Installation of LV Cables: Inspection and Test Plan For
Installation of LV Cables: Inspection and Test Plan For
: ITP-ACL-ELE/002/19
INSPECTION AND TEST PLAN FOR
REVISION 0
Associated Constructors Limited
INSTALLATION OF LV CABLES
Dated 9/13/2019
Inspection Code
Testing Requirement &
SL. NO. Activity Description Responsibility Type of Inspection Reference Document Verifying Document
Acceptance Criteria hill
IQC intrenatio Emmar
nal
Material Submittal # MAT-
Project Manager
Check material Delivery and Visual Inspection/ 241_REV_1, Method Statement # Approval Status, Specification
1 Construction Manager A0 w/v M/S
storage at site. Review of documents CBRF4-ACL-CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer
Project Manager
Check material as per the Review material Approval Status, Specification
2 Construction Manager Material submittal/Specification A0 W/V M/S
approved material submittal documents section 8001 & 8212.
QA/QC Engineer
Project Manager
Visual Inspection/ Method Statement # CBRF4-ACL- Approval Status, Specification
3 Check size as required Construction Manager A0 w/v M/S
Review of documents CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer
Project Manager
Visual Inspection/ Method Statement # CBRF4-ACL- Approval Status, Specification
4 Check Installation of L.V Cable Construction Manager A0 W/V M/S
Review of documents CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer
Project Manager
Field testing by using Method Statement # CBRF4-ACL- Approval Status, Specification
5 Continuity test Construction Manager A0 W/V M/S
Continuity tester CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer
Project Manager
Field testing by using Method Statement # CBRF4-ACL- Approval Status, Specification
6 Insulation resistance test Construction Manager A0 W/V M/S
megger CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer
Legend:
Emaar = Client Representative / Engineer M= monitoring W = Witness S = Surveillance A0 = Datum of Inspection
ACL IQC = Internal QC R = Review T = Testing 0 = 100%