Program For Installation of 80 Kva Genset in Kalulushi 41 Days

The document outlines a 41-day program for installing an 80kVA silent diesel generator set at a complex in Kalulushu, Zambia. Key steps include mobilizing equipment in 2 days, constructing a generator shelter over 14 days, installing a feeder pillar over 7 days, supplying and connecting the generator set over 35 days, commissioning it in 2 days, and demobilizing in another 2 days. The overall project aims to install a new backup power source at the site by November 29th.

Uploaded by

Zach
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
93 views1 page

Program For Installation of 80 Kva Genset in Kalulushi 41 Days

The document outlines a 41-day program for installing an 80kVA silent diesel generator set at a complex in Kalulushu, Zambia. Key steps include mobilizing equipment in 2 days, constructing a generator shelter over 14 days, installing a feeder pillar over 7 days, supplying and connecting the generator set over 35 days, commissioning it in 2 days, and demobilizing in another 2 days. The overall project aims to install a new backup power source at the site by November 29th.

Uploaded by

Zach
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROGRAM FOR INSTALLATION OF 80 KVA GENSET IN KALULUSHI

ID Task Task Name Duration Week -1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18
1 PROGRAM FOR INSTALLATION OF 80 41 days PROGRAM FOR INSTALLATION OF 80 KVA GENSET IN KALULUSHI
KVA GENSET IN KALULUSHI

2 INSTALLATION OF AN 80kVA 41 days INSTALLATION OF AN 80kVA SILENT DIESEL GENERATOR SET AT MAWE C
SILENT DIESEL GENERATOR SET AT
MAWE COMPLEX IN KALULUSHI

3 Mobilisation 2 days Mobilisation

4 Construction of a Genset open shelter


14 days Construction of a Genset open shelter

5 Supply and install feeder pillar 7 days Supply and install feeder pillar

6 Supply, Install and Connect Genset35 days Supply, Install and Connect Genset

7 Commissioning of Genset 2 days Commissioning of Genset

8 Demobilisation 2 days Demobilisation

9 Finish Project 0 days 29/11

Task Inactive Milestone Start-only Critical Split

Split Inactive Summary Finish-only Progress

Project: Program - 80KVA Gens Milestone Manual Task External Tasks Manual Progress
Date: Sun 13/10/19 Summary Duration-only External Milestone

Project Summary Manual Summary Rollup Deadline

Inactive Task Manual Summary Critical