0% found this document useful (0 votes)
569 views3 pages

Hvac CV

The document contains the resume of Sheikh Masoom Akram, who has nearly 6 years of experience working as an HVAC Engineer and Project Manager on various construction projects in Kolkata, India. He has expertise in project management, maintenance operations, and quality assurance. Some of the key projects he has worked on include HVAC installations for hospitals, hotels, power plants, and industrial facilities. He holds a Bachelor's degree in Electronics and Communication Engineering and is proficient in English, Hindi, and Bengali. He is seeking senior level positions in HVAC Engineering, preferably in Kolkata or overseas.

Uploaded by

Masoom Akram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
569 views3 pages

Hvac CV

The document contains the resume of Sheikh Masoom Akram, who has nearly 6 years of experience working as an HVAC Engineer and Project Manager on various construction projects in Kolkata, India. He has expertise in project management, maintenance operations, and quality assurance. Some of the key projects he has worked on include HVAC installations for hospitals, hotels, power plants, and industrial facilities. He holds a Bachelor's degree in Electronics and Communication Engineering and is proficient in English, Hindi, and Bengali. He is seeking senior level positions in HVAC Engineering, preferably in Kolkata or overseas.

Uploaded by

Masoom Akram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

SHEIKH MASOOM AKRAM

Phone: +91 9836517998


Email: [email protected]

Versatile, high-energy technocrat with excellence in leading through ambiguity and


implementing pioneering solutions, targeting senior level assignments in HVAC
Engineering in Construction Industry preferbly in Kolkata/Overseas

ǁ Profile Summary
 A professional with nearly 6 years of experience as an Engineer- Projects HVAC
 Expertise in implementing plans / schedules for maintenance & annual turnaround with focus on optimum
utilization of manpower
 Possess clear understanding of industry & technology trends, ensuring smooth functioning of overall
operations and enhancing operational efficiency by making use of leading edge technologies
 Proficient in supervising project activities from conceptualization to execution including technical
specifications, stage inspections, progress monitoring, site management and manpower planning
 Spearheaded projects involving contract administration, resource planning with a flair for adopting modern
methodologies in compliance with quality standards
 Familiar with control wiring drawings in HVAC system
 A team leader with excellent communication & analytical competencies
 Successfully conducting measurement/bill preparation and certification with clients as well as quality checking
of the work performed by labours

ǁ Key Skills

 Project Management
 Labour and Material Management
 Process Enhancement
 Quality Assurance
 HVAC Engineering
 Maintenance Operations
 Resource Optimization
 Costing & Estimation

ǁ Work Experience

Dec’18 to Jun’19: Unique Engineers Pvt. Ltd., Kolkata as Engineer- Projects HVAC
Jan’18 to Dec’18: Betterman Contracting LLP, Kolkata as Project Manager MEP
Mar’16 to Dec’17: Jhonson Controls- Hitachi Air Conditioning India Ltd., West Bengal
as Executive Engineer- Projects HVAC
Mar’13 to Mar’16: ETA Engineering Pvt. Ltd., Kolkata as Engineer- Projects HVAC
Key Result Areas:

 Spearheaded the management of IOM (installation, operations and maintenance) activities of a range of
equipment while ensuring compliance with the set norms
 Supervised a skilled team of technicians and rendering technical solutions for daily service calls
 Anchored on-site erection & commissioning activities and ensuring completion of project within the time & cost
parameters and effective resource utilization for maximizing the output
 Understood tender document along with tender drawings and specified discrepancies, to the seniors, client /
consultant
 Assisted in preparation and approval of shop drawings from the consultants and architects
 Prepared work schedule, method statement, work progress report, quality plan, various check lists, and so on
 Administered control on cost of maintenance, labour and supplies within budget by implementing initiatives
 Managed corrective, preventative, predictive and proactive maintenance programs while steering continuous
line improvement through KPI improvement
 Monitored and analysed quantity of tools available, usage, breakage loses as well as arranged resources like
manpower, contractors, equipment, and so on
 Ensured work measurements correctly & certification from client / consultant
 Handed over systems to client / facility management team complete with close out documentation including pre-
commissioning & commissioning reports, brief process description, test reports, installation checklists, technical
data, operation manual, and so on
 Managed billing, payment collection and material reconciliation
 Analyz available work scope as per original contract and examining the past data for preparation of performance
improvement plans & recommendations
 Controlling the maintenance functions by planning, organizing and assigning duties to ensure most effective use
of the personnel, materials and financial budget

ǁ Organizational Projects

 Swagat Super Specialty Surgical Institute cum Nursing Home, a two pipe HVAC System for cooling and
ventilation of 80 bedded hospital, from 1st March 2013 to 4th July 2013
 Courtyard Marriott a five-star hotel for Maxim Infrastructure & Real Estate Pvt. Ltd., a four pipe HVAC system
for a five-star hotel of 200 Guest Rooms cooling, heating and ventilation, from 5th July 2013 to 30th November
2014
 +-800 KV, 6000 MW, HVDC, ABB AB, North East Agra, a project of hydro power distribution, for Power Grid
Corp. Of India Ltd., a two pipe HVAC system for cooling and ventilation, from 1 st December 2014 to 5th January
2015
 HVAC works for Water System for Heat Strip Mill for TATA Projects Ltd., a two pipe HVAC system for cooling
and ventilation, from 6th January 2015 to 17th March 2016
 Proposed 8 Storey Tertiary Healthcare Hospital for West Bengal Medical Services Corporation Ltd. Build by
Shapoorji Pallonji & Co. Pvt. Ltd., a two pipe HVAC system for cooling and ventilation system, from 18 th March
2016 to 31st December 2017
 Diamond Beverages Pvt. Ltd. New Office Building, a two pipe HVAC system for cooling and ventilation
 Retrofit job HVAC for Fox Solutions Pvt. Ltd. at Kolkata sector 5, Infinity Benchmark building
 Retrofit job HVAC for Techna Infrastructure Pvt. Ltd. at Kolkata sector 5, Bengal Eco Intelligent Park building
 Retrofit job for HVAC Capital Numbers Ltd. at Kolkata rajarhat, Mani Cassadona building
 R.S Mall at burrabazar Kolkata, a fully decorated plumbing job
 Madhepura Medical College cum Hospital, at Madhepura Bihar, a 2000 HP VRV system from Daikin for HVAC
works
 Construction of Permanent Campus of IISER Kolkata at Haringhata, Kalyani, Dist.:- Nadia (W.B.) Phase-II, SH:
Supply, Installation, testing and commissioning of Air-conditioning system (Low side) in Auditorium

ǁ Academic Project

Mini
 Industrial Appliances Controlled using IR
Major
 Wireless Sensor Network Designing for Prototype Module
 Automatic Train
ǁ Education

 Bachelor of Technology in Electronics and Communication Engineering from Nizam Institute of Engineering
and Technology, JNTU, Hyderabad in 2012
 12th from Sri Chaitanya Jr. Kalasala, Board of Intermediate Examination, Miyapur Branch, Hyderabad in 2008
 10th from from Kendriya Vidyalaya 1, (C.B.S.E), Dundigal, Hyderabad, 2006
ǁ Technical Skills

 Client Operating Systems: Win XP, Vista, Windows 7, Windows 8 & Windows 10
 Applications: MS Office

ǁ Extracurricular Activities/ Academic Achievements

 Participated in Technical Exhibition conducted in the college


 Stood first in Technical Exhibition for the project “AUTOMATIC TRAIN”

ǁ Personal Details

Date of Birth: 26th March 1990


Languages Known: English, Hindi and Bengali
Address: C/o MD. Neksaruddin sheikh, Village: Shali, P.O.: Bikrampur, P.S.: Nakashipara, Dist.:
Nadia -741126,West Bengal
Passport No: L2124636

You might also like