MDL APPENDIX E1

ENGG
PROJECT EPC-Buxar PACKAGE ID 155_CHP LOA DATE 22-Jun-2019 COMPLN
DATE

"H"
SCHEDULED
"M" "S"
"E" SUBMISSION "K" "L"
"C" "F" "I" "J" "N" DOCUMENT
"D" PURPOSE (NO. OF DAYS INPUT TO INPUT FROM "O" "T"
"A" "B" NTPC_DRG_NO. "G" SCH_SUB_DATE SCH_APPL_DATE SUBSYSTEM CUSTODIAN "P" "Q" "R" CATEGORY Mileston
DRAWING TITLE FROM LOA OTHER OTHER
S NO VENDOR_DRG_NO. Compulsory BOI NAME OF BOI (DD- (DD- ID (Compulsory DETAIL AREA REMARKS (A/B/C/D) e
Compulsory Field DATE/SCH PO PACKAGE PACKAGE REVIEWER DETAIL2
Field (Y/N) MON-YYYY) MON-YYYY) (Compulsory Field ) (Compulsory
Compulsory Field DATE) (Y/N) (Y/N)
Field ) Field )
(Compulsory
Field)

Page No : 1 of 5_x000D_ Sensitivity : This Document is Classified as "LNT Internal Use".


#
LIST OF BOUGHT OUT ITEMS(BOIs)
(Only items for which documents/drawings approval is req

PROJECT: BUXAR PACKAGE:


"A" "B" "C" "D"
SL NO SPECIFIC NAME OF SCHEDULED PO
BOI NUMBER OF DATE
DRAWINGS (as per L-2
RELATED TO Network) (in
BOI dd-mon-yyyy)

1 WAGON TIPPLER 47 28-Dec-2019


2 SIDE ARM CHARGER 6 2-Aug-2020
3 PADDLE FEEDER 28 2-Aug-2020
4 STACKER-CUM-RECLAIMER 47 2-Aug-2020
5 HT TRANSFORMER 1 2-Aug-2020
6 HT BOARD 1 2-Aug-2020
7 LT BOARD 1 2-Aug-2020
NOTE:
1 The exact name of the BOI as appearing in this list in Column B and in the Master Drawings List (MDL) in Co
2 Column D in this list shall be filled up based on agreed L-2 schedule as and when finalized.

Indicates compulsory fields to be filled by vendor


Appendix-E2

s approval is required from Engineering)

CHP PACKAGE ID: 155


"E" "F" "G"
ACTUAL PO DATE SUB
VENDOR DETAILS INSPECTION
(in dd-mon- CATEGORY
yyyy) (I/II/III)