Check List For Commissioning

1. The document is a commissioning checklist for piping, pumps, and toilet units in a building project. It contains inspection points to verify installation and functionality of piping networks, pumps, and sanitary fixtures. 2. The piping checklist includes verifying pump fittings, suction and delivery pipes, valves, supports, insulation, and performing leak and pressure tests. 3. The pump checklist covers installation, electrical, flow tests and ensuring proper functioning of pressure gauges, motors and controls. 4. The toilet checklist involves inspecting installation of sanitary ware, fixtures and drainage, testing water supply and leakproof operation.

Uploaded by

Anil Radheshwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
6K views18 pages

Check List For Commissioning

1. The document is a commissioning checklist for piping, pumps, and toilet units in a building project. It contains inspection points to verify installation and functionality of piping networks, pumps, and sanitary fixtures. 2. The piping checklist includes verifying pump fittings, suction and delivery pipes, valves, supports, insulation, and performing leak and pressure tests. 3. The pump checklist covers installation, electrical, flow tests and ensuring proper functioning of pressure gauges, motors and controls. 4. The toilet checklist involves inspecting installation of sanitary ware, fixtures and drainage, testing water supply and leakproof operation.

Uploaded by

Anil Radheshwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 18

PROJECT :-

CLIENT :-
CONTRACTOR :-
Rev. :-
Commissioning Check list for Piping
Catagory- network
Type of Material
Other Details (If Any)

CHECK LIST FOR COMMISSIONING OF BUILDING PI


Types Of
S No Description of Work
Inspection
Verify the WIR of mentioned area for completion of
1 installation part. Visual

A. PIPING
1 Pump fitting are completed
2 Suction Pipes are connected to water tanks
3 Suction Pipes are connected to individual pumps

4 Delivery Pipes are connected to individual pumps

5 Valves, strainers and NRV's are in placed


High side discharged pipings are connected to end
6 source
7 Supporting to pipes are in placed
Necessary tappings / branch are provided in the
8 network
Isolation valves of individual zone / section are in
9 placed
10 Air released valeves / PRV's / UV's are in placed
11 Pipes are painted / labeled
12 Pipes are insulated ( If Not Applicable - NA)
B. ELECTRICAL & CONTROLS
1 Power connects in place
2 All electric connections are done and tight
3 Proper earthing installed for equilments

4 Control system interlocks hooked up and functional

All control devices, pneumatic tubing and wiring


5 complete
C. FINAL CHECK

1 Startup report completed with this checklist attached

Installation report complete and operating aspects for


2 this equipments are ready for the commissioning
profile.
D. Hook Up
Physical Check For Water Supply Branch & drainage
1 connection of Relevant area / Block.
Pump and panel system are hook up and allowed
2 water to flow to the network
3 Water charged in the network of relevant block

4 Physical Check For Leakages In connected network

5 Physical Check For Chockage In Drainage System.


Physical Check For Leack Proof Operation Of Piping
6 network.
Attending Of Listed leakages for 100% leakproof
7 operation.

Inspector (BLUE STAR LTD) Name


Signature

Inspector (SAMSUNG) Name


Signature
WORLI MIXED USE DEVOLOPMENT.
SAMSUNG C&T INDIA PVT LTD
BLUE STAR LIMITED
Date : - ____________
sioning Check list for Piping
ITP Ref. No -
Inspection Date -
Inspection Location -

R COMMISSIONING OF BUILDING PIPING NETWORK


INSPECTION
Ref. Doc.
BSL SAMSUNG

WIR
_______________________________________

_______________________________________
: - ____________

WORK

Remarks (If Any)


PROJECT :-
CLIENT :-
CONTRACTOR :-
Rev. :-

Catagory- Commissioning Check list for Pumps


Type of Material
Other Details (If Any)

CHECK LIST FOR COMMISSIONING OF PU


Types Of
S No Description of Work
Inspection
Pump / Equipment and connected piping / valves /
1 NRV's / flexible connectors etc. are physically verified Visual
for completion.

Suction & discharge piping are properly connected to


2 water tank and building network respectively.

3 Provision of pressure guage.


4 Provision of BMS point ( If Not Applicable - NA)
Flushing of suction piping done prior to starting of
6 pump
Water priming are dane to the Pumps.
7 Electrical termination done.
8 Physical functionality of Pressure gauges.
9 Pump discharge test
10 Pump Motor electric current test
11 Pumps noise and vibration level test.
12 Temperature of the pump motor test
13 Electrical panel and wiring Inspection test.
14 Control panel input/output function test
16 Pump performance curve test

17 Flow meter calliberation test. ( If Not Applicable - NA)

Flow test line provision Inspection. ( If Not Applicable -


18 NA)
19 Secondary power supply functional test
20 Auto/manual operational test
21 Pressure switch control function test
22 Interface with FA Panel testing
23 NRV Function test.

24 System valve Supervisory signal test(if applicable)

25 Physical Check for Noise and Vibration.


26 Control panel input/output function test
Inspector (BLUE STAR LTD) Name
Signature

Inspector (SAMSUNG) Name


Signature
WORLI MIXED USE DEVOLOPMENT.
SAMSUNG C&T INDIA PVT LTD
BLUE STAR LIMITED
Date : - ____________

sioning Check list for Pumps ITP Ref. No -


Inspection Date -
Inspection Location -

CK LIST FOR COMMISSIONING OF PUMPS


INSPECTION
Ref. Doc.
BSL SAMSUNG

WIR
_______________________________________

_______________________________________
: - ____________

Remarks (If Any)


PROJECT :-
CLIENT :-
CONTRACTOR :-
Rev. :-

Catagory- Commissioning Check list for toilets units


Type of Material
Other Details (If Any)

CHECK LIST FOR COMMISSIONING OF TOILET CP AND S

Types Of
S No Description of Work
Inspection

Verify the WIR of mentioned area for completion of


1 installation part. Visual

2 Check Physical Installation Of Sanitary Ware. Visual

3 Check Physical Installation Of C.P. Fixtures. Visual

Physical Check For Water Supply Branch & drainage


4 connection of Relative Block. Visual

5 Water charged in the network of relevant block Visual

Comissioning / Testing Of relative Block With Water


6 Flow In All Unit. Visual

7 Physical Check For Leakages In Sanitary Units. Visual

8 Physical Check For Leakages In C.P. Fixtures. Visual

9 Physical Check For Chockage In Drainage System. Visual


Physical Check For Leack Proof Operation Of C.P. &
10 Sanitary Units. Visual

Attending Of Listed leakages for 100% leakproof


11 operation of toilet fixtures Visual

Inspector (BLUE STAR LTD) Name

Signature

Inspector (SAMSUNG) Name

Signature
WORLI MIXED USE DEVOLOPMENT.

SAMSUNG C&T INDIA PVT LTD


BLUE STAR LIMITED
Date : - ____________

sioning Check list for toilets units ITP Ref. No -


Inspection Date -
Inspection Location -

OMMISSIONING OF TOILET CP AND SANITARY FIXTURES

INSPECTION
Ref. Doc.
BSL SAMSUNG

WIR

Approved MOS

Approved MOS

Approved Drawings.
MOS

Approved MOS

Approved MOS

Approved MOS

Approved MOS

Approved MOS
Approved MOS

Approved MOS

_______________________________________

_______________________________________
: - ____________

IXTURES

Remarks (If Any)