Index To PTS
Index To PTS
Index To PTS
Index To PTS
PTS 00.01.01
June 2019
FOREWORD
PETRONAS Technical Standards (PTS) has been developed based on the accumulated knowledge,
experience and best practices of the PETRONAS group supplementing National and International
standards where appropriate. The key objective of PTS is to ensure standard technical practice across
the PETRONAS group.
Compliance to PTS is compulsory for PETRONAS-operated facilities and Joint Ventures (JVs) where
PETRONAS has more than fifty percent (50%) shareholding and/or operational control, and includes
all phases of work activities.
Contractors/manufacturers/suppliers who use PTS are solely responsible in ensuring the quality of
work, goods and services meet the required design and engineering standards. In the case where
specific requirements are not covered in the PTS, it is the responsibility of the
Contractors/manufacturers/suppliers to propose other proven or internationally established
standards or practices of the same level of quality and integrity as reflected in the PTS.
In issuing and making the PTS available, PETRONAS is not making any warranty on the accuracy or
completeness of the information contained in PTS. The Contractors/manufacturers/suppliers shall
ensure accuracy and completeness of the PTS used for the intended design and engineering
requirement and shall inform the Owner for any conflicting requirement with other international
codes and technical standards before start of any work.
PETRONAS is the sole copyright holder of PTS. No part of this document may be reproduced, stored
in a retrieval system or transmitted in any form or by any means (electronic, mechanical, recording or
otherwise) or be disclosed by users to any company or person whomsoever, without the prior written
consent of PETRONAS.
The PTS shall be used exclusively for the authorised purpose. The users shall arrange for PTS to be
kept in safe custody and shall ensure its secrecy is maintained and provide satisfactory information to
PETRONAS that this requirement is met.
PTS 00.01.01
INDEX TO PTS June 2019
Page 3 of 47
Table of Contents
1.0 INTRODUCTION ..................................................................................................... 4
1.1 SCOPE ............................................................................................................................ 4
1.2 GLOSSARY OF TERM ...................................................................................................... 4
1.3 SUMMARY OF CHANGES ............................................................................................... 4
1.4 WHAT’S NEW IN THIS REVISION ................................................................................... 5
2.0 LIST OF PTS ACCORDING TO SKG .......................................................................... 10
2.1 00 – GENERAL ............................................................................................................. 10
2.2 SKG 11 – CIVIL, STRUCTURE & PIPELINE ..................................................................... 10
2.3 SKG 12 – MECHANICAL ............................................................................................... 14
2.4 SKG 13 – ELECTRICAL .................................................................................................. 16
2.5 SKG 14 – INSTRUMENT & CONTROL ........................................................................... 18
2.6 SKG 15 – MATERIAL CORROSION & INSPECTION........................................................ 19
2.7 SKG 16 – PROCESS....................................................................................................... 21
2.8 SKG 18 – GHSE ............................................................................................................ 23
2.9 SKG 19 – PROJECT MANAGEMENT ............................................................................. 23
2.10 SKG 20 – MARITIME .................................................................................................... 24
2.11 SKG 25 – DRILLING ...................................................................................................... 24
3.0 PTS MAPPING ACCORDING TO SKG ...................................................................... 25
3.1 00 - GENERAL .............................................................................................................. 25
3.2 SKG 11 – CIVIL, STRUCTURE & PIPELINE ..................................................................... 25
3.3 SKG 12 - MECHANICAL ................................................................................................ 28
3.4 SKG 13 - ELECTRICAL ................................................................................................... 31
3.5 SKG 14 – INSTRUMENT & CONTROL ........................................................................... 33
3.6 SKG 15 – MATERIAL CORROSION & INSPECTION........................................................ 36
3.7 SKG 16 – PROCESS....................................................................................................... 38
3.8 SKG 19 – PROJECT MANAGEMENT ............................................................................. 41
3.9 SKG 20 – MARITIME .................................................................................................... 44
3.10 SKG 25 – DRILLING ...................................................................................................... 46
4.0 BIBLIOGRAPHY .................................................................................................... 47
PTS 00.01.01
INDEX TO PTS June 2019
Page 4 of 47
1.0 INTRODUCTION
The new PTS numbering is based on PETRONAS SKILL GROUP. For general PTS that is not under
any specific SKG, it would be labelled as PTS 00.XX.XX.
1.1 SCOPE
1.1.2 This PTS is to be read and understood as follows (applicable to Section 2.0 only):
i. PTS that is new is shown in bold with symbol ;
1.1.3 This index also maps identified areas according to SKG. The mapping is not exhaustive and it
will be added as per need, if necessary.
Refer to PTS 00.01.03 for PTS Requirements, General Definition Of Terms, Abbreviations &
Reading Guide.
No Term Definition
1.4.3 The following PTS has been re-numbered due to transfer of ownership
2.1 00 – GENERAL
No New PTS New PTS Title PSR Active Status
Number
1 00.01.01 ※ Index to PTS Jun 2019
2 00.01.03 PTS Requirements, General Definition Of Terms, Feb 2016
Abbreviations & Reading Guide
3 00.11.01 Index to Standard Drawings Dec 2014
4 00.11.02 Index To Standard Forms Dec 2014
5 00.11.03 Index to Requisitions Dec 2014
2.8.1 These are the list of PTS that were transferred from ENGINEERING to GHSE.
3.1 00 - GENERAL
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 00 (General) EEx 00
01 EEx
02
03
04
05
06
07
08
09
EDO 10
11 EDO
12
13
14
15
16
17
18
19
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
13 Foundation & Sub structure
14 Buildings
15 Upper Structure
16 Maritime
17 Inspection & Maintenance
18
19
Structure 20 Safety
21 Survey
22 Design
23 Construction
Installation & Pre-
24 commissioning
25 Integrity
26 Subsea Structure
27 Geotechnical
28
29
Pipeline 30 Pipeline Design
31 Pipeline Mechanical Design
Pipeline Cathodic
32 Protection & Coating
33 Pipeline Safety
Construction &
34 Commissioning
35 Inspection & Maintenance
36 Integrity Management
Advance Design &
37 Assessment
38
39
Metocean 40
41
42
43
44
45
46
47
48
49
50
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
92 Drawing
93
94
95
96
97
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 12 (Mechanical) General 00 General
01 Rotating
02 Static Unfired
03 Piping
04 Static Fired
05 Reliability
06 Subsea
07
08
09
Rotating 10 Driver / Prime Mover
Engineering 11 Driven Equipment
12 Auxiliaries & System
13
14
15
16
17
18
19
Unfired Static 20 Pressure Vessel
Engineering 21 Heat Exchanger
22 Storage Tank
23 Lifting Equipment
24 HVAC
25 Auxiliaries & System
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
26
27
28
29
Piping 30 Design & Fabrication
Engineering 31 Pipe Classification
32 Valve
33 Fire Fighting
34 System
35
36
37
38
39
Fired 40 Boiler
Equipment 41 Reformer / Fired Heater
Engineering
42 Flare/ stack
43 System
44
45
46
47
48
49
Subsea 50 System
51 Umbilical
52 Intervention
53 Control
54 Hardware
55
56
57
58
59
Reliability 60
61
62
63
64
65
66
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
67
68
69
Reserved (TBA 70
by 71
Mechanical)
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
39
Explosion 40 Maintenance
Proof 41 Assessment
Installation
42 Design & Selection
43
44
45
46
47
48
49
LPS/EMC 50 EMC
51 LPS
52
53
54
55
56
57
58
59
Safety 60 Inspection
61 Safety Rules
62
63
64
65
66
67
68
69
Subsea 70
71
72
73
74
75
76
77
78
79
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
16
17
18
19
Machinery 20 Anti-Surge Control System
21 Machine Control System
22
23
24
25
26
27
28
29
Measurement 30 Metering
31 Analytical
32 Environmental Analytical
33
34
35
36
37
38
39
Telecommunic 40 Radio/PAGA
ation 41 Cable
42
43
44
45
46
47
48
49
Subsea 50 Control System
Instrumentati 51
on
52
53
54
55
56
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 15 Material, Corrosion General 00 General
and Inspection 01 Material Selection
02 QA/QC
03 Mill/Manufacturing Audit
04 Corrosion Management
05 Cleaning
06 Records
07
08
09
Materials 10 Metallic
11 Non-Metallic
12 Welding
13 Insulation
14
15
16
17
18
19
Corrosion 20 Corrosion Protection
21 Corrosion Control
22 Corrosion Monitoring
Corrosion Testing/
23 Analysis
Corrosion Prediction &
24 Modelling
25
26
27
28
29
Inspection Non Destructive testing
30 (NDT)
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
31 Equipment Inspection
32 Welding Inspection
Double Wall LNG Tank
Hydrostatic Test using
33 Seawater
34
35
36
37
38
39
Asset Integrity 40 PRBI
41 Fitness for service (FFS)
42 Failure Investigation
43 Integrity Audit
44 Preservation
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 16 Process Engineering General 00 General
01
02
03
04
05
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
06
07
08
09
Operation 10General
11Start Up & Commissioning
12Shut Down
Maintenance &
13 Warehousing
14
15
16
17
18
19
Production 20 General
Planning 21
22
23
24
25
26
27
28
29
Technology 30 General
31 Treating
32 Reaction
33 Separation
34 Cryogenic
35
36
37
38
39 Utility & Offsite
Optimization 40 General
Process Data
41 Management
42 Regulatory Control
43 Advanced Process Control
44
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
45 Process Modelling
46 Online Modelling
Operator Training
47 Simulator
48
49
Design 50 General
Design Philosophy &
51 Deliverables
Equipment & System
52 Design
53 Safety Design
54 Fire Safety Design
55
56
57
58
59
Analytical 60 General
Sampling, Techniques &
61 Test Method
62 Design
63
64
65
66
67
68
69
Process Safety 70 General
Process Safety Risk
71 Assessment (PSRA) Tools
72 Offshore Specific
73 Onshore Specific
74
75
76
77
78
79
80
81
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
82
83
84
85
86
87
88
89
90 Requisition
91 Form
92 Drawing
93
94
95
96
97
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 19 Project Management General 00 General
01 Resource Management
Infra & Admin
02 Management
Document & Records
03 Management
04
05
06
07
08
09
General Project General Project
Management 10 Management
11
12
13
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
14
15
16
17
18
19
Project Risk 20 Project Risk Management
Management 21
22
23
24
25
26
27
28
29
Project Project Construction
Construction 30 Management
Management 31
32
33
34
35
36
37
38
39
Project Comm. Project Comm.
Management 40 Management
41
42
43
44
45
46
47
48
49
Project HSE 50 Project HSE Management
Management 51
52
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
53
54
55
56
57
58
59
Project QA QC Project QA QC
Management 60 Management
61
62
63
64
65
66
67
68
69
Project HSE 70 Project HSE Management
Management 71
72
73
74
75
76
77
78
79
Project Control Project Control
Management 80 Management
81
82
83
84
85
86
87
88
89
90
91
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
92
93
94
95
96
97
98
99
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 20 Maritime General
00 General
01
02
03
04
05
06
07
08
09
Marine 10 Ship Vetting & Audit
Assurance Offshore Support Vessel &
Marine Support Craft
11 Procedures
12
13
14
15
16
17
18
19
Marine 20 Marine Safety of MODU
Operations 21 Use of Small Marine Craft
22 Offshore Marine Safety
Load Out and Sea
23 Fastening
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
24
25
26
27
28
29
Port & Marine Handling Bulk Liquid at
Terminal 30 Jetty
Operations 31
32
33
34
35
36
37
38
39
Ship 40
Construction 41
42
43
44
45
46
47
48
49
Marine Oil Loading & Discharging
Equipment Hoses for Offshore Marine
50 Facilities
Offshore Facilities Life
51 Support Appliances (LSA)
52
53
54
55
Area No.
SKG/Discipline (First 2 Digit) Category (Second 2 Digit) Area Description
SKG 25 Drilling General 00 General
01 Well Engineering
02 Well Construction
03 Well Completions
04 Well Intervention
4.0 BIBLIOGRAPHY
PETRONAS STANDARDS
Index to PTS PTS 00.01.01
Requirements, General Definition of Terms, Abbreviations & PTS 00.01.03
Reading Guide