I PEKERJAAN PERSIAPAN
1 Pemebersihan Lapangan
2 Pagar sementara
Vol = (34 x 2)+(18.75 x 2) 105.500 m'
Panjang galian :
(9 x 7)+(12 x 6)+(6 x 4)+(3 x 4)+(3,5 x 3)+(1,75 x 2)+(5,25)
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
=190,25 m'
Volume Galian = (1+1.3) x 1.2 x 0.5 x 190,25 262.545 m3
-Pondasi Footplat
Jumlah = 38 Buah
Vol.Galian = 1.2 x 1.2 x 2.2 x 38 120.384 m3
3 Urugan Pasir
-pondasi bt. kali
Panjang Pondasi = 190.25 m'
Volume = 0.1 x 1 x 190,25
= 19.025 m3
-Footplat
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
Jumlah = 38 bh
Volume = 0.1 x 1.2 x 1.2 x 38
5.472 m3
Total Urugan Pasir
-pondasi bt. Kali = 19.025 m3
= 5.472 m3
24.497 m3 24.497 m3
Jumlah kolom
Lt. 1 = 38 bh
Lt.2 = 38 bh
Tinggi
Lt. 1 = 4 m
Lt. 2 = 4 m
Panjang = 304 m'
Volume = 304 x 0.3 x 0.3
27.36 m3
Bekisting = 38 x 0,3 x 4 x 8
364.8 m2
Jumlah kolom
Lt. 1 = 16 bh
Lt.2 = 16 bh
Tinggi
Lt. 1 = 4 m
Lt. 2 = 4 m
Panjang = 128 m'
Volume = 128 x 0.2 x 0.2
5.12 m3
Bekisting = 4 x 0.2 x 128
102.4 m2
Luas I
Tebal = 12 cm
Luas = 6 x 11.75
= 70.5 m2
Volume Beton = 0.12 x 6 x 11.75
= 8.28 m3
Pembesian
Arah X
Æ10-400 = ( 6/0,4) x 11.75 x 0.617
= 108.75 Kg
Arah Y
Æ10-400 = (11,75/0,4) x 6 x 0.617
= 108.75 Kg
Luas 2
Tebal = 12 cm
Luas = 2 x 9 x 13
= 234 m2
Volume Beton = 0.12 x 234
= 28.08 m3
Pembesian
Arah X
Æ10-400 = (9/0,4) x 13 x 0.617 x 2
= 360.95 Kg
Arah Y
Æ10-400 = (13/0,4) x 9 x 0.617 x 2
= 360.65 Kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
Luas 3
Tebal = 12 cm
Luas = 6x5
= 30 m2
Volume Beton = 0.12 x 30
= 3.6 m3
Pembesian
Arah X
Æ10-400 = (6/0,4) x 5 x 0.617
= 46.28 Kg
Arah Y
Æ10-400 = (5/0,4) x 6 x 0.617
= 46.28 Kg
Luas 4
Tebal = 12 cm
Luas = 4*1*12
= 48 m2
Volume Beton = 0.12*48
= 5.76 m3
Pembesian
Arah X
Æ10-400 = (12/0,4) x 1 x 0.617 x 4
= 74.04 Kg
Arah Y
Æ10-400 = (1/0,4) x 12 x 0.617 x 4
= 73.98 Kg
Jumlah
Luas = 70,5 + 234 + 30 + 48
= 382.5 m2 382.5 m2
Volume = 8,28 + 28,08 + 3,6 + 5,76
= 45.72 m3 45.72 m3
Pembesian = 108,75 + 108,75 + 360,95
+ 360,95 + 46,28 + 46,28
= 1179.66 kg 1,179.66 kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
Pekerjaan Tangga
Plat Bordes
Vol. Beton = 0.15 x 1 x 3
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
0.45 m3
Pembesian
Arah X
Æ 10- 150(atas) = (3/0.15) x 3.1 x 0.616
38.192 Kg
Æ 10- 150(bawah) = (3/0.15) x 3.025 x 0.616
37.268 Kg
Arah Y
Æ 10- 150(atas) = (1/0.15) x 1.1 x 0.616
4.517 Kg
Æ 10- 150(bawah) = (1/0.15) x 1.025 x 0.616
4.209 Kg
Bekisting balok dan plat bordes
Bagian I
Volume Beton = 0.12 x 1.5 x (3.6 + 3.6)
1.296 m3
Pembesian
Æ 10- 150 = (1.5/0.15) x 7.2 x 0.616
= 44.352 Kg
Bagian II
Volume beton = 0.18 x 0.28 x 0.5 x 1.5 x 20
= 0.756 m3
Pembesian
Æ 10- 150 = (1.5/0.15) x 0.46 x 0.616
= 2.8336 x 20 bh
= 56.672 kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
Æ 10- 150 = ((0.28/0.18)+1) x 1.5 x 0.616
= 2.361 x 20 bh
= 47.227 kg
Bekisting = (2(0.12x6.8))+(2x0.18x0.28x20)
+(1x x6.8)+(0.18 x 1.5x 20)
= 15.848 m2
Kapasitas
Volume Beton = 0.36 + 0.45 + 1.296 + 0.756
= 2.862 m3 2.862 m3
Panjang = 90 m'
Volume = 0.15 x 0.30 x 90
4.05 m3
bekisting = 0.3 x 2 x 90
54 m2
Sengkang Æ 8-100
= (90/0.1) x 0.82 = 738 m'
= 738 x 0.39 = 287.82 kg
Panjang = 76 m'
Volume = 0.15 x 0.12 x 76
1.368 m3
bekisting = 0.15 x 2 x 76
22.8 m2
Sengkang Æ 8-100
= 76/0.1*0.46 = 349.6 m'
= 349.6*0.39 = 136.344 kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
13 Footplat
Vol 1
Tebal selimut = 2.5
Jumlah = 38
Total = 3597.84 Kg
Vol 2
Volume Beton = 38 x 1.5 x (0.3 x 0.3)
5.13 m3
Pembesian
8 d14 = 38 x 2.05 x 8 x 1.208
752.8256 Kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME SATUAN
Total = 1139.058 Kg
Kapasitas 4736.898
Pembesian = 4736.898/21.546
219.850 kg/m3
14 Lantai Kerja 10 cm
Jumlah Footplat = 38 bh
Volume = 38 x 1.2 x 1.2 x 0.1
5.472 m3
15 Dag Atap
Luas L1 1 x 12 x 4 = 48
L2 1x6x2 = 12
L3 1x9x2 = 18
L4 1 x 6 x 1.75 = 10.5
total = 88.5
PEKERJAAN PASANGAN
3
Pasangan Trasram
Kamar Mandi
Lt .1 (2.83 m) = 2.83 x 37.25 = 105.4175 m2
Lt .1 (2.83 m) = 2.83 x 29.5 = 83.485 m2
4 188.9025 m2
Pasangan Batu Bata merah 1pc : 5 pp
Luas Bukaan Kusen
L. PJ 1 = 6,125 x 1 = 6.125 m2
L. PJ 2 = 7.489 x 1 = 7.489 m2
L. P1 = 3.792 x 5 = 18.96 m2
L. P2 = 2.136 x 11 = 23.496 m2
L. P3 = 1.848 x 14 = 25.872 m2
L. J1 = 5.104 x 30 = 153.12 m2
L. J2 = 2.266 x 6 = 13.596 m2
L. J3 = 2.42 x 4 = 9.68 m2
258.338 m2
No URAIAN PEKERJAAN / PERHITUNGAN
Panjang Lt 1 = 172.25
Lt 2 = 178.75
Total 351
6 Granite Tile
60 x 60 Lantai 1
Luasan = 44544.1701388889
= 283.5 m2
Lantai 2
Luasan = 350.5 - 12 - 16.5
= 322 m2
PEKERJAAN PLESTERAN
- Plesteran dinding tembok ( 1pc : 5 pp )
tebal = 20 mm
Volume = 2(L.dinding Pas. Batu bata )
= 2(942.7195)
= 1885.439 m2
Type P. J2 (1 buah)
Type J2 (6 buah )
Type J3 (4 buah )
Type BV (6 buah )
No URAIAN PEKERJAAN / PERHITUNGAN
Type P3
Volume = 0.67 x 2.35 x 14
= 22.043 m2
Total = 42.465 m2
Type J.1
Volume = 30 x 2 x 0.5 x 2.1
= 63 m2
Total = 66.552 m2
Total = 4.046 m2
No URAIAN PEKERJAAN / PERHITUNGAN
Total = 5.3026 m2
VOLUME SAT
27.304 m3
67.248 m3
942.720 m2
VOLUME SAT
1.375 m2
605.500 m2
37.500 m2
9.200 m2
251.160 m2
VOLUME SAT
1885.439 m2
377.805 m2
VOLUME SAT
VOLUME SAT
VOLUME SAT
VOLUME SAT
114.000 bh
120.000 bh
2.000 bh
16.000 bh
13.000 bh
60.000 bh
16.000 bh
16.000 bh
HITUNGAN VOLUME KANTOR IAIN WALISONGO DAKULTAS USHULUDIN SEMARANG
PEKERJAAN SANITASI
1 Closet duduk C 150 E/S 151 ( lengkap ) warna spesial ex Toto 7.00 bh
PEKERJAAN LAIN-LAIN
Penyambungan daya 3500 VA 1.00 LS
Pekerjaan Atap
1 Metal light steel Galvallum
Type T1 ( 22 Unit )
Volume = 8.875 Kg
Type T2 ( 2 Unit )
Volume = 10.792 Kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
Baja _II_ 50.50.5 mm
Panjang = 41.14 m'
Berat = 3.77 Kg/m
Volume = 10.912 Kg
Type T3 ( 2 Unit )
Volume = 10.373 Kg
Volume = 10.271 Kg
Type T4 ( 2 Unit )
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
Volume = 9.791 Kg
Volume = 9.199 Kg
Type T5 ( 2 Unit )
Volume = 8.314 Kg
Volume = 6.111 Kg
Type T6 ( 2 Unit )
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
Volume = 7.951 Kg
Volume = 5.443 Kg
Type 7 ( 2 Unit )
Volume = 10.751 Kg
Volume = 11.252 Kg
Type 8 ( 2 Unit )
Volume = 10.605 Kg
Volume = 10.578 Kg
Type 9 ( 2 Unit )
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
Baja _II_ 70.70.7 mm
Panjang = 82.26 m'
Berat = 7.83 Kg/m
Volume = 10.506 Kg
Volume = 10.016 Kg
Type 10 ( 8 Unit )
Volume = 6.378 Kg
Volume = 5.332 Kg
Volume = 1.315 Kg
Volume = 0.382 Kg
Volume = 1.073 Kg
Volume = 0.382 Kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
Volume = 0.843 Kg
Volume = 0.382 Kg
Volume = 0.605 Kg
Volume = 0.382 Kg
Volume = 0.370 Kg
Volume = 0.382 Kg
Volume = 0.133 Kg
Volume = 0.382 Kg
Volume = 1.425 Kg
Volume = 0.955 Kg
Volume = 0.475 Kg
Volume = 1.642 Kg
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
Volume = 0.382 Kg
I
I I I
II
I
I I
V V
Panjang = 21+8.98
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
= 29.98 m'
Panjang I = 1.53+3.13+4.72+6.32+7.91
= 23.61 m
Panjang II = 21+22.53+24.13+25.72+27.32+28.91
= 149.61 m
Panjang II = 8.98+8.16+7.36+6.57
= 31.07 m
6 Rangka Kayu
- Usuk(5/7) 494.880
Jumlah =
T1 ( 22 Unit ) = 22 x 5.59 x 2 m
= 245.96 m
T2 ( 2 Unit ) = 2 x 4.65 x 2 m
= 18.6 m
T3 ( 2 Unit ) = 2 x 3.74 x 2 m
= 14.96 m
T4 ( 2 Unit ) = 2 x 2.81 x 2 m
= 11.24 m
T5 ( 2 Unit ) = 2 x 1.89 x 2 m
= 7.56 m
T6 ( 2 Unit ) = 2 x 0.96 x 2 m
= 3.84 m
No URAIAN PEKERJAAN / PERHITUNGAN VOLUME
T7 ( 2 Unit ) = 2 x 7.88 m
= 15.76 m
T8 ( 2 Unit ) = 2 x 8.79 m
= 17.58 m
T9 ( 2 Unit ) = 2 x 9.69 m
= 19.38 m
R1 ( 2 Unit ) = 2 x 5.62 m
= 11.24 m
R2 ( 4 Unit ) = 4 x 4.67 m
= 18.68 m
R3 ( 4 Unit ) = 4 x 3.77 m
= 15.08 m
R4 ( 4 Unit ) = 4 x 2.87 m
= 11.48 m
R5 ( 4 Unit ) = 4 x 1.92 m
= 7.68 m
R6 ( 4 Unit ) = 4 x 0.99 m
= 3.96 m
R7 ( 2 Unit ) = 2 x 2.76 m
= 5.52 m
R8 ( 2 Unit ) = 2 x 1.85 m
= 3.7 m
R9 ( 2 Unit ) = 2 x 0.93 m
= 1.86 m
m3
m2
m'
SAT
m3
kg
m'
SAT
m2
SAT
m'
No Perhitungan Rangka Atap Baja Ringan dan luas genteng volume satuan
Luas I
( luas sisi sejajar ) / 2 * tinggi
( 21 + 30 ) / 2 * 3,21 81.855 m²
Luas II
( luas sisi sejajar ) / 2 * tinggi
( 21 + 30 ) / 2 * 3,21 81.855 m²
Luas III
( alas * tinggi ) / 2
( 9 * 3,21 ) / 2 14.445 m²
Luas IV
( alas * tinggi ) / 2
( 9 * 3,21 ) / 2 14.445 m²
Luas V
( alas * tinggi )
( 5 * 2,33 ) 11.65 m²
Luas VI
( alas * tinggi )
( 5 * 2,33 ) 11.65 m²
Luas VII
( alas * tinggi ) / 2
( 6 * 2,33 ) / 2 6.99 m²