01. Introduction
This note presents the detail design calculations for Abutment and its Pile foundation. A
typical design for Abutment with Elastomeric bearings is been presented here. The analysis
& design consist of design of Abutment, design of Pile foundation & design of return wall
Pile Cap
Abutment FRL GL Bottom DIFF
Level
(M) (M) (M) (M)
A1 23.474 15.409 13.109 10.37
A2 23.474 15.409 13.109 10.37
As can be seen from above Abutment A1 & A2 has same level difference
Since the design is applicable for group of Abutment
Design Data
Span Arrangement (Effective) = 1 48.8
Structural system = simply supported
construction type = RCC
Effective Span = 48.8 m
Expansion gap in abutment = 40 mm
Width Deck Outer to outer = 12 m
No of Lane = 2 nos
Bearing type = Elastomeric Bearing
Skew Angle = 0 deg
Salient Reduced Levels (RL's)
Deck Level (cL of carriageway) = 23.4739 m
Soffit Level (cL of cariageway) = 20.649 m
Abutment Cap Top Level = 20.249 m
Abutment Cap Bottom Level = 19.649 m
Pile cap Bottom Level = 13.11 m
Depth of Superstructure = 2.750 m
Thickness of wearing coat = 0.056 m
Camber (Bi direction) = 2.5%
Length of approach slab = 3.5 m
Thickness of approach Slab = 0.3 m
Expansion joint Type = Strip seal
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
Ra * 0.00 48.80
4.00 * 17.00 * 46.22 = 3143.0
2.00 * 12.00 * 40.44 = 970.56
1.00 * 8.00 * 35.73 = 285.80
Total : 4399.3
Ra = 4399.32 ./ 48.80 = 90.15 t
Impact 1.000 90.15 t
Ra * 48.8 =
4 * 6.8 * 39.12 = 1064
2 * 11.4 * 48.515 = 1106
Total : 2170
Ra = = 44.4686 t
Impact 1.000 44.4686
Area of the GIRDER @ MID Section Area of the GIRDER @ End Section
Area No. Area Area No. Area
1 1.210 1 2.1009
Total 1.210 Total 2.1009
Average Area 1.655
SIDL
W/C 1 0.2 7.5 50 = 75.00 T
Kerb + Railing 2 0.91 50 = 91.00 T
Foot Path 2 0.9 1.475 50 = 132.75 T
298.75 T
FP LL 2 0.4 1.475 50 = 59.00 T
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
b. Design Data
Span Arrangement = 1 x 48.800 m c/c Brg
Span Arrangement = 1 x 50.000 m c/c EJ
3.225
0.300
Cap Top 20.249
0.30
1.550
0.30 0.65
0.250
0.00
1 2
GL 15.409
4.350
Stem Bottom 14.909
Cg of Pile cap
Cg of Abutment From A 4.350
LOAD CALCULATIONS
SUPER STRUCTURE
Load Girder 1 Girder 2 Girder 3 Girder 4
DL of Girder 162.19 162.19 162.19 162.19
DL of Slab 39.01 39.01 39.01 39.01
SIDL 37.34 37.34 37.34 37.34
LIVE LOAD LOAD (t) ecc (L) (M) ecc (T) (M) ML (t-m) MT (t-m)
Class A 44.47 0.00 4.150 0.00 184.54
Class 2 A 88.94 0.00 2.400 0.00 213.45
70 R Wheel 90.15 0.00 2.855 0.00 257.38
70 R Track 90.15 0.00 2.855 0.00 257.38
FPLL 29.50 0.00 0.000 0.00 0.00
LIVE LOAD LOAD (t) ecc (L) (M) ecc (T) (M) ML (t-m) MT (t-m)
Class A 44.47 0.00 4.15 0.0 184.54
Class 2 A 88.94 0.00 2.40 0.0 213.45
70 R Wheel 90.15 0.00 2.86 0.0 257.38
70 R Track 90.15 0.00 2.86 0.0 257.38
FPLL 29.50 0.00 0.00 0.0 0.00
FRL
2
water level 1
10.365
Stem Bottom
4 3
o
d = 20 = 0.349 Radian
o
i = 0 = 0 Radian
Ka = 0.297
COEFFICIENT OF EARTH PRESSURE IN HORIZONTAL DIRECTION Kah = 0.279
Kav= 0.102
EARTH PRESSURE
Kah 0.279
g 1.80 t/M3
g1 1.80 t/M3
SURCHARGE PRESSURE
SURCHARGE PRESSURE = 2.16 t/M2
Soil Above Pile Cap (2) Above HFL 18.39 -0.78 0.00 -14.3 0.00
Soil Above Pile Cap (2) Below HFL -1.38 -0.78 0.00 1.1 0.00
Returnwall (1) Above HFL 49.81 -2.50 0.00 -124.5 0.00
Returnwall (1) Below HFL -4.55 -2.50 0.00 11.4 0.00
Earth Pressure 1800.2
602.3 0.00
DUE TO BEARING
TEMPERATURE CORRECTIONS L a T
Symbol Description Units Span
L = SPAN = M 50.00
0
a = EXPANSION COEFFICIENT = / C 1E-05
0
T = TEMPERATURE DIFFERENCE = C 50.00
TEMPERATURE CORRECTIONS L α T = M 0.0300
ON EACH ABUTMENT 0.03/2*1000 = mm 15.00
SHRINKAGE = 0.0002 M
TOTAL DEFORMATION 0.0002*50X1000/2+15 20.00 mm
NO OF BEARINGS = 4.00 NOS
F = G*A* d /T
WHERE
F = FORCE IN BEARING
G = SHEAR MODULUS = 10.00 KG/CM2
d = DEFORMATION = 2.00 CM
A = AREA OF BEARING (63*22) = 1386.0 CM2
T = THICKNESS OF BEARING = 6.20 CM
F = 10/1000*2000*.855/9.6 = 4.47 T
Leveram = 7.35 m
Moment at Pile Cap Bottom MLs = 131.48 t-m
Moment at Pile Cap Bottom MTs = 0.00 t-m
Description P L B Cd G FT (Ton)
Wind on Parapet 1021 25.00 3.23 1.40 2.00 23.05
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
Seismic Calculations
Long Seismic Coefficient 0.160 Refer Seismic Calculations
Trans Seismic Coefficient 0.160 Refer Seismic Calculations
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
Seismic Long ML MT H
Eq (L) 1564.4 0.00 191.41
Seismic Trans (20% Live Load)
Eq (T) 0.00 1713.9 205.83
Combination of Orthogonal Seismic Force
RX & RZ With out Live Load 2033.7
With Live Load
RX X +0.3*Z 2078.6 0.00 253.15
RZ 0.3*X + Z 0.00 2183 263.25
Seismic Long ML MT H
Eq L 1220 0.00 191.41
Seismic Trans (20% Live Load)
Eq T 0.00 1343 205.83
Combination of Orthogonal Seismic Force
RX X +0.3*Z 1623 0.00
RZ 0.3*X + Z 0.00 1709
Summary of force @ Pile Cap Bottom
Load Case V ML MT HL HT HR
Norma (T) (T-m) (T-m) (T) (T) (T)
l
DL+SIDL 1998.1 734 0.00 17.88 0.00 17.88
DL+SIDL+LL (Max) 2117.7 741 330.28 17.88 0.00 17.88
DL+SIDL+20% LL (Max) 2045.6 735 66.06 17.88 0.00 17.88
Wind
Conditi + Wind
DL+SIDL 1998.1 734 374.61 17.88 35.92 40.12
DL+SIDL +LL (Max) + Wind 2117.7 741 913.78 17.88 54.30 57.17
Seismi
c
DL+SIDL + Eq(L) 1998.1 2298 0.00 209.29 0.00 209.29
DL+SIDL + Eq(T) 1998.1 734 1564 17.88 191.41 192.24
DL+SIDL + Eq(RX) 1998.1 2767 0.00 266.71 0.00 266.71
DL+SIDL + Eq(RZ) 1998.1 734 2034 266.71 0.00 266.71
DL+SIDL + 20% LL + Eq(L) 2045.6 2300 66.06 209.29 0.00 209.29
DL+SIDL + 20% LL + Eq(T) 2045.6 735 1780 17.88 205.83 206.61
DL+SIDL + 20% LL + Eq(RX)2045.6 2814 66.06 271.04 0.00 271.04
DL+SIDL + 20% LL + Eq(RZ)2045.6 735 2249 17.88 263.25 263.86
(+ ve, +ve)
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
1 2 3 4
3.60
. .
5 6 7 8 Traffic Direction (L)
3 3
3.60
9 10 11 12
(- ve, -ve)
S 194.40 103.68
Load on Each Pile
Pile Nos 1 2 3 4 5 6 7 8
Load Case MT MT MT MT MT MT MT MT
Case 1 146.12 159.71 173.30 186.89 146.12 159.71 173.30 186.89
Case 2 167.36 181.08 194.81 208.53 155.89 169.62 183.34 197.06
Case 3 152.34 165.95 179.57 193.18 150.05 163.66 177.27 190.89
Wind
Conditi
Case 4 159.13 172.72 186.31 199.90 146.12 159.71 173.30 186.89
Case 5 187.62 201.34 215.07 228.79 155.89 169.62 183.34 197.06
Seismic condition
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
T = 5 EI
K1
Free length of the pile in soil, L1 = 13.1089 - 13.1089 0.00
For 1.20 m dia. pile with 35M concrete
05 ) Design of Pile
Design parameters
Grade of Concrete = M - 35
Grade of Reinforcement = Fe 500(HYSD) Seismic
2
Permissible Compressive stress in Concrete = 1167 t/m 1750
2
Permissible Tensile stress in Steel = 24000 t/m 36000
Dia of the pile = 1200 mm
Reinforcement
Dia of the bar = 20 mm
No of Bars = 25 nos
Area of the reinforcement = 7854 mm2
% of reinforcement = 0.69 %
Modular ratio, m = 10
factor, k = 0.327
Lever arm factor, j = 0.891
Moment of Resistance = 170.0 t/m2
Length of the pile = 30.00 m
Stress (Pmax)
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
Stress (Pmin)
Load Case Pmin Moment Concrete Steel
Mt t-m kg/cm2 kg/cm2
Normal 144.43 4.03 14.10 100.92
Wind Condition Loaded
124.16 12.90 17.17 43.57
Seismic Long 71.94 61.15 64.44 -1126
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
6) Pile Stress Check:
Case: Normal Pmax Condition
Input Data :
Diameter of section, D = 120.00 cm
Modular ratio, m = 10
Axial thrust, P = 208.53 t
Moment, M = 4.03 t-m
Permissible stresses in concrete = 116.67 kg/cm2
Permissible stresses in steel = 2400 kg/cm2
Effective cover = 8.62 cm
Assumed area of steel uniformly distributed
along periphery = 0.69 %
Assume neutral axis at = 1.00 D 19.40 O.K.
Calculated neutral axis = 4.49 D 153.92 O.K
cgeff 539.26
e'
N A
Step 1 : Assume 78.54 cm2 of tor steel uniformly distributed along the
periphery.
4
Step 6 : Ieff = 1E+07 cm
cgeff 224.49
e'
N A
Step 1 : Assume 78.54 cm2 of tor steel uniformly distributed along the
periphery.
4
Step 6 : Ieff = 1E+07 cm
cgeff 259.33
e'
N A
Step 1 : Assume 78.54 cm2 of tor steel uniformly distributed along the
periphery.
4
Step 6 : Ieff = 1E+07 cm
cgeff 391.9
e'
N A
Step 1 : Assume 78.54 cm2 of tor steel uniformly distributed along the
periphery.
4
Step 6 : Ieff = 1E+07 cm
cgeff 149.27
e'
N A
Step 1 : Assume 78.54 cm2 of tor steel uniformly distributed along the
periphery.
4
Step 6 : Ieff = 1E+07 cm
cgeff 43.43
e'
N A
Step 1 : Assume 78.54 cm2 of tor steel uniformly distributed along the
periphery.
4
Step 6 : Ieff = 3E+06 cm
1 2 3 4
3.60
5 6 7 8 1.30
8.70
9 10 11 12
12.30
Design parameters
Grade of Concrete = M - 30
Grade of Reinforcement = Fe 500(HYSD)
Permissible Compressive stress in Concrete = 1000 t/m2
Permissible Tensile stress in Steel = 24000 t/m2
Dia of the pile = 1200 mm
Width of the abutment = 1300 mm
Reinforcement
Dia of the bar = 20 mm
No of Bars = 59 nos
Area of the reinforcemnet = 18535 mm2
% of reinforcement = 0.314 %
Modular ratio, m = 10
factor, k = 0.294
Lever arm factor, j = 0.902
Moment of Resistance = 132.6 t/m2
Length of the pile = 30.00 m
Clear cover Bottom = 75 mm
Depth of pile cap = 1.80 m
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
UNGUTUR ROAD Made By
Chk By
Title: Design of Abutment Rev 0
Distribution reinforcement
0.3 X Ast required 0.3*4865 1460 mm2
Provide 16 dia @ Spacing 137.8 mm C/C
Modular ratio, m = 10
factor, k = 0.294
Lever arm factor, j = 0.902
Moment of Resistance = 132.6 t/m2
0.300 23.474
0.600
20.249
0.3 1.550
0.3 0.650
0.250
1.30
14.909
FORCE ecc MT
DESCRIPTION
t m t-m
ABOVE GL 196.26 2.86 560.32
SURCHARGE
UP TO TOP OF FORCE ecc MT
Stem Bottom 75.06 4.28 321.44
TOTAL 271.3 881.77
Forces Summary at Bottom of the Stem
Description V ecc L ecc T ML MT
Super Structure
Dead weight 804.78 0.00 0.00 0.00 0.00
SIDL 149.38 0.00 0.00 0.00 0.00
Sub structure
Dirt wall 29.025 -0.750 0.000 -21.769 0.000
Rectang 2.250 -0.775 0.000 -1.744 0.000
Abutment Cap
le
Triangle 1.125 -0.817 0.000 -0.919 0.000
Pedestal 1.470 0.000 0.000 0.000 0.000
Abutment Stem 208.260 0.000 0.000 0.000 0.000
Earth Pressure 881.766
Seismic Long ML MT H
Eq L 1219.9 0.00 191.41
Seismic Trans (20% Live Load)
Eq T 0.00 1343.4 205.83
Combination of Orthogonal Seismic Force
RX X +0.3*Z 1622.9 0.00
RZ 0.3*X + Z 0.00 1709.4
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
UNGUTUR ROAD Made By
Chk By
Title: Design of Abutment Rev 0
1.300
12.00
% of reinforcement 0.387
Step 6 I 15484303.77
com. steel617916.5464
ten. steel 40169434.84
I of perpendicular steel = 535949.88
4
Ieff = 56807605.03 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 18.27087 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.3874 D = 50.35956
cm cm
MT = 0.00 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.384 x 130 49.92 cm
3 4
It ( con) = 49.92 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8423541622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 2
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 16277091.32
com. steel637285.3746
ten. steel 39829857.21
I of perpendicular steel = 529805.45
4
Ieff = 57274039.35 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 19.12209 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.3969 D = 51.59394
cm cm
MT = 257.38 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.393 x 130 51.09 cm
3 4
It ( con) = 51.09 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8592021622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 3
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 16007748.48
com. steel630748.2675
ten. steel 39943721.77
I of perpendicular steel = 531860.64
4
Ieff = 57114079.15 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG= eff 18.87856 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.394 D = 51.22175
cm cm
MT = 51.48 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.39 x 130 50.7 cm
3 4
It ( con) = 50.70 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8535861622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 4
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 15484303.77
com. steel617916.5464
ten. steel 40169434.84
I of perpendicular steel = 535949.88
4
Ieff = 56807605.03 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 18.27087 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.3874 D = 50.35956
cm cm
MT = 309.95 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.384 x 130 49.92 cm
3 4
It ( con) = 49.92 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8423541622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 5
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 16277091.32
com. steel637285.3746
ten. steel 39829857.21
I of perpendicular steel = 529805.45
4
Ieff = 57274039.35 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 19.12209 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.3969 D = 51.59394
cm cm
MT = 743.14 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.393 x 130 51.09 cm
3 4
It ( con) = 51.09 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8592021622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 6
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 9575826.444
com. steel454743.2099
ten. steel 43339819.8
I of perpendicular steel = 595441.45
4
Ieff = 53965830.9 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 7.346833 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.2764 D = 35.93346
cm cm
MT = 0.00 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.284 x 130 36.92 cm
3 4
It ( con) = 36.92 x 1200 / 12 = 5E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 6551541622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 7
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 15484303.77
com. steel617916.5464
ten. steel 40169434.84
I of perpendicular steel = 535949.88
4
Ieff = 56807605.03 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 18.27087 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.3874 D = 50.35956
cm cm
MT = 1220 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.384 x 130 49.92 cm
3 4
It ( con) = 49.92 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8423541622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 8
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 9260335.578
com. steel444260.7189
ten. steel 43566155.49
I of perpendicular steel = 599829.01
4
Ieff = 53870580.79 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 6.261942 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.2662 D = 34.60353
cm cm
MT = 0.00 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.274 x 130 35.62 cm
3 4
It ( con) = 35.62 x 1200 / 12 = 5E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 6364341622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 9
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 15484303.77
com. steel617916.5464
ten. steel 40169434.84
I of perpendicular steel = 535949.88
4
Ieff = 56807605.03 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 18.27087 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.3874 D = 50.35956
cm cm
MT = 1585.8 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.384 x 130 49.92 cm
3 4
It ( con) = 49.92 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8423541622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 10
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 9679821.608
com. steel458120.6421
ten. steel 43267576.2
I of perpendicular steel = 594044.79
4
Ieff = 53999563.24 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 7.596103 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.2789 D = 36.26108
cm cm
MT = 51.48 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.287 x 130 37.31 cm
3 4
It ( con) = 37.31 x 1200 / 12 = 5E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 6607701622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 11
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 16007748.48
com. steel630748.2675
ten. steel 39943721.77
I of perpendicular steel = 531860.64
4
Ieff = 57114079.15 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG= eff 18.87856 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.394 D = 51.22175
cm cm
MT = 1395 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.39 x 130 50.7 cm
3 4
It ( con) = 50.70 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8535861622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 12
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 9289736.061
com. steel445254.1335
ten. steel 43544566.74
I of perpendicular steel = 599409.73
4
Ieff = 53878966.67 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG=eff 6.396697 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.2674 D = 34.76163
cm cm
MT = 51.48 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.275 x 130 35.75 cm
3 4
It ( con) = 35.75 x 1200 / 12 = 5E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 6383061622 cm
4
2
Date: March-18
CONSTRUCTION OF HLB AT+KM 0/10 ON ATKURU-
UNGUTUR ROAD 2 Made By
Chk By
Title: Design of+Abutment Rev 0
2
Case 13
Design of a solid rectangular RC section subjected to axial thrust and biaxial bending
about a side. 1200 cm
INPUT : 490.87 cm 2
Width of section 1200.00 cm 2 12.25 cm 2
Step 6 I 16007748.48
com. steel630748.2675
ten. steel 39943721.77
I of perpendicular steel = 531860.64
4
Ieff = 57114079.15 cm 2
2
Step 7 Distance of neutral axis = Ieff below CG= eff 18.87856 cm
Aeff'(e - e1 )
N.A from extreme fibre = 0.394 D = 51.22175
cm cm
MT = 1761 tm
Transverse steel = 12.252 cm2 on each face
N.A. = 0.39 x 130 50.7 cm
3 4
It ( con) = 50.70 x 1200 / 12 = 7E+09 cm
2
It (steel) 490.8738521 x 1185.1 / 12 x 2 x 10 = 1.15E+09 cm 4
2
12.25221135 x 592.55 x 2 x 10 = 9E+07
Total It = 8535861622 cm
4
Abutment Cap
20.00 T Axle
CL of Dirt Wall
0.25
0.3
1.30
20.00
0.3 T Axle 1.93 Abutment
0.3 0.6
0.25
Design Constants:
Grade of Concrete: = 30
Grade of steel: = Fe 500 (HYSD)
Modular ratio, m = 10
factor, k = 0.29412
Lever arm factor, j = 0.90196
Moment of Resistance = 132.641 t/m2
Therefore abutment cap has been designed as per Clause 710.8.7 , IRC :78- 2000
The abutment cap shall be reinforced with a total minimum of 1% steel
Length of abutment cap 12.00 m
Width of abutment cap 1.55 m
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
Steel provided at each face i.e top face and bottom face 20 nos. 12 dia
Grade of Concrete = M- 30
Grade of Reinforcement = Fe 500 (HYSD)
Permissible Compressive stress in Concrete = 1000 t/m2
Permissible Tensile stress in Steel = 24000 t/m2
=
Modular ratio, m = 10
factor, k = 0
Lever arm factor, j = 0.902
Moment of Resistance = 132.6 t/m2
Dia of reinforcement Bar = 16
Ka = 0.279
Density of soil, g = 1.8 t/m3
Refer ROARK’s Formulas for stress & strain-Warren C Young & Richarg G. Budynas.
For Three sides fixed one side free
a = 3.70
b = 8.57
a/ b = 0.43
z
Free
n=0.2
a sa = -b2qb2/t2 Ma = -b2qb2/6
sb = -b1qb2/t2 Mb = -b1qb2/6
Here a= 3.70
b= 8.57
a/b = 0.432
From -Table -26 -Case -11 of "Formula for Stress Strain" by Roark & Young, by linear Interpolatio
b1 = 0.581
b2 = 0.444
Therefore
Ma = -b2qb2/6 = 3.28 tm per m
2
Mb = -b1qb /6 = 4.28 tm per m
From -Table -26 -Case -11 of "Formula for Stress Strain" by Roark & Young, by linear Interpolatio
Date: March-18
CONSTRUCTION OF HLB AT KM 0/10 ON ATKURU-
Made By
UNGUTUR ROAD
Chk By
Title: Design of Abutment Rev 0
b1 = 0.3360
b2 = 0.1221
Therefore
For Horiz. Reinf. Ma = -b2qb2/6 = 6.43 tm per m
2
For Vert. Reinf. Mb = -b1qb /6 = 17.70 tm per m
Mb = 4.28 + 17.70
= 21.98 tm per m
DL + SIDL + 20%LL
Long Direction Trans Direction
3
Deflection d = F*L /3EI
Height of Abutment h = 5.34 m
Force required F = 2826.7 KN 44156 KN
Weight of the Structure D = 11838 KN
Length of the Abutment L = 8.07 m
Width of the Abutment W = 1.00 m
Area of Abutment Ap = 8.07 m 8.07 m
4
Inertia Ip = 0.672 m 43.715 m4
E of conc E = 3E+07 KN/m2
CG of Superstructure H2 = 6.903 m
Abutment Top Level H1 = 5.34 m
At top of pier d = 13.03 mm 3.13 mm
Time period T = 0.13 sec 0.03 sec
Horizontal Coefficient Ah =
For Trivandrum region (Z/2)*(Sa/g)* (I/R)
Seismic Zone iii
Z = 0.16
I = 1.2
R = 1.5
(Sa/g=>0.4) (Sa/g=<0.4)
Sa/g = 2.50 2.50
Ah = 0.160 0.160
Date: March 18
Job:
Made By
Chk By
Title: Design Calculation of Pile Capacity (B1)
Rev 0
Qe = 0.00 T
Qf = 689.35 T
Q ult = 689.35 T
Q safe = 276 T