02 - 04 - Product Specification Sample Document
02 - 04 - Product Specification Sample Document
Project Specification
Project Name: BG Apps Flexible Working
NOTE: This document is a sample document intended to demonstrate the typical contents required.
All names and information relate to the fictitious scenario provided.
Revision History
Date of next revision:
Today
Approvals
This document requires the following approvals. A signed copy should be placed in the project files.
Distribution
This document has been distributed to:
Today V1.0
• Define the people or skills required to produce, review, and approve the product
Advice A Product Specification is derived from the Product Breakdown Structure, the end users of
the product, Quality Management Strategy, and the Configuration Management Strategy.
• The product is described to a level of detail sufficient to plan and manage its development
• The Product Specification is concise yet sufficient to enable the product to be produced,
reviewed, and approved
• Responsibility for the development of the product is consistent with the roles and
responsibilities described in the project management team organization and the Quality
Management Strategy
• The quality criteria are consistent with the project quality standards, standard checklists,
and acceptance criteria
• The quality criteria can be used to determine when the product is fit for purpose
• The types of quality inspection required are able to verify whether the product meets its
stated quality criteria
• The Senior User(s) confirms that their requirements of the product, as defined in the
Product Specification, are accurately defined
• The Senior Supplier(s) confirms that the requirements of the product, as defined in the
Product Specification, can be achieved
Purpose
(This defines the purpose that the product will fulfill and who will use it. Is it a means to an end or an end
in itself? It is helpful in understanding the product’s functions, size, quality, complexity, robustness, etc.)
The secure lockers are to provide staff with storage space for work-related effects.
Composition
(This is a list of the parts of the product. For example, if the product were a report, this would be a list of
the expected chapters or sections.)
• Locker units
• Locker stands
• Locker doors
Derivation
(What are the source products from which this product is derived? Examples: a design is derived from a
specification; a product is bought in from a supplier; a statement of the expected benefits is obtained
from the user; or a product is obtained from another department or team.)
• As per manufacturer’s specifications
¹ Unique key, probably allocated by the configuration management method and likely to include the project name, item name,
and version number.
² Name by which the product is known.
Each unit will comprise 4 lockers None Check User & Assurance
Compartment size must be +/- 1mm Measure and User & Assurance
390mm H x 300mm W x 550 D check
in each unit
Each unit must have a door- None Check User & Assurance
mounted combination lock with
master key override facility and
user codes, which can be reset
Locker stands must be no more - 8mm/+ 0mm Measure and User & Assurance
than 60mm high check
3
To what quality specification must the product be produced, and what quality measurements will be applied by those inspecting
the finished product? This might be a simple reference to one or more common standards that are documented elsewhere, or
it might be a full explanation of some yardstick to be applied. If the product is to be developed and approved in different states
(e.g., dismantled machinery, moved machinery, and reassembled machinery), then the quality criteria should be grouped into
those that apply for each state.
4
Details of any range in the quality criteria within which the product would be acceptable.
5
The kinds of quality method (e.g., design verification, pilot, test, inspection, or review) that are to be used to check the quality or
functionality of the product.
6
An indication of the skills required to undertake the quality method or a pointer to which area(s) should supply the checking
resources. Identification of the actual people may be left until planning the stage in which the quality inspection is to be done.