50x5 50 5 9.6 6 7.54

C. DEFLECTION
f= 2.257 cm
L= 700 cm
f/L= 2.257/700= 0.00322429 < [f/L]=1/250=

b d
(mm) (mm)

40x3 40 3
40x4 40 4
40x5 40 5
50x3 50 3
50x4 50 4
50x5 50 5
63x4 63 4
63x5 63 5
63x6 63 6
70x5 70 5
70x6 70 6
70x7 70 7
70x8 70 8
80x6 80 6
80x7 80 7
80x8 80 8
90x6 90 6
90x7 90 7
90x8 90 8
90x9 90 9
100x7 100 7
100x8 100 8
100x10 100 10
100x12 100 12
100x14 100 14
100x16 100 16
Jx Jy Wx Wy rx ry M
(cm4) (cm4) (cm3) (cm3) (cm) (cm) (Tm)

146.8 322 24.47 53.70 2.44 3.62


128.4 267 21.40 44.44 2.44 3.51
9.16 22 1.53 3.63 1.22 1.88
9.16 22 1.53 3.63 1.22 1.88
54.2 117 9.03 19.53 1.93 2.84
54.2 117 9.03 19.53 1.93 2.84
54.2 117 9.03 19.53 1.93 2.84
54.2 117 9.03 19.53 1.93 2.84
54.2 117 9.03 19.53 1.93 2.84
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30
22.4 51 3.73 8.47 1.53 2.30

0.004

R A g z Jx rx
(mm) (cm2) (KG/m) (cm) (cm4) (cm)

5 2.35 1.85 1.09 3.55 1.23


5 3.08 2.42 1.13 4.58 1.22
5 3.79 2.97 1.17 5.53 1.21
5.5 2.96 2.32 1.33 7.11 1.55
5.5 3.89 3.05 1.38 9.21 1.54
5.5 4.8 3.77 1.42 11.2 1.53
7 4.96 3.9 1.6 18.9 1.95
7 6.13 4.81 1.74 23.1 1.94
7 7.28 5.72 1.78 27.1 1.93
8 6.86 5.38 1.9 31.9 2.16
8 8.15 6.39 1.94 37.6 2.15
8 9.42 7.39 1.99 43 2.14
8 10.7 8.37 2.02 48.2 2.12
9 9.38 7.86 2.19 57 2.47
9 10.8 8.48 2.23 64.2 2.44
9 12.3 9.65 2.37 73.4 2.44
10 10.6 8.33 2.43 82.1 2.78
10 12.3 9.64 2.47 94.3 2.77
10 13.9 10.9 2.51 106 2.76
10 15.6 12.2 2.55 118 2.75
12 13.8 108 2.71 131 3.08
12 15.6 12.2 2.75 147 3.07
12 19.2 15.1 2.83 179 3.05
12 22.8 17.9 2.91 209 3.03
12 26.3 10.6 2.99 237 3.00
12 29.7 23.3 3.06 264 2.98
N Lx Ly lx ly l0x l0y
(T) (cm) (cm)

41.000 125 500 51.17 138.16 1.62 4.37


-36.500 125 125 51.27 35.58 1.62 1.13
-4.800 80 80 65.60 42.57 2.07 1.35
7.000 140 700 114.81 372.47 3.63 11.78
8.710 140 700 72.56 246.73 2.29 7.80
-13.264 400 1450 207.32 511.09 6.56 16.16
-11.815 142 142 73.60 50.05 2.33 1.58
-10.352 142 142 73.60 50.05 2.33 1.58
-8.881 142 142 73.60 50.05 2.33 1.58
-7.403 142 142 92.96 61.73 2.94 1.95
0.020 28 28 18.33 12.17 0.58 0.38
0.312 56 56 36.66 24.34 1.16 0.77
0.604 84 84 54.99 36.52 1.74 1.15
0.899 112 112 73.32 48.69 2.32 1.54
2.362 140 140 91.65 60.86 2.90 1.92
-1.450 142 142 92.96 61.73 2.94 1.95
-1.548 150 150 98.20 65.21 3.11 2.06
-1.686 163 163 106.71 70.86 3.37 2.24
-1.860 179 179 117.18 77.81 3.71 2.46
jx jy jmin s Status
(KG/cm ) 2
[2100]

0.86 0.37 0.37 1,666.67 OK


0.86 0.92 0.86 1,963.26 OK
0.80 0.89 0.80 975.99 OK
0.50 0.06 0.06 1,136.36 OK
0.77 0.13 0.13 598.21 OK
0.17 0.04 0.04 24,970.26 False
0.76 0.87 0.76 1,067.11 OK
0.76 0.87 0.76 934.94 OK
0.76 0.87 0.76 802.09 OK
0.64 0.82 0.64 1,211.60 OK
0.97 0.98 0.97 2.05 OK
0.92 0.95 0.92 32.50 OK
0.85 0.92 0.85 62.96 OK
0.76 0.87 0.76 93.62 OK
0.65 0.82 0.65 246.01 OK
0.64 0.82 0.64 237.32 OK
0.60 0.80 0.60 268.01 OK
0.55 0.77 0.55 320.76 OK
0.49 0.74 0.49 399.44 OK
No. Mark H B t1 t2 r A P Jx Jy ix iy Sx Sy
(mm) (mm) (mm) (mm) (mm) (cm2) (Kg/m) (cm4) (cm4) (cm) (cm) (cm )
3
(cm3)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 I-100x100x6x8 100 100 6 8 10 21.9 17.2 383 134 4.18 2.47 76.5 26.7
2 I-125x125x6.5x9 125 125 6.5 9 10 30.31 23.8 847 293 5.29 3.11 136 47
3 I-150x75x5x7 150 75 5 7 8 26.84 14 666 49.5 6.11 1.66 88.8 13.2
4 I-200x100x5.5x8 200 100 5.5 8 11 27.16 21.3 1840 134 8.24 2.22 184 26.8
5 H-200x200x8x12 200 200 8 12 13 63.53 49.9 4720 1600 8.62 5.02 472 160
6 I-248x124x5x8 248 124 5 8 12 32.68 25.7 3540 255 10.4 2.79 285 41.1
7 I-250x125x6x9 250 125 6 9 12 37.66 29.6 4050 294 10.4 2.79 324 47
8 H-250x250x9x14 250 250 9 14 16 92.18 72.4 10800 3650 10.8 6.29 867 292
9 I-298x149x5.5x8 298 149 5.5 8 13 40.8 32 6320 442 12.4 3.29 424 59.3
10 I-300x150x6.5x9 300 150 6.5 9 13 46.78 36.7 7210 508 12.4 3.29 481 67.7
11 I-300x200x8x12 294 200 8 12 18 72.38 56.8 11300 1600 12.5 4.71 771 160
12 H-300x300x10x15 300 300 10 15 18 119.8 94 20400 6750 13.1 7.51 1360 450
13 H-350x350x12x19 350 350 12 19 20 173.9 137 40300 13600 15.2 8.84 2300 776
14 I-400x200x8x13 400 200 8 13 16 84.12 66 23700 1740 16.8 4.54 1190 174
15 I-400x300x9x14 386 299 9 14 22 120.1 94.3 33700 6240 16.7 7.81 1740 418
16 I-400x300x10x16 390 300 10 16 22 136 107 38700 7210 16.9 7.28 1980 481
17 H-400x400x13x21 400 400 13 21 22 218.7 172 66600 22400 17.5 10.1 3330 1120
18 I-450x200x8x12 446 199 8 12 18 84.3 66.2 28700 1580 18.5 4.33 1290 159
19 I-450x200x9x14 450 200 9 14 18 96.76 76 33500 1870 18.6 4.4 1490 187
20 I-450x300x10x15 434 299 10 15 24 135 106 46800 6690 18.6 7.04 2160 448
21 I-450x300x11x18 440 300 11 18 24 157.4 124 56100 8110 18.9 7.18 2550 541
22 U-300x90 300 90 9 13 48.57 38.1 6440 309 11.5 2.52 429 45.7
23 U-200x80 200 80 7.5 11 31.33 24.6 1950 168 7.88 2.32 195 29.1
rT H/Af Wx Wy Ac/Ab
(cm) (cm )
-1
(cm )
3
(cm )
3

15 16 17 18 19
2.73 1.25 87.6 41.2 1.59
3.43 1.11 154 71.9 1.62
1.96 2.86 102 20.8 0.77
2.6 2.5 209 41.9 0.79
5.5 0.835 525 244 1.70
3.23 2.5 319 63.6 0.86
3.26 2.22 366 73.1 0.81
6.87 0.715 960 444 1.75
3.84 2.5 475 91.8 0.77
3.87 2.22 542 105 0.74
5.32 1.22 859 247 1.11
8.23 0.666 1500 684 1.67
9.65 0.526 2550 1180 1.78
5.26 1.54 1330 268 0.87
8.02 0.923 1920 637 1.30
8.09 0.813 2190 733 1.34
11.1 0.473 3670 1700 1.80
5.11 1.87 1450 247 0.71
5.18 1.61 1680 291 0.74
7.94 0.967 2380 686 1.11
8.05 0.815 2820 828 1.22
429.333
195
0.1 0.25 0.5
0.5 0.967 0.922 0.850
1.0 0.925 0.854 0.787
1.5 0.875 0.804 0.716
2.0 0.813 0.742 0.653
2.5 0.742 0.672 0.587
3.0 0.667 0.597 0.520
3.5 0.587 0.522 0.455
4.0 0.505 0.447 0.394
4.5 0.418 0.382 0.342
5.0 0.354 0.326 0.295
5.5 0.302 0.280 0.256
6.0 0.258 0.244 0.223
6.5 0.223 0.213 0.196
7.0 0.194 0.186 0.173
8.0 0.152 0.146 0.138
9.0 0.122 0.117 0.112
10.0 0.100 0.097 0.093
11.0 0.083 0.079 0.077
12.0 0.069 0.067 0.064
13.0 0.062 0.061 0.054
14.0 0.052 0.049 0.049
0.75 1 1.25 1.5 1.75 2 2.5 3 3.5 4 4.5 5
0.782 0.722 0.669 0.620 0.577 0.538 0.469 0.417 0.370 0.337 0.307 0.280
0.711 0.653 0.600 0.563 0.520 0.484 0.427 0.382 0.341 0.307 0.283 0.259
0.647 0.593 0.548 0.507 0.470 0.439 0.388 0.347 0.312 0.283 0.262 0.240
0.587 0.536 0.496 0.457 0.425 0.397 0.352 0.315 0.286 0.260 0.240 0.222
0.526 0.480 0.442 0.410 0.383 0.357 0.317 0.287 0.262 0.238 0.220 0.204
0.465 0.425 0.395 0.365 0.342 0.320 0.287 0.260 0.238 0.217 0.202 0.187
0.408 0.375 0.350 0.325 0.303 0.287 0.258 0.233 0.216 0.198 0.183 0.172
0.356 0.330 0.309 0.289 0.270 0.256 0.232 0.212 0.197 0.181 0.168 0.158
0.310 0.288 0.272 0.257 0.242 0.229 0.208 0.192 0.178 0.165 0.155 0.146
0.273 0.253 0.239 0.225 0.215 0.205 0.188 0.175 0.162 0.150 0.143 0.135
0.240 0.224 0.212 0.200 0.192 0.184 0.170 0.158 0.148 0.138 0.132 0.124
0.210 0.198 0.190 0.178 0.172 0.166 0.153 0.145 0.137 0.128 0.120 0.115
0.185 0.176 0.170 0.160 0.155 0.149 0.140 0.132 0.125 0.117 0.112 0.106
0.163 0.157 0.152 0.145 0.141 0.136 0.127 0.121 0.115 0.108 0.102 0.098
0.133 0.128 0.121 0.117 0.115 0.113 0.106 0.100 0.095 0.091 0.087 0.083
0.107 0.103 0.100 0.098 0.096 0.093 0.088 0.085 0.082 0.079 0.075 0.072
0.091 0.090 0.085 0.081 0.080 0.079 0.075 0.072 0.070 0.069 0.065 0.062
0.076 0.075 0.073 0.071 0.069 0.068 0.063 0.062 0.061 0.060 0.057 0.055
0.063 0.062 0.060 0.059 0.059 0.058 0.055 0.054 0.053 0.052 0.051 0.050
0.053 0.052 0.051 0.051 0.050 0.490 0.049 0.048 0.048 0.047 0.045 0.044
0.048 0.048 0.047 0.047 0.046 0.450 0.044 0.043 0.043 0.042 0.041 0.040
5.5 6 6.5 7 8 9 10 12 14 17 20
0.260 0.237 0.222 0.210 0.183 0.164 0.150 0.125 0.106 0.090 0.077
0.240 0.225 0.209 0.196 0.175 0.157 0.142 0.121 0.103 0.086 0.074
0.223 0.207 0.195 0.182 0.163 0.148 0.134 0.114 0.099 0.082 0.070
0.206 0.193 0.182 0.170 0.153 0.138 0.125 0.107 0.094 0.079 0.067
0.190 0.178 0.168 0.158 0.144 0.130 0.118 0.101 0.090 0.076 0.065
0.175 0.166 0.156 0.147 0.135 0.123 0.112 0.097 0.086 0.073 0.063
0.162 0.153 0.145 0.137 0.125 0.115 0.106 0.092 0.082 0.069 0.060
0.149 0.140 0.135 0.127 0.118 0.108 0.098 0.088 0.078 0.066 0.057
0.137 0.130 0.125 0.118 0.011 0.101 0.093 0.083 0.075 0.064 0.055
0.126 0.120 0.117 0.111 0.103 0.095 0.088 0.079 0.072 0.062 0.053
0.117 0.112 0.108 0.104 0.095 0.089 0.084 0.075 0.069 0.060 0.051
0.109 0.104 0.100 0.096 0.086 0.084 0.079 0.072 0.066 0.057 0.049
0.101 0.097 0.094 0.089 0.083 0.080 0.074 0.068 0.062 0.054 0.047
0.094 0.091 0.087 0.083 0.078 0.074 0.070 0.064 0.059 0.052 0.045
0.081 0.078 0.076 0.074 0.068 0.065 0.062 0.057 0.053 0.047 0.041
0.069 0.066 0.065 0.064 0.061 0.058 0.055 0.051 0.048 0.043 0.038
0.060 0.059 0.058 0.057 0.055 0.052 0.049 0.046 0.043 0.039 0.035
0.053 0.052 0.051 0.050 0.049 0.046 0.044 0.040 0.038 0.035 0.032
0.049 0.048 0.047 0.046 0.004 0.042 0.040 0.037 0.035 0.032 0.029
0.043 0.042 0.041 0.041 0.039 0.038 0.037 0.035 0.033 0.030 0.027
0.040 0.039 0.039 0.038 0.037 0.036 0.036 0.034 0.032 0.029 0.026
CALCULATION SHEET
Project : YAKULT By :
Item : STEEL ROOF Date :
Part : RAFTER R1, R2, R3, R4, PURLIN Checked by :

I. LOAD
1. Dead load
- Metal sheet 0.53 mm thk.: 6.50 Kg/m2

- Insulation layer 0.84 Kg/m2


- Purlin, bracing 4.73 Kg/m2
- Service load Kg/m2

Total: (DL) 12.07 Kg/m2 5.33

Purlin Z20019@1400, Lap 900


Purlin bay: B= 1.40 m
Uniform load on purlin: 16.90 Kg/m
Rafter bay: B= 9.00 m
Uniform load on rafter : R1: 108.66 Kg/m (B=9m)
R2: 108.66 Kg/m (B=9m)
R3: 108.66 Kg/m (B=9m)
R4: 108.66 Kg/m (B=9m)
R1a: 65.20 Kg/m (B=5.4m)

2. Live load: Base on Reaction from Beam B1

4. Load combination
COMB1 1.1DL + 1.2 LL
COMB2 DL + LL

II. INTERNAL FORCE & DEFLECTION


1. Purlin checking
Deflection: f= 2.20 cm
[f/L]= 1/ 150
f/L= 1/ 409.09 OK
Stress:
Mmax= 0.68 Tm
Purlin Z20019: Jx= 502 cm4
Wx= 50.2 cm3
s= M/W= 1354.5817 Kg/cm2 OK
2. Steel rafter checking
2.1 Rafter R-1
Deflection: f= 7.30 cm
L= 22.80 m
[f/L]= 1/ 250
f/L= 1/ 312.41 OK
Stress capacity checking: see annex

2.2 Rafter R-2


Deflection: f= 3.73 cm
L= 11.40 m
[f/L]= 1/ 250
f/L= 1/ 305.63 OK
Stress capacity checking: see annex

2.3 Rafter R-3


Deflection: f= 8.51 cm
L= 22.80 m
[f/L]= 1/ 250
f/L= 1/ 267.79 OK
Stress capacity checking: see annex

2.3 Rafter R-4


Deflection: f= 6.70 cm
L= 17.10 m
[f/L]= 1/ 250
f/L= 1/ 255.22 OK
Stress capacity checking: see annex

II. CONNECTION CHECKING

M= 68.62 Tm (Frame R1)


Q= 11.4 T
Bolts f 20 : Rcbl= 3,200 Kg/cm2
Grade 8.8 : Rkbl= 4,000 Kg/cm2
: Rembl= 3,400 Kg/cm2
: Athbl= 2.45 cm2
: Abl= 3.14 cm2
g = 0.90
nc = 2 d = 1.40 cm
[N]kbl=AthblxRkbl= 9,800 (Kg) = 9.80 (T)
[N]cbl=AblxRcblxgxnc= 18,096 (Kg) = 18.10 (T)
[N]embl=dxdxRembl= 9,520 (Kg) = 9.52 (T)
[N]minbl = 9,520 (Kg) = 9.52 (T)

Nkbl=MLmax/(mxSLi2)
Ncbl=Q/(mxn)

Bolts/row
M Q Rows (n) Lmax=L1 L2 L3 L4 L5 L6
(m)
Tm (T) (cm) (cm) (cm) (cm) (cm) (cm)

68.62 11.4 7 2.00 130.00 118 112 100 94 48


L7 Nkbl Ncbl Status

(cm)

42 6.73 0.81 OK
CALCULATION SHEET
Project : YAKULT By :
Item : STEEL ROOF Date :
Part : BEAM B1, B2 Checked by :

I. LOAD
1. Dead load
- Ceiling: 2 layer metal sheet. 15.00 Kg/m2
insulation
- Purlin C100, C150 5.47 Kg/m2
- Cat walk 6.00 Kg/m2
- Service load Kg/m2

Total: (DL) 26.47 Kg/m2 5.33

Beam space: B= 1.00 m


Uniform load on beam B1 26.47 Kg/m

2. Live load:
LL= 70 Kg/m2
Beam space: B= 1.00 m
Uniform load on beam B1 70.00 Kg/m

4. Load combination
COMB1 1.1DL + 1.2 LL
COMB2 DL + LL

II. INTERNAL FORCE & DEFLECTION


Beam B1
Deflection: f= 2.77 cm
L= 9.00 m
[f/L]= 1/ 250
f/L= 1/ 324.91 OK
Stress capacity checking: see annex

Beam B2
Deflection: f= 2.28 cm
L= 9.00 m
[f/L]= 1/ 250
f/L= 1/ 394.74 OK
Stress capacity checking: see annex
CALCULATION SHEET
Project : YAKULT By :
Item : STEEL ROOF Date :
Part : CANOPY Checked by :

I. LOAD
1. Dead load
- Roofing, Purlin 10.00 Kg/m2

Beam space: B= 9.00 m


Uniform load on beam 90.00 Kg/m

2. Live load:
LL= 30 Kg/m2
Beam space: B= 9.00 m
Uniform load on beam 270.00 Kg/m

4. Load combination
COMB1 1.1DL + 1.2 LL
COMB2 DL + LL

II. INTERNAL FORCE & DEFLECTION

Deflection: f= 1.36 cm
L= 7.50 m
[f/L]= 1/ 250
f/L= 1/ 551.47 OK
Stress capacity checking
E= 2.1E+06 (KG/cm2)
R= 2.1E+03 (KG/cm2)

h bc tc tb A g Jx Jy Wx Wy
(cm) (cm) (cm) (cm) (cm2) (KG/m) (cm4) (cm4) (cm3) (cm3)
FRAME F2
25 15 0.8 0.6 38.04 29.86 4,156 450 332 60.06
M s Status
(Tm) (KG/m2) [2100]

2.49 748.96 OK
Caáp 4.6 4.8 5.6 5.8 6.6 8.8
Rcbl 1,500 1,600 1,900 2,000 2,300 3,200
Rkbl 1,750 1,600 2,100 2,000 2,500 4,000

d Abl Atbl
16 2.01 1.57
18 2.54 1.92
20 3.14 2.45 5,280.00
22 3.80 3.03
24 4.52 3.52
27 5.73 4.59
30 7.07 5.60
36 10.18 8.20
42 13.85 11.30
48 18.10 14.80
56 24.63 20.50
64 32.17 26.90
72 40.72 34.70
80 50.27 43.50
90 63.62 56.00
100 78.54 70.20
2.0106193
TÍNH TOAÙN KEÙT CAÁU THEÙP
CALCULATION OF STEEL STRUCTURE

KIEÅM TRA ÖÙNG SUAÁT - STRESS CAPACITY CHECKING


Tính toaùn theo tieân chuaån keát caáu theùp Vieät Nam TCVN 338:2005
This calculation is based on Vietnamese standard (TCVN 338:2005, item 5.3, 5.4)
1. Tính toaùn caáu kieän chòu ñoàng thôøi löïc neùn vaø uoán
Member under combined compression axial load & bending
Noäi löïc: M: Moment
Internal force: N: Löïc doïc (Axial force)
1.1 Tính toaùn veà beàn:
Durability checking
m= ex/rx=(Mx/N).(Ang/Wx)
m1=h.m
h.: heä soá aûnh höôûng hình daïng tieát dieän, laáy theo baûng D9, phuï luïc D, TCXD
factor to depend on the section, base on sheet D9, Annex D, TCXDVN 338:2005
Neáu m1>20: kieåm tra caáu kieän veà beàn theo ñieàu kieän:
If m1>20: The component must be checked with durability

N Mx My
 y x  Rg c
An I nx I ny
An: Dieän tích tieát dieän nguyeân (Section area)

1.2. Kieåm tra oån ñònh toång theå cuûa caáu kieän chòu neùn uoán
Overal Stability checking
OÅn ñònh toång theå cuûa caáu kieän chòu neùn uoán ñöôïc kieåm tra theo ñieàu kieän:
The overal stability of component to be checked with condition:
N
 Rg
j lt A
c

j lt:heä soá phuï thuoäc vaøo m1 vaø lx, ñöôïc tra theo baûng D10, phuï luïc D, TCXDVN 338
factor to depend on m1 and lx, base on sheet D10, Annex D, TCXDVN 338:2005
1.3. Kieåm tra oån ñònh toång theå trong maët phaúng vuoâng goùc vôùi maët phaúng uoán
Checking the Overal Stability in perpendicular plan
N
 Rg
cj
c
y A
C: heä soá, ñöôïc xaùc ñònh: (factor, to be determined as below)

In case mx<=5: b (a)


c
1  am x
a, b: heä soá, duïa theo baûng 16, TCXDVN 338:2005
factor, base on sheet 16, TCXDVN 338:2005
mx=m
1
In case mx>=10: c  (b)
1  m xj y / j b

jb : Factor, base on item 5.2.2.1 and annex E, TCXDVN 338:2005


Heä soá, xaùc ñònh theo muïc 5.2.2.1 vaø phuï luïc E, TCXDVN 338:2005
In case <5mx<10: C = c5 (2 – 0,2 mx) + c10 (0,2 mx – 1)
c5: determined by (a) with mx=5
Xaùc ñònh theo (a) vôù mx=5
c10: determined by (b) with mx=10
Xaùc ñònh theo (b) vôù mx=10
1.4. Kieåm tra ñoä beàn cuûa tieát dieän daàm coù moment uoán M vaø löïc caét Q ñoàng thôø
Durability checking in case of both M&Q (Shear) occur concomitant

σ td = √ σ 2 2
1 +3 τ 1 ≤1 . 15 R

Where σ 1 =Mh 0 /( Wh d ) ; τ 1 =QS c /( J b t b ); S c =b c t c h /2


2. Kieåm tra caáu kieän chòu neùn ñuùng taâm
Concentrically load compression member

N
≤fγ c
ϕA
j : Factor, base on item 5.3.2.1 and sheet D.8, annex E, TCXDVN 338:2005

3. Caáu kieän chòu keùo - Tension member

N
≤ fγ c
A
D9, phuï luïc D, TCXDVN 338:2005
CXDVN 338:2005

luïc D, TCXDVN 338:2005


DVN 338:2005
aët phaúng uoán

VN 338:2005
caét Q ñoàng thôøi taùc duïng
h bc tc tb A g Jx Jy Wx Wy rx ry Ac/Ab M N Lx Ly jx jy jmin s
(cm) (cm) (cm) (cm) (cm )2
(KG/m) (cm ) 4
(cm ) 4
(cm )
3
(cm )
3
(cm) (cm) (Tm) (T) (cm) (cm) (KG/cm2)

25 25 1.4 0.9 89.98 70.63 10,579 3,647 846 292 10.84 6.37 1.75 0 67.5 1,600 840 0.33 0.41 0.33 2,280
25 25 1.4 0.9 89.98 70.63 10,579 3,647 846 292 10.84 6.37 1.75 0 20.48 1,600 840 0.33 0.41 0.33 691
20 20 1.2 0.8 62.08 48.73 4,610 1,601 461 160 8.62 5.08 1.70 0 30 1,600 840 0.21 0.27 0.21 2,264
CALCULATION SHEET
Project : YAKULT By :
Item : Date :
Part : Checked by :

E= 2.1E+06 (KG/cm2)
R= 2.1E+03 (KG/cm2)

h bc tc tb A g Jx Jy Wx Wy rx ry Ac/Ab M
(cm) (cm) (cm) (cm) (cm ) 2
(KG/m) (cm ) 4
(cm ) 4
(cm )
3
(cm )
3
(cm) (cm) (Tm)
RAFTER R1
15 15 1.0 0.7 39.10 30.69 1,601 563 213 75.05 6.40 3.79 1.65 91.63
RAFTER R1a
80 20 1.2 0.8 110.08 86.41 105,672 1,603 2,642 160.33 30.98 3.82 0.39 50.99
RAFTER R2
50 20 1.0 0.6 68.80 54.01 29,543 1,334 1,182 133.42 20.72 4.40 0.69 23.93
RAFTER R3
120 20 1.4 0.8 149.76 117.56 304,255 1,872 5,071 187.17 45.07 3.54 0.30 99.73
RAFTER R4
80 20 1.2 0.8 110.08 86.41 105,672 1,603 2,642 160.33 30.98 3.82 0.39 49.65
FRAME F1
80 20 1.2 0.8 110.08 86.41 105,672 1,603 2,642 160.33 30.98 3.82 0.39 49.65
BEAM B1
25 15 0.8 0.6 38.04 29.86 4,156 450 332 60.06 10.45 3.44 0.85 5.47
BEAM B2
20 12 0.8 0.6 30.24 23.74 2,082 231 208 38.46 8.30 2.76 0.87 6.48
65 25 1.2 0.8 110.08 86.41 77,418 3,128 2,382 250.21 26.52 5.33 0.60 6.48
55.08
s Status Painting
(KG/m2) [2100] (m2/m)

42,933.90 False 0.900

1,930.13 OK 2.400

2,025.02 OK 1.800

1,966.70 OK

1,879.41 OK 2.400
###
1,879.41 OK

1,645.30 OK

3,112.43 False 0.880


272.03 OK 2.300
CALCULATION SHEET
Project : By :
Item : Date :
Part : Checked by :

PIPE ELEMENT
Member under compression/ tension axial load

E= 2.10E+06 (KG/cm2)
R= 2.45E+03 (KG/cm2)

Output
No. Elem. N Lx Ly D t A Jx Wx P r lx ly lmax [l]
case
(T) (cm) (cm) (mm) (mm) (cm2) (cm4) (cm3) (KG/m)

THANH CAÙNH DÖÔÙI: F168x7.11


1 B7 COMB1 14.00 600 1200 273 9.30 77.0 6705.2 491.2 60.45 9.33 64.3 128.6 128.6 400.0
2 B7 COMB2 -13.16 600 1200 30 2.50 2.2 2.1 1.4 1.69 0.98 614.4 1228.8 1228.8 7361.3
3 B7 COMB3 5.10 600 1200 30 2.50 2.2 2.1 1.4 1.69 0.98 614.4 1228.8 1228.8 400.0

THANH BUÏNG
4 M2 COMB1 -29.00 201 201 168 7.11 35.9 1165.1 138.7 28.20 5.70 35.3 35.3 35.3 231.7
5 M2 COMB2 -2.80 201 201 168 7.11 35.9 1165.1 138.7 28.20 5.70 35.3 35.3 35.3 212.1
6 M2 COMB3 -2.00 201 201 168 7.11 35.9 1165.1 138.7 28.20 5.70 35.3 35.3 35.3 211.5
7 M3 COMB1 17.46 221 221 90 5.00 13.3 121.0 26.9 10.48 3.01 73.5 73.5 73.5 400.0
8 M3 COMB2 2.03 221 221 90 5.00 13.3 121.0 26.9 10.48 3.01 73.5 73.5 73.5 400.0
9 M3 COMB3 1.46 221 221 90 5.00 13.3 121.0 26.9 10.48 3.01 73.5 73.5 73.5 400.0
10 M4 COMB1 -12.32 226 226 90 5.00 13.3 121.0 26.9 10.48 3.01 74.9 74.9 74.9 241.4
11 M4 COMB2 -1.24 226 226 90 5.00 13.3 121.0 26.9 10.48 3.01 74.9 74.9 74.9 213.2
12 M4 COMB3 -0.91 226 226 90 5.00 13.3 121.0 26.9 10.48 3.01 74.9 74.9 74.9 212.3
13 M27 COMB1 -13.90 236 236 90 5.00 13.3 121.0 26.9 10.48 3.01 78.3 78.3 78.3 246.7
14 M27 COMB2 -1.04 236 236 90 5.00 13.3 121.0 26.9 10.48 3.01 78.3 78.3 78.3 212.7
15 M27 COMB3 -1.34 236 236 90 5.00 13.3 121.0 26.9 10.48 3.01 78.3 78.3 78.3 213.5
16 M29 COMB1 -31.42 216 216 168 7.11 35.9 1165.1 138.7 28.20 5.70 38.0 38.0 38.0 233.8
17 M29 COMB2 -2.19 216 216 168 7.11 35.9 1165.1 138.7 28.20 5.70 38.0 38.0 38.0 211.7
18 M29 COMB3 -3.07 216 216 30 1.50 1.3 1.4 0.9 1.05 1.01 214.3 214.3 214.3 604.7
l0 jmin sneùn skeùo Status

(KG/cm2) (KG/cm2)

4.4 0.37 0 182 Ok


42.0 0.02 292,012 0 False
42.0 0.02 0 2,362 False

1.2 0.91 887 0 Ok


1.2 0.91 86 0 Ok
1.2 0.91 61 0 Ok
2.5 0.73 0 1,308 Ok
2.5 0.73 0 152 Ok
2.5 0.73 0 109 Ok
2.6 0.72 1,280 0 Ok
2.6 0.72 129 0 Ok
2.6 0.72 95 0 Ok
2.7 0.70 1,498 0 Ok
2.7 0.70 112 0 Ok
2.7 0.70 144 0 Ok
1.3 0.90 972 0 Ok
1.3 0.90 68 0 Ok
7.3 0.14 16,117 0 False
CALCULATION SHEET
Project : By :
Item : Date :
Part : Checked by :

PIPE ELEMENT
E= 2.10E+06 (KG/cm ) 2
Member under combined compression axial load & bending
R= 2.45E+03 (KG/cm ) 2

Output
No. Ele. M N Lx Ly D t A Jx Wx P r lx ly lmax [l] l0 m h
case
(Tm) (T) (cm) (cm) (mm) (mm) (cm2) (cm4) (cm3) (KG/m)

1 T9 COMB1 0.45 -56.39 300 150 219 6.35 42.4 2400.0 219.2 33.28 7.52 39.9 19.9 39.9 239.6 1.4 0.00 1.10
2 T9 COMB2 0.05 -2.71 300 150 219 6.35 42.4 2400.0 219.2 33.28 7.52 39.9 19.9 39.9 211.4 1.4 0.00 1.10
3 T9 COMB3 0.06 -3.40 300 150 219 6.35 42.4 2400.0 219.2 33.28 7.52 39.9 19.9 39.9 211.8 1.4 0.00 1.10
m1 jlt s Status

(KG/cm2)

0.00 0.889 1,496.33 Ok


0.00 0.889 71.91 Ok
0.00 0.889 90.22 Ok
CALCULATION SHE
Project : By :
Item : Date :
Part : Checked by :

HOT ROLLED FORM- I S


Member under combined compression axial load & bending
E= 2.10E+06 (KG/cm2)
R= 2.450E+03 (KG/cm2)

DURABILITY CHECKING
M N Lx m Lox Loy A rx ry Wx Wy Ac/Ab lx ly l0x l0y m
(Tm) (T) (cm) (cm) (cm) (cm2) (cm) (cm) (cm3) (cm3)

RAFTER: I-250x125x6x9
4.59 10.25 700 2.00 1,400 350 37.66 10.4 2.79 366 73.1 0.81 134.62 125.45 4.60 4.28 4.61
COLUMN H-350x350x12x19
6 20 700 2.00 1,400 700 173.9 15.2 8.84 2550 1180 1.78 92.11 79.19 3.15 2.70 2.05

CHECKING THE OVERAL STABILITY IN PERPENDICULAR PLAN


M N Lox Loy A rx ry Jx Jy Wx Wy lx ly mx l0x l0y jx
(Tm) (T) (cm) (cm) (cm2) (cm) (cm) (cm4) (cm4) (cm3) (cm3)
RAFTER: I-250x125x6x9
4.59 10.25 1,400 350 37.66 10.4 2.79 4,050 294 366 73.1 134.62 125.45 4.61 4.60 4.28 0.34
COLUMN H-350x350x12x19
6 20 1400 700 173.9 15.2 8.84 40,300 ### 2550 1180 92.11 79.19 2.05 3.15 2.70 0.59
ULATION SHEET

ED FORM- I SECTION

h(0<l0x <5, m<5) h(0<l0x <5, m>5) h m1 jlt s Status


Ac/Ab=0.25 Ac/Ab=0.5 Ac/Ab>=1 Ac/Ab=0.25 Ac/Ab=0.5 Ac/Ab>=1 Ac/Ab (KG/cm2)

1.20 1.25 1.31 1.2 1.25 1.31 1.2889 5.94 0.13 2,112 Ok

0.95 0.89 0.84 1.2 1.25 1.34 0.9 1.84 0.32 356 Ok

jy a b C5 C10 jd mx C Ixn a y j1 s Status


(KG/cm2)

0.39 0.67 1.23 0.30 0.33 0.90 4.61 0.30 7.6 7.80 2.80 1.04 2334.00 Ok

0.69 0.66 1.00 0.43 0.42 1.00 2.05 0.43 ### 9.06 2.88 2.43 392.90 Ok
CALCULATION SHEET
Project : By :
Item : Date :
Part : Checked by :

DURABILITY CHECKING OF BEAM


E= 2.10E+06 (KG/cm )
2

R= 2.45E+03 (KG/cm2)
Rc= 1.25E+03 (KG/cm2)

M Q Lx Lox Loy A g Jx Jy Wx Wy Sx Ixn a y


(Tm) (T) (cm) (cm) (cm) (cm2) (Kg/m) (cm4) (cm4) (cm3) (cm3) (cm3)
B6: I-300x200x8x12
13.3 0.2 730 730 250 72.38 56.8 11,300 1,600 859 247 771 28.80 2.00 2.39
B2: I-300x200x8x12
9.17 0.21 730 730 730 72.38 56.8 11,300 1,600 859 247 247 28.80 17.09 3.45
B1: I-300x150x6.5x9
8.46 0.1 600 600 300 46.78 36.7 7,210 508 542 105 105 9.11 2.76 2.44
B3: I-200x100x5.5x8
1.39 0.1 400 400 400 27.16 21.3 1,840 134 209 41.9 41.9 4.27 19.61 3.62
CANOPY I-250x125x6x9
1.39 0.1 400 400 400 37.66 29.6 4,050 294 366 73.1 73.1 7.59 10.18 2.96
j1 jd s t Status

4.012 1.000 1,548 1.71 ok

0.678 0.678 1,574 0.57 ok

1.476 0.990 1,561 0.22 ok

0.565 0.565 1,176 0.41 ok

0.720 0.720 527 0.30 ok