Installation of LV Cables: Inspection and Test Plan For

The document is an inspection and test plan for the installation of low voltage cables. It outlines 6 activities to be inspected including checking material delivery and storage, material requirements, cable size, installation, continuity testing, and insulation resistance testing. For each activity, it identifies the party responsible for inspection, type of inspection, reference documents outlining testing requirements and acceptance criteria, inspection codes, and required verifying documentation. Upon completion of inspections, representatives from the contractor, client, and third party inspection firm will sign off to indicate approval and compliance with specifications.

Uploaded by

HussainShabbir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
286 views1 page

Installation of LV Cables: Inspection and Test Plan For

The document is an inspection and test plan for the installation of low voltage cables. It outlines 6 activities to be inspected including checking material delivery and storage, material requirements, cable size, installation, continuity testing, and insulation resistance testing. For each activity, it identifies the party responsible for inspection, type of inspection, reference documents outlining testing requirements and acceptance criteria, inspection codes, and required verifying documentation. Upon completion of inspections, representatives from the contractor, client, and third party inspection firm will sign off to indicate approval and compliance with specifications.

Uploaded by

HussainShabbir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

ITP NO.

: ITP-ACL-ELE/002/19
INSPECTION AND TEST PLAN FOR
REVISION 0
Associated Constructors Limited
INSTALLATION OF LV CABLES
Dated 9/13/2019

Inspection Code
Testing Requirement &
SL. NO. Activity Description Responsibility Type of Inspection Reference Document Verifying Document
Acceptance Criteria hill
IQC intrenatio Emmar
nal
Material Submittal # MAT-
Project Manager
Check material Delivery and Visual Inspection/ 241_REV_1, Method Statement # Approval Status, Specification
1 Construction Manager A0 w/v M/S
storage at site. Review of documents CBRF4-ACL-CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer

Project Manager
Check material as per the Review material Approval Status, Specification
2 Construction Manager Material submittal/Specification A0 W/V M/S
approved material submittal documents section 8001 & 8212.
QA/QC Engineer

Project Manager
Visual Inspection/ Method Statement # CBRF4-ACL- Approval Status, Specification
3 Check size as required Construction Manager A0 w/v M/S
Review of documents CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer

Project Manager
Visual Inspection/ Method Statement # CBRF4-ACL- Approval Status, Specification
4 Check Installation of L.V Cable Construction Manager A0 W/V M/S
Review of documents CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer

Project Manager
Field testing by using Method Statement # CBRF4-ACL- Approval Status, Specification
5 Continuity test Construction Manager A0 W/V M/S
Continuity tester CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer

Project Manager
Field testing by using Method Statement # CBRF4-ACL- Approval Status, Specification
6 Insulation resistance test Construction Manager A0 W/V M/S
megger CO-4-ELE-LV-TS-417 section 8001 & 8212.
QA/QC Engineer

Approval Status & Compliance to specs.


ACL= Representative Signature and Date Client= Emmar Representative Signature and Date HILL INTERNATIONAL= Reprenetative signatuer and date

Legend:
Emaar = Client Representative / Engineer M= monitoring W = Witness S = Surveillance A0 = Datum of Inspection
ACL IQC = Internal QC R = Review T = Testing 0 = 100%