0% found this document useful (0 votes)
72 views7 pages

Housekeeping Schedule: of Trainee's)

The document outlines a housekeeping schedule that assigns cleaning responsibilities on a daily, weekly, and monthly basis. Tasks include cleaning chairs, tables, electrical panels, floors, walls, windows, and restrooms. Equipment like computers, air conditioners, tools, and wash areas must also be inspected, cleaned, and maintained to ensure proper functioning and hygiene. The schedule assigns responsibilities to trainers, trainees, utility staff, and building maintenance to complete the cleaning activities before and after using the various facilities.

Uploaded by

unknown
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views7 pages

Housekeeping Schedule: of Trainee's)

The document outlines a housekeeping schedule that assigns cleaning responsibilities on a daily, weekly, and monthly basis. Tasks include cleaning chairs, tables, electrical panels, floors, walls, windows, and restrooms. Equipment like computers, air conditioners, tools, and wash areas must also be inspected, cleaned, and maintained to ensure proper functioning and hygiene. The schedule assigns responsibilities to trainers, trainees, utility staff, and building maintenance to complete the cleaning activities before and after using the various facilities.

Uploaded by

unknown
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

HOUSEKEEPING SCHEDULE

F&B/BERTENDING/HOUSEKEEPING/
ASSESSMENT AREA/PRACTICAL
Qualification Station/Bldg
WORK AREA
FRONT OFFICE/ BREAD & PASTRY
Area/Section ASSESSMENT AREA/PRACTICAL WORK AREA
In-Charge Mark Gabriel D. Sibayan
Schedule for the 2nd Semester, SY 2018-2019
Responsible
ACTIVITIES Daily Every Weekly Every Monthly Remarks
Person
other Day 15 Day
th

1. Clean and arrange working chairs Trainer’s/Trainees Activity is


and tables according to floor /Utility(in absence done before

plan/lay-out; check stability of Trainee’s) and after
using the
tables and
chairs.

2. Check panel board, and circuit Trainer/Building Activity is


breakers’ electrical connections, Maintenance done after

cables and outlets using the
equipment.
 Clean and keep dry
 Parts are well-secured/attached
 Properly labeled

Date Developed: Document


F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0
3. Clean and check floor, walls, Trainer’s/Trainees Activity is
windows, ceilings /Utility/Building done before

Maintenance (in and after
• graffiti/dust/rust
absence of using the
• cobwebs and Trainee’s) facility.
outdated/unnecessary
objects/items

• obstructions

• any used materials/scraps (bolt


and nuts) spilled liquid

• open cracks (floor)

4. Clean and check work shop Trainer’s/Trainees Activity is


ventilation and illumination by /Utility(in absence done before

dusting lamps/bulbs, replacing of Trainee’s) and after
non-functional lamps and keeping using the
exhaust clean facility.

5. Clean and check computer set - Trainer’s/Trainees Activity is


monitor, CPU, keyboards, mouse – /Utility(in absence done before

free, LCD projector, projector of Trainee’s) and after
screen, audio visual, unnecessary using the
markings, dust; cables and plugs computer and
are in order; well-arranged; all peripherals

Date Developed: Document


F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0
items functional

6. Clean, inspect air conditioning Trainer’s/Trainees Activity is


equipment: /Utility/Aircon done before

Technician/Buildi and after
• keep screen and filter free from
ng Maintenance(in using the air
dust/rust
absence of condition
• Check selector knobs if in Trainee’s) equipment.
normal positions and are
functional

• Check if drainage is OK

Clean, inspect Ceiling Fan


equipment:

• keep Fan Blade free from


dust/rust

• Check selector knobs if in


normal positions and are
functional

• Check if drainage is OK

Date Developed: Document


F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0
7. Clean, check and maintain Tool Trainer’s/Trainees Activity is
Room /Utility(in absence done before
 
of Trainee’s) and after
• Free of dust, not damp using the
• Tools in appropriate tools and
positions/locations equipment.

• With visible labels/signage

• Logbook and forms are


complete, in order and updated

• Lights, ventilation – OK

8. Clean and check Rest Room Trainer’s/Trainees Activity is


/Utility/Building done before
• Urinals, bowls, wash basins, 
Maintenace(in and after
walls and partitions are free
absence of using the rest
from stains, dirt, oils, graffiti
Trainee’s) room.
and unnecessary objects;

• Ceilings free from cobwebs and


dangling items

• Floor is kept dry; no broken tiles


or protruding objects

• Equipped with dipper and pails;


properly located after use

• Water systems is functional: no


Date Developed: Document
F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0
dripping/damaged faucets or
pipes

• Drainage system is working, no


water-clogged areas

• No offensive odor

• Lights /Ventilation – OK

9. Clean and check wash area: Trainer’s/Trainees Activity is


/Utility(in absence done after
• Walls/Floors- –free from oils, 
of Trainee’s) using the
molds, broken tiles, gums,
wash area.
stains or graffiti

• Drainage system is functional

• Water system functional; no


dripping faucets or leaking
pipes

• Free from unnecessary objects


(mops, rags)

10. Clean and maintain work shop Trainer’s/Trainees Activity is


surroundings by sweeping/ /Utility(in absence done after

removing fallen leaves, branches, of Trainee’s) using the
debris and other refuse, facility.
impounded water, clearing
pathways of obstructions
Date Developed: Document
F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0
10. Disposal of waste materials Trainer’s/Trainees Activity is
/Utility(in absence done before
(Follow waste segregation system) 
of Trainee’s) and after
training.

11. Conduct of Inventory Trainer’s Activity is


done before
 Materials  and after
 Tools
using
 Equipment
material,
tools, and
equipment.

12. Clean instructional materials & Trainer’s/Trainees Activity is


modules; arrange and put in order done after
 using
instructional
materials.

Date Developed: Document


F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0
Date Developed: Document
F&B/BERTENDING/HOUSEKEEPING/ November 18, 2018 Number: 1
FRONT OFFICE/ BREAD & PASTRY Developed by:
Mark Gabriel D. Sibayan Revision
Number: 0

You might also like