0% found this document useful (0 votes)
387 views2 pages

LR35 Checklist ATI PDF

This document is a checklist for a Lear 35 aircraft that provides the procedures and checks to be completed by the pilot (PF) and co-pilot (PNF) at various stages of flight, including start-up, take-off, cruise, descent, approach, landing, and shutdown. It lists critical aircraft systems and components to be checked, configured, or monitored at each phase of flight to ensure safe and compliant operation of the aircraft.

Uploaded by

BrendanRatchford
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
387 views2 pages

LR35 Checklist ATI PDF

This document is a checklist for a Lear 35 aircraft that provides the procedures and checks to be completed by the pilot (PF) and co-pilot (PNF) at various stages of flight, including start-up, take-off, cruise, descent, approach, landing, and shutdown. It lists critical aircraft systems and components to be checked, configured, or monitored at each phase of flight to ensure safe and compliant operation of the aircraft.

Uploaded by

BrendanRatchford
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Lear 35 Checklist

START
PNF PF Engine Instruments NORMAL
Batteries ON/VOLTAGE CHECK Radar/Avionics STANDBY/ON

Park Brake SET Fuel Panel CHECKED/BALANCED

Cabin Door TWO FORWARD LIGHT OUT Seat Belts Shoulder FASTENED
Harnesses
AC/ Aux Heat OFF Crew Briefing COMPLETED
Inverters ON/VOLTAGE CHECKED
Beacon LINE UP CHECK
ON
PNF PNF
1ST Engine START
Transponder ON
Generator ON/CHECKED
Anti-Ice AS REQ’D
Flaps 30 DEGREES
Lights ON
Spoileron/Spoilers CHECKED
-----------Hold Line-----------
Flaps 8 DEGREES
Pitot Heat ON
2nd Engine START
Thrust Reversers ARMED
Generator ON/CHECKED (DEE HOWARDS)
Avionics Master ON Stall Warnings ON

Current Limiters CHECKED Air Ignition ON

Fuel Control CHECK Radar Altimeter ON


Governors (TCAS ONLY)
Avionics ON Warning Lights OUT

Standby Gyro ON/UNCAGED


Radar STBY AFTER TAKEOFF
PNF PNF
No Smoking Fasten ON
Seat Belt Sign Landing Gear UP
Gyro Flags OFF Yaw Damper ON
Parking Brake RELEASE BEFORE TAXI Flaps UP
Air Ignition OFF
TAXI
PNF PF Landing Lights OFF
Brakes and Steering CHECKED Thrust Reversers OFF
(DEE HOWARDS)
Flight Controls CHECKED Pressurization MONTIOR
Anti-Skid CHECKED Anti-Ice ON/OFF
Spoilers, Flaps Trim RETRACTED, SET_____/CHKD Angle of Attack CHECKED
Flight and Nav SET AND CHECKED
Instruments
Altimeters _______SET CLIMB (FL 180)
PNF PF
Bugs and V Speeds _______SET
Altimeters 29.92
Cabin Bleed Air and ON & CHECKED
Pressurization Pressurization MONITOR
Hold 2nd Engine Start
Air Conditioner OFF
Cabin Temp Controls SET Recognition Light OFF
Generators ON Oxygen Pressure CHECKED
Thrust Reversers CHECKED Seat Belt / No AS REQ
*Windshield Heat CHECKED/PURGED/OFF Smoking Sign
Circuit Breakers CHECKED

C:\Wp\Hwyc01c\asr\Lear\LR35_Checklist.doc Rev. 1/18/2005


AFTER LANDING
CRUISE PNF PF
PNF PF Ignition OFF
Pressurization MONITOR Stall Warning OFF
Fuel Panel MONITOR Thrust Reversers OFF
Engine Instruments MONITOR (Dee Howards)
Landing / Taxi Lights TAXI OR OFF
Cabin Temp Controls SET
Recog / Strobe Lights OFF
Other Systems MONITOR
Spoilers/Flaps/Trim RETRACTED/UP/RESET
DESCENT Radar and OFF
PNF PF Unnecessary
Windshield Heat ON Avionics
Radar Altimeter OFF
Anti-Ice ON/OFF
Pitot Heat & Anti-Ice OFF
Pressurization LANDING ELEVATION
Emergency Power OFF
Crew Briefing COMPLETED
Cabin Bleed / H- CLOSED
Valve
APPROACH (FL 180) Hydraulic Pressure CHECKED
PNF PF Fuel Transfer AS REQ
Altimeters ______SET
Bugs & V -Speeds ______SET SHUTDOWN
Lights ON PNF PNF
Fuel Balance CHECKED CHOCKS OR SET
PARKING BRAKE
Circuit Breakers CHECKED WINDSHIELD HEAT OFF
Hydraulic & Emer Air CHECKED AND ANTI-ICE
STANDBY GYRO OFF/CAGED
Seat Belt No ON
Smoking Sign PANEL SWITCHES OFF
Radar Altimeter ON AND AVIONICS
(MASTER)
Air Conditioner ON THRUST LEVERS CUTOFF
Thrust Reverser ARMED CROSS FLOW CLOSED
FLT & NAV SET & CHECKED VALVE
Instruments FUEL TRANSFER OFF / CLOSED
FUSELAGE VALVE
HYDRAULIC PUMP OFF
BEFORE LANDING
PNF PF INVERTERS AND OFF
GENERATORS
Spoilers RETRACTED BEACON/NAV OFF
Landing Gear DOWN LIGHTS
OXYGEN HOSES DISCONNECT
Landing Lights ON
BATTERIES OFF
Parking Brake OFF
CONTROLS LOCK
Hydraulic Pressure CHECKED
ENTRY LIGHTS OFF
Anti-Skid CHECKED-ON
Flaps LAND
Air Ignition ON
Engine Syncs OFF
Yaw Damper OFF

C:\Wp\Hwyc01c\asr\Lear\LR35_Checklist.doc Rev. 1/18/2005

You might also like